The DOI matches its Crossref record; 56 of the 56 references it cites were found in a registry or an index.
Key constraints and mitigation strategies for prefabricated prefinished volumetric construction
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
An Introduction to Statistical Methods and Data Analysis
(1994) · Technometrics · doi:10.1080/00401706.1994.10485832 · Cited by 5,346
T test as a parametric statistic
Kim, T. K. (2015) · Korean Journal of Anesthesiology · doi:10.4097/kjae.2015.68.6.540 · Cited by 1,436
Life cycle performance of modular buildings: A critical review
Kamali, M., & Hewage, K. (2016) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2016.05.031 · Cited by 642
Towards adoption of prefabrication in construction
Tam, V. W. Y., Tam, C. M., Zeng, S. X., & Ng, W. C. Y. (2007) · Building and Environment · doi:10.1016/j.buildenv.2006.10.003 · Cited by 628
Major Barriers to Off-Site Construction: The Developer’s Perspective in China
Mao, C., Shen, Q., Pan, W., & Ye, K. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000246 · Cited by 446
A scientometric review of global BIM research: Analysis and visualization
Zhao, X. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.04.002 · Cited by 434
Jaillon, L., & Poon, C. S. (2008) · Construction Management and Economics · doi:10.1080/01446190802259043 · Cited by 405
Re-engineering through pre-assembly: client expectations and drivers
Gibb, A., & Isack, F. (2003) · Building Research & Information · doi:10.1080/09613210302000 · Cited by 397
Perspectives of UK housebuilders on the use of offsite modern methods of construction
Pan, W., Gibb, A. G. F., & Dainty, A. R. J. (2007) · Construction Management and Economics · doi:10.1080/01446190600827058 · Cited by 357
Transforming Non-Normal Data to Normality in Statistical Process Control
Chou, Y.-M., Polansky, A. M., & Mason, R. L. (1998) · Journal of Quality Technology · doi:10.1080/00224065.1998.11979832 · Cited by 299
Kamali, M., & Hewage, K. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.10.108 · Cited by 288
Barriers of Implementing Modern Methods of Construction
Rahman, M. M. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000173 · Cited by 282
A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects
Zhao, X., Hwang, B.-G., & Gao, Y. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.11.042 · Cited by 279
Self-citationKim, M.-K., Wang, Q., Park, J.-W., Cheng, J. C. P., Sohn, H., & Chang, C.-C. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.08.035 · Cited by 269
A Generalization of Shapiro–Wilk's Test for Multivariate Normality
Villasenor Alva, J. A., & Estrada, E. G. (2009) · Communications in Statistics - Theory and Methods · doi:10.1080/03610920802474465 · Cited by 235
Cost analysis for sustainable off-site construction based on a multiple-case study in China
Mao, C., Xie, F., Hou, L., Wu, P., Wang, J., & Wang, X. (2016) · Habitat International · doi:10.1016/j.habitatint.2016.08.002 · Cited by 226
Leading UK housebuilders' utilization of offsite construction methods
Pan, W., Gibb, A., & Dainty, A. (2007) · Building Research & Information · doi:10.1080/09613210701204013 · Cited by 221
Darko, A., & Chan, A. P. C. (2018) · Building and Environment · doi:10.1016/j.buildenv.2017.12.022 · Cited by 221
Chiang, Y.-H., Hon-Wan Chan, E., & Ka-Leung Lok, L. (2006) · Habitat International · doi:10.1016/j.habitatint.2004.12.004 · Cited by 218
Making a case for offsite construction in China
Arif, M., & Egbu, C. (2010) · Engineering Construction & Architectural Management · doi:10.1108/09699981011090170 · Cited by 209
Risk paths in international construction projects: Case study from Chinese contractors
Liu, J., Zhao, X., & Yan, P. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001116 · Cited by 203
Xue, X., Shen, Q., & Ren, Z. (2010) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000025 · Cited by 191
Design issues of using prefabrication in Hong Kong building construction
Jaillon, L., & Poon, C. (2010) · Construction Management and Economics · doi:10.1080/01446193.2010.498481 · Cited by 189
Li, C. Z., Hong, J., Xue, F., Shen, Q., Xu, X., & Luo, L. (2016) · Habitat International · doi:10.1016/j.habitatint.2016.07.002 · Cited by 177
Environmental impacts of prefabricated school buildings in Catalonia
Pons, O., & Wadel, G. (2011) · Habitat International · doi:10.1016/j.habitatint.2011.03.005 · Cited by 175
Lu, Y., Li, Y., Skibniewski, M., Wu, Z., Wang, R., & Le, Y. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000319 · Cited by 169
Psychological Antecedents of Risk-Taking Behavior in Construction
Tixier, A. J.-P., Hallowell, M. R., Albert, A., van Boven, L., & Kleiner, B. M. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000894 · Cited by 166
Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization
O’Connor, J. T., O’Brien, W. J., & Choi, J. O. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000842 · Cited by 161
House-Building Business Models and Off-Site Construction Take-Up
Pan, W., & Goodier, C. I. (2011) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000058 · Cited by 155
Optimization of process integration and multi-skilled resource utilization in off-site construction
