The DOI matches its Crossref record; 274 of the 274 references it cites were found in a registry or an index.
Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Green supply-chain management: a state-of-the-art literature review
Srivastava, S. K. (2007) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2007.00202.x · Cited by 3,984
Zhu, Q., & Sarkis, J. (2004) · Journal of Operations Management · doi:10.1016/j.jom.2004.01.005 · Cited by 2,761
Do green supply chains lead to competitiveness and economic performance?
Rao, P., & Holt, D. (2005) · International Journal of Operations & Production Management · doi:10.1108/01443570510613956 · Cited by 2,453
Closed-Loop Supply Chain Models with Product Remanufacturing
Savaskan, R. C., Bhattacharya, S., & Van Wassenhove, L. N. (2004) · Management Science · doi:10.1287/mnsc.1030.0186 · Cited by 2,227
Quantitative models for reverse logistics: A review
Fleischmann, M., Bloemhof-Ruwaard, J. M., Dekker, R., van der Laan, E., van Nunen, J. A. E. E., & Van Wassenhove, L. N. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(97)00230-0 · Cited by 1,902
Green supply chain management in China: pressures, practices and performance
Zhu, Q., Sarkis, J., & Geng, Y. (2005) · International Journal of Operations & Production Management · doi:10.1108/01443570510593148 · Cited by 1,506
Performance measurement for green supply chain management
Hervani, A. A., Helms, M. M., & Sarkis, J. (2005) · Benchmarking: An International Journal · doi:10.1108/14635770510609015 · Cited by 1,473
Issues in environmentally conscious manufacturing and product recovery: a survey
Gungor, A., & Gupta, S. M. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00167-9 · Cited by 1,107
Self-citationProduction planning and control for remanufacturing: industry practice and research needs
Guide, V. D. R. (2000) · Journal of Operations Management · doi:10.1016/s0272-6963(00)00034-6 · Cited by 1,098
(1998) · Journal of Business Logistics · Cited by 960
(2004) · Lecture Notes in Computer Science · doi:10.1007/b98643 · Cited by 957
Analysis of interactions among the barriers of reverse logistics
Ravi, V., & Shankar, R. (2005) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2004.07.002 · Cited by 902
Reverse Channel Design: The Case of Competing Retailers
Savaskan, R. C., & Wassenhove, L. N. V. (2006) · Management Science · doi:10.1287/mnsc.1050.0454 · Cited by 872
THE IMPACT OF PRODUCT RECOVERY ON LOGISTICS NETWORK DESIGN
FLEISCHMANN, M., BEULLENS, P., BLOEMHOF‐RUWAARD, J. M., & VANWASSENHOVE, L. N. (2001) · Production and Operations Management · doi:10.1111/j.1937-5956.2001.tb00076.x · Cited by 833
The Effect of Competition on Recovery Strategies
Ferguson, M. E., & Toktay, L. B. (2006) · Production and Operations Management · doi:10.1111/j.1937-5956.2006.tb00250.x · Cited by 823
Managing New and Remanufactured Products
Ferrer, G., & Swaminathan, J. M. (2006) · Management Science · doi:10.1287/mnsc.1050.0465 · Cited by 814
A characterisation of logistics networks for product recovery
Fleischmann, M., Krikke, H. R., Dekker, R., & Flapper, S. D. P. (2000) · Omega · doi:10.1016/s0305-0483(00)00022-0 · Cited by 786
MANAGING PRODUCT RETURNS FOR REMANUFACTURING
GUIDE, V. D. R., & VANWASSENHOVE, L. N. (2001) · Production and Operations Management · doi:10.1111/j.1937-5956.2001.tb00075.x · Cited by 708
Market Segmentation and Product Technology Selection for Remanufacturable Products
Debo, L. G., Toktay, L. B., & Van Wassenhove, L. N. (2005) · Management Science · doi:10.1287/mnsc.1050.0369 · Cited by 691
Rao, R. V. (2012) · Springer series in advanced manufacturing · doi:10.1007/978-1-4471-4375-8 · Cited by 646
Reverse logistics : quantitative models for closed-loop supply chains
Dekker, R., Fleischmann, M., Inderfurth, K., & Wassenhove, L. N. V. (2004) · EUR Research Repository (Erasmus University Rotterdam) · Cited by 636
Network design for reverse logistics☆
SRIVASTAVA, S. (2008) · Omega · doi:10.1016/j.omega.2006.11.012 · Cited by 623
A hybrid approach using ISM and fuzzy TOPSIS for the selection of reverse logistics provider
Kannan, G., Pokharel, S., & Sasi Kumar, P. (2009) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2009.06.004 · Cited by 621
Perspectives in reverse logistics: A review
Pokharel, S., & Mutha, A. (2009) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2008.11.006 · Cited by 613
A closed-loop logistics model for remanufacturing
Jayaraman, V, Guide, V. D. R., & Srivastava, R. (1999) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600716 · Cited by 537
COMPETITION IN REMANUFACTURING
