A hybrid BN-HFACS model for predicting safety performance in construction projects
The DOI matches its Crossref record; 59 of the 59 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Human error: models and management
Reason, J. (2000) · BMJ · doi:10.1136/bmj.320.7237.768 · Cited by 5,665
Estimating within-group interrater reliability with and without response bias
James, L. R., Demaree, R. G., & Wolf, G. (1984) · Journal of Applied Psychology · doi:10.1037/0021-9010.69.1.85 · Cited by 4,774
Safety climate in industrial organizations: Theoretical and applied implications.
Zohar, D. M. (1980) · Journal of Applied Psychology · doi:10.1037//0021-9010.65.1.96 · Cited by 2,603
Zohar, D. M. (2000) · Journal of Applied Psychology · doi:10.1037//0021-9010.85.4.587 · Cited by 1,497
Thirty years of safety climate research: Reflections and future directions
Zohar, D. (2010) · Accident Analysis & Prevention · doi:10.1016/j.aap.2009.12.019 · Cited by 1,114
Understanding the key risks in construction projects in China
Zou, P. X. W., Zhang, G., & Wang, J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.03.001 · Cited by 859
Self-citationA CROSS‐LEVEL INVESTIGATION OF FACTORS INFLUENCING UNSAFE BEHAVIORS AND ACCIDENTS
HOFMANN, D. A., & STETZER, A. (1996) · Personnel Psychology · doi:10.1111/j.1744-6570.1996.tb01802.x · Cited by 835
Industrial accident prevention
Hienrich, H. W., Peterson, D., & Roos, N. R. (1941) · Cited by 815
Hofmann, D. A., & Morgeson, F. P. (1999) · Journal of Applied Psychology · doi:10.1037//0021-9010.84.2.286 · Cited by 804
Why operatives engage in unsafe work behavior: Investigating factors on construction sites
Choudhry, R. M., & Fang, D. (2008) · Safety Science · doi:10.1016/j.ssci.2007.06.027 · Cited by 722
Industrial Accident Prevention.
Ingall, C. G. (1927) · Journal of State Medicine · Cited by 710
Analysis of factors influencing project cost estimating practice
Akintoye, A. (2000) · Construction Management and Economics · doi:10.1080/014461900370979 · Cited by 608
Stakeholder management studies in mega construction projects: A review and future directions
Mok, K. Y., Shen, G. Q., & Yang, J. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.08.007 · Cited by 599
Identifying elements of poor construction safety management in China
Tam, C. M., Zeng, S. X., & Deng, Z. M. (2004) · Safety Science · doi:10.1016/j.ssci.2003.09.001 · Cited by 590
Chauvin, C., Lardjane, S., Morel, G., Clostermann, J.-P., & Langard, B. (2013) · Accident Analysis & Prevention · doi:10.1016/j.aap.2013.05.006 · Cited by 590
Institutional and Strategic Barriers to Public—Private Partnership: An Analysis of Dutch Cases
Klijn, E.-H., & Teisman, G. R. (2003) · Public Money & Management · doi:10.1111/1467-9302.00361 · Cited by 481
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Guo, B. H. W., Yiu, T. W., & González, V. A. (2016) · Safety Science · doi:10.1016/j.ssci.2015.11.020 · Cited by 374
Wiegmann, D. A., & Shappell, S. A. (2001) · PubMed · Cited by 352
Patterson, J. M., & Shappell, S. A. (2010) · Accident Analysis & Prevention · doi:10.1016/j.aap.2010.02.018 · Cited by 348
The psychology of workplace safety.
(2004) · American Psychological Association eBooks · doi:10.1037/10662-000 · Cited by 346
Alzahrani, J. I., & Emsley, M. W. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.06.006 · Cited by 344
Safety climate and safety at work.