Arashpour, M., Wakefield, R. R., Blismas, N. G., & Minas, J. P. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.12.002 · Cited by 130
Off-site construction optimization: Sequencing multiple job classes with time constraints
Arashpour, M., Wakefield, R. R., Abbasi, B., Lee, E. W. M., & Minas, J. P. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.08.001 · Cited by 127
Performance of International Joint Ventures in Construction
Özorhon, B., Arditi, D., Dikmen, İ., & Birgönül, M. T. (2010) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000022 · Cited by 119
Impact of Green Building Design and Construction on Worker Safety and Health
Rajendran, S., Gambatese, J., & Behm, M. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:10(1058 · Cited by 117
Azhar, S., Lukkad, M. Y., & Ahmad, I. U. (2013) · International Journal of Construction Education and Research · doi:10.1080/15578771.2012.723115 · Cited by 113
The impacts of industrialization on construction subcontractors: a resource based view
Goh, E., & Loosemore, M. (2016) · Construction Management and Economics · doi:10.1080/01446193.2016.1253856 · Cited by 97
Robust directed tests of normality against heavy-tailed alternatives
Gel, Y. R., Miao, W., & Gastwirth, J. L. (2006) · Computational Statistics & Data Analysis · doi:10.1016/j.csda.2006.08.022 · Cited by 92
Cao, D., Li, H., Wang, G., Luo, X., Yang, X., & Tan, D. (2016) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000503 · Cited by 92
Hwang, B., Zhao, X., & Ong, S. Y. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000342 · Cited by 91
Self-citationRoberts, A. C., Christopoulos, G. I., Car, J., Soh, C. K., & Lü, M. (2016) · Tunnelling and Underground Space Technology · doi:10.1016/j.tust.2015.12.016 · Cited by 88
Deng, X., Pheng, L. S., & Zhao, X. (2014) · Project Management Journal · doi:10.1002/pmj.21397 · Cited by 87
Shan, M., Hwang, B., & Wong, K. S. N. (2017) · Tunnelling and Underground Space Technology · doi:10.1016/j.tust.2017.07.004 · Cited by 74
Self-citationZhao, X., & Singhaputtangkul, N. (2016) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000434 · Cited by 71
Lean Management and Low Carbon Emissions in Precast Concrete Factories in Singapore
Wu, P., & Low, S. P. (2011) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000053 · Cited by 68
Collins, W., Parrish, K., & Gibson, G. E. (2017) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000514 · Cited by 68
Deng, F., Liu, G., & Jin, Z. (2012) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000161 · Cited by 62
Zhao, X., Hwang, B., & Phng, W. (2013) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-014-0045-x · Cited by 61
Self-citationZhao, X., Feng, Y., Pienaar, J., & O’Brien, D. (2017) · Architectural Science Review · doi:10.1080/00038628.2017.1373628 · Cited by 61
JIT in developing countries—a case study of the Turkish prefabrication sector
Oral, E. L., Mıstıkoğlu, G., & Erdiş, E. (2003) · Building and Environment · doi:10.1016/s0360-1323(03)00021-0 · Cited by 52
Xia, B., Xiong, B., Skitmore, M., Wu, P., & Hu, F. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000386 · Cited by 50
Wu, P., Low, S. P., Liu, J., Pienaar, J., & Xia, B. (2014) · Journal of Professional Issues in Engineering Education and Practice · doi:10.1061/(asce)ei.1943-5541.0000217 · Cited by 42
Modeling and Likelihood Prediction of Prefabrication Feasibility for Electrical Construction Firms
Said, H. (2015) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001051 · Cited by 29
Wang, T., Li, Y., Zhang, L., & Li, G. (2016) · Journal of Professional Issues in Engineering Education and Practice · doi:10.1061/(asce)ei.1943-5541.0000288 · Cited by 29
Entry Mode Taxonomy and Choice of Chinese International Construction Companies
Jia, R., Li, Q., Deng, X., Zhao, X., & Yuan, J. (2016) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000506 · Cited by 26
Kim, Y., Azari, R. S., Yi, J.-S., & Bae, J. (2013) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2013.795186 · Cited by 21
Du, J., & El-Gafy, M. A. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000343 · Cited by 21
Performance of Mediator Tactics in Building Management Disputes
Cheung, S. O., Chow, P. T., & Tse, J. K. M. (2013) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000230 · Cited by 10
Cited by
Building information modelling for off-site construction: Review and future directions
Yin, X., Liu, H., Chen, Y., & Al-Hussein, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.010 · Cited by 420
A holistic review of off-site construction literature published between 2008 and 2018
Jin, R., Gao, S., Cheshmehzangi, A., & Aboagye-Nimo, E. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.08.195 · Cited by 363
Wang, M., Wang, C. C., Sepasgozar, S., & Zlatanova, S. (2020) · Buildings · doi:10.3390/buildings10110204 · Cited by 357
Metadata
- Authors
- Hwang, B.-G., Shan, M., & Looi, K.-Y.
- Venue
- Journal of Cleaner Production
- Publisher
- Elsevier BV
- Published
- 2018-05
- Volume
- 183
- Pages
- 183-193
- ISSN
- 0959-6526 (ISSN-L)
- OpenAlex
- W2793865381
- Cited by
- 318
- References
- 56
- FWCI
- 22.30
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.