Stakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong
The DOI matches its Crossref record; 74 of the 74 references it cites were found in a registry or an index.
Abstract
Prefabricated building projects (PBPs) have contributed significantly to addressing Hong Kong’s serious housing shortage and accommodate almost half of the residents in this densely populated city. The supply chains of PBPs involve large numbers of stakeholders, including clients, designers, main contractors, transporters, and assembly subcontractors, all of which need to interact with each other by frequent information exchanges. However, cross-border supply chains are found to be quite complex, resulting in risks that significantly affect the performance of PBPs. Supply chain risks (SCRs) are closely associated with the stakeholders involved and have high interdependency with each other. This paper adopts social network analysis (SNA) to develop the risk network of the supply chain of a PBP in Hong Kong to prioritize the stakeholder-associated SCR. The research findings show that poor planning of resources and schedule, poor control of working flows, and poor information sharing between stakeholders are the major challenges to the supply chains of PBPs. This is the first study to consider the dynamic risk interdependency and associated stakeholders in SCRs. By providing a greater understanding of the risks embedded across the supply chains of PBPs in Hong Kong, this study could assist practitioners dealing with such risks more effectively and efficiently.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Social Network Analysis: Methods and Applications
Wasserman, S., & Faust, K. (1994) · doi:10.1017/cbo9780511815478 · Cited by 17,557
Social Network Analysis: A Handbook.
Pappi, F. U., & Scott, J. (1993) · Contemporary Sociology · doi:10.2307/2075047 · Cited by 5,969
A guide to the project management body of knowledge (PMBOK guide)
Pmbok (2004) · Cited by 4,316
A New Status Index Derived from Sociometric Analysis
Katz, L. (1953) · Psychometrika · doi:10.1007/bf02289026 · Cited by 3,866
Building the Resilient Supply Chain
Christopher, M., & Peck, H. (2004) · The International Journal of Logistics Management · doi:10.1108/09574090410700275 · Cited by 3,664
Managing Disruption Risks in Supply Chains
Kleindorfer, P. R., & Saad, G. H. (2005) · Production and Operations Management · doi:10.1111/j.1937-5956.2005.tb00009.x · Cited by 2,088
Managing Risk To Avoid Supply-Chain Breakdown
Chopra, S., & Sodhi, M. S. (2004) · MIT Sloan Management Review · Cited by 1,859
Supply chain risk management: outlining an agenda for future research
Jüttner, U., Peck, H., & Christopher, M. (2003) · International Journal of Logistics Research and Applications · doi:10.1080/13675560310001627016 · Cited by 1,630
Structures of Mediation: A Formal Approach to Brokerage in Transaction Networks
Gould, R. V., & Fernandez, R. M. (1989) · Sociological Methodology · doi:10.2307/270949 · Cited by 1,332
Jüttner, U. (2005) · The International Journal of Logistics Management · doi:10.1108/09574090510617385 · Cited by 1,025
AN EMPIRICAL EXAMINATION OF SUPPLY CHAIN PERFORMANCE ALONG SEVERAL DIMENSIONS OF RISK
Wagner, S. M., & Bode, C. (2008) · Journal of Business Logistics · doi:10.1002/j.2158-1592.2008.tb00081.x · Cited by 927
An empirical analysis of supply chain risk management in the German automotive industry
Thun, J.-H., & Hoenig, D. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.10.010 · Cited by 733
Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.01.003 · Cited by 574
Supply chain risk management and performance: A guiding framework for future development
Ritchie, B., & Brindley, C. (2007) · International Journal of Operations & Production Management · doi:10.1108/01443570710725563 · Cited by 478
Major Barriers to Off-Site Construction: The Developer’s Perspective in China
Mao, C., Shen, Q., Pan, W., & Ye, K. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000246 · Cited by 446
Prefabricated construction enabled by the Internet-of-Things
Zhong, R. Y., Peng, Y., Xue, F., Fang, J., Zou, W., Luo, H., Thomas Ng, S., Lu, W., Shen, G. Q. P., & Huang, G. Q. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.01.006 · Cited by 395