MAJUMDER, P., & GROENEVELT, H. (2001) · Production and Operations Management · doi:10.1111/j.1937-5956.2001.tb00074.x · Cited by 535
Matching Demand and Supply to Maximize Profits from Remanufacturing
Guide, V. D. R., Teunter, R. H., & Van Wassenhove, L. N. (2003) · Manufacturing & Service Operations Management · doi:10.1287/msom.5.4.303.24883 · Cited by 525
Evaluating environmentally conscious business practices
Sarkis, J. (1998) · European Journal of Operational Research · doi:10.1016/s0377-2217(97)00160-4 · Cited by 523
An integrated logistics operational model for green-supply chain management
Sheu, J.-B., Chou, Y.-H., & Hu, C.-C. (2005) · Transportation Research Part E: Logistics and Transportation Review · doi:10.1016/j.tre.2004.07.001 · Cited by 513
Initiatives and outcomes of green supply chain management implementation by Chinese manufacturers
Zhu, Q., Sarkis, J., & Lai, K.-H. (2007) · Journal of Environmental Management · doi:10.1016/j.jenvman.2006.09.003 · Cited by 502
Combinatorial optimization and Green Logistics
Sbihi, A., & Eglese, R. W. (2007) · 4OR · doi:10.1007/s10288-007-0047-3 · Cited by 498
Ravi, V., Shankar, R., & Tiwari, M. K. (2005) · Computers & Industrial Engineering · doi:10.1016/j.cie.2005.01.017 · Cited by 474
The design of reverse distribution networks: Models and solution procedures
Jayaraman, V., Patterson, R. A., & Rolland, E. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00497-6 · Cited by 473
Design for manufacture and design for ‘X’: concepts, applications, and perspectives
Kuo, T.-C., Huang, S. H., & Zhang, H.-C. (2001) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(01)00045-6 · Cited by 467
Competition in remanufacturing and the effects of government subsidies
Mitra, S., & Webster, S. T. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2007.02.042 · Cited by 467
Ko, H. J., & Evans, G. W. (2005) · Computers & Operations Research · doi:10.1016/j.cor.2005.03.004 · Cited by 456
A two-level network for recycling sand: A case study
Barros, A. I., Dekker, R., & Scholten, V. (1998) · European Journal of Operational Research · doi:10.1016/s0377-2217(98)00093-9 · Cited by 447
Managing new and differentiated remanufactured products
Ferrer, G., & Swaminathan, J. M. (2010) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.08.007 · Cited by 446
Inventory Management of Remanufacturable Products
Toktay, L. B., Wein, L. M., & Zenios, S. A. (2000) · Management Science · doi:10.1287/mnsc.46.11.1412.12082 · Cited by 434
Vlachos, D., Georgiadis, P., & Iakovou, E. (2007) · Computers & Operations Research · doi:10.1016/j.cor.2005.03.005 · Cited by 432
Empirical research opportunities in reverse supply chains
Prahinski, C., & Kocabasoglu, C. (2006) · Omega · doi:10.1016/j.omega.2005.01.003 · Cited by 425
Time Value of Commercial Product Returns
Guide, V. D. R., Souza, G. C., Van Wassenhove, L. N., & Blackburn, J. D. (2006) · Management Science · doi:10.1287/mnsc.1060.0522 · Cited by 406
Chan, J. W. K., & Tong, T. K. L. (2007) · Materials & Design · doi:10.1016/j.matdes.2006.02.016 · Cited by 404
Min, H., Jeung Ko, H., & Seong Ko, C. (2006) · Omega · doi:10.1016/j.omega.2004.07.025 · Cited by 402
Kannan, G., Sasikumar, P., & Devika, K. (2010) · Applied Mathematical Modelling · doi:10.1016/j.apm.2009.06.021 · Cited by 400
(2005) · Lecture Notes in Computer Science · doi:10.1007/b136266 · Cited by 394
Concurrent product and closed-loop supply chain design with an application to refrigerators
Krikke, H., Bloemhof-Ruwaard, J., & Van Wassenhove, L. N. (2003) · International Journal of Production Research · doi:10.1080/0020754031000120087 · Cited by 392
Sarkis, J., & Cordeiro, J. J. (2001) · European Journal of Operational Research · doi:10.1016/s0377-2217(00)00306-4 · Cited by 391
Disassembly sequencing: A survey
Lambert, A. J. D. (2003) · International Journal of Production Research · doi:10.1080/0020754031000120078 · Cited by 382
A deterministic inventory model for reparable items
Schrady, D. A. (1967) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800140310 · Cited by 380
A multiple attribute utility theory approach to lean and green supply chain management
Kainuma, Y., & Tawara, N. (2006) · International Journal of Production Economics · doi:10.1016/j.ijpe.2005.05.010 · Cited by 380
Importance of closed-loop supply chain relationships for product remanufacturing
Östlin, J., Sundin, E., & Björkman, M. (2008) · International Journal of Production Economics · doi:10.1016/j.ijpe.2008.02.020 · Cited by 363
