Determining the causal structure of rework influences in construction
The DOI matches its Crossref record; 33 of the 33 references it cites were found in a registry or an index.
Abstract
One of the most perplