Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects
The DOI matches its Crossref record; 17 of the 17 references it cites were found in a registry or an index.
Abstract
While it is widely recognized that additional costs due to rework can have an adverse effect on project performance, limited empirical research has been done to investigate the influencing factors. The research presented in this paper aims to determine the influence of different project types and procurement methods on rework costs in construction projects. Using a questionnaire survey, rework costs were obtained from 161 Australian construction projects. The direct and indirect consequences of rework are analyzed and discussed. It is shown that, contrary to expectation, rework costs do not differ relative to project type or procurement method. In addition, it was found rework contributed to 52% of a project’s cost growth and that 26% of the variance in cost growth was attributable to changes due to direct rework. To reduce rework costs and therefore improve project performance, it is posited that construction organizations begin to consider and measure them, so that an understanding of their magnitude can be captured, root causes identified, and effective prevention strategies implemented.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Nonparametric Statistics for the Behavioral Sciences
Guitton, H., & Siegel, S. (1958) · Revue économique · doi:10.2307/3498751 · Cited by 35,245
Questionnaire Design, Interviewing and Attitude Measurement
Albuam, G., & Oppenheim, A. N. (1993) · Journal of Marketing Research · doi:10.2307/3172892 · Cited by 4,971
(1975) · doi:10.1145/800027.808439 · Cited by 3,227
Brooks, F. P. (1975) · ACM SIGPLAN Notices · doi:10.1145/390016.808439 · Cited by 3,224
The mythical man-month: essays on software engineering
(1996) · Choice Reviews Online · doi:10.5860/choice.33-5142 · Cited by 2,452
(1990) · Computers, Environment and Urban Systems · doi:10.1016/0198-9715(90)90035-r · Cited by 1,024
Quantifying the causes and costs of rework in construction
Love, P. E. D., & Li, H. (2000) · Construction Management and Economics · doi:10.1080/01446190050024897 · Cited by 486
Self-citationQuestionnaire design, interviewing and attitude measurement
Frey, J. H. (1994) · Evaluation and Program Planning · doi:10.1016/0149-7189(94)90021-3 · Cited by 483
The causes and costs of defects in construction
Josephson, P.-E., & Hammarlund, Y. (1999) · Automation in Construction · doi:10.1016/s0926-5805(98)00114-9 · Cited by 410
Albaum, G., Alreck, P. L., & Settle, R. B. (1985) · Journal of Marketing Research · doi:10.2307/3151595 · Cited by 391
Selecting a suitable procurement method for a building project
Love, P. E. D., Skitmore, M., & Earl, G. (1998) · Construction Management and Economics · doi:10.1080/014461998372501 · Cited by 281
Self-citationQuality failure costs in civil engineering projects
Barber, P., Graves, A., Hall, M., et al. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010298544 · Cited by 213
Determining the causal structure of rework influences in construction
LOVE, P. E. D., MANDAL, P., & LI, H. (1999) · Construction Management and Economics · doi:10.1080/014461999371420 · Cited by 211
Self-citationConcurrent engineering: a strategy for procuring construction projects
Love, P. E. D., Gunasekaran, A., & Li, H. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00066-5 · Cited by 185
Self-citationImpact of Change Orders on Labor Efficiency for Electrical Construction
Hanna, A. S., Russell, J. S., Nordheim, E. V., & Bruggink, M. J. (1999) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1999)125:4(224 · Cited by 175
Predictors of Cost‐Overrun Rates
Jahren, C. T., & Ashe, A. M. (1990) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1990)116:3(548 · Cited by 134
Overcoming the problems associated with quality certification
Love, P. E. D., & Li, H. (2000) · Construction Management and Economics · doi:10.1080/014461900370771 · Cited by 81
Self-citation
Cited by
Park, C.-S., Lee, D.-Y., Kwon, O.-S., & Wang, X. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.09.010 · Cited by 367
Measuring the Impact of Rework on Construction Cost Performance
Hwang, B.-G., Thomas, S. R., Haas, C. T., & Caldas, C. H. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:3(187 · Cited by 352
Taxonomy for change causes and effects in construction projects
Sun, M., & Meng, X. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.10.005 · Cited by 331
Implementation of lean practices in the construction industry: A systematic review
Babalola, O., Ibem, E. O., & Ezema, I. C. (2019) · Building and Environment · doi:10.1016/j.buildenv.2018.10.051 · Cited by 270
A seamless supply chain management model for construction
Love, P. E. D., Irani, Z., & Edwards, D. J. (2004) · Supply Chain Management: An International Journal · doi:10.1108/13598540410517575 · Cited by 249
Self-citation
Metadata
- Authors
- Love, P. E. D.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2002-02
- Volume
- 128
- Issue
- 1
- Pages
- 18-29
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2002)128:1(18
- OpenAlex
- W2080136349
- Cited by
- 463
- References
- 17
- FWCI
- 14.08
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.