Lu, L. Y. Y., Wu, C. H., & Kuo, T.-C. (2007) · International Journal of Production Research · doi:10.1080/00207540701472694 · Cited by 361
A stochastic approach to a case study for product recovery network design
Listeş, O., & Dekker, R. (2005) · European Journal of Operational Research · doi:10.1016/j.ejor.2001.12.001 · Cited by 354
The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles
Geyer, R., Van Wassenhove, L. N., & Atasu, A. (2007) · Management Science · doi:10.1287/mnsc.1060.0600 · Cited by 351
A goal programming model for paper recycling system☆
PATI, R., VRAT, P., & KUMAR, P. (2008) · Omega · doi:10.1016/j.omega.2006.04.014 · Cited by 350
Inventory Control in Hybrid Systems with Remanufacturing
van der Laan, E., Salomon, M., Dekker, R., & Van Wassenhove, L. (1999) · Management Science · doi:10.1287/mnsc.45.5.733 · Cited by 342
Design for environment : creating eco-efficient products and processes
Fiksel, J. R. (1996) · McGraw-Hill eBooks · Cited by 337
Daugherty, P. J., Richey, R. G., Genchev, S. E., & Chen, H. (2005) · Transportation Research Part E: Logistics and Transportation Review · doi:10.1016/j.tre.2004.04.002 · Cited by 326
A conceptual model for selecting and evaluating third‐party reverse logistics providers
Meade, L., & Sarkis, J. (2002) · Supply Chain Management: An International Journal · doi:10.1108/13598540210447728 · Cited by 321
Subramoniam, R., Huisingh, D., & Chinnam, R. B. (2009) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2009.03.004 · Cited by 317
Competitive strategy in remanufacturing and the impact of take‐back laws
Webster, S., & Mitra, S. (2007) · Journal of Operations Management · doi:10.1016/j.jom.2007.01.014 · Cited by 316
Reverse logistics system planning for recycling electrical appliances and computers in Taiwan
Shih, L.-H. (2001) · Resources, Conservation and Recycling · doi:10.1016/s0921-3449(00)00098-7 · Cited by 315
A tool to implement sustainable end-of-life strategies in the product development phase
Gehin, A., Zwolinski, P., & Brissaud, D. (2008) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2007.02.012 · Cited by 314
Input‐Output Analysis of Waste Management
Nakamura, S., & Kondo, Y. (2002) · Journal of Industrial Ecology · doi:10.1162/108819802320971632 · Cited by 308
Environmentally conscious design and manufacturing: A state-of-the-art survey
Zhang, H. C., Kuo, T. C., Lu, H., & Huang, S. H. (1997) · Journal of Manufacturing Systems · doi:10.1016/s0278-6125(97)88465-8 · Cited by 306
Characteristics of the research on reverse logistics (1995–2005)
Rubio, S., Mera, A. C., & González, F. J. M. (2006) · International Journal of Production Research · doi:10.1080/00207540600943977 · Cited by 304
Production planning and inventory control with remanufacturing and disposal
van der Laan, E., & Salomon, M. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(97)00108-2 · Cited by 304
Schultmann, F., Zumkeller, M. A., & Rentz, O. (2005) · European Journal of Operational Research · doi:10.1016/j.ejor.2005.01.016 · Cited by 299
Arena, U., Mastellone, M. L., & Perugini, F. (2003) · Chemical Engineering Journal · doi:10.1016/j.cej.2003.08.019 · Cited by 298
Laganà, A., Gervasi, O., Tan, C. J. K., Mun, Y., Kumar, V., & Gavrilova, M. L. (2004) · Lecture notes in computer science · doi:10.1007/b98048 · Cited by 297
A model for reverse logistics entry by third-party providers
Krumwiede, D. W., & Sheu, C. (2002) · Omega · doi:10.1016/s0305-0483(02)00049-x · Cited by 293
Optimal Acquisition and Sorting Policies for Remanufacturing
Galbreth, M. R., & Blackburn, J. D. (2006) · Production and Operations Management · doi:10.1111/j.1937-5956.2006.tb00252.x · Cited by 293
Product Modularity and the Design of Closed-Loop Supply Chains
Krikke, H., Blanc, I. L., & van de Velde, S. (2004) · California Management Review · doi:10.2307/41166208 · Cited by 293
Zhou, C.-C., Yin, G.-F., & Hu, X.-B. (2009) · Materials & Design · doi:10.1016/j.matdes.2008.06.006 · Cited by 287
A heuristic approach to logistics network design for end-of-lease computer products recovery
Lee, D.-H., & Dong, M. (2008) · Transportation Research Part E: Logistics and Transportation Review · doi:10.1016/j.tre.2006.11.003 · Cited by 280
Dynamic network design for reverse logistics operations under uncertainty
Lee, D.-H., & Dong, M. (2009) · Transportation Research Part E: Logistics and Transportation Review · doi:10.1016/j.tre.2008.08.002 · Cited by 274
Disassembly line in product recovery
Güngör, A., & Gupta, S. M. (2002) · International Journal of Production Research · doi:10.1080/00207540210135622 · Cited by 274
