Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling
Open accessThe DOI matches its Crossref record; 56 of the 57 references it cites were found in a registry or an index.
Abstract
The major aim of this research is to demonstrate that causal relationships exist among various risk factors that necessitate identification of risk paths, rather than individual risk factors, during risk assessment of construction projects. International construction projects have more complex risk-emergence patterns because they are affected by global and foreign country conditions and project-related factors. Identification of a network of interactive risk paths, each of which initiated from diverse vulnerabilities of the project system, is considered to be a better reflection of the real conditions of construction projects than the use of generic risk checklists. In this study, using the data from 166 projects carried out by Turkish contractors in international markets and utilizing structural equation modeling (SEM) techniques, 36 interrelated risk paths were identified and the total effects of each vulnerability factor and risk path on cost overrun were assessed. SEM findings demonstrate that every risk path is initiated from a specific vulnerability factor related to project environment, and that contractor-specific vulnerabilities have the most effect on project cost overrun. Risk identification using SEM helps decision makers in answering what-if questions in the early stages of a project, tracing the effects of interdependent risks throughout the life cycle of the project and evaluating the influence of alternative mitigation strategies, not only on specific risks but also on the whole network of interrelated risk factors.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Cost overrun risks are declared to be dynamic and interdependent.”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [45]
In the citing paper
“Similarly, cost overrun risks are said to be dynamic, interdependent, complicated, uncertain, subjective, and fuzzy due to their large size, higher complexity, and unique project contexts and environment [45].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [45]
Citations
Cites
Structural equation modeling in practice: A review and recommended two-step approach
Anderson, J. C., & Gerbing, D. W. (1988) · Psychological Bulletin · doi:10.1037/0033-2909.103.3.411 · Cited by 41,941
Principles and Practice of Structural Equation Modeling
Tabri, N., & Elliott, C. M. (2012) · Canadian Graduate Journal of Sociology and Criminology · doi:10.15353/cgjsc-rcessc.v1i1.25 · Cited by 38,891
(1998) · Cited by 36,049
Alternative Ways of Assessing Model Fit
Browne, M. W., & Cudeck, R. (1992) · Sociological Methods & Research · doi:10.1177/0049124192021002005 · Cited by 27,200
Qu, X. (2007) · Technometrics · doi:10.1198/tech.2007.s455 · Cited by 14,705
Testing Structural Equation Models.
Mueller, C. W., Bollen, K. A., & Long, J. S. (1994) · Contemporary Sociology · doi:10.2307/2074955 · Cited by 14,120
EQS : structural equations program manual
Bentler, P. M. (1989) · Medical Entomology and Zoology · Cited by 9,669
(2005) · Cited by 6,097
Structural Equation Modeling With AMOS: Basic Concepts, Applications, and Programming, Third Edition
Byrne, B. M. (2016) · doi:10.4324/9781315757421 · Cited by 4,653
Byrne, B. M. (2013) · doi:10.4324/9780203805534 · Cited by 4,016
Research works printed but not linked: 5
- Byrne B. M., 2006, Structural equation modeling with EQS: Basic concepts, applications, and programming
- Dikmen I. Birgonul M. T. and Fidan G. (2008b). “Assessment of project vulnerability as a part of risk management in construction.” Proc. Joint CIB W065/W055 Symp. Conseil International du Bâtiment (CIB) Rotterdam Netherlands.
- Dikmen I., 2009, A risk and vulnerability ontology for construction projects, Int. J. Eng. Manage., 1, 63
- Garson G. D., 2008, Structural equation modeling
- Nunally J., 1978, Psychometric theory
Cited by
Items 101–200 of 226
An empirical assessment of relational contracting model for supply chain of construction projects
Jagtap, M., & Kamble, S. (2019) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-05-2018-0097 · Cited by 17
Uğural, M. N., & Giritli, H. (2021) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002012 · Cited by 17
Bashir, H. A., Hamdan, S., Ojiako, U., Haridy, S., Shamsuzzaman, M., & Zarooni, H. A. A. (2023) · Engineering Management Journal · doi:10.1080/10429247.2022.2162305 · Cited by 22
“In the latter study, the SEM technique was used to model the relationships among RFs affecting schedule, quality, and cost based on data collected from 104 professionals from Chinese international contracting firms.”
