Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling
Open accessThe DOI matches its Crossref record; 56 of the 57 references it cites were found in a registry or an index.
Abstract
The major aim of this research is to demonstrate that causal relationships exist among various risk factors that necessitate identification of risk paths, rather than individual risk factors, during risk assessment of construction projects. International construction projects have more complex risk-emergence patterns because they are affected by global and foreign country conditions and project-related factors. Identification of a network of interactive risk paths, each of which initiated from diverse vulnerabilities of the project system, is considered to be a better reflection of the real conditions of construction projects than the use of generic risk checklists. In this study, using the data from 166 projects carried out by Turkish contractors in international markets and utilizing structural equation modeling (SEM) techniques, 36 interrelated risk paths were identified and the total effects of each vulnerability factor and risk path on cost overrun were assessed. SEM findings demonstrate that every risk path is initiated from a specific vulnerability factor related to project environment, and that contractor-specific vulnerabilities have the most effect on project cost overrun. Risk identification using SEM helps decision makers in answering what-if questions in the early stages of a project, tracing the effects of interdependent risks throughout the life cycle of the project and evaluating the influence of alternative mitigation strategies, not only on specific risks but also on the whole network of interrelated risk factors.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Cost overrun risks are declared to be dynamic and interdependent.”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [45]
In the citing paper
“Similarly, cost overrun risks are said to be dynamic, interdependent, complicated, uncertain, subjective, and fuzzy due to their large size, higher complexity, and unique project contexts and environment [45].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [45]
Citations
Cites
Structural equation modeling in practice: A review and recommended two-step approach
Anderson, J. C., & Gerbing, D. W. (1988) · Psychological Bulletin · doi:10.1037/0033-2909.103.3.411 · Cited by 41,941
Principles and Practice of Structural Equation Modeling
Tabri, N., & Elliott, C. M. (2012) · Canadian Graduate Journal of Sociology and Criminology · doi:10.15353/cgjsc-rcessc.v1i1.25 · Cited by 38,891
(1998) · Cited by 36,049
Alternative Ways of Assessing Model Fit
Browne, M. W., & Cudeck, R. (1992) · Sociological Methods & Research · doi:10.1177/0049124192021002005 · Cited by 27,200
Qu, X. (2007) · Technometrics · doi:10.1198/tech.2007.s455 · Cited by 14,705
Testing Structural Equation Models.
Mueller, C. W., Bollen, K. A., & Long, J. S. (1994) · Contemporary Sociology · doi:10.2307/2074955 · Cited by 14,120
EQS : structural equations program manual
Bentler, P. M. (1989) · Medical Entomology and Zoology · Cited by 9,669
(2005) · Cited by 6,097
Structural Equation Modeling With AMOS: Basic Concepts, Applications, and Programming, Third Edition
Byrne, B. M. (2016) · doi:10.4324/9781315757421 · Cited by 4,653
Byrne, B. M. (2013) · doi:10.4324/9780203805534 · Cited by 4,016
Amick, D. J., Cooley, W. W., & Lohnes, P. R. (1972) · Contemporary Sociology · doi:10.2307/2062821 · Cited by 2,915
Causes and effects of delays in Malaysian construction industry
Sambasivan, M., & Soon, Y. W. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.007 · Cited by 1,422 · cited 1×
“Client-related factors Delays Time overrun Sambasivan and Soon (2007) Contractor-related factors Cost overrun”
BackgroundLogistics Research Methods: Employing Structural Equation Modeling to Test for Construct Validity
Mentzer, T., & Garver, M. S. (1999) · Journal of Business Logistics · Cited by 1,347
A new framework for determining critical success/failure factors in projects
Belassi, W., & Tukel, O. I. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00064-x · Cited by 1,187 · cited 1×
“Several authors have previously emphasized the role of such managerial and resource-specific factors in the success of the project in achieving its budget targets (e.g., Morris and Hough 1987; Munns and Bjeirmi 1996; Belassi and Tukel 1996).”
BackgroundLISREL Approaches to Interaction Effects in Multiple Regression
Alexander, W. P. (1998) · Technometrics · doi:10.1080/00401706.1998.10485533 · Cited by 1,149
The role of project management in achieving project success
Munns, A., & Bjeirmi, B. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00057-7 · Cited by 910 · cited 1×
“Several authors have previously emphasized the role of such managerial and resource-specific factors in the success of the project in achieving its budget targets (e.g., Morris and Hough 1987; Munns and Bjeirmi 1996; Belassi and Tukel 1996).”
