Construction and demolition waste research: a bibliometric analysis
The DOI matches its Crossref record; 84 of the 84 references it cites were found in a registry or an index.
Abstract
Although construction and demolition (C&D) waste has drawn increasing attention from scholars, there is a lack of study to summarize the latest development of C&D waste research. By using a bibliometric analysis method, this study carries out a holistic review of C&D waste articles published from 1994 to 2017. It shows that the number of C&D waste articles has risen eight-times within the period. This study also demonstrates the social networks among the authors, countries, and organizations. Based on the keywords cluster analysis, the C&D waste research can be divided into five clusters, including (1) environmental concerns of C&D waste; (2) recyclability of C&D waste; (3) performance and behaviour tests of recycled products; (4) C&D waste management; and (5) C&D waste with industrial ecology. Meanwhile, the research status and future directions are discussed as well. The results would be valuable for understanding the streams and trends in C&D waste research.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Citations
Cites
Statistical bibliography or bibliometrics
Pritchard, A. E. (1969) · Journal of Documentation · Cited by 6,140
Comparison of PubMed, Scopus, Web of Science, and Google Scholar: strengths and weaknesses
Falagas, M. E., Pitsouni, E. I., Malietzis, G. A., & Pappas, G. (2008) · The FASEB Journal · doi:10.1096/fj.07-9492lsf · Cited by 5,039 · cited 1×
“PubMed, Scopus and Google Scholar), Web of Science (WoS) has a comprehensive coverage in science, technology, social sciences, arts and humanities (Falagas et al. 2008).”
BackgroundGreen supply chain management: A review and bibliometric analysis
Fahimnia, B., Sarkis, J., & Davarzani, H. (2015) · International Journal of Production Economics · doi:10.1016/j.ijpe.2015.01.003 · Cited by 2,131 · cited 1×
“Bibliometric analysis hasbeenauseful tool to gain an overall understanding about a given research field, which is deemed useful for providing further insights not previously fully grasped or evaluated (Fahimnia, Sarkis, and Davarzani 2015).”
MethodBehera, M., Bhattacharyya, S. K., Minocha, A. K., Deoliya, R., & Maiti, S. (2014) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2014.07.003 · Cited by 1,188 · cited 1×
“However, touse recycledC&Dwasteproducts like recycled aggregate as a structural material need to be characterized very precisely its quality and properties (Behera et al. 2014).”
BackgroundScott, J. (2017) · doi:10.4135/9781529716597 · Cited by 879
Social Network Analysis: History, Theory and Methodology
Prell, C. (2011) · Medical Entomology and Zoology · Cited by 677
Industrial ecology: An historical view
Erkman, S. (1997) · Journal of Cleaner Production · doi:10.1016/s0959-6526(97)00003-6 · Cited by 654 · cited 1×
“The industrial ecology concernsmultiple issues in an industry system, such asmaterials flows, life cycle impacts and dynamic of technology in industry (Erkman 1997).”
BackgroundTrend of the research on construction and demolition waste management
Yuan, H., & Shen, L. (2011) · Waste Management · doi:10.1016/j.wasman.2010.10.030 · Cited by 574 · cited 3×
“In particular, it is not clear whether the C&D waste management discipline has reshaped compared with the findings fromprevious reviews, such as (Lu and Yuan 2011; Yuan and Shen 2011).”
BackgroundResultSelf-citationCharacterizing the generation and flows of construction and demolition waste in China
Zheng, L., Wu, H., Zhang, H., Duan, H., Wang, J., Jiang, W., Dong, B., Liu, G., Zuo, J., & Song, Q. (2017) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2017.01.055 · Cited by 535 · cited 3×
“…billion tons of construction and demolition (C&D) waste havebeengenerated every year, amongwhich theUnited States generates about 700 million tons (Jain, Powell, and Tolaymat 2015), the European Union over 800 million tons (Ajayi et al. 2016), and China around 2300 million tons (Zheng et al. 2017).”
BackgroundSelf-citationArulrajah, A., Piratheepan, J., Disfani, M. M., & Bo, M. W. (2013) · Journal of Materials in Civil Engineering · doi:10.1061/(asce)mt.1943-5533.0000652 · Cited by 503 · cited 2×
“…C&D waste materials (Garcia-Gonzalez et al. 2014), (Vegas et al. 2015); (2) understanding recycledproducts of C&Dwaste (Kumar 2017; Hou et al. 2016); and (3) making the use of C&D recycled products (Xuan, Molenaar, and Houben 2016; Arulrajah et al. 2013; Belagraa, Beddar, and Bouzid 2017).”