BackgroundMethodResultInfluentialA systematic literature review on knowledge management for project risk management in construction
Amaechi, C. V., Reda, A., Beddu, S. B., Mohamad, D., Syamsir, A., Ja’e, I. A., Ullah, S., Deng, X., Huang, B. S., Wang, C., et al. (2025) · Journal of Building Engineering · doi:10.1016/j.jobe.2025.114261 · Cited by 15
Effect of network position on inter-team conflict and project success in megaprojects
Liu, C., Cao, J., Duan, K., & Wu, G. (2022) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2022-0438 · Cited by 15
Khodabakhshian, A., Cecconi, F. R., & Droguett, E. L. (2025) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2025.009 · Cited by 15
“The risk path approach, despite delineating what happens in reality, has been limitedly studied (Eybpoosh, Dikmen and Talat Birgonul, 2011).”
Guo, H.-S., Liu, M., Xue, J., Jian, I. Y., Xu, Q., & Wang, Q.-C. (2023) · Systems · doi:10.3390/systems11070359 · Cited by 16
Heravi, G., & Seresht, N. G. (2018) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-017-1275-5 · Cited by 15
Viswanathan, S. K., & Jha, K. N. (2020) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2019-0265 · Cited by 17
Wu, K., Zhang, J., Huang, Y., Wang, H., Li, H., & Chen, H. (2023) · Buildings · doi:10.3390/buildings13112700 · Cited by 14
Machine learning and optimization strategies for infrastructure projects risk management
Moussa, A., Ezzeldin, M., & El-Dakhakhni, W. W. (2025) · Construction Management and Economics · doi:10.1080/01446193.2025.2479764 · Cited by 14
Empowering Risk Communication: Use of Visualizations to Describe Project Risks
Atasoy, G., Ertaymaz, U., Dikmen, İ., & Birgönül, M. T. (2022) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002265 · Cited by 15
Self-citationStimulation strategies to promote green building uptake in developing countries: the case of Ghana
Anzagira, L. F., Duah, D. Y. A., Badu, E., Simpeh, E. K., & Marful, A. B. (2022) · Journal of Engineering Design and Technology · doi:10.1108/jedt-12-2021-0719 · Cited by 14
Effect of Critical Risk Factors Causing Cost Deviation in Medium Sized Construction Projects
Renuka, S. M., & Umarani, C. (2026) · Journal of Construction in Developing Countries · doi:10.21315/jcdc2018.23.2.5 · Cited by 22
“Recently, number of systematic models have been proposed for use in the risk evaluation phase of the management process by past researches such as Dey (2002), Thomas et al. (2006), Zeng and Smith (2007), Abdelgawad and Fayek (2010), Eybpoosh et al. (2011) and Tamosaitiene et al. (2013).”
MethodMa, D., Li, X., & Cheng, C. (2020) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2020.13749 · Cited by 15
“Eybpoosh et al. (2011) noted that international construction projects are affected not only by project-related factors but also by international market-related factors, such as host government policy and culture risks, resource fluctuations, and different construction standards (Liu et al.”
BackgroundAnzagira, L. F., Duah, D. Y. A., Badu, E., Simpeh, E. K., Marful, A. B., & Amos-Abanyie, S. (2024) · Journal of responsible production and consumption. · doi:10.1108/jrpc-11-2023-0019 · Cited by 14
Yussif, A., Taiwo, R., Shakor, P., Han, T., Mohandes, S. R., Antwi‐Afari, M. F., Qazi, K., Singh, A. K., Christo, M. S., & Shah, M. A. (2025) · Cleaner Engineering and Technology · doi:10.1016/j.clet.2025.101089 · Cited by 12
RISK CAUSATION MODEL TO CAPTURE AND TRANSFER KNOWLEDGE IN INTERNATIONAL CONSTRUCTION PROJECTS
Zhu, F., Hu, H., & Xu, F. (2022) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2022.16925 · Cited by 12
A stage-gate integrated risk control system for LNG plant projects: Focusing on the design phase
Jang, W., Han, S. H., & Park, H. (2015) · Journal of Natural Gas Science and Engineering · doi:10.1016/j.jngse.2014.12.018 · Cited by 12
Defining Mitigation Strategies for Recurring EPC Contract Risks
Sadeghi, B., Mortaheb, M. M., & Kashani, H. (2016) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784479827.276 · Cited by 12
Locomotive Model for International Competitive Advantages Paths of High-Speed Railway Contractors
Niu, Y., Zhao, X., Wang, Y., & Deng, X. (2021) · Journal of Infrastructure Systems · doi:10.1061/(asce)is.1943-555x.0000600 · Cited by 12
Risk-based entry decision into African construction markets: a proposed integrated model
Odediran, S. J., & Windapo, A. O. (2017) · Built Environment Project and Asset Management · doi:10.1108/bepam-05-2016-0021 · Cited by 12
Principal component analysis of driver challenges in the shared taxi market in Ghana
Agyeman, S., Kwarteng, R. A., & Zurkalnaine, S. (2018) · Case Studies on Transport Policy · doi:10.1016/j.cstp.2018.12.001 · Cited by 13
Critical delay factors in power transmission projects: a structural equation modeling approach
Pall, G. K., Bridge, A., Washington, S. P., Gray, J., & Skitmore, M. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2019.1686835 · Cited by 11
“…direct and relative impacts of latent constructs on the measured phenomena in hypothetical constructs (Ng et al. 2010;; Yang et al. 2010; Doloi et al. 2011; Eybpoosh et al. 2011; Chen et al. 2012; Doloi et al. 2012; Zhang et al. 2012; Memon and Rahman 2014; Xiong et al. 2014; Rajeh et al. 2015).”
BackgroundNiu, Y., Li, H., Ye, K., Mahmoudi, A., & Deng, X. (2022) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-022-1649-1 · Cited by 11
“To achieve this aim, this study follows a framework by Eybpoosh et al. (2011), Orozco et al. (2014), Liu et al. (2016), and Zhao et al. (2018), which comprises background research, questionnaire design, and pilot study, questionnaire survey, and the path analysis through partial least squares…”
MethodEvaluation of risks affecting international construction joint venture (ICJV) projects in Ghana
Akunyumu, S., Fugar, F. D. K., & Adinyira, E. (2023) · Journal of Engineering Design and Technology · doi:10.1108/jedt-06-2022-0299 · Cited by 11
Structuring risks for a comprehensive understanding of cost overruns in power plant projects
Islam, M. S., Nepal, M. P., & Skitmore, M. (2023) · Construction Innovation · doi:10.1108/ci-05-2022-0120 · Cited by 11
Junjia, Y., Xiaoxiang, Q., Alias, A. H., Haron, N. A., & Bakar, N. A. (2024) · PLoS ONE · doi:10.1371/journal.pone.0301370 · Cited by 10
Machine Learning Application in Construction Delay and Cost Overrun Risks Assessment
Khodabakhshian, A., Malsagov, U., & Cecconi, F. R. (2024) · Lecture notes in networks and systems · doi:10.1007/978-3-031-54053-0_17 · Cited by 15
Jokar, E., Aminnejad, B., & Lork, A. (2022) · Australian Journal of Civil Engineering · doi:10.1080/14488353.2022.2083288 · Cited by 10
Niu, Y., Zhao, D., Deng, X., Lu, R., & Zhao, X. (2021) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2021.15021 · Cited by 11
SOCIAL NETWORKS, COGNITION AND RISK RECOGNITION IN NEW VENTURES: EVIDENCE FROM CHINA
Yang, J., & Zhang, J. (2015) · Journal of Developmental Entrepreneurship · doi:10.1142/s1084946715500120 · Cited by 10
Qiao, Y. (2019) · Purdue e-Pubs (Purdue University System) · doi:10.25394/pgs.8295788 · Cited by 10
BUDGET AND COST CONTINGENCY CART MODELS FOR POWER PLANT PROJECTS
Arifuzzaman, M., Gazder, U., Islam, M. S., & Skitmore, M. (2022) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2022.16944 · Cited by 9
Risk Response Strategies Selection over the Life Cycle of Project Portfolio
Zhang, B., Bai, L., & Kang, S. (2022) · Buildings · doi:10.3390/buildings12122191 · Cited by 9
Atapattu, C. N., Domingo, N., & Sutrisna, M. (2023) · Built Environment Project and Asset Management · doi:10.1108/bepam-07-2022-0105 · Cited by 9
Analysis of the Risk Path of the Pipeline Corridor Based on System Dynamics
Han, B.-J., Jiang, Y., Wang, Z., Gong, D., Hua, J., & Jiang, P.-L. (2021) · Shock and Vibration · doi:10.1155/2021/5529642 · Cited by 9
“used structural equation modeling (SEM) techniques to identify 36 interrelated risk paths and to assess the overall impact of each vulnerability factor and risk path on cost overruns [7].”
