Stakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong
The DOI matches its Crossref record; 74 of the 74 references it cites were found in a registry or an index.
Abstract
Prefabricated building projects (PBPs) have contributed significantly to addressing Hong Kong’s serious housing shortage and accommodate almost half of the residents in this densely populated city. The supply chains of PBPs involve large numbers of stakeholders, including clients, designers, main contractors, transporters, and assembly subcontractors, all of which need to interact with each other by frequent information exchanges. However, cross-border supply chains are found to be quite complex, resulting in risks that significantly affect the performance of PBPs. Supply chain risks (SCRs) are closely associated with the stakeholders involved and have high interdependency with each other. This paper adopts social network analysis (SNA) to develop the risk network of the supply chain of a PBP in Hong Kong to prioritize the stakeholder-associated SCR. The research findings show that poor planning of resources and schedule, poor control of working flows, and poor information sharing between stakeholders are the major challenges to the supply chains of PBPs. This is the first study to consider the dynamic risk interdependency and associated stakeholders in SCRs. By providing a greater understanding of the risks embedded across the supply chains of PBPs in Hong Kong, this study could assist practitioners dealing with such risks more effectively and efficiently.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Social Network Analysis: Methods and Applications
Wasserman, S., & Faust, K. (1994) · doi:10.1017/cbo9780511815478 · Cited by 17,557
Social Network Analysis: A Handbook.
Pappi, F. U., & Scott, J. (1993) · Contemporary Sociology · doi:10.2307/2075047 · Cited by 5,969
A guide to the project management body of knowledge (PMBOK guide)
Pmbok (2004) · Cited by 4,316
A New Status Index Derived from Sociometric Analysis
Katz, L. (1953) · Psychometrika · doi:10.1007/bf02289026 · Cited by 3,866
Building the Resilient Supply Chain
Christopher, M., & Peck, H. (2004) · The International Journal of Logistics Management · doi:10.1108/09574090410700275 · Cited by 3,664
Managing Disruption Risks in Supply Chains
Kleindorfer, P. R., & Saad, G. H. (2005) · Production and Operations Management · doi:10.1111/j.1937-5956.2005.tb00009.x · Cited by 2,088
Managing Risk To Avoid Supply-Chain Breakdown
Chopra, S., & Sodhi, M. S. (2004) · MIT Sloan Management Review · Cited by 1,859
Supply chain risk management: outlining an agenda for future research
Jüttner, U., Peck, H., & Christopher, M. (2003) · International Journal of Logistics Research and Applications · doi:10.1080/13675560310001627016 · Cited by 1,630
Structures of Mediation: A Formal Approach to Brokerage in Transaction Networks
Gould, R. V., & Fernandez, R. M. (1989) · Sociological Methodology · doi:10.2307/270949 · Cited by 1,332
Jüttner, U. (2005) · The International Journal of Logistics Management · doi:10.1108/09574090510617385 · Cited by 1,025
Cited by
Critical success factors for modular integrated construction projects: a review
Wuni, I. Y., & Shen, G. Q. (2020) · Building Research & Information · doi:10.1080/09613218.2019.1669009 · Cited by 237
Critical risk factors in the application of modular integrated construction: a systematic review
Wuni, I. Y., Shen, G. Q. P., & Mahmud, A. T. (2022) · International Journal of Construction Management · doi:10.1080/15623599.2019.1613212 · Cited by 185
Multi-objective optimization for improved project management: Current status and future directions
Guo, K., & Zhang, L. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104256 · Cited by 164
Metadata
- Authors
- Luo, L., Qiping Shen, G., Xu, G., Liu, Y., & Wang, Y.
- Venue
- Journal of Management in Engineering
- Published
- 2019-03
- Volume
- 35
- Issue
- 2
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- OpenAlex
- W2905852799
- Cited by
- 236
- References
- 74
- FWCI
- 12.19
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.