BackgroundMethodQuantifying construction and demolition waste: An analytical review
Wu, Z., Yu, A. T. W., Shen, L., & Liu, G. (2014) · Waste Management · doi:10.1016/j.wasman.2014.05.010 · Cited by 400 · cited 2×
“In terms of C&D waste quantification, some reviewed the methods capable of quantifyingC&Dwaste generation (Abanda, Tah, and Cheung 2013; Wu et al. 2014), while some discussed the existing prediction models on the creep behaviour of recycled aggregate concrete (Lye et al. 2016; Silva, de Brito, and…”
BackgroundMatias, D., de Brito, J., Rosa, A., & Pedro, D. (2013) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2013.03.011 · Cited by 399 · cited 1×
“…(1) developing performance test indicator system for testing the performance of recycled products (Zega, Villagran-Zaccardi, and Di Maio 2010; Matias et al. 2013; da Silva et al. 2014; Belagraa, Beddar, and Bouzid 2017); (2) conducting specific performance tests, such as strength,…”
BackgroundMarzouk, M., & Azab, S. (2014) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2013.10.015 · Cited by 383 · cited 1×
“…Huppes 2010); (2) life cycle assessment, including developing models to assess the life cycle impacts of processing C&D waste (Simion et al. 2013; Marzouk and Azab 2014) and assessing the life cycle energy and resource efficiency of processing C&D waste (Mercader-Moyano and…”
BackgroundA framework for understanding waste management studies in construction
Lu, W., & Yuan, H. (2011) · Waste Management · doi:10.1016/j.wasman.2011.01.018 · Cited by 353 · cited 2×
“The first type targets the general perspective of C&D waste management by identifying major topics in C&D waste management and recycling (Lu and Yuan 2011) and further analysing research trends (YuanandShen2011).”
BackgroundResultSelf-citation(2023) · Journal of Documentation · doi:10.1108/jd · Cited by 329
Dantas, A. T. A., Batista Leite, M., & de Jesus Nagahama, K. (2013) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2012.09.026 · Cited by 314
Zhao, W., Leeftink, R. B., & Rotter, V. S. (2010) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2009.09.003 · Cited by 313 · cited 1×
“…C&Dwaste viamanagementmeasures (Wang, Li, and Tam 2014; Wang et al. 2010; Lu and Yuan 2010); (3) assessing the management performance of C&D waste (Zhao, Leeftink, and Rotter 2010; Coelho and de Brito 2013; Jung et al. 2015); and (4) adopting information techs in C&D waste research (Lu et al.…”
BackgroundBlengini, G. A., & Garbarino, E. (2010) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2010.01.027 · Cited by 306 · cited 1×
“…perspective mainly focus on following aspects: (1) tracking C&Dwaste materials flow from thewaste generation to final disposal (Huang and Hsu 2003; Blengini and Garbarino 2010; Wiedenhofer et al. 2015; Hu, van der Voet, and Huppes 2010); (2) life cycle assessment, including developing models to…”
BackgroundCritical success factors for on-site sorting of construction waste: A china study
Wang, J., Yuan, H., Kang, X., & Lu, W. (2010) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2010.01.012 · Cited by 291 · cited 1×
“…estimationmodels (Won, Cheng, and Lee 2016; Wu et al. 2016a); (2) reducing the generation of C&Dwaste viamanagementmeasures (Wang, Li, and Tam 2014; Wang et al. 2010; Lu and Yuan 2010); (3) assessing the management performance of C&D waste (Zhao, Leeftink, and Rotter 2010; Coelho and de Brito…”
BackgroundSelf-citationThe support of Quality Management to sustainable development: a literature review
Siva, V., Gremyr, I., Bergquist, B., Garvare, R., Zobel, T., & Isaksson, R. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.01.020 · Cited by 288 · cited 1×
“As a result, WoS has been widely adopted in bibliometric studies (i.e. Qiao, Kristoffersson, and Randrup 2018; Siva et al. 2016).”
MethodFor Your Citations Only? Hot Topics in Bibliometric Analysis
van Raan, A. F. J. (2005) · Measurement: Interdisciplinary Research & Perspective · doi:10.1207/s15366359mea0301_7 · Cited by 280
Tensile strength behaviour of recycled aggregate concrete
Silva, R. V., de Brito, J., & Dhir, R. K. (2015) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2015.03.034 · Cited by 268 · cited 2×
“…such as timber, carpet, plaster, etc.; (2) improving the performance of recycled C&D products in term of strength, durability, stiffness, and so on (Silva, de Brito, and Dhir 2015b; Tam, Kotrayothar, and Xiao 2015; Belagraa, Beddar, and Bouzid 2017; Dantas, Leite, and Nagahama 2013; Younis and…”
BackgroundLu, W., Yuan, H., Li, J., Hao, J. J. L., Mi, X., & Ding, Z. (2011) · Waste Management · doi:10.1016/j.wasman.2010.12.004 · Cited by 266 · cited 1×
“…generation in particular region (Bergsdal, Bohne, and Brattebo 2007; Wu et al. 2016a ; Zheng et al. 2017), investigate the waste generation rate (Lu et al. 2011; Li et al. 2013; Malia et al. 2013; Lu et al. 2017), and develop C&Dwaste generation estimationmodels (Won, Cheng, and Lee 2016; Wu et…”
BackgroundSelf-citationTrends in research on global climate change: A Science Citation Index Expanded-based analysis
Li, J., Wang, M.-H., & Ho, Y.-S. (2011) · Global and Planetary Change · doi:10.1016/j.gloplacha.2011.02.005 · Cited by 258 · cited 1×
“The approach has been used to search management information systems and analyse the research trends (Du et al. 2014), discover researchhotpots (Duet al. 2015) and identify the evolution of research topics (Li, Wang, and Ho 2011).”