MethodModeling for external stakeholder risk assessment of project portfolios
Bai, L., Kang, S., Zhang, K., Zhang, B., & Pan, T. (2022) · Engineering Construction & Architectural Management · doi:10.1108/ecam-01-2022-0010 · Cited by 9
Tracing risk paths in international construction projects: A case study
Dikmen, İ., Birgönül, M. T., & Eybpoosh, M. (2011) · Research Repository (Delft University of Technology) · Cited by 9
Self-citationTembo, C. K., & Khatleli, N. (2018) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001471 · Cited by 9
Verification and Validation Framework for Purdue Index for Construction
Yoon, S., Jeon, J., Cai, H., & Hastak, M. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000850 · Cited by 9
A risk-cost optimization model for selecting human resources in construction projects
Abbasianjahromi, H., & Hosseini, S. (2019) · SN Applied Sciences · doi:10.1007/s42452-019-1570-5 · Cited by 8
Propagation Analysis and Assessment for the Risks in EPC Projects
Zhang, H., & Alhashedi, E. (2025) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-16233 · Cited by 9
Yan, W., Guo, C., & Li, L. (2024) · Buildings · doi:10.3390/buildings14051304 · Cited by 9
Lu, Y., Zhou, X., & Simmons, B. A. (2023) · iScience · doi:10.1016/j.isci.2023.107457 · Cited by 8
“At the project level, we control for project size (capacity), as larger projects would have longer lead times and may encounter more uncertainties due to greater economic and technical complexity.(35,36) Internalization theory(37) suggests that the success of foreign direct investment (FDI) in the power plant sector c…”
BackgroundBelay, G. T., Woldegiorgis, B. H., & Prasetyo, Y. T. (2024) · Heliyon · doi:10.1016/j.heliyon.2024.e32234 · Cited by 7
“Also, root means square error of approximation (RMSEA) which checks the average discrepancy between observed and predicted covariance and must be of less than 0.1 [24].”
BackgroundInfluentialA Risk Management Proposal to the International Contractors Industry from the Financial Perspective
Berk, C. (2012) · RePEc: Research Papers in Economics · Cited by 7
Altuncan, İ. Ü., & Vanhoucke, M. (2025) · European Journal of Operational Research · doi:10.1016/j.ejor.2025.03.012 · Cited by 6
Complexity-based risk decision framework for cost overrun using fuzzy Bayesian network
Afzal, F., Afzal, F., Junaid, D., Shah, I. A., & Shao, Y. (2023) · Soft Computing · doi:10.1007/s00500-023-07983-7 · Cited by 6
“…(2005) Construction management (D2) TM6 Uncertainty in technical methods Arashpour et al. (2017); Samantra et al. (2017) IT7 Innovative technology Eybpoosh et al. (2011) LS8 Lacking skill with the technology in use Wang (2011); Dikmen et al. (2010) LE9 Lacking experience with project team…”
BackgroundMethodInfluentialCoopetition capability of international joint ventures for high-speed railway projects
Niu, Y., Li, H., Xia, B., & Deng, X. (2023) · International Journal of Construction Management · doi:10.1080/15623599.2023.2289752 · Cited by 7
“Structural equation modeling (SEM), a significant and flexible method for analyzing the possible interrelationships among related variables (Eybpoosh et al. 2011), is widely utilized for validating the hypotheses.”
