Economic comparison of concrete recycling: A case study approach
The DOI matches its Crossref record; 6 of the 6 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
On-site sorting of construction and demolition waste in Hong Kong
Poon, C. S., Yu, A. T. W., & Ng, L. H. (2001) · Resources, Conservation and Recycling · doi:10.1016/s0921-3449(01)00052-0 · Cited by 431
Implementation of environmental management in the Hong Kong construction industry
Shen, L. Y., & Tam, V. W. Y. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00054-0 · Cited by 367
Self-citationStrategies for successful construction and demolition waste recycling operations
Peng, C.-L., Scorpio, D. E., & Kibert, C. J. (1997) · Construction Management and Economics · doi:10.1080/014461997373105 · Cited by 291
Evaluations of existing waste recycling methods: A Hong Kong study
Tam, V. W. Y., & Tam, C. M. (2006) · Building and Environment · doi:10.1016/j.buildenv.2005.06.017 · Cited by 173 · cited 1×
“…the huge generation of concrete waste, five major causes are identified, including (Cheung, 1993, Poon et al. , 2001; , 2001, Shen and Tam, 2002, Tam and Tam, 2006): i) over ordering; ii) damage during transportation; iii) loss during installation; iv) poor workmanship; and v) change of design.”
Self-citationA guide for managing and minimizing building and demolition waste
Poon, C. S., Yu, A. T. W., & Ng, L. H. (2001) · PolyU Institutional Research Archive (Hong Kong Polytechnic University) · Cited by 86
THE RECLAIMED AND RECYCLED CONSTRUCTION MATERIALS HANDBOOK
Coventry, S., Woolveridge, C., & Hillier, S. (1999) · OpenGrey (Institut de l'Information Scientifique et Technique) · Cited by 65
Cited by
A review on automated sorting of source-separated municipal solid waste for recycling
Gundupalli, S. P., Hait, S., & Thakur, A. (2017) · Waste Management · doi:10.1016/j.wasman.2016.09.015 · Cited by 583
Trend of the research on construction and demolition waste management
Yuan, H., & Shen, L. (2011) · Waste Management · doi:10.1016/j.wasman.2010.10.030 · Cited by 574
Shen, L.-Y., Tam, V. W. Y., Tam, L., & Ji, Y.-B. (2010) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2009.10.014 · Cited by 426
Self-citationJin, R., Li, B., Zhou, T., Wanatowski, D., & Piroozfar, P. (2017) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2017.07.034 · Cited by 401
Purchase, C. K., Al Zulayq, D. M., O’Brien, B. T., Kowalewski, M. J., Berenjian, A., Tarighaleslami, A. H., & Seifan, M. (2021) · Materials · doi:10.3390/ma15010076 · Cited by 357
A framework for understanding waste management studies in construction
Lu, W., & Yuan, H. (2011) · Waste Management · doi:10.1016/j.wasman.2011.01.018 · Cited by 353
Di Maria, A., Eyckmans, J., & Van Acker, K. (2018) · Waste Management · doi:10.1016/j.wasman.2018.01.028 · Cited by 340
Critical success factors for on-site sorting of construction waste: A china study
Wang, J., Yuan, H., Kang, X., & Lu, W. (2010) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2010.01.012 · Cited by 291
Silva, R. V., de Brito, J., & Dhir, R. K. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.12.070 · Cited by 289
Strength and Durability Evaluation of Recycled Aggregate Concrete
Yehia, S., Helal, K., Abusharkh, A., Zaher, A., & Istaitiyeh, H. (2015) · International Journal of Concrete Structures and Materials · doi:10.1007/s40069-015-0100-0 · Cited by 278
Strategies for Applying the Circular Economy to Prefabricated Buildings
Minunno, R., O’Grady, T., Morrison, G. M., Gruner, R. L., & Colling, M. (2018) · Buildings · doi:10.3390/buildings8090125 · Cited by 270
“Concrete and steel are among the most used materials in the construction sector [78], and they can both be recycled [42,43].”
BackgroundCoelho, A., & de Brito, J. (2013) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2012.08.024 · Cited by 256
Exploring critical success factors for waste management in construction projects of China
Lu, W., & Yuan, H. (2010) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2010.09.010 · Cited by 239
Yuan, H. P., Shen, L. Y., Hao, J. J. L., & Lu, W. S. (2011) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2010.06.004 · Cited by 214
Chen, W., Jin, R., Xu, Y., Wanatowski, D., Li, B., Yan, L., Pan, Z., & Yang, Y. (2019) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2019.05.130 · Cited by 202
“866 [123] A. Akbarnezhad, K.C.G. Ong, C.T. Tam, M.H. Zhang, Effects of the parent concrete properties and 867 crushing procedure on the properties of coarse recycled concrete aggregates, J Mater Civ Eng 25(12) (2013) 868 1795-1802.”
BackgroundInfluentialUtilisation of recycled concrete aggregates for sustainable highway pavement applications; a review
Maduabuchukwu Nwakaire, C., Poh Yap, S., Chuen Onn, C., Wah Yuen, C., & Adebayo Ibrahim, H. (2020) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2019.117444 · Cited by 198
Carbon implications of end-of-life management of building materials
Dodoo, A., Gustavsson, L., & Sathre, R. (2009) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2008.12.007 · Cited by 181
Carbon dioxide sequestration of concrete slurry waste and its valorisation in construction products
Xuan, D., Zhan, B., Poon, C. S., & Zheng, W. (2016) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2016.03.109 · Cited by 178
Bio-mineralized self-healing recycled aggregate concrete for sustainable infrastructure
Khushnood, R. A., Qureshi, Z. A., Shaheen, N., & Ali, S. (2020) · Science of The Total Environment · doi:10.1016/j.scitotenv.2019.135007 · Cited by 168
Younis, A., Ebead, U., & Judd, S. (2018) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2018.04.183 · Cited by 160
Construction and Demolition Waste Recycling Plants Revisited: Management Issues
Ulubeyli, S., Kazaz, A., & Arslan, V. (2017) · Procedia Engineering · doi:10.1016/j.proeng.2017.02.139 · Cited by 140
Hiete, M., Stengel, J., Ludwig, J., & Schultmann, F. (2011) · Building Research & Information · doi:10.1080/09613218.2011.576849 · Cited by 116
“…(2002) in Taiwan, Begum et al. (2006) in Malaysia, Duran et al. (2006) in Ireland, Nunes et al. (2007) in Brazil, Robinson et al. (2004) in the United States, Tam (2008) in Australia, and Zhao et al. (2010) in China, with differences in the level of detail and in the chain links and costs covered.”
BackgroundMethodDesign of concrete buildings for disassembly: An explorative review
Salama, W. (2017) · International Journal of Sustainable Built Environment · doi:10.1016/j.ijsbe.2017.03.005 · Cited by 115
Jaskowska-Lemańska, J., & Sagan, J. (2019) · Archives of Civil Engineering · doi:10.2478/ace-2019-0059 · Cited by 16
“Construction and demolition (C&D) waste management should be based on the waste management hierarchy, and its observance can bring environmental and financial benefits [1], [2].”
Background
Metadata
- Authors
- Tam, V. W. Y.
- Venue
- Resources, Conservation and Recycling
- Publisher
- Elsevier BV
- Published
- 2008-03
- Volume
- 52
- Issue
- 5
- Pages
- 821-828
- ISSN
- 0921-3449 (ISSN-L)
- OpenAlex
- W2016778940
- Cited by
- 254
- References
- 6
- FWCI
- 17.57
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.