MethodCoelho, A., & de Brito, J. (2013) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2012.08.024 · Cited by 256 · cited 1×
“…(Wang, Li, and Tam 2014; Wang et al. 2010; Lu and Yuan 2010); (3) assessing the management performance of C&D waste (Zhao, Leeftink, and Rotter 2010; Coelho and de Brito 2013; Jung et al. 2015); and (4) adopting information techs in C&D waste research (Lu et al. 2016; Wu et al. 2016b).”
BackgroundWang, J., Wu, H., Duan, H., Zillante, G., Zuo, J., & Yuan, H. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.11.087 · Cited by 249 · cited 1×
“…the life cycle impacts of processing C&D waste (Simion et al. 2013; Marzouk and Azab 2014) and assessing the life cycle energy and resource efficiency of processing C&D waste (Mercader-Moyano and Ramirez-deArellano-Agudo 2013; Rivero, Sathre, and Navarro 2016; Wang et al. 2018; Wu et al. 2015).”
BackgroundSelf-citationUtilization of fine recycled aggregates in concrete with fly ash and steel slag
Anastasiou, E., Georgiadis Filikas, K., & Stefanidou, M. (2014) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2013.09.037 · Cited by 247
Exploring critical success factors for waste management in construction projects of China
Lu, W., & Yuan, H. (2010) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2010.09.010 · Cited by 239 · cited 2×
“…Cheng, and Lee 2016; Wu et al. 2016a); (2) reducing the generation of C&Dwaste viamanagementmeasures (Wang, Li, and Tam 2014; Wang et al. 2010; Lu and Yuan 2010); (3) assessing the management performance of C&D waste (Zhao, Leeftink, and Rotter 2010; Coelho and de Brito 2013; Jung et al.…”
BackgroundSelf-citationWiedenhofer, D., Steinberger, J. K., Eisenmenger, N., & Haas, W. (2015) · Journal of Industrial Ecology · doi:10.1111/jiec.12216 · Cited by 234 · cited 1×
“…following aspects: (1) tracking C&Dwaste materials flow from thewaste generation to final disposal (Huang and Hsu 2003; Blengini and Garbarino 2010; Wiedenhofer et al. 2015; Hu, van der Voet, and Huppes 2010); (2) life cycle assessment, including developing models to assess the life cycle impacts…”
BackgroundMaterials flow analysis and emergy evaluation of Taipei’s urban construction
Huang, S.-L., & Hsu, W.-L. (2003) · Landscape and Urban Planning · doi:10.1016/s0169-2046(02)00152-4 · Cited by 233 · cited 1×
“…industrial ecology perspective mainly focus on following aspects: (1) tracking C&Dwaste materials flow from thewaste generation to final disposal (Huang and Hsu 2003; Blengini and Garbarino 2010; Wiedenhofer et al. 2015; Hu, van der Voet, and Huppes 2010); (2) life cycle assessment, including…”
BackgroundEffects on concrete durability of using recycled ceramic aggregates
Correia, J. R., de Brito, J., & Pereira, A. S. (2006) · Materials and Structures · doi:10.1617/s11527-005-9014-7 · Cited by 227
Strength prediction model and methods for improving recycled aggregate concrete
Younis, K. H., & Pilakoutas, K. (2013) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2013.09.003 · Cited by 226 · cited 1×
“…and so on (Silva, de Brito, and Dhir 2015b; Tam, Kotrayothar, and Xiao 2015; Belagraa, Beddar, and Bouzid 2017; Dantas, Leite, and Nagahama 2013; Younis and Pilakoutas 2013; Correia, de Brito, and Pereira 2006); and (3) developing more application situations for recycled C&D waste products.”
BackgroundA study conducted to reduce construction waste generation in Turkey
Esin, T., & Cosgun, N. (2007) · Building and Environment · doi:10.1016/j.buildenv.2006.02.008 · Cited by 222 · cited 1×
“In order tominimize the generation of C&Dwaste,multiple studies reported practical experiences and proposed measures (e.g. waste charging scheme) from various countries (Esin and Cosgun 2007; Begum et al. 2007; Tam and Tam 2008; Ajayi et al. 2016).”