Gann, D. M. (1996) · Construction Management and Economics · doi:10.1080/014461996373304 · Cited by 385
Jaillon, L., & Poon, C. S. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.09.002 · Cited by 367
Construction Delays and Their Causative Factors in Nigeria
Aibinu, A. A., & Odeyinka, H. A. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:7(667 · Cited by 348
Supply chain risk management in French companies
Lavastre, O., Gunasekaran, A., & Spalanzani, A. (2012) · Decision Support Systems · doi:10.1016/j.dss.2011.11.017 · Cited by 345
Yang, R. J., & Zou, P. X. W. (2014) · Building and Environment · doi:10.1016/j.buildenv.2013.12.014 · Cited by 321
Key constraints and mitigation strategies for prefabricated prefinished volumetric construction
Hwang, B.-G., Shan, M., & Looi, K.-Y. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.136 · Cited by 318
Life cycle design and prefabrication in buildings: A review and case studies in Hong Kong
Jaillon, L., & Poon, C. S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.09.006 · Cited by 305
Life-cycle energy analysis of prefabricated building components: an input–output-based hybrid model
Hong, J., Shen, G. Q., Mao, C., Li, Z., & Li, K. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.10.030 · Cited by 304
Schedule risks in prefabrication housing production in Hong Kong: a social network analysis
Li, C. Z., Hong, J., Xue, F., Shen, G. Q., Xu, X., & Mok, M. K. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.02.123 · Cited by 282
Li, C. Z., Zhong, R. Y., Xue, F., Xu, G., Chen, K., Huang, G. G., & Shen, G. Q. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.07.156 · Cited by 272
Self-citationExploring the challenges to industrialized residential building in China
Zhang, X., Skitmore, M., & Peng, Y. M. (2013) · Habitat International · doi:10.1016/j.habitatint.2013.08.005 · Cited by 244
A service oriented framework for construction supply chain integration
Cheng, J. C. P., Law, K. H., Bjornsson, H., Jones, A., & Sriram, R. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.10.003 · Cited by 227
Cost analysis for sustainable off-site construction based on a multiple-case study in China
Mao, C., Xie, F., Hou, L., Wu, P., Wang, J., & Wang, X. (2016) · Habitat International · doi:10.1016/j.habitatint.2016.08.002 · Cited by 226
Chiang, Y.-H., Hon-Wan Chan, E., & Ka-Leung Lok, L. (2006) · Habitat International · doi:10.1016/j.habitatint.2004.12.004 · Cited by 218
Best practice of prefabrication implementation in the Hong Kong public and private sectors
Tam, V. W. Y., Fung, I. W. H., Sing, M. C. P., & Ogunlana, S. O. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.09.045 · Cited by 212
Luo, L., Mao, C., Shen, L., & Li, Z.-D. (2015) · Engineering Construction & Architectural Management · doi:10.1108/ecam-04-2014-0048 · Cited by 210
Self-citationModelling stakeholder-associated risk networks in green building projects
Yang, R. J., Zou, P. X. W., & Wang, J. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.09.010 · Cited by 207
Developing sustainable supply chains in the UK construction industry: A case study
Dadhich, P., Genovese, A., Kumar, N., & Acquaye, A. A. (2014) · International Journal of Production Economics · doi:10.1016/j.ijpe.2014.12.012 · Cited by 199
Lu, W., & Yuan, H. (2013) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2013.08.048 · Cited by 196
Understanding Construction Supply Chain Management
Behera, P., Mohanty, R. P., & Prakash, A. (2015) · Production Planning & Control · doi:10.1080/09537287.2015.1045953 · Cited by 194
Cloud asset-enabled integrated IoT platform for lean prefabricated construction
Xu, G., Li, M., Chen, C.-H., & Wei, Y. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.05.012 · Cited by 192
Self-citationXue, X., Shen, Q., & Ren, Z. (2010) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000025 · Cited by 191
Design issues of using prefabrication in Hong Kong building construction
Jaillon, L., & Poon, C. (2010) · Construction Management and Economics · doi:10.1080/01446193.2010.498481 · Cited by 189
Is structural change the primary solution to the problems of construction?