Self-citationMin, H., & Ko, H.-J. (2008) · International Journal of Production Economics · doi:10.1016/j.ijpe.2007.01.017 · Cited by 269
The EOQ repair and waste disposal model with variable setup numbers
Richter, K. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00276-6 · Cited by 258
Reverse logistics network design with stochastic lead times
Lieckens, K. T., & Vandaele, N. J. (2005) · Computers & Operations Research · doi:10.1016/j.cor.2005.03.006 · Cited by 256
Agrawal, S., & Tiwari, M. K. (2008) · International Journal of Production Research · doi:10.1080/00207540600943985 · Cited by 252
Jayaraman, V. (2006) · International Journal of Production Research · doi:10.1080/00207540500250507 · Cited by 241
Applying Quality Function Deployment to environmentally conscious design
Masui, K., Sakao, T., Kobayashi, M., & Inaba, A. (2003) · International Journal of Quality & Reliability Management · doi:10.1108/02656710310453836 · Cited by 239
Georgiadis, P., & Besiou, M. (2008) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2008.04.019 · Cited by 239
A production/remanufacturing inventory model with price and quality dependant return rate
El Saadany, A. M. A., & Jaber, M. Y. (2010) · Computers & Industrial Engineering · doi:10.1016/j.cie.2009.01.017 · Cited by 238
A reverse logistics cost minimization model for the treatment of hazardous wastes
Hu, T.-L., Sheu, J.-B., & Huang, K.-H. (2002) · Transportation Research Part E: Logistics and Transportation Review · doi:10.1016/s1366-5545(02)00020-0 · Cited by 237
Competitive advantage through take-back of used products
Heese, H. S., Cattani, K., Ferrer, G., Gilland, W., & Roth, A. V. (2005) · European Journal of Operational Research · doi:10.1016/j.ejor.2003.11.008 · Cited by 236
A QFD-centred design methodology for environmentally conscious product design
Sakao, T. (2007) · International Journal of Production Research · doi:10.1080/00207540701450179 · Cited by 234
Integrating Closed-Loop Supply Chains and Spare-Parts Management at IBM
Fleischmann, M., van Nunen, J. A. E. E., & Gräve, B. (2003) · INFORMS Journal on Applied Analytics · doi:10.1287/inte.33.6.44.25189 · Cited by 234
Reverse-Logistics Strategy for Product Take-Back
Klausner, M., & Hendrickson, C. T. (2000) · Interfaces · doi:10.1287/inte.30.3.156.11657 · Cited by 234
Presley, A., Meade, L., & Sarkis, J. (2007) · International Journal of Production Research · doi:10.1080/00207540701440220 · Cited by 232
GUPTA, S. M., & TALEB, K. N. (1994) · International Journal of Production Research · doi:10.1080/00207549408957046 · Cited by 227
Self-citationA facility location allocation model for reusing carpet materials
Louwers, D., Kip, B. J., Peters, E., Souren, F., & Flapper, S. D. P. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00168-0 · Cited by 225
Evaluation of disassemblability to enable design for disassembly in mass production
Desai, A., & Mital, A. (2003) · International Journal of Industrial Ergonomics · doi:10.1016/s0169-8141(03)00067-2 · Cited by 224
An analysis of decentralized collection and processing of end‐of‐life products
Karakayali, I., Emir‐Farinas, H., & Akcali, E. (2007) · Journal of Operations Management · doi:10.1016/j.jom.2007.01.017 · Cited by 222
Designing sustainable recovery network of end-of-life products using genetic algorithm
Dehghanian, F., & Mansour, S. (2009) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2009.04.007 · Cited by 220
Koc, A., Sabuncuoğlu, İ., & Erel, E. (2009) · IIE Transactions · doi:10.1080/07408170802510390 · Cited by 214
The effect of environmental parameters on product recovery
Georgiadis, P., & Vlachos, D. (2004) · European Journal of Operational Research · doi:10.1016/s0377-2217(03)00203-0 · Cited by 210
Forecasting the returns of reusable containers
Kelle, P., & Silver, E. A. (1989) · Journal of Operations Management · doi:10.1016/s0272-6963(89)80003-8 · Cited by 210
Design for X : concurrent engineering imperatives
Huang, G. Q. (1996) · Chapman & Hall eBooks · Cited by 208
On a medium term product recovery and disposal strategy for durable assembly products
Krikke, H. R., van Harten, A., & Schuur, P. C. (1998) · International Journal of Production Research · doi:10.1080/002075498193967 · Cited by 208
Business case Océ: Reverse logistic network re-design for copiers
Krikke, H. R., van Harten, A., & Schuur, P. C. (1999) · OR Spectrum · doi:10.1007/s002910050095 · Cited by 204
Optimum Solution Structure for a Repairable Inventory Problem
Simpson, V. P. (1978) · Operations Research · doi:10.1287/opre.26.2.270 · Cited by 202
The effect of categorizing returned products in remanufacturing