Neal, A., & Griffin, M. A. (2004) · The psychology of workplace safety. · doi:10.1037/10662-002 · Cited by 326
Bayesian-network-based safety risk analysis in construction projects
Zhang, L., Wu, X., Skibniewski, M. J., Zhong, J., & Lu, Y. (2014) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2014.06.006 · Cited by 324
Quantifying schedule risk in construction projects using Bayesian belief networks
Luu, V. T., Kim, S.-Y., Tuan, N. V., & Ogunlana, S. O. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.03.003 · Cited by 309
A system dynamics approach for modeling construction workers’ safety attitudes and behaviors
Shin, M., Lee, H.-S., Park, M., Moon, M., & Han, S. (2014) · Accident Analysis & Prevention · doi:10.1016/j.aap.2013.09.019 · Cited by 307
Safety climate and the Theory of Planned Behavior: Towards the prediction of unsafe behavior
Fogarty, G. J., & Shaw, A. (2010) · Accident Analysis & Prevention · doi:10.1016/j.aap.2009.08.008 · Cited by 295
Impact of the Supervisor on Worker Safety Behavior in Construction Projects
Fang, D., Wu, C., & Wu, H. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000355 · Cited by 295
Developing a Risk Assessment Model for construction safety
Fung, I. W. H., Tam, V. W. Y., Lo, T. Y., & Lu, L. L. H. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.09.006 · Cited by 262
Chen, S.-T., Wall, A., Davies, P., Yang, Z., Wang, J., & Chou, Y.-H. (2013) · Safety Science · doi:10.1016/j.ssci.2013.06.009 · Cited by 254
Risk analysis during tunnel construction using Bayesian Networks: Porto Metro case study
Sousa, R. L., & Einstein, H. H. (2011) · Tunnelling and Underground Space Technology · doi:10.1016/j.tust.2011.07.003 · Cited by 251
Development of a Safety Culture Interaction (SCI) model for construction projects
Fang, D., & Wu, H. (2013) · Safety Science · doi:10.1016/j.ssci.2013.02.003 · Cited by 244
Professional ethics in the construction industry
Vee, C., & Skitmore, C. (2003) · Engineering, Construction and Architectural Management · doi:10.1108/09699980310466596 · Cited by 239
Langford, D., Rowlinson, S., & Sawacha, E. (2000) · Engineering Construction and Architectural Management · doi:10.1046/j.1365-232x.2000.00137.x · Cited by 230
Using Ranked Nodes to Model Qualitative Judgments in Bayesian Networks
Fenton, N. E., Neil, M., & Caballero, J. G. (2007) · IEEE Transactions on Knowledge and Data Engineering · doi:10.1109/tkde.2007.1073 · Cited by 226
Garrett, J. W., & Teizer, J. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000034 · Cited by 215
Ding, L. Y., Zhou, C., Deng, Q. X., Luo, H. B., Ye, X. W., Ni, Y. Q., & Guo, P. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.08.017 · Cited by 205
Expert elicitation and Bayesian Network modeling for shipping accidents: A literature review
Zhang, G., & Thai, V. V. (2016) · Safety Science · doi:10.1016/j.ssci.2016.03.019 · Cited by 195
A dynamic Bayesian network based approach to safety decision support in tunnel construction
Wu, X., Liu, H., Zhang, L., Skibniewski, M. J., Deng, Q., & Teng, J. (2014) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2014.10.021 · Cited by 195
The Human Factors Analysis Classification System (HFACS) Applied to Health Care
Diller, T., Helmrich, G., Dunning, S., Cox, S., Buchanan, A., & Shappell, S. (2014) · American Journal of Medical Quality · doi:10.1177/1062860613491623 · Cited by 186
The differential effects of transformational leadership facets on employee safety