Koskela, L. (2003) · Building Research & Information · doi:10.1080/09613210301999 · Cited by 168
Yu, T., Shen, G. Q., Shi, Q., Lai, X., Li, C. Z., & Xu, K. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.04.004 · Cited by 167
Hossen, M. M., Kang, S.-K., & Kim, J. (2015) · Nuclear Engineering and Technology · doi:10.1016/j.net.2014.12.019 · Cited by 152
Safety concerns related to modular/prefabricated building construction
Fard, M. M., Terouhid, S. A., Kibert, C. J., & Hakim, H. (2015) · International Journal of Injury Control and Safety Promotion · doi:10.1080/17457300.2015.1047865 · Cited by 145
Mok, K. Y., Shen, Q., Yang, R. J., & Li, C. Z. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.10.017 · Cited by 142
Measuring Project Management Performance: Case of Construction Industry
Demirkesen, S., & Özorhon, B. (2017) · Engineering Management Journal · doi:10.1080/10429247.2017.1380579 · Cited by 140
Effect of stakeholder collaborative management on off-site construction cost performance
Xue, H., Zhang, S., Su, Y., Wu, Z., & Yang, R. J. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.258 · Cited by 138
Supply-chain transparency within industrialized construction projects
Babić, N. Č., Rebolj, D., Nekrep, M. P., & Podbreznik, P. (2014) · Computers in Industry · doi:10.1016/j.compind.2013.12.003 · Cited by 137
Lean Transformation in a Modular Building Company: A Case for Implementation
Yu, H., Al‐Hussein, M., Al-Jibouri, S. H. S., & Telyas, A. (2011) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000115 · Cited by 136
Collaboration and Integration in Project-Based Supply Chains in the Construction Industry
Koolwijk, J. S. J., van Oel, C. J., Wamelink, H., & Vrijhoef, R. (2018) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000592 · Cited by 124
Loosemore, M. (1998) · Engineering Construction & Architectural Management · doi:10.1046/j.1365-232x.1998.54039.x · Cited by 122
Demiralp, G., Güven, G., & Ergen, E. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.02.005 · Cited by 113
Production lead-time hedging and coordination in prefabricated construction supply chain management
Zhai, Y., Zhong, R. Y., Li, Z., & Huang, G. Q. (2016) · International Journal of Production Research · doi:10.1080/00207543.2016.1231432 · Cited by 105
Schedule risk modeling in prefabrication housing production
Li, C. Z., Shen, Q., Xu, X., Xue, F., Sommer, L., & Luo, L. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.11.028 · Cited by 103
Self-citationThe interdependences of BIM and supply chain partnering: empirical explorations
Papadonikolaki, E., Vrijhoef, R., & Wamelink, H. (2016) · Architectural Engineering and Design Management · doi:10.1080/17452007.2016.1212693 · Cited by 91
Kim, S.-Y., & Nguyen, V. T. (2017) · Production Planning & Control · doi:10.1080/09537287.2017.1398846 · Cited by 88
Identifying and Categorizing the Sources of Uncertainty in Construction Supply Chains
Gosling, J., Naim, M., & Towill, D. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000574 · Cited by 85
Impact of competitive conditions on supplier evaluation: a construction supply chain case study
Seth, D., Nemani, V. K., Pokharel, S., & Sayed, A. Y. A. (2017) · Production Planning & Control · doi:10.1080/09537287.2017.1407971 · Cited by 85
Pheng, L. S., & Chuan, C. J. (2001) · Integrated Manufacturing Systems · doi:10.1108/eum0000000006107 · Cited by 81
An SCO-Enabled Logistics and Supply Chain–Management System in Construction
Niu, Y., Lu, W., Liu, D., Chen, K., Anumba, C., & Huang, G. G. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001232 · Cited by 81
Decision model for planning material supply channels in construction