Aras, N., Boyacı, T., & Verter, V. (2004) · IIE Transactions · doi:10.1080/07408170490279561 · Cited by 202
An approach for estimating the end-of-life product disassembly effort and cost
Das, S. K., Yedlarajiah, P., & Narendra, R. (2000) · International Journal of Production Research · doi:10.1080/002075400189356 · Cited by 202
Optimal return policy and modular design for build‐to‐order products
Mukhopadhyay, S. K., & Setoputro, R. (2005) · Journal of Operations Management · doi:10.1016/j.jom.2004.10.012 · Cited by 201
Controlling inventories with stochastic item returns: A basic model
Fleischmann, M., Kuik, R., & Dekker, R. (2002) · European Journal of Operational Research · doi:10.1016/s0377-2217(01)00100-x · Cited by 201
Revenue management for remanufactured products
Mitra, S. (2007) · Omega · doi:10.1016/j.omega.2005.10.003 · Cited by 200
Zhang, Y. (1999) · International Journal of Production Research · doi:10.1080/002075499191418 · Cited by 200
The newsboy problem with resalable returns: A single period model and case study
Mostard, J., & Teunter, R. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.04.048 · Cited by 200
Linear programming in disassembly/clustering sequence generation
Lambert, A. J. D. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00162-x · Cited by 196
Supply-chain network configuration for product recovery
Beamon, B. M., & Fernandes, C. (2004) · Production Planning & Control · doi:10.1080/09537280410001697701 · Cited by 193
Reverse logistics network design using simulated annealing
Pishvaee, M. S., Kianfar, K., & Karimi, B. (2010) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-009-2194-5 · Cited by 193
Network model and optimization of reverse logistics by hybrid genetic algorithm
Lee, J.-E., Gen, M., & Rhee, K.-G. (2009) · Computers & Industrial Engineering · doi:10.1016/j.cie.2008.09.021 · Cited by 192
Simultaneous design and planning of supply chains with reverse flows: A generic modelling framework
Salema, M. I. G., Barbosa-Povoa, A. P., & Novais, A. Q. (2010) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.08.002 · Cited by 192
Production planning and control for remanufacturing: a state-of-the-art survey
Guide, V. D. R., Jayaraman, V., & Srivastava, R. (1999) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/s0736-5845(99)00020-4 · Cited by 191
Business case Océ: Reverse logistic network re-design for copiers
Krikke, H. R., van Harten, A., & Schuur, P. C. (2003) · Advanced Planning and Scheduling Solutions in Process Industry · doi:10.1007/978-3-662-05607-3_14 · Cited by 190
MATERIAL PLANNING FOR A REMANUFACTURING FACILITY
FERRER, G., & WHYBARK, D. C. (2001) · Production and Operations Management · doi:10.1111/j.1937-5956.2001.tb00073.x · Cited by 189
Lot-sizing for inventory systems with product recovery
Teunter, R. H. (2004) · Computers & Industrial Engineering · doi:10.1016/j.cie.2004.01.006 · Cited by 187
Reverse logistics in e‐business: Optimal price and return policy
Mukhopadhyay, S. K., & Setoputro, R. (2004) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030410515691 · Cited by 181
Aras, N., Aksen, D., & Gönül Tanuğur, A. (2008) · European Journal of Operational Research · doi:10.1016/j.ejor.2007.08.002 · Cited by 180
Locating collection centers for distance- and incentive-dependent returns
Aras, N., & Aksen, D. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2007.01.015 · Cited by 178
Disassembly sequence planning for products with defective parts in product recovery
Gungor, A., & Gupta, S. M. (1998) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(98)00047-3 · Cited by 176
Self-citationRemanufacturing of mobile phones—capacity, program and facility adaptation planning
Franke, C., Basdere, B., Ciupek, M., & Seliger, S. (2006) · Omega · doi:10.1016/j.omega.2005.01.016 · Cited by 176
An analysis of single item inventory systems with returns
Muckstadt, J. A., & Isaac, M. H. (1981) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800280207 · Cited by 176
Moore, K. E., Güngör, A., & Gupta, S. M. (2001) · European Journal of Operational Research · doi:10.1016/s0377-2217(00)00321-0 · Cited by 175
Self-citationZikopoulos, C., & Tagaras, G. (2007) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.10.025 · Cited by 173
Remanufacturing planning for the reverse Wagner/Whitin models
Richter, K., & Sombrutzki, M. (2000) · European Journal of Operational Research · doi:10.1016/s0377-2217(99)00219-2 · Cited by 172
A methodological framework for evaluating environmentally conscious manufacturing programs