BackgroundLISREL Approaches to Interaction Effects in Multiple Regression
Jaccard, J., & Wan, C. (1996) · Sage eBooks · doi:10.4135/9781412984782 · Cited by 884
Structural Equation Modeling: Reviewing the Basics and Moving Forward
Ullman, J. B. (2006) · Journal of Personality Assessment · doi:10.1207/s15327752jpa8701_03 · Cited by 861 · cited 1×
“SEM is a highly flexible technique that can be used to estimate diverse types of interrelations among variables, namely, direct (A → B), indirect (A → C → B), and interactive (A → C → B and D → C → E) relationships and at the same time to confirm the underlying structure among observed and latent factors (Hair et al.…”
BackgroundModelling global risk factors affecting construction cost performance
Baloi, D., & Price, A. D. F. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00017-0 · Cited by 587
The Search for "Optimal" Cutoff Properties: Fit Index Criteria in Structural Equation Modeling
Sivo, S. A., Fan, X., Witta, E. L., & Willse, J. T. (2006) · The Journal of Experimental Education · doi:10.3200/jexe.74.3.267-288 · Cited by 568
Risk management framework for construction projects in developing countries
Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004) · Construction Management and Economics · doi:10.1080/0144619032000124689 · Cited by 445 · cited 2×
“A risk-management process is generally defined as an iterative process that starts with identification of risk factors, followed by qualitative and/or quantitative assessment of risk effects on the project, and finally, development of risk-mitigation strategies to maintain an optimum risk-return structure among the pr…”
BackgroundManaging Risk in Construction Projects
Smith, N. J. T., Merna, T., & Jobling, P. E. (1998) · Cited by 425
Systematic Risk Management Approach for Construction Projects
Al‐Bahar, J. F., & Crandall, K. C. (1990) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1990)116:3(533 · Cited by 414
Chou, C.-P., & Bentler, P. M. (1990) · Multivariate Behavioral Research · doi:10.1207/s15327906mbr2501_13 · Cited by 410
Risk management for overseas construction projects
Zhi, H. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00015-i · Cited by 407 · cited 5×
“A risk-management process is generally defined as an iterative process that starts with identification of risk factors, followed by qualitative and/or quantitative assessment of risk effects on the project, and finally, development of risk-mitigation strategies to maintain an optimum risk-return structure among the pr…”
BackgroundInfluentialUsing fuzzy risk assessment to rate cost overrun risk in international construction projects
Dikmen, I., Birgonul, M. T., & Han, S. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.12.002 · Cited by 374 · cited 2×
“(2005); Garson (2008). Garson (2008).”
MethodSelf-citationA proposal for construction project risk assessment using fuzzy logic
Tah, J. H. M., & Carr, V. (2000) · Construction Management and Economics · doi:10.1080/01446190050024905 · Cited by 374 · cited 1×
“Within the literature, risk consequences are generally defined as the effect of risk factors on project objectives such as cost, time, quality, client satisfaction, and safety (Al-Bahar and Crandall 1990; Ward 1999; Tah and Carr 2000).”
BackgroundArrindell, W. A., Sanavio, E., Aguilar, G., Sica, C., Hatzichristou, C., Eisemann, M., Recinos, L. A., Gaszner, P., Peter, M., Battagliese, G., et al. (1999) · Personality and Individual Differences · doi:10.1016/s0191-8869(98)00192-5 · Cited by 369
Measuring the Impact of Rework on Construction Cost Performance
Hwang, B.-G., Thomas, S. R., Haas, C. T., & Caldas, C. H. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:3(187 · Cited by 352
Taxonomy for change causes and effects in construction projects
Sun, M., & Meng, X. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.10.005 · Cited by 331
Morris, P. W. G., & Hough, G. (1987) · UCL Discovery (University College London) · Cited by 300
ICRAM-1: Model for International Construction Risk Assessment
Hastak, M., & Shaked, A. (2000) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2000)16:1(59 · Cited by 285
Structural Equation Model of Construction Contract Dispute Potential
Molenaar, K., Washington, S., & Diekmann, J. (2000) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2000)126:4(268 · Cited by 262
Ghosh, S., & Jintanapakanont, J. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.05.004 · Cited by 242
Factors Affecting International Construction
Gunhan, S., & Arditi, D. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:3(273 · Cited by 239
Causes of High Costs of Construction in Nigeria
Okpala, D. C., & Aniekwu, A. N. (1988) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1988)114:2(233 · Cited by 234
Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman
Alnuaimi, A. S., Taha, R. A., Al Mohsin, M., & Al-Harthi, A. S. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000154 · Cited by 233
Approaches for Making Risk-Based Go/No-Go Decision for International Projects
Han, S. H., & Diekmann, J. E. (2001) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2001)127:4(300 · Cited by 203
Cognition, culture and competition: an empirical test of the learning organization
Jashapara, A. (2003) · The Learning Organization · doi:10.1108/09696470310457487 · Cited by 187
The effectiveness of working group risk identification and assessment techniques
Chapman, R. J. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00015-5 · Cited by 160 · cited 1×
“The benefits of the risk-management process are mostly affected by the reliability and inclusiveness of the identification and further assessment phases (Chapman 1998).”
