Risk Management in the Chinese Construction Industry
The DOI matches its Crossref record; 38 of the 38 references it cites were found in a registry or an index.
Abstract
There has been an increase in research on risk management practice in the construction industry. However, little research has been conducted to systematically investigate the overall aspects of risk management on the perspectives of various project participants. This paper reports the findings of an empirical Chinese industry survey on the importance of project risks, application of risk management techniques, status of the risk management system, and the barriers to risk management, which were perceived by the main project participants. The risk management strategies adopted in the Three Gorges Project were also studied. The study reveals that: Most project risks are commonly of concern to project participants; the industry has shifted from risk transfer to risk reduction; current risk management systems are inadequate to manage project risks; and lack of joint risk management mechanisms is the key barrier to adequate risk management. Future studies should be conducted to systematically improve the risk management in construction by different approaches that facilitate equitable sharing of rewards through effective risk management among participants. Such studies should also consider the establishment of an open communication risk management process to permit the corporate experience of all participants, as well as their personal knowledge and judgment, to be effectively utilized.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Evaluating the risks of public private partnerships for infrastructure projects
Grimsey, D., & Lewis, M. K. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00040-5 · Cited by 964 · cited 1×
“…introduced in the literature COSO 2004; Lyons 2003; Walker and Johannes 2003; Cano and Cruz 2002; Elkington and Smallman 2002; Velde and Donk 2002; Grimsey and Lewis 2002; Duffield 2001; Jaafari 2001; Raz and Michael 2001; Floricel and Miller 2001; Turner and Simister 2001; Berends 2000; Dey…”
BackgroundThe allocation of risk in PPP/PFI construction projects in the UK
Bing, L., Akintoye, A., Edwards, P. J., & Hardcastle, C. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.04.006 · Cited by 901 · cited 2×
“…industry of mainland China and Hong Kong Rahman and Kumaraswamy 2002a ; 9 allocation of risk in PPP/PFI construction projects in the United Kingdom Bing et al. 2005 ; 10 contractual risk and liability sharing in hydropower construction Charoenngam and Yeh 1999 ; 11 practices of using risk…”
BackgroundEnterprise Risk Management—Integrated Framework
Anand, S. (2012) · Wiley eBooks · doi:10.1002/9781119201939.app4 · Cited by 884
Risk analysis and management in construction
Akintoye, A. S., & MacLeod, M. J. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00035-x · Cited by 755 · cited 3×
“Akintoye and Macleod 1997 argued that postal surveys can be biased if the return rate is lower than 30–40%.”
BackgroundTrust in project relationships—inside the black box
Kadefors, A. (2004) · International Journal of Project Management · doi:10.1016/s0263-7863(03)00031-0 · Cited by 584
Management of risks, uncertainties and opportunities on projects: time for a fundamental shift
Jaafari, A. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00047-2 · Cited by 466 · cited 2×
“…Lyons 2003; Walker and Johannes 2003; Cano and Cruz 2002; Elkington and Smallman 2002; Velde and Donk 2002; Grimsey and Lewis 2002; Duffield 2001; Jaafari 2001; Raz and Michael 2001; Floricel and Miller 2001; Turner and Simister 2001; Berends 2000; Dey 1999; Barber et al. 1999; Standards…”
BackgroundManaging Risk in Construction Projects
Smith, N. J. T., Merna, T., & Jobling, P. E. (1998) · Cited by 425
Use and benefits of tools for project risk management
Raz, T., & Michael, E. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00036-8 · Cited by 402 · cited 2×
“…Walker and Johannes 2003; Cano and Cruz 2002; Elkington and Smallman 2002; Velde and Donk 2002; Grimsey and Lewis 2002; Duffield 2001; Jaafari 2001; Raz and Michael 2001; Floricel and Miller 2001; Turner and Simister 2001; Berends 2000; Dey 1999; Barber et al. 1999; Standards Association of…”
BackgroundProject risk management in the Queensland engineering construction industry: a survey
Lyons, T., & Skitmore, M. (2004) · International Journal of Project Management · doi:10.1016/s0263-7863(03)00005-x · Cited by 340
Innovation and learning in complex offshore construction projects
Barlow, J. (2000) · Research Policy · doi:10.1016/s0048-7333(00)00115-3 · Cited by 329 · cited 1×
“…2003; Bower et al. 2002; Gallagher 2002; Hoisie 2001; Scott 2001; NAO 2001; Bresnen and Marshall 2000; Association of Consultant Architects 2000; Barlow 2000; Carr et al. 1999; ACA 1999; Bennett and Jayes 1998; Baldry 1998; Egan 1998; Pietroforte 1997; Li and Green 1996; Crowley and Karim 1995;…”
Background
Cited by
A critical review of 3D printing in construction: benefits, challenges, and risks
El-Sayegh, S., Romdhane, L., & Manjikian, S. (2020) · Archives of Civil and Mechanical Engineering · doi:10.1007/s43452-020-00038-w · Cited by 387
Identifying and assessing critical risk factors for BIM projects: Empirical study
Chien, K.-F., Wu, Z.-H., & Huang, S.-C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.012 · Cited by 317
Risk Assessment and Allocation in Highway Construction Projects in the UAE
El-Sayegh, S. M., & Mansour, M. H. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000365 · Cited by 236
Xia, N., Zou, P. X. W., Griffin, M. A., Wang, X., & Zhong, R. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2018.03.006 · Cited by 229
“Among the included literature, empirical surveys in various countries or regions also reveal that although practitioners desire joint RM, in reality, the mechanism for such a joint effort is lacking (Choudhry and Iqbal, 2013; Nguyen and Chileshe, 2015; Tang et al., 2007).”
BackgroundFactors affecting contractors’ risk attitudes in construction projects: Case study from China
Wang, J., & Yuan, H. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.02.006 · Cited by 216
“According to Teo and Loosemore (2001), the attitude is based on individual’s positive or negative evaluation on consequences of a particular type of behavior, as well as personal beliefs or knowledge about the consequences.”
BackgroundInfluentialAn Analytical Network Process model for risks prioritisation in megaprojects
Boateng, P., Chen, Z., & Ogunlana, S. O. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.08.007 · Cited by 172
Li, H. X., Al-Hussein, M., Lei, Z., & Ajweh, Z. (2013) · Canadian Journal of Civil Engineering · doi:10.1139/cjce-2013-0013 · Cited by 164
Risk Assessment at the Design Phase of Construction Projects in Ghana
Awuni, M. A. (2019) · Journal of Building Construction and Planning Research · doi:10.4236/jbcpr.2019.72004 · Cited by 5
Metadata
- Authors
- Tang, W., Qiang, M., Duffield, C. F., Young, D. M., & Lu, Y.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2007-12
- Volume
- 133
- Issue
- 12
- Pages
- 944-956
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2007)133:12(944
- OpenAlex
- W2158619472
- Cited by
- 198
- References
- 38
- FWCI
- 3.81
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.