Sarkis, J. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00166-7 · Cited by 170
Product acquisition management: Current industry practice and a proposed framework
Daniel, V., Guide, R., & Jayaraman, V. (2000) · International Journal of Production Research · doi:10.1080/00207540050176003 · Cited by 168
Return handling options and order quantities for single period products
Vlachos, D., & Dekker, R. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00596-9 · Cited by 167
Modular design to support green life-cycle engineering
TSENG, H., CHANG, C., & LI, J. (2008) · Expert Systems with Applications · doi:10.1016/j.eswa.2007.04.018 · Cited by 167
Incorporating component reuse, remanufacture, and recycle into product portfolio design
Mangun, D., & Thurston, D. L. (2002) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2002.807292 · Cited by 166
Product, process, and organizational design for remanufacture – an overview of research
Bras, B., & McIntosh, M. W. (1999) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/s0736-5845(99)00021-6 · Cited by 165
Retail–collection network design under deposit–refund
Wojanowski, R., Verter, V., & Boyacı, T. (2005) · Computers & Operations Research · doi:10.1016/j.cor.2005.03.003 · Cited by 164
Simulation modelling of reverse logistics networks
Kara, S., Rugrungruang, F., & Kaebernick, H. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.04.009 · Cited by 162
A Multi-Objective Methodology for Evaluating Product End-of-Life Options and Disassembly
Lee, S. G., Lye, S. W., & Khoo, M. K. (2001) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s001700170086 · Cited by 161
The spatial and temporal consolidation of returned products in a closed-loop supply chain network
Min, H., Ko, C. S., & Ko, H. J. (2006) · Computers & Industrial Engineering · doi:10.1016/j.cie.2006.02.010 · Cited by 161
van der Laan, E., Salomon, M., & Dekker, R. (1999) · European Journal of Operational Research · doi:10.1016/s0377-2217(98)00108-8 · Cited by 159
Scheduling policies for remanufacturing
Guide, V. D. R., Kraus, M. E., & Srivastava, R. V. (1997) · International Journal of Production Economics · doi:10.1016/s0925-5273(96)00091-6 · Cited by 159
Disassembly of multiple product structures
Taleb, K. N., & Gupta, S. M. (1997) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(97)00023-5 · Cited by 158
Self-citationThe optimization of the closed-loop supply chain network
Guang-fen, Y., Wang, Z., & Li, X. (2008) · Transportation Research Part E Logistics and Transportation Review · doi:10.1016/j.tre.2008.02.007 · Cited by 155
Robust reverse production system design for carpet recycling
Realff, M. J., Ammons, J. C., & NEWTON, D. J. (2004) · IIE Transactions · doi:10.1080/07408170490458580 · Cited by 151
Giudice, F., Rosa, G. L., & Risitano, G. (2004) · Materials & Design (1980-2015) · doi:10.1016/j.matdes.2004.04.006 · Cited by 150
An evaluation methodology for disassembly processes
Güngör, A., & Gupta, S. M. (1997) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(97)00104-6 · Cited by 149
Self-citationOptimal disposal policies for a single‐item inventory system with returns
Heyman, D. P. (1977) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800240302 · Cited by 149
Strategic safety stocks in reverse logistics supply chains
Minner, S. (2001) · International Journal of Production Economics · doi:10.1016/s0925-5273(00)00138-9 · Cited by 148
Madu, C. N., Kuei, C., & Madu, I. E. (2002) · Journal of Environmental Management · doi:10.1006/jema.2001.0498 · Cited by 147
An (s, Q) inventory model with remanufacturing and disposal
van der Laan, E., Dekker, R., Salomon, M., & Ridder, A. (1996) · International Journal of Production Economics · doi:10.1016/0925-5273(95)00020-8 · Cited by 147
Georgiadis, P., Vlachos, D., & Tagaras, G. (2006) · Production and Operations Management · doi:10.1111/j.1937-5956.2006.tb00160.x · Cited by 145
The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost
Richter, K., & Weber, J. (2001) · International Journal of Production Economics · doi:10.1016/s0925-5273(00)00142-0 · Cited by 139
Akçalı, E., Çetinkaya, S., & Üster, H. (2008) · Networks · doi:10.1002/net.20267 · Cited by 139
Designing a reverse logistics operation for short cycle time repair services
Amini, M., Retzlaff‐Roberts, D., & Bienstock, C. C. (2004) · International Journal of Production Economics · doi:10.1016/j.ijpe.2004.05.010 · Cited by 138
Value of information in remanufacturing complex products
Ferrer, G., & Ketzenberg, M. E. (2004) · IIE Transactions · doi:10.1080/07408170490274223 · Cited by 137
