Role of Blockchain-Enabled Smart Contracts in Automating Construction Progress Payments
The DOI matches its Crossref record; 47 of the 47 references it cites were found in a registry or an index.
Abstract
The construction industry has long been plagued with late and nonpayments. Despite the desired benefits of payment automation and today’s increased access to digitized progress data, too often payment applications still rely on inefficient workflows and documents that are time-consuming to prepare, review, approve, and execute. This paper argues that current payment applications, even if computerized, cannot support reliable automation of progress payments due to their reliance on centralized control mechanisms and lack of guaranteed execution. The paper examines why blockchain-based and decentralized smart contracts can address these limitations. It explores the conceptual underpinning for the design of an automated payment system and investigates the role of smart contracts in enabling reliable and autonomous conditioning of cash flow on product flow status. To illustrate these points, a use case is presented for smart contract-based progress payments in the context of unmanned aerial vehicle-based progress monitoring. The paper concludes with a discussion of challenges facing blockchain-based payment automation and the broader implications for dispute resolution and construction law informatics, namely zero-trust computing and the creation of an auditable single source of truth for projects.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Bitcoin: A Peer-to-Peer Electronic Cash System
Squarepants, S. (2008) · SSRN Electronic Journal · doi:10.2139/ssrn.3977007 · Cited by 11,148
(2013) · Cited by 5,372
(2015) · Cited by 3,471
Formalizing and Securing Relationships on Public Networks
Szabo, N. (1997) · First Monday · doi:10.5210/fm.v2i9.548 · Cited by 2,102
Making the Social World: The Structure of Human Civilization
Searle, J. (2010) · Oxford University Press eBooks · doi:10.1093/acprof:osobl/9780195396171.001.0001 · Cited by 1,818
The Construction of Social Reality.
Spillman, L., & Searle, J. R. (1996) · Contemporary Sociology · doi:10.2307/2077133 · Cited by 1,757
Causes of delay in large construction projects
Assaf, S. A., & Al-Hejji, S. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.010 · Cited by 1,705
On the Security and Performance of Proof of Work Blockchains
Gervais, A., Karame, G. O., Wüst, K., Glykantzis, V., Ritzdorf, H., & Capkun, S. (2016) · Proceedings of the 2016 ACM SIGSAC Conference on Computer and Communications Security · doi:10.1145/2976749.2978341 · Cited by 1,646
A Privacy-Preserving and Transparent Certification System for Digital Credentials
Saramago, R. Q., Meling, H., & Jehl, L. N. (2014) · DROPS (Schloss Dagstuhl – Leibniz Center for Informatics) · doi:10.4230/lipics.opodis.2022.9 · Cited by 1,171
Bitcoin and Cryptocurrency Technologies : A Comprehensive Introduction
Bolt, W. (2017) · Data Archiving and Networked Services (DANS) · Cited by 1,064
Big Data in the construction industry: A review of present status, opportunities, and future trends
Bilal, M., Oyedele, L. O., Qadir, J., Munir, K., Ajayi, S. O., Akinade, O. O., Owolabi, H. A., Alaka, H. A., & Pasha, M. (2016) · Advanced Engineering Informatics · doi:10.1016/j.aei.2016.07.001 · Cited by 929
Li, J., Greenwood, D., & Kassem, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.02.005 · Cited by 665
Cost Analysis of Inadequate Interoperability in the U.S. Capital Facilities Industry
Gallaher, M. P., O'Connor, A. C., Dettbarn, Jr., & Gilday, L. T. (2004) · doi:10.6028/nist.gcr.04-867 · Cited by 663
Formal Verification of Smart Contracts: Short Paper
Bhargavan, K., Delignat-Lavaud, A., Fournet, C., Gollamudi, A., Gonthier, G., Kobeissi, N., Kulatova, N., Rastogi, A., Sibut-Pinote, T., Swamy, N., et al. (2016) · Proceedings of the 2016 ACM Workshop on Programming Languages and Analysis for Security · doi:10.1145/2993600.2993611 · Cited by 626
Ham, Y., Han, K. K., Lin, J. J., & Golparvar-Fard, M. (2016) · Visualization in Engineering · doi:10.1186/s40327-015-0029-z · Cited by 503
Public and private blockchain in construction business process and information integration
Yang, R., Wakefield, R., Lyu, S., Jayasuriya, S., Han, F., Yi, X., Yang, X., Amarasinghe, G., & Chen, S. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103276 · Cited by 490
Risk assessment and allocation in the UAE construction industry
El-Sayegh, S. M. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.07.004 · Cited by 468
2017 Global Cryptocurrency Benchmarking Study
Hileman, G., & Rauchs, M. (2017) · doi:10.2139/ssrn.2965436 · Cited by 466
Potentials of Blockchain Technology for Construction Management
Turk, Ž., & Klinc, R. (2017) · Procedia Engineering · doi:10.1016/j.proeng.2017.08.052 · Cited by 459
Blockchain and the Law: The Rule of Code
De Filippi, P., & Wright, A. (2018) · doi:10.4159/9780674985933 · Cited by 453
Santos, R., Costa, A. A., & Grilo, A. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.03.005 · Cited by 318
Construction supply chain integration: an elusive goal?