Jaśkowski, P., Sobotka, A., & Czarnigowska, A. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.02.026 · Cited by 78
The Role of Commitments in the Management of Construction Make-to-Order Supply Chains
Isatto, E. L., de Azambuja, M. C., & Formoso, C. T. (2013) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000253 · Cited by 71
Min, J. U., & Björnsson, H. C. (2008) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2008)24:4(245 · Cited by 62
An ontology-based web service framework for construction supply chain collaboration and management
Das, M., Cheng, J. C. P., & Law, K. H. (2015) · Engineering Construction & Architectural Management · doi:10.1108/ecam-07-2014-0089 · Cited by 60
London, K. A., & Pablo, Z. C. (2017) · Construction Management and Economics · doi:10.1080/01446193.2017.1339361 · Cited by 60
Han, Y., Skibniewski, M. J., & Wang, L. (2017) · Sustainability · doi:10.3390/su9112069 · Cited by 51
Experiencing Supply Chain Optimizations: A Serious Gaming Approach
van den Berg, M., Voordijk, H., Adriaanse, A., & Hartmann, T. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001388 · Cited by 46
Arantes, A., Ferreira, L. M. D. F., & Costa, A. A. (2015) · Supply Chain Management An International Journal · doi:10.1108/scm-06-2014-0207 · Cited by 38
An AHP Framework for Evaluating Construction Supply Chain Relationships
Kim, S.-Y., & Nguyen, V. T. (2017) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-017-1546-1 · Cited by 36
A structural analysis of green supply chain management enablers in the UAE construction sector
Balasubramanian, S. (2014) · International Journal of Logistics Systems and Management · doi:10.1504/ijlsm.2014.064655 · Cited by 34
Environmental supply chain management in the construction sector: theoretical underpinnings
Balasubramanian, S., & Shukla, V. (2018) · International Journal of Logistics Research and Applications · doi:10.1080/13675567.2018.1452902 · Cited by 27
Wu, P., & Low, S. P. (2014) · International Journal of Construction Management · doi:10.1080/15623599.2014.899126 · Cited by 22
SCM competencies in construction: issues and challenges in New Zealand
Ying, J. F., Tookey, J., & Roberti, J. (2015) · Journal of Engineering Design and Technology · doi:10.1108/jedt-01-2013-0002 · Cited by 20
Success Factors of JIT Integration with IBS Construction Projects– A Literature Review
Asri, M. A. N. M., Nawi, M. N. M., Nadarajan, S., Osman, W. N., & Harun, A. N. (2016) · Cited by 12
Impact of Using an E-Marketplace in the Construction Supply Process: Lessons from a Case Study
Alarcón, L. F., Maturana, S., & Schonherr, I. (2009) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2009)25:4(214 · Cited by 8
Cited by
Critical success factors for modular integrated construction projects: a review
Wuni, I. Y., & Shen, G. Q. (2020) · Building Research & Information · doi:10.1080/09613218.2019.1669009 · Cited by 237
Critical risk factors in the application of modular integrated construction: a systematic review
Wuni, I. Y., Shen, G. Q. P., & Mahmud, A. T. (2022) · International Journal of Construction Management · doi:10.1080/15623599.2019.1613212 · Cited by 185
Multi-objective optimization for improved project management: Current status and future directions
Guo, K., & Zhang, L. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104256 · Cited by 164
Metadata
- Authors
- Luo, L., Qiping Shen, G., Xu, G., Liu, Y., & Wang, Y.
- Venue
- Journal of Management in Engineering
- Published
- 2019-03
- Volume
- 35
- Issue
- 2
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- OpenAlex
- W2905852799
- Cited by
- 236
- References
- 74
- FWCI
- 12.19
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.