Khodeir, & Mohamed, L. (2017) · JES. Journal of Engineering Sciences/JES. Journal of engineering sciences · doi:10.21608/jesaun.2017.116886 · Cited by 5
The risk of involving foreign contractors in the Norwegian infrastructure market
Pedersen, A. L., Utkilen, S., Wondimu, P. A., & Torp, O. (2021) · Procedia Computer Science · doi:10.1016/j.procs.2021.01.317 · Cited by 5
ASSESSMENT QUALITY RISK FACTORS DURING THE CONSTRUCTION PHASE OF THE BICONSI TOWER PROJECT
Phan, P., Nguyen, P. T. T., & Nguyen, Q. (2022) · Journal of Process Management New Technologies · doi:10.5937/jouproman2203001p · Cited by 5
Yang, S., Xiang, P., Wang, Y., Zhang, X., & Yan, Q. (2025) · Engineering Construction & Architectural Management · doi:10.1108/ecam-11-2024-1516 · Cited by 4
Political Risk Management in International Construction: Evidence from Pakistan
Ullah, S., Xiaopeng, D., Anbar, D. R., Amaechi, C. V., & Ashraf, M. W. (2025) · Global Journal of Flexible Systems Management · doi:10.1007/s40171-025-00463-x · Cited by 5
Li, W., Yuan, J., Guo, J., Liu, J., & Pan, Y. (2022) · Impact Assessment and Project Appraisal · doi:10.1080/14615517.2022.2099729 · Cited by 4
“unobserved variables, which cannot be directly observed) (Hair et al. 2006; Eybpoosh et al. 2011).”
BackgroundRethinking the challenges to the pricing of projects in the Ghanaian construction industry
Kissi, E., Ahadzie, D. K., Adjei-Kumi, T., & Badu, E. (2017) · Journal of Engineering Design and Technology · doi:10.1108/jedt-11-2016-0090 · Cited by 4
Modelling Cost Overrun Risks in Power Plant Projects
Islam, M. S. (2019) · Queensland University of Technology · doi:10.5204/thesis.eprints.125508 · Cited by 5
Akunyumu, S., Fugar, F. D. K., Adinyira, E., & Adade-Boateng, A. O. (2025) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-01-2025-0007 · Cited by 3
Akunyumu, S., Fugar, F. D. K., & Adinyira, E. (2024) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-07-2023-0046 · Cited by 3
Critical Interactive Risks in Project Portfolios from the Life Cycle Perspective
Bai, L., Liu, J., Huang, N., Zheng, K., & Hao, T. (2022) · Asia Pacific Journal of Operational Research · doi:10.1142/s0217595922500075 · Cited by 3
Risk Mapping in Construction Projects
Yildiz, A. E., Dikmen, İ., Birgönül, M. T., Ercoskun, K., & Alten, S. (2012) · OpenMETU (Middle East Technical University) · Cited by 3
Self-citationImpacts of cultural risk factors on project success in the UAE construction industry
Hasani, M. A., Tularam, G. A., & Regan, M. (2017) · MODSIM · doi:10.36334/modsim.2017.a5.alhasani · Cited by 3
“Some of these papers still had significant deficiencies, such as insufficiently justified model fit (Kim et al., 2009; Liu et al., 2016), while the others did not consider cultural risk constructs (Doloi et al., 2012; Eybpoosh et al., 2011; Sambasivan et al., 2017).”