Hoffmeister, K., Gibbons, A. M., Johnson, S. K., Cigularov, K. P., Chen, P. Y., & Rosecrance, J. C. (2014) · Safety Science · doi:10.1016/j.ssci.2013.07.004 · Cited by 182
Safety climate, perceived risk, and involvement in safety management
Kouabénan, D. R., Ngueutsa, R., & Mbaye, S. (2015) · Safety Science · doi:10.1016/j.ssci.2015.03.009 · Cited by 182
Zhan, Q., Zheng, W., & Zhao, B. (2017) · Safety Science · doi:10.1016/j.ssci.2016.08.017 · Cited by 181
Critical factors and paths influencing construction workers’ safety risk tolerances
Wang, J., Zou, P. X. W., & Li, P. P. (2016) · Accident Analysis & Prevention · doi:10.1016/j.aap.2015.11.027 · Cited by 170
Self-citationKhodakarami, V., & Abdi, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.01.001 · Cited by 164
Safety citizenship behaviour: a proactive approach to risk management
Didla, S., Mearns, K. J., & Flin, R. H. (2009) · Journal of Risk Research · doi:10.1080/13669870903041433 · Cited by 162
Zou, P. X. W., Sunindijo, R. Y., & Dainty, A. (2014) · Safety Science · doi:10.1016/j.ssci.2014.07.005 · Cited by 162
Self-citationEvaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model
Nasir, D., McCabe, B. Y., & Hartono, L. (2003) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2003)129:5(518 · Cited by 159
Bayesian-network-based safety risk assessment for steel construction projects
Leu, S.-S., & Chang, C.-M. (2013) · Accident Analysis & Prevention · doi:10.1016/j.aap.2013.02.019 · Cited by 153
Bayesian Belief Networks for predicting drinking water distribution system pipe breaks
Francis, R. A., Guikema, S. D., & Henneman, L. (2014) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2014.04.024 · Cited by 128
Jitwasinkul, B., Hadikusumo, B. H. W., & Memon, A. Q. (2015) · Safety Science · doi:10.1016/j.ssci.2015.09.027 · Cited by 127
Daramola, A. Y. (2013) · Journal of Air Transport Management · doi:10.1016/j.jairtraman.2013.11.004 · Cited by 112
Developing the understanding of underlying causes of construction fatal accidents
Hale, A., Walker, D. G., Walters, N., & Bolt, H. (2012) · Safety Science · doi:10.1016/j.ssci.2012.01.018 · Cited by 107
Zou, P. X. W., & Sunindijo, R. Y. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.10.018 · Cited by 107
Self-citationUse of HFACS–FCM in fire prevention modelling on board ships
Söner, Ö., Asan, U., & Çelik, M. (2015) · Safety Science · doi:10.1016/j.ssci.2015.03.007 · Cited by 106
Zhou, Z., & Irizarry, J. (2016) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000431 · Cited by 86
Hermann, J. A., Ibarra, G. V., & Hopkins, B. L. (2010) · Journal of Organizational Behavior Management · doi:10.1080/01608060903472445 · Cited by 57
van Os, A., van Berkel, F. J. F. W., de Gilder, D., van Dyck, C., & Groenewegen, P. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.10.016 · Cited by 40
Lifecycle cost risk analysis for infrastructure projects with modified Bayesian networks
Xia, N., Wang, X., Wang, Y., Yang, Q., & Liu, X. (2017) · Journal of Engineering Design and Technology · doi:10.1108/jedt-05-2015-0033 · Cited by 34
Self-citation
Cited by
Human Factors Analysis for Maritime Accidents Based on a Dynamic Fuzzy Bayesian Network
Qiao, W., Liu, Y., Ma, X., & Liu, Y. (2020) · Risk Analysis · doi:10.1111/risa.13444 · Cited by 161
Metadata
- Authors
- Xia, N., Zou, P. X. W., Liu, X., Wang, X., & Zhu, R.
- Venue
- Safety Science
- Publisher
- Elsevier BV
- Published
- 2018-01
- Volume
- 101
- Pages
- 332-343
- ISSN
- 0925-7535 (ISSN-L)
- OpenAlex
- W2761043641
- Cited by
- 163
- References
- 59
- FWCI
- 15.82
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.