BackgroundWang, J., Li, Z., & Tam, V. W. Y. (2014) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2013.11.003 · Cited by 218 · cited 2×
“…C&Dwaste generation estimationmodels (Won, Cheng, and Lee 2016; Wu et al. 2016a); (2) reducing the generation of C&Dwaste viamanagementmeasures (Wang, Li, and Tam 2014; Wang et al. 2010; Lu and Yuan 2010); (3) assessing the management performance of C&D waste (Zhao, Leeftink, and Rotter 2010;…”
BackgroundSelf-citationConstruction and demolition waste indicators
Mália, M., de Brito, J., Pinheiro, M. D., & Bravo, M. (2013) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x12471707 · Cited by 213 · cited 1×
“…(Bergsdal, Bohne, and Brattebo 2007; Wu et al. 2016a ; Zheng et al. 2017), investigate the waste generation rate (Lu et al. 2011; Li et al. 2013; Malia et al. 2013; Lu et al. 2017), and develop C&Dwaste generation estimationmodels (Won, Cheng, and Lee 2016; Wu et al. 2016a); (2) reducing the…”
BackgroundWon, J., Cheng, J. C. P., & Lee, G. (2016) · Waste Management · doi:10.1016/j.wasman.2015.12.026 · Cited by 204 · cited 1×
“…the waste generation rate (Lu et al. 2011; Li et al. 2013; Malia et al. 2013; Lu et al. 2017), and develop C&Dwaste generation estimationmodels (Won, Cheng, and Lee 2016; Wu et al. 2016a); (2) reducing the generation of C&Dwaste viamanagementmeasures (Wang, Li, and Tam 2014; Wang et al. 2010;…”
BackgroundProjection of Construction and Demolition Waste in Norway
Bergsdal, H., Bohne, R. A., & Brattebø, H. (2007) · Journal of Industrial Ecology · doi:10.1162/jiec.2007.1149 · Cited by 197 · cited 1×
“…can be divided into four groups: (1) quantifying of C&D waste generation, including conduct surveys of C&D waste generation in particular region (Bergsdal, Bohne, and Brattebo 2007; Wu et al. 2016a ; Zheng et al. 2017), investigate the waste generation rate (Lu et al. 2011; Li et al. 2013;…”
BackgroundImplementation of waste management and minimisation in the construction industry of Malaysia
Begum, R. A., Siwar, C., Pereira, J. J., & Jaafar, A. H. (2006) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2006.09.004 · Cited by 177 · cited 1×
“In order tominimize the generation of C&Dwaste,multiple studies reported practical experiences and proposed measures (e.g. waste charging scheme) from various countries (Esin and Cosgun 2007; Begum et al. 2007; Tam and Tam 2008; Ajayi et al. 2016).”
BackgroundQiao, X.-J., Kristoffersson, A., & Randrup, T. B. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.06.049 · Cited by 177 · cited 1×
“As a result, WoS has been widely adopted in bibliometric studies (i.e. Qiao, Kristoffersson, and Randrup 2018; Siva et al. 2016).”
MethodA model for estimating construction waste generation index for building project in China
Li, J., Ding, Z., Mi, X., & Wang, J. (2013) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2013.02.015 · Cited by 171 · cited 1×
“…particular region (Bergsdal, Bohne, and Brattebo 2007; Wu et al. 2016a ; Zheng et al. 2017), investigate the waste generation rate (Lu et al. 2011; Li et al. 2013; Malia et al. 2013; Lu et al. 2017), and develop C&Dwaste generation estimationmodels (Won, Cheng, and Lee 2016; Wu et al. 2016a); (2)…”
BackgroundSelf-citationReducing waste to landfill: A need for cultural change in the UK construction industry
Ajayi, S. O., Oyedele, L. O., Akinade, O. O., Bilal, M., Owolabi, H. A., Alaka, H. A., & Kadiri, K. O. (2016) · Journal of Building Engineering · doi:10.1016/j.jobe.2015.12.007 · Cited by 170 · cited 3×
“Over 10 billion tons of construction and demolition (C&D) waste havebeengenerated every year, amongwhich theUnited States generates about 700 million tons (Jain, Powell, and Tolaymat 2015), the European Union over 800 million tons (Ajayi et al. 2016), and China around 2300 million tons (Zheng et al.”
BackgroundWu, H., Wang, J., Duan, H., Ouyang, L., Huang, W., & Zuo, J. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.08.096 · Cited by 167 · cited 1×
“…the life cycle impacts of processing C&D waste (Simion et al. 2013; Marzouk and Azab 2014) and assessing the life cycle energy and resource efficiency of processing C&D waste (Mercader-Moyano and Ramirez-deArellano-Agudo 2013; Rivero, Sathre, and Navarro 2016; Wang et al. 2018; Wu et al. 2015).”
BackgroundSelf-citationProduction of recycled sand from construction and demolition waste
Ulsen, C., Kahn, H., Hawlitschek, G., Masini, E. A., Angulo, S. C., & John, V. M. (2013) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2012.02.004 · Cited by 162
Lu, W., Webster, C., Peng, Y., Chen, X., & Zhang, X. (2017) · International Journal of Construction Management · doi:10.1080/15623599.2016.1166548 · Cited by 162 · cited 2×
“Meanwhile, with the development of Information technologies, some tools such as GIS, BIM, and Big Data have been limitedly applied in C&D waste research (Lu et al. 2016;Wuet al. 2016), while these studies mainly use these techs to improve the research quality and accurately.”