Risk Assessment and Mitigation Measures for Green Construction Projects
Bon-Gang, H. (2018) · Elsevier eBooks · doi:10.1016/b978-0-12-815483-0.00013-2 · Cited by 3
Validation Methodologies for Construction Engineering and Management Research
Liu, J. (2013) · UWSpace (University of Waterloo) · Cited by 3
Kurukulasooriya, I. N., Amaratunga, C. U., Perera, B. A. K. S., & Seneviratne, L. (2024) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/jladah.ladr-1155 · Cited by 2
Benchmarking international construction contract knowledge of large language models
Xia, H., Chen, Y., Qi, X., & Wang, Y. (2026) · Expert Systems with Applications · doi:10.1016/j.eswa.2026.131754 · Cited by 4
Alqahtani, D. A., Ahmed, M., Mallick, J., & Shahrani, M. D. S. A. (2026) · Buildings · doi:10.3390/buildings16081518 · Cited by 2
Rouhanizadeh, B., & Kermanshachi, S. (2022) · Natural Hazards Review · doi:10.1061/(asce)nh.1527-6996.0000565 · Cited by 2
Hapuarachchi, H. N. M., & Udayangani, K. (2022) · International Research Conference of the Faculty of Architecture Research Unit (FARU) · doi:10.31705/faru.2022.11 · Cited by 2
Liu, H., Shen, D., Dabić, M., & Lu, J. (2025) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2025.3534687 · Cited by 7
Modelling project complexity driven risk paths in new product development
Qazi, A. J., Quigley, J. M., Dickson, A., & Kirytopoulos, K. A. (2015) · International Conference on Industrial Engineering and Systems Management · doi:10.1109/iesm.2015.7380267 · Cited by 2
“[17] introduced the concept of identifying risk paths in international construction projects using Structural Equation Modelling.”
MethodEtemadinia, H., & Tavakolan, M. (2016) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784479827.283 · Cited by 2
The simulation of schedule risk paths in submarine pipeline projects using bayesian networks
Zou, Y., Xu, B., Liu, S., & Zhou, J. (2018) · Journal of Physics Conference Series · doi:10.1088/1742-6596/1074/1/012150 · Cited by 2
Gao, R., Wu, J., Wang, H., & Lyu, S. (2020) · International Conference on Construction and Real Estate Management (ICCREM) · doi:10.1061/9780784483237.087 · Cited by 2
Risk-Informed, Reliability-Driven Decision Support for Building Basement Systems
Asmone, A. S., Senarathne, H. N. Y., & Chew, M. Y. L. (2023) · Buildings · doi:10.3390/buildings13112737 · Cited by 2
Jaber, H. (2016) · theses.fr (ABES) · doi:10.70675/d51e0cf0z4610z4653zb908z99cfb367f967 · Cited by 2
Identification of Critical Transportation Risk Factors Using DEMATEL
Dicks, E. P., & Molenaar, K. R. (2024) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784485286.008 · Cited by 1
Risk factors in international rail-system projects
Telmaç, A., & Çelik, G. T. (2024) · Advances in Civil and Architectural Engineering · doi:10.13167/2024.29.1 · Cited by 2
“Eybpoosh et al. [40] indicated that inadequate quality management resulting from management-skill deficiency is the reason why the quality requirements of international construction projects are not met.”
Bai, L., Zhang, L., Sun, Y., & Li, X. (2026) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2026.113051 · Cited by 1
Alipour, S., Zirakian, T., & Boyajian, D. (2017) · Journal of Civil Engineering and Architecture · doi:10.17265/1934-7359/2017.02.004 · Cited by 1
Abdirad, H., Nazari, A., Gholizadeh, P., & Ansari, A. (2012) · Cited by 1
Parra, H. A., Zúñiga-Collazos, A., & Cruz-Caicedo, L. F. (2022) · Journal of Construction in Developing Countries · doi:10.21315/jcdc-07-21-0106 · Cited by 1
Identifying and analyzing effects of interdependencies on construction contractor payment risks
Kenyatta, M. O., Gwaya, A. O., Masu, S. M., & Ajwang, P. O. (2022) · Journal of Strategic Contracting and Negotiation · doi:10.1177/20555636221136469 · Cited by 1
“To illustrate vulnerability to cost variation risks, Eybpoosh et al. (2011) use the paths between risk causes, mediating events, and their outcomes.”