BackgroundInfrastructure Vulnerability Assessment Model (I‐VAM)
Ezell, B. C. (2007) · Risk Analysis · doi:10.1111/j.1539-6924.2007.00907.x · Cited by 156 · cited 1×
“However, the system’s vulnerabilities, inherent in its capacities and capabilities and known with more certainty, are the factors providing potential for occurrence of future risks (Ezell 2007; Zhang 2007).”
BackgroundFactors Affecting Contractors' Risk of Cost Overburden
Akinci, B., & Fischer, M. A. (1998) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(1998)14:1(67 · Cited by 155
A web-based integrated system for international project risk management
Han, S. H., Kim, D. Y., Kim, H., & Jang, W. (2007) · Automation in Construction · doi:10.1016/j.autcon.2007.05.012 · Cited by 152 · cited 3×
“the project on time) Han et al. (2007)”
BackgroundCapturing Client Requirements in Construction Projects
Kamara, J. M., Evbuomwan, N. F., & Anumba, C. J. (2002) · doi:10.1680/ccricp.31036 · Cited by 147
Learning from risks: A tool for post-project risk assessment
Dikmen, İ., Birgönül, M. T., Anaç, C., Tah, J. H. M., & Aouad, G. F. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.04.008 · Cited by 144
Self-citationZhang, H. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.02.004 · Cited by 140 · cited 2×
“The vulnerabilities of a system represent its innate characteristics and capacities, the existence of which creates possibilities for future harm and its subsequent consequences (Zhang 2007; Barber 2005).”
BackgroundAssessing and managing important risks
Ward, S. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00051-9 · Cited by 138 · cited 3×
“After the magnitude of each risk factor is assessed, the critical risk factors are identified for further analysis and development of response strategies (Ward 1999).”
BackgroundPolitical Risks in International Construction
Ashley, D. B., & Bonner, J. J. (1987) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1987)113:3(447 · Cited by 137
Ontology for Relating Risk and Vulnerability to Cost Overrun in International Projects
Fidan, G., Dikmen, İ., Tanyer, A. M., & Birgönül, M. T. (2011) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000090 · Cited by 127
Self-citationKim, D. Y., Han, S. H., Kim, H., & Park, H.-D. (2008) · Expert Systems with Applications · doi:10.1016/j.eswa.2007.12.048 · Cited by 115
Understanding internally generated risks in projects
Barber, R. B. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.05.006 · Cited by 107 · cited 2×
“The vulnerabilities of a system represent its innate characteristics and capacities, the existence of which creates possibilities for future harm and its subsequent consequences (Zhang 2007; Barber 2005).”
Background13 Structural Equation Modeling
Hayashi, K., Bentler, P. M., & Yuan, K. (2007) · Handbook of statistics · doi:10.1016/s0169-7161(07)27013-0 · Cited by 76
Causes of Bad Profit in Overseas Construction Projects
Han, S. H., Park, S. H., Kim, D. Y., Kim, H., & Kang, Y. W. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:12(932 · Cited by 75
A knowledge-based system for identifying potential project risks
LEUNG, H. M., Tummala, V. M. R., & Chuah, K. B. (1998) · Omega · doi:10.1016/s0305-0483(98)00010-3 · Cited by 54
Knowledge-based risk identification in infrastructure projects
Zoysa, S. D., & Russell, A. D. (2003) · Canadian Journal of Civil Engineering · doi:10.1139/l03-001 · Cited by 45 · cited 2×
“Several writers (e.g., Al-Bahar and Crandall 1990; Ward 1999; Zoysa and Russell 2003; Wang et al. 2004) have emphasized the importance of the identification phase of risk management, because subsequent phases (assessment, analysis, and responding) are carried out based on the identified risk factors.”