BackgroundMethodWu, H., Duan, H., Zheng, L., Wang, J., Niu, Y., & Zhang, G. (2016) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2016.03.130 · Cited by 161 · cited 3×
“…(Lu et al. 2011; Li et al. 2013; Malia et al. 2013; Lu et al. 2017), and develop C&Dwaste generation estimationmodels (Won, Cheng, and Lee 2016; Wu et al. 2016a); (2) reducing the generation of C&Dwaste viamanagementmeasures (Wang, Li, and Tam 2014; Wang et al. 2010; Lu and Yuan 2010); (3)…”
BackgroundSelf-citationDynamic Material Flow Analysis for Strategic Construction and Demolition Waste Management in Beijing
Hu, M., Van Der Voet, E., & Huppes, G. (2010) · Journal of Industrial Ecology · doi:10.1111/j.1530-9290.2010.00245.x · Cited by 157 · cited 1×
“…C&Dwaste materials flow from thewaste generation to final disposal (Huang and Hsu 2003; Blengini and Garbarino 2010; Wiedenhofer et al. 2015; Hu, van der Voet, and Huppes 2010); (2) life cycle assessment, including developing models to assess the life cycle impacts of processing C&D waste…”
BackgroundLu, W., Chen, X., Ho, D. C. W., & Wang, H. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.06.106 · Cited by 151 · cited 2×
“Meanwhile, with the development of Information technologies, some tools such as GIS, BIM, and Big Data have been limitedly applied in C&D waste research (Lu et al. 2016;Wuet al. 2016), while these studies mainly use these techs to improve the research quality and accurately.”
BackgroundMethodVegas, Í., Broos, K., Nielsen, P., Lambertz, O., & Lisbona, A. (2014) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2014.09.109 · Cited by 146 · cited 2×
“Previous studies have focused on three main aspects: (1) understanding recyclable C&D waste materials (Garcia-Gonzalez et al. 2014), (Vegas et al. 2015); (2) understanding recycledproducts of C&Dwaste (Kumar 2017; Hou et al. 2016); and (3) making the use of C&D recycled products (Xuan, Molenaar,…”
BackgroundJiménez-Rivero, A., Sathre, R., & Navarro, J. G. (2016) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2016.01.014 · Cited by 146 · cited 1×
“…the life cycle impacts of processing C&D waste (Simion et al. 2013; Marzouk and Azab 2014) and assessing the life cycle energy and resource efficiency of processing C&D waste (Mercader-Moyano and Ramirez-deArellano-Agudo 2013; Rivero, Sathre, and Navarro 2016; Wang et al. 2018; Wu et al. 2015).”
BackgroundWang, Y., Lai, N., Zuo, J., Chen, G., & Du, H. (2016) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2016.07.006 · Cited by 146 · cited 3×
“The aspects of the body of the literature by the bibliometric analysis method include both quantitative information and qualitative data (Wang et al. 2016).”
BackgroundMethodInfluentialSelf-citationLong-term deformation behaviour of recycled aggregate concrete
Tam, V. W. Y., Kotrayothar, D., & Xiao, J. (2015) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2015.10.013 · Cited by 141 · cited 3×
“…recycled products (Zega, Villagran-Zaccardi, and Di Maio 2010; Matias et al. 2013; da Silva et al. 2014; Belagraa, Beddar, and Bouzid 2017); (2) conducting specific performance tests, such as strength, durability, stiffness, etc. (Tam, Kotrayothar, and Xiao 2015; Silva, de Brito, and Dhir 2015b).”
BackgroundDu, H., Li, N., Brown, M. A., Peng, Y., & Shuai, Y. (2014) · Renewable Energy · doi:10.1016/j.renene.2014.01.018 · Cited by 131 · cited 2×
“The approach has been used to search management information systems and analyse the research trends (Du et al. 2014), discover researchhotpots (Duet al.”
MethodWaste reduction through incentives: a case study
Tam, V. W. Y., & Tam, C. M. (2008) · Building Research & Information · doi:10.1080/09613210701417003 · Cited by 124 · cited 1×
“In order tominimize the generation of C&Dwaste,multiple studies reported practical experiences and proposed measures (e.g. waste charging scheme) from various countries (Esin and Cosgun 2007; Begum et al. 2007; Tam and Tam 2008; Ajayi et al. 2016).”
BackgroundKumar, R. (2017) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2017.03.077 · Cited by 122 · cited 1×
“…(1) understanding recyclable C&D waste materials (Garcia-Gonzalez et al. 2014), (Vegas et al. 2015); (2) understanding recycledproducts of C&Dwaste (Kumar 2017; Hou et al. 2016); and (3) making the use of C&D recycled products (Xuan, Molenaar, and Houben 2016; Arulrajah et al. 2013; Belagraa,…”
BackgroundEvaluation of leaching and extraction procedures for soil and waste
Kalbe, U., Berger, W. J., Eckardt, J., & Simon, F. (2007) · Waste Management · doi:10.1016/j.wasman.2007.03.008 · Cited by 114 · cited 1×
“Unfortunately, the understanding of the complexity of environmental impacts from C&D waste remain limited and few measures have been developed to control these pollutants (Kalbe et al. 2008; Cabalar, Abdulnafaa, and Karabash 2016).”
BackgroundGarcía-González, J., Rodríguez-Robles, D., Juan-Valdés, A., Pozo, J. M. M.-D., & Guerra‐Romero, M. I. (2014) · Materials · doi:10.3390/ma7096224 · Cited by 110 · cited 2×
“Previous studies have focused on three main aspects: (1) understanding recyclable C&D waste materials (Garcia-Gonzalez et al. 2014), (Vegas et al. 2015); (2) understanding recycledproducts of C&Dwaste (Kumar 2017; Hou et al. 2016); and (3) making the use of C&D recycled products (Xuan, Molenaar,…”
BackgroundAbanda, F. H., Tah, J. H. M., & Cheung, F. K. T. (2012) · Building and Environment · doi:10.1016/j.buildenv.2012.07.014 · Cited by 110 · cited 1×
“In terms of C&D waste quantification, some reviewed the methods capable of quantifyingC&Dwaste generation (Abanda, Tah, and Cheung 2013; Wu et al. 2014), while some discussed the existing prediction models on the creep behaviour of recycled aggregate concrete (Lye et al. 2016; Silva, de Brito, and…”
BackgroundZega, C. J., Zaccardi, Y. V., & Maio, Á. A. D. (2009) · Materials and Structures · doi:10.1617/s11527-009-9480-4 · Cited by 109
Silva, R. V., de Brito, J., & Dhir, R. K. (2015) · Engineering Structures · doi:10.1016/j.engstruct.2015.06.004 · Cited by 108 · cited 2×
“…such as timber, carpet, plaster, etc.; (2) improving the performance of recycled C&D products in term of strength, durability, stiffness, and so on (Silva, de Brito, and Dhir 2015b; Tam, Kotrayothar, and Xiao 2015; Belagraa, Beddar, and Bouzid 2017; Dantas, Leite, and Nagahama 2013; Younis and…”
BackgroundExpanding and shifting trends in carbon market research: a quantitative bibliometric study
Du, H., Li, B., Brown, M. A., Mao, G., Rameezdeen, R., & Chen, H. (2014) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.05.094 · Cited by 100
Engelsen, C. J., van der Sloot, H. A., & Petković, G. (2017) · The Science of The Total Environment · doi:10.1016/j.scitotenv.2017.02.052 · Cited by 91 · cited 1×
“This is mainly because the methods that used to understand these issues are heavily reliant on traditional methods such as leaching test (Engelsen, van der Sloot, and Petkovic 2017; Galvin et al. 2012; Van Praagh and Modin 2016).”
MethodCreep strain of recycled aggregate concrete
Lye, C.-Q., Dhir, R. K., Ghataora, G. S., & Li, H. (2015) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2015.10.181 · Cited by 90 · cited 1×
“…Tah, and Cheung 2013; Wu et al. 2014), while some discussed the existing prediction models on the creep behaviour of recycled aggregate concrete (Lye et al. 2016; Silva, de Brito, and Dhir CONTACT Jian Zuo jian.zuo@adelaide.edu.au School of Architecture and Built Environment, The University of…”
BackgroundLeaching behaviour of hazardous demolition waste
Roussat, N., Méhu, J., Abdelghafour, M., & Brula, P. (2007) · Waste Management · doi:10.1016/j.wasman.2007.10.019 · Cited by 90 · cited 1×
“On the other hand, a small fraction of C&D waste might contain hazardous components bringing adverse impacts on human beings and the total environment (Roussat et al. 2008).”
BackgroundMercader-Moyano, P., & Agudo, A. R. D. A. (2013) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x13477719 · Cited by 84
Galvín, A. P., Ayuso, J., Jiménez, J. R., & Agrela, F. (2011) · Waste Management · doi:10.1016/j.wasman.2011.09.010 · Cited by 83 · cited 1×
“This is mainly because the methods that used to understand these issues are heavily reliant on traditional methods such as leaching test (Engelsen, van der Sloot, and Petkovic 2017; Galvin et al. 2012; Van Praagh and Modin 2016).”
MethodDuan, H., Yu, D., Zuo, J., Yang, B., Zhang, Y., & Niu, Y. (2016) · The Science of The Total Environment · doi:10.1016/j.scitotenv.2016.07.165 · Cited by 73 · cited 3×
“It is frequently discussed in previous studies that C&Dwastemay contain heavy metals (Jang and Townsend 2001; Van Praagh and Modin 2016) and organic matters (Duan et al. 2016).”
BackgroundSelf-citationDelay, M., Lager, T., Schulz, H. D., & Frimmel, F. H. (2006) · Waste Management · doi:10.1016/j.wasman.2006.01.013 · Cited by 71 · cited 1×
“There are two main research aspects in this area: (1) identification of pollutant composition of C&D waste (Jang and Townsend 2001; Van Praagh and Modin 2016; Duan et al. 2016); (2) control and mitigation of pollution for C&D waste (Delay et al. 2007; Iden et al. 2008; Shin, Na, and Kim 2016).”
BackgroundWu, H., Duan, H., Wang, J., Wang, T., & Wang, X. (2015) · Journal of Material Cycles and Waste Management · doi:10.1007/s10163-015-0404-9 · Cited by 65 · cited 1×
“…the life cycle impacts of processing C&D waste (Simion et al. 2013; Marzouk and Azab 2014) and assessing the life cycle energy and resource efficiency of processing C&D waste (Mercader-Moyano and Ramirez-deArellano-Agudo 2013; Rivero, Sathre, and Navarro 2016; Wang et al. 2018; Wu et al. 2015).”
BackgroundSelf-citationInfluences of various construction and demolition materials on the behavior of a clay
Çabalar, A. F., Abdulnafaa, M. D., & Karabash, Z. (2016) · Environmental Earth Sciences · doi:10.1007/s12665-016-5631-4 · Cited by 52 · cited 1×
“Unfortunately, the understanding of the complexity of environmental impacts from C&D waste remain limited and few measures have been developed to control these pollutants (Kalbe et al. 2008; Cabalar, Abdulnafaa, and Karabash 2016).”
BackgroundShrinkage cracking of cement treated demolition waste as a road base
Xuan, D., Molenaar, A. A. A., & Houben, L. J. M. (2015) · Materials and Structures · doi:10.1617/s11527-015-0524-7 · Cited by 49
Occurrence of organic pollutants in recovered soil fines from construction and demolition waste
Jang, Y.-C., & Townsend, T. G. (2001) · Waste Management · doi:10.1016/s0956-053x(01)00007-1 · Cited by 49 · cited 3×
“It is frequently discussed in previous studies that C&Dwastemay contain heavy metals (Jang and Townsend 2001; Van Praagh and Modin 2016) and organic matters (Duan et al. 2016).”
BackgroundGavrilescu, M., Simion, I. M., Ghinea, C., Maxineasa, S. G., Taranu, N., & Bonoli, A. (2013) · Environmental Engineering and Management Journal · doi:10.30638/eemj.2013.097 · Cited by 48 · cited 1×
“…Hu, van der Voet, and Huppes 2010); (2) life cycle assessment, including developing models to assess the life cycle impacts of processing C&D waste (Simion et al. 2013; Marzouk and Azab 2014) and assessing the life cycle energy and resource efficiency of processing C&D waste (Mercader-Moyano and…”
Hou, Y., Ji, X., Zou, L., Liu, S., & Su, X. (2015) · Road Materials and Pavement Design · doi:10.1080/14680629.2015.1064466 · Cited by 45 · cited 1×
“…recyclable C&D waste materials (Garcia-Gonzalez et al. 2014), (Vegas et al. 2015); (2) understanding recycledproducts of C&Dwaste (Kumar 2017; Hou et al. 2016); and (3) making the use of C&D recycled products (Xuan, Molenaar, and Houben 2016; Arulrajah et al. 2013; Belagraa, Beddar, and…”
BackgroundHuang, S., Zhao, X., Sun, Y., Ma, J., Gao, X., Xie, T., Xu, D., Yu, Y., & Zhao, Y. (2017) · Frontiers of Environmental Science & Engineering · doi:10.1007/s11783-017-0901-2 · Cited by 40 · cited 1×
“The environmental impacts of these C&D waste are very complex and uncertain; the mixed hazardous substances would cause serious harms to the environment (Huang et al. 2016, 2017).”
Backgroundda Silva, V. M., Góis, L. C., Duarte, J. B., da Silva, J. B., & Acchar, W. (2014) · Materials Research · doi:10.1590/s1516-14392014005000014 · Cited by 33 · cited 2×
“Studies have been conducted to test the performance of C&D waste and recycled products (particularly recycled aggregate) (Anastasiou, Filikas, and Stefanidou 2014; da Silva et al. 2014; Belagraa, Beddar, and Bouzid 2017; Tam, Kotrayothar, and Xiao 2015).”
BackgroundA comparison of economic feasibility and emission of carbon dioxide for two recycling processes
Jung, J.-S., Song, S., Jun, M.-H., & Park, S. (2015) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-015-0708-2 · Cited by 33 · cited 1×
“…(Wang, Li, and Tam 2014; Wang et al. 2010; Lu and Yuan 2010); (3) assessing the management performance of C&D waste (Zhao, Leeftink, and Rotter 2010; Coelho and de Brito 2013; Jung et al. 2015); and (4) adopting information techs in C&D waste research (Lu et al. 2016; Wu et al. 2016b).”
BackgroundPraagh, M. V., & Modin, H. (2016) · Waste Management · doi:10.1016/j.wasman.2016.07.009 · Cited by 32 · cited 4×
“It is frequently discussed in previous studies that C&Dwastemay contain heavy metals (Jang and Townsend 2001; Van Praagh and Modin 2016) and organic matters (Duan et al. 2016).”
BackgroundMethodInfluentialEffect of low cost fillers on cement hydration
Choudhary, A., Shah, V., & Bishnoi, S. (2016) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2016.07.088 · Cited by 29 · cited 1×
“The use of recycled products of C&D waste has been discussed in many articles, where these recycled products are used in many applications (Arulrajah et al. 2013; Choudhary, Shah, and Bishnoi 2016; Belagraa, Beddar, and Bouzid 2017).”