BackgroundDandage, R. V., & Mirji, H. (2022) · Polaris Global Journal of Scholarly Research and Trends · doi:10.58429/pgjsrt.v1n4a91 · Cited by 1
Critical Project Impact Factors for Federal Capital Facility Projects
Sharma, V., Bapat, P., Garg, S., Degezelle, D., & Gajjar, D. (2024) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-14685 · Cited by 1
Risk and Vulnerability Assessment for International Contractors
Maddah, R., Tripathi, K. K., & Jha, K. N. (2025) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/jladah.ladr-1235 · Cited by 1
Afolabi, A. O., Akanmu, A. A., Yusuf, A. O., Murzi, H., Ofori-Boadu, A. N., & Ball, S. B. (2025) · Journal of Civil Engineering Education · doi:10.1061/jceecd.eieng-2111 · Cited by 1
Adediran, A. (2018) · Open University of Cape Town (University of Cape Town) · Cited by 7
Benchmarking International Construction Contract Knowledge of Large Language ModelsPreprint
Xia, H., Chen, Y., Qi, X., & Wang, Y. (2025) · SSRN Electronic Journal · doi:10.2139/ssrn.5247570 · Cited by 1
Garzon, F. S. (2019) · theses.fr (ABES) · doi:10.70675/77dff9c9zde36z4f7dz8d53z9ed5c3fc83f2 · Cited by 3
Arogundade, A. A. (2013) · eSource (Dublin Business School)
Analysis of the Interactions Between Risks Affecting Construction Project Cost
Li, P., Wang, J., & Yuan, H. (2014) · Springer eBooks · doi:10.1007/978-3-642-44916-1_42
The underwriting process of engineering insurance in South Africa
Murphy, D. K., Mostert, F. J., & Mostert, J. H. (2014) · Risk Governance and Control Financial Markets & Institutions · doi:10.22495/rgcv4i1art4
“Complicated models may be employed to identify the risks (Eybpoosh et al., 2011:1164-1175).”
Juhász, P., Váradi, K., Vidovics-Dancs, Á., & Száz, J. (2017) · UTMS Journal of Economics · Cited by 4
Immune Response Model for Government-Invested Large Projects Risks
Hou, Y., Guo, Y., & Wanwan, Z. (2018) · International Conference on Applied Mathematics, Modelling and Statistics Application (AMMSA) · doi:10.2991/ammsa-18.2018.48
“For example, Eybpoosh et al. (2011) used structural equation modeling (SEM) techniques to identify risk paths.”
MethodMeta-Network Modelling for International Construction Risk Management of Multiple Objectives
Ganbat, T., & Liao, P. (2019) · International Conference on Construction and Real Estate Management (ICCREM) · doi:10.1061/9780784482308.032
AL-Yafeai, A. H., Hassan, A., & Elhassan, E. E. (2019) · International Journal of Engineering Research and Advanced Technology · doi:10.31695/ijerat.2019.3584
“5) for this validity to achieve [31-124], and as shown in table 1.”
BackgroundChen, S., Qin, X., & Qiao, R. (2020) · International Conference on Construction and Real Estate Management (ICCREM) · doi:10.1061/9780784483237.055
Metadata
- Authors
- Eybpoosh, M., Dikmen, I., & Talat Birgonul, M.
- Affiliations
- Middle East Technical University (TR)
- Research Assistant, Dept. of Civil Engineering, Middle East Technical Univ., 06531, Ankara, Turkey (corresponding author).
- Venue
- Journal of Construction Engineering and Management
- Published
- 2011-12
- Volume
- 137
- Issue
- 12
- Pages
- 1164-1175
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2085400663
- Semantic Scholar
- 93f3ab82a6bd250cd8b17fed1cf3bd547d09d5e6
- Cited by
- 217
- References
- 57
- Citations by year
- 2026: 9 · 2025: 20 · 2024: 14 · 2023: 16 · 2022: 29 · 2021: 20 · 2020: 17 · 2019: 24 · 2018: 18 · 2017: 17 · 2016: 10 · 2015: 6 · 2014: 10 · 2013: 2 · 2012: 4
- FWCI
- 7.38
- Type
- journal article
- Language
- en
- Open access
- green
- hdl.handle.net
- Licence
- cc-by-nc-nd
- Locations
- Journal of Construction Engineering and Management (publishedVersion)
- OpenMETU (Middle East Technical University) (submittedVersion, cc-by-nc-nd)
- Funders
- Türkiye Bilimsel ve Teknolojik Araştırma Kurumu
- Türkiye Bilimler Akademisi
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Strategy and Management › Value Engineering and Management
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Keywords
- construction risk management, international construction projects, risk assessment, cost overruns, vulnerability factors, project environment, risk mitigation strategies
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.