Optimal manufacturing–remanufacturing policies in a lean production environment
Rubio, S., & Subias, A. C. (2007) · Computers & Industrial Engineering · doi:10.1016/j.cie.2007.12.009 · Cited by 137
On the optimal design of the disassembly and recovery processes
Xanthopoulos, A., & Iakovou, E. T. (2009) · Waste Management · doi:10.1016/j.wasman.2008.11.009 · Cited by 136
Strategic Management of Spare Parts in Closed-Loop Supply Chains—A System Dynamics Approach
Spengler, T., & Schröter, M. (2003) · Interfaces · doi:10.1287/inte.33.6.7.25179 · Cited by 135
Sasikumar, P., & Govindan, K. (2008) · International Journal of Sustainable Engineering · doi:10.1080/19397030802433860 · Cited by 135
On the attractiveness of sorting before disassembly in remanufacturing
Zikopoulos, C., & Tagaras, G. (2008) · IIE Transactions · doi:10.1080/07408170701488078 · Cited by 134
Product recovery in stochastic remanufacturing systems with multiple reuse options
Inderfurth, K., de Kok, A. G., & Flapper, S. D. P. (2001) · European Journal of Operational Research · doi:10.1016/s0377-2217(00)00188-0 · Cited by 133
The production, remanufacture and waste disposal model with lost sales
Jaber, M. Y., & Saadany, A. M. A. E. (2008) · International Journal of Production Economics · doi:10.1016/j.ijpe.2008.07.016 · Cited by 132
Wadhwa, S., Madaan, J., & Chan, F. T. S. (2008) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2008.01.006 · Cited by 132
Leadtime effects and policy improvement for stochastic inventory control with remanufacturing
Inderfurth, K., & van der Laan, E. (2001) · International Journal of Production Economics · doi:10.1016/s0925-5273(00)00135-3 · Cited by 131
Value of Information in Closed Loop Supply Chains
Ketzenberg, M. E., van derLaan, E., & Teunter, R. H. (2006) · Production and Operations Management · doi:10.1111/j.1937-5956.2006.tb00253.x · Cited by 130
Computer Aided Disassembly Planning: State of the Art and Perspectives
Santochi, M., Dini, G., & Failli, F. (2002) · CIRP Annals · doi:10.1016/s0007-8506(07)61698-9 · Cited by 129
Product remanufacturing and disposal: A numerical comparison of alternative control strategies
van der Laan, E., Dekker, R., & Salomon, M. (1996) · International Journal of Production Economics · doi:10.1016/0925-5273(95)00137-9 · Cited by 129
The Relationship between the Environmental and Economic Performance of Firms
Wagner, M., Schaltegger, S., & Wehrmeyer, W. (2001) · Greener Management International · doi:10.9774/gleaf.3062.2001.su.00009 · Cited by 126
Materials selection for optimal environmental impact in mechanical design
Holloway, L. (1998) · Materials & Design (1980-2015) · doi:10.1016/s0261-3069(98)00031-4 · Cited by 125
Development of a sustainable product lifecycle in manufacturing firms: a case study
Bevilacqua, M., Ciarapica, F. E., & Giacchetta, G. (2007) · International Journal of Production Research · doi:10.1080/00207540701439941 · Cited by 123
Analysis of the EOQ repair and waste disposal problem with integer setup numbers
Richter, K., & Dobos, I. (1999) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00110-8 · Cited by 123
Nakamura, S., & Kondo, Y. (2005) · Ecological Economics · doi:10.1016/j.ecolecon.2005.05.002 · Cited by 122
Issues in reverse supply chain, part III: classification and simple analysis
Sasikumar, P., & Govindan, K. (2009) · International Journal of Sustainable Engineering · doi:10.1080/19397030802673374 · Cited by 122
Design for X — concurrent engineering imperatives
Edwards, K. L. (1996) · Materials & Design (1980-2015) · doi:10.1016/s0261-3069(97)86627-7 · Cited by 120
Logistics network design for product recovery in fuzzy environment
Qin, Z., & Ji, X. (2009) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.05.036 · Cited by 119
Coordination and Priority Decisions in Hybrid Manufacturing/Remanufacturing Systems
Aras, N., Verter, V., & Boyacı, T. (2006) · Production and Operations Management · doi:10.1111/j.1937-5956.2006.tb00161.x · Cited by 119
Optimizing disassembly processes subjected to sequence-dependent cost
Lambert, A. J. D. (2005) · Computers & Operations Research · doi:10.1016/j.cor.2005.03.012 · Cited by 119
Appropriate Human Involvement in Assembly and Disassembly
Bley, H., Reinhart, G., Seliger, G., Bernardi, M., & Korne, T. (2004) · CIRP Annals · doi:10.1016/s0007-8506(07)60026-2 · Cited by 118
Strategic response to EEE returns:
Zuidwijk, R. A., & Krikke, H. R. (2007) · European Journal of Operational Research · doi:10.1016/j.ejor.2007.08.004 · Cited by 117
How to set the holding cost rates in average cost inventory models with reverse logistics?