Briscoe, G., & Dainty, A. (2005) · Supply Chain Management: An International Journal · doi:10.1108/13598540510612794 · Cited by 303
Causes of delays on construction projects: a comprehensive list
Durdyev, S., & Hosseini, M. R. (2019) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-09-2018-0178 · Cited by 245
Hunhevicz, J. J., & Hall, D. M. (2020) · Advanced Engineering Informatics · doi:10.1016/j.aei.2020.101094 · Cited by 241
Blockchain and the Law: The Rule of Code
De Filippi, P., & Wright, A. (2018) · doi:10.2307/j.ctv2867sp · Cited by 227
Trust influencing factors in main contractor and subcontractor relationships during projects
Manu, E., Ankrah, N. A., Chinyio, E., & PROVERBS, D. G. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.06.006 · Cited by 205
Automated computer vision-based detection of components of under-construction indoor partitions
Hamledari, H., McCabe, B., & Davari, S. (2017) · Automation in Construction · doi:10.1016/j.autcon.2016.11.009 · Cited by 204
Self-citationAn incentive scheme for true information providing in Supply Chains
Feldmann, M., & Muller, S. M. (2003) · Omega · doi:10.1016/s0305-0483(02)00096-8 · Cited by 191
Blockchain for Cities—A Systematic Literature Review
Shen, C., & Pena-Mora, F. (2018) · IEEE Access · doi:10.1109/access.2018.2880744 · Cited by 187
Trust: A Very Short Introduction
Hawley, K. (2012) · doi:10.1093/actrade/9780199697342.001.0001 · Cited by 178
Nawari, N., & Ravindran, S. (2019) · Buildings · doi:10.3390/buildings9060149 · Cited by 169
Visualization, Information Modeling, and Simulation: Grand Challenges in the Construction Industry
Leite, F. L., Cho, Y. K., Behzadan, A. H., Lee, S. H., Choe, S., Fang, Y., Akhavian, R., & Hwang, S. (2016) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000604 · Cited by 166
Silvestro, R., & Lustrato, P. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-04-2012-0131 · Cited by 163
Intelligent Contracts and the Construction Industry
Mason, J. (2017) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/(asce)la.1943-4170.0000233 · Cited by 143
The Need for Third-Party Coordination in Supply Chain Governance
Bitran, G. R., Gurumurthi, S., & Sam, S. L. (2007) · Dialnet (Universidad de la Rioja) · Cited by 130
Automated Schedule and Progress Updating of IFC-Based 4D BIMs
Hamledari, H., McCabe, B. Y., Davari, S., & Shahi, A. (2017) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000660 · Cited by 120
Self-citationThe Potential of Blockchain in Building Construction
Dakhli, Z., Lafhaj, Z., & Mossman, A. (2019) · Buildings · doi:10.3390/buildings9040077 · Cited by 117
Hamledari, H., Azar, E. R., & McCabe, B. Y. (2017) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000727 · Cited by 117
Self-citationProfessional construction management : including C.M., design-construct, and general contracting
Barrie, D. S., & Paulson, B. C. (1992) · McGraw-Hill eBooks · Cited by 107
Late Payment and Nonpayment within the Construction Industry: Causes, Effects, and Solutions
Peters, E. J., Subar, K., & Martin, H. G. (2019) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/(asce)la.1943-4170.0000314 · Cited by 107
BIM Fork: Are Smart Contracts in Construction More Likely to Prosper with or without BIM?
Mason, J. (2019) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/(asce)la.1943-4170.0000316 · Cited by 52
Li, J. Y.-M., Greenwood, D. J., & Kassem, M. (2018) · Springer eBooks · doi:10.1007/978-3-030-00220-6_7 · Cited by 45
Power of Incentivization in Construction Dispute Avoidance
Zhu, L., & Cheung, S. O. (2020) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/(asce)la.1943-4170.0000368 · Cited by 37
Jalal, M. P., Noorzai, E., & Roushan, T. Y. (2019) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/(asce)la.1943-4170.0000289 · Cited by 35
Toward a property rights theory of legal rights for rivers
Talbot-Jones, J., & Bennett, J. (2019) · Ecological Economics · doi:10.1016/j.ecolecon.2019.06.007 · Cited by 28
Managing mistrust in construction using DLT: a review of use-case categories for technical decisions
Hunhevicz, J., & Hall, D. (2019) · Computing in construction · doi:10.35490/ec3.2019.171 · Cited by 21
Rethinking Trust in Construction Contract Formation: Dispute Resolution Method Selection
Gad, G. M., Shane, J. S., Strong, K. C., & Choi, J. (2016) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/(asce)la.1943-4170.0000191 · Cited by 21
Cited by
Smart Contracts in Blockchain Technology: A Critical Review
Taherdoost, H. (2023) · Information · doi:10.3390/info14020117 · Cited by 355
Li, J., & Kassem, M. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103955 · Cited by 287
Hamledari, H., & Fischer, M. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103926 · Cited by 237
Self-citationDigital building twins and blockchain for performance-based (smart) contracts
Hunhevicz, J. J., Motie, M., & Hall, D. M. (2022) · Automation in Construction · doi:10.1016/j.autcon.2021.103981 · Cited by 180
“Several publications support this observation by investigating blockchain-based payments along the construction supply chain [67 – 75].”
BackgroundBlockchain in construction management: Applications, advantages and limitations
Mahmudnia, D., Arashpour, M., & Yang, R. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104379 · Cited by 180
Metadata
- Authors
- Hamledari, H., & Fischer, M.
- Venue
- Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Published
- 2021-02
- Volume
- 13
- Issue
- 1
- ISSN
- 1943-4162 (ISSN-L)
- 1943-4170
- OpenAlex
- W3091857560
- Cited by
- 172
- References
- 47
- FWCI
- 23.01
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.