BackgroundJUDGMENT-BASED CROSS-IMPACT METHOD FOR PREDICTING COST VARIANCE FOR HIGHLY UNCERTAIN PROJECTS
Han, S. H., & Diekmann, J. E. (2004) · Journal of Restructuring Finance · doi:10.1142/s1609945104000139 · Cited by 32 · cited 1×
“High uncertainties within the early estimates, unfamiliarity of contractors with most macroand microenvironmental factors, and the diversity and complexity of the interrelations cause risk identification to be a difficult endeavor for overseas projects (Zhi 1995; Han and Diekmann 2004).”
Background
Research works printed but not linked: 5
- Byrne B. M., 2006, Structural equation modeling with EQS: Basic concepts, applications, and programming
- Dikmen I. Birgonul M. T. and Fidan G. (2008b). “Assessment of project vulnerability as a part of risk management in construction.” Proc. Joint CIB W065/W055 Symp. Conseil International du Bâtiment (CIB) Rotterdam Netherlands.
- Dikmen I., 2009, A risk and vulnerability ontology for construction projects, Int. J. Eng. Manage., 1, 63
- Garson G. D., 2008, Structural equation modeling
- Nunally J., 1978, Psychometric theory
Cited by
A critical review of structural equation modeling applications in construction research
Xiong, B., Skitmore, M., & Xia, B. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.09.006 · Cited by 427
Qazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.05.008 · Cited by 294
“Following the same ontology, Yildiz et al. (2014) developed a knowledge-based risk mapping tool for cost estimation of international construction projects and Eybpoosh et al. (2011) introduced the concept of identifying risk paths in international construction projects using SEM.”
MethodA fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects
Zhao, X., Hwang, B.-G., & Gao, Y. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.11.042 · Cited by 279
“…equipment and plants √ √ √ √ √ √ √ Project team risk R24 Project teams without relevant knowledge √ √ R25 Inefficient communication and coordination √ √ √ R26 Unfavorable sub-contractors √ √ √ √ √ Cost overrun risk R27 Inaccurate cost estimation √ √ R28 Labor and materials price…”
Modelling stakeholder-associated risk networks in green building projects
Yang, R. J., Zou, P. X. W., & Wang, J. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.09.010 · Cited by 207
Risk paths in international construction projects: Case study from Chinese contractors
Liu, J., Zhao, X., & Yan, P. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001116 · Cited by 203
Metadata
- Authors
- Eybpoosh, M., Dikmen, I., & Talat Birgonul, M.
- Affiliations
- Middle East Technical University (TR)
- Research Assistant, Dept. of Civil Engineering, Middle East Technical Univ., 06531, Ankara, Turkey (corresponding author).
- Venue
- Journal of Construction Engineering and Management
- Published
- 2011-12
- Volume
- 137
- Issue
- 12
- Pages
- 1164-1175
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2085400663
- Semantic Scholar
- 93f3ab82a6bd250cd8b17fed1cf3bd547d09d5e6
- Cited by
- 217
- References
- 57
- Citations by year
- 2026: 9 · 2025: 20 · 2024: 14 · 2023: 16 · 2022: 29 · 2021: 20 · 2020: 17 · 2019: 24 · 2018: 18 · 2017: 17 · 2016: 10 · 2015: 6 · 2014: 10 · 2013: 2 · 2012: 4
- FWCI
- 7.38
- Type
- journal article
- Language
- en
- Open access
- green
- hdl.handle.net
- Licence
- cc-by-nc-nd
- Locations
- Journal of Construction Engineering and Management (publishedVersion)
- OpenMETU (Middle East Technical University) (submittedVersion, cc-by-nc-nd)
- Funders
- Türkiye Bilimsel ve Teknolojik Araştırma Kurumu
- Türkiye Bilimler Akademisi
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Strategy and Management › Value Engineering and Management
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Keywords
- construction risk management, international construction projects, risk assessment, cost overruns, vulnerability factors, project environment, risk mitigation strategies
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.