Teunter, R. H., van der Laan, E., & Inderfurth, K. (2000) · Omega · doi:10.1016/s0305-0483(99)00070-5 · Cited by 117
Evaluation of connection types in design for disassembly (DFD) using analytic network process
Güngör, A. (2006) · Computers & Industrial Engineering · doi:10.1016/j.cie.2005.12.002 · Cited by 117
Inventory buffers in recoverable manufacturing
Guide, V. D. R., & Srivastava, R. V. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(97)00024-7 · Cited by 117
A genetic algorithm for product disassembly sequence planning
Wang, H., Dong, X., & Guanghong, D. (2008) · Neurocomputing · doi:10.1016/j.neucom.2007.11.042 · Cited by 116
An evaluation of capacity planning techniques in a remanufacturing environment
Guide, V. D. R., Srivastava, R., & Spencer, M. S. (1997) · International Journal of Production Research · doi:10.1080/002075497195984 · Cited by 115
An integrated product returns model with logistics and marketing coordination
Yalabik, B., Petruzzi, N. C., & Chhajed, D. (2003) · European Journal of Operational Research · doi:10.1016/j.ejor.2003.07.006 · Cited by 114
An integrated analysis of ergonomics and time consumption in Swedish ‘craft-type’ car disassembly
Kazmierczak, K., Mathiassen, S. E., Forsman, M., & Winkel, J. (2005) · Applied Ergonomics · doi:10.1016/j.apergo.2005.01.010 · Cited by 112
Design and analysis of government subsidized collection systems for incentive-dependent returns
Aksen, D., Aras, N., & Karaarslan, A. G. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.02.012 · Cited by 112
Product Design For The Environment: A Life Cycle Approach
Giudice, F., Rosa, G. L., & Risitano, A. (2006) · Cited by 111
Product structure complexity and scheduling of operations in recoverable manufacturing
Guide, V. D. R., Srivastava, R., & Kraus, M. E. (1997) · International Journal of Production Research · doi:10.1080/002075497194345 · Cited by 110
Multi-Criteria Decision-Making for Optimization of Product Disassembly under Multiple Situations
Hula, A., Jalali, K., Hamza, K., et al. (2003) · Environmental Science & Technology · doi:10.1021/es0345423 · Cited by 110
Business case Roteb: recovery strategies for monitors
Krikke, H., van Harten, A., & Schuur, P. C. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00163-1 · Cited by 109
A MULTI-CRITERIA DECISION MAKING APPROACH FOR DISASSEMBLY-TO-ORDER SYSTEMS
Kongar, E. A., & Gupta, S. M. (2002) · Journal of Electronics Manufacturing · doi:10.1142/s0960313102000345 · Cited by 108
Self-citationEssential perspectives for design for environment. Experiences from the electronics industry
Boks, C., & Stevels, A. L. N. (2007) · International Journal of Production Research · doi:10.1080/00207540701439909 · Cited by 108
Redesign methodology for developing environmentally conscious products
Bovea, M. D., & Wang, B. (2007) · International Journal of Production Research · doi:10.1080/00207540701472678 · Cited by 107
Zhu, J. Y., & Deshmukh, A. S. (2003) · Engineering Applications of Artificial Intelligence · doi:10.1016/s0952-1976(03)00057-5 · Cited by 102
Automatic PC disassembly for component recovery
Torres, F., Gil, P., Méndez, S. T. P., Pomares, J., & Aracil, R. (2004) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-003-1590-5 · Cited by 101
A Petri net approach to disassembly process planning
Moore, K. E., Güngör, A., & Gupta, S. M. (1998) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(98)00051-5 · Cited by 101
Self-citationAn economic production and remanufacturing model with learning effects
Jaber, M. Y., & Saadany, A. M. A. E. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.04.019 · Cited by 100
A decision-making model for waste management in the footwear industry
Staikos, T., & Rahimifard, S. (2007) · International Journal of Production Research · doi:10.1080/00207540701450187 · Cited by 100
Fuzzy approach for the selection of third party reverse logistics provider
Govindan, K. (2009) · Asia Pacific Journal of Marketing and Logistics · doi:10.1108/13555850910973865 · Cited by 99
Cited by
Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future
Govindan, K., Soleimani, H., & Kannan, D. (2015) · European Journal of Operational Research · doi:10.1016/j.ejor.2014.07.012 · Cited by 1,963
Business models and supply chains for the circular economy
Geissdoerfer, M., Morioka, S. N., de Carvalho, M. M., & Evans, S. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.04.159 · Cited by 1,335
Quantitative models for sustainable supply chain management: Developments and directions
Brandenburg, M., Govindan, K., Sarkis, J., & Seuring, S. (2014) · European Journal of Operational Research · doi:10.1016/j.ejor.2013.09.032 · Cited by 1,198
Sustainable supply chain network design: An optimization-oriented review
Eskandarpour, M., Dejax, P., Miemczyk, J., & Péton, O. (2015) · Omega · doi:10.1016/j.omega.2015.01.006 · Cited by 709
The evolution and future of manufacturing: A review
Esmaeilian, B., Behdad, S., & Wang, B. (2016) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2016.03.001 · Cited by 686
Metadata
- Authors
- Ilgin, M. A., & Gupta, S. M.
- Venue
- Journal of Environmental Management
- Publisher
- Elsevier BV
- Published
- 2010-01
- Volume
- 91
- Issue
- 3
- Pages
- 563-591
- ISSN
- 0301-4797 (ISSN-L)
- OpenAlex
- W2157806109
- Cited by
- 1,015
- References
- 274
- FWCI
- 150.29
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.