MethodLee, J.-Y., Moon, S.-H., Yi, M., & Yun, S. (2008) · Quarterly Journal of Engineering Geology and Hydrogeology · doi:10.1144/1470-9236/07-021 · Cited by 13 · cited 1×
“…compositions would affect the surrounding environment (e.g. water, groundwater, soils) via multiple mechanisms (e.g. sorption, adsorption, release, immobilization, incineration, pyrolysis, etc.) and approaches (e.g. leachate, biomass, landfill gas, etc.) (Lee et al. 2008; Shin, Na, and Kim 2016).”
Shin, W.-S., Na, K.-R., & Kim, Y. (2015) · Desalination and Water Treatment · doi:10.1080/19443994.2015.1029528 · Cited by 13
Iden, S. C., Delay, M., Frimmel, F. H., & Durner, W. (2008) · Environmental Science & Technology · doi:10.1021/es702171z · Cited by 12 · cited 1×
“There are two main research aspects in this area: (1) identification of pollutant composition of C&D waste (Jang and Townsend 2001; Van Praagh and Modin 2016; Duan et al. 2016); (2) control and mitigation of pollution for C&D waste (Delay et al. 2007; Iden et al. 2008; Shin, Na, and Kim 2016).”
BackgroundHuang, S., Zhao, X., Sun, Y., Ma, J., Gao, X., Xie, T., Xu, D., Yu, Y., & Zhao, Y. (2016) · Environmental Science Processes & Impacts · doi:10.1039/c6em00019c · Cited by 12 · cited 1×
“The environmental impacts of these C&D waste are very complex and uncertain; the mixed hazardous substances would cause serious harms to the environment (Huang et al. 2016, 2017).”
BackgroundMARBLE FILLERS EFFECT ON THE MECHANICAL PERFORMANCE OF A RECYCLED AGGREGATE CONCRETE
Belagraa, L., Beddar, M., & Bouzid, A. (2017) · Environmental Engineering and Management Journal · doi:10.30638/eemj.2017.021 · Cited by 8 · cited 5×
“The use of recycled products of C&D waste has been discussed in many articles, where these recycled products are used in many applications (Arulrajah et al. 2013; Choudhary, Shah, and Bishnoi 2016; Belagraa, Beddar, and Bouzid 2017).”
BackgroundMethodInfluentialMaterials Research: Ibero-american Journal of Materials
Jorge, A. M., & Leiva, D. R. (2013) · Materials Research · doi:10.1590/s1516-14392013000300001 · Cited by 2
Research works printed but not linked: 1
- Jain P., 2015, Methodology to Estimate the Quantity, Composition, and Management of Construction and Demolition Debris in the United States
Cited by
Kabirifar, K., Mojtahedi, M., Wang, C., & Tam, V. W. Y. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.121265 · Cited by 695
Tang, Q., Ma, Z., Wu, H., & Wang, W. (2020) · Cement and Concrete Composites · doi:10.1016/j.cemconcomp.2020.103807 · Cited by 549
Self-citationRanjbari, M., Saidani, M., Shams Esfandabadi, Z., Peng, W., Lam, S. S., Aghbashlo, M., Quatraro, F., & Tabatabaei, M. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2021.128009 · Cited by 224
Chen, K., Wang, J., Yu, B., Wu, H., & Zhang, J. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.125071 · Cited by 193
Self-citationPlastic waste recycling via pyrolysis: A bibliometric survey and literature review
Armenise, S., SyieLuing, W., Ramírez-Velásquez, J. M., Launay, F., Wuebben, D., Ngadi, N., Rams, J., & Muñoz, M. (2021) · Journal of Analytical and Applied Pyrolysis · doi:10.1016/j.jaap.2021.105265 · Cited by 185
Metadata
- Authors
- Wu, H., Zuo, J., Zillante, G., Wang, J., & Yuan, H.
- Affiliations
- The University of Adelaide (AU)
- Shenzhen University (CN)
- Guangzhou University (CN)
- Corresponding author
- Zuo, Jian
- Yuan, Hongping
- Venue
- Architectural Science Review
- Publisher
- Informa UK Limited
- Published
- 2019-01-08
- Volume
- 62
- Issue
- 4
- Pages
- 354-365
- ISSN
- 0003-8628 (ISSN-L)
- 1758-9622
- OpenAlex
- W2909877553
- Cited by
- 115
- References
- 84
- Citations by year
- 2026: 10 · 2025: 11 · 2024: 23 · 2023: 21 · 2022: 16 · 2021: 24 · 2020: 9 · 2019: 1
- FWCI
- 8.38
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Architectural Science Review (publishedVersion)
- Adelaide Research & Scholarship (AR&S) (University of Adelaide) (submittedVersion)
- Funders
- National Natural Science Foundation of China (71573216)
- Sichuan Science and Technology Program (2017ZR0150)
- Shenzhen Science and Technology Plan (JCYJ20160520173631894)
- Topics
- Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
- Physical Sciences › Environmental Science › Waste Management and Disposal › Municipal Solid Waste Management
- Physical Sciences › Engineering › Building and Construction › Recycling and utilization of industrial and municipal waste in materials production
- Keywords
- construction and demolition waste, research trends, waste management, recyclability, recycled products, industrial ecology, environmental impact of waste, author and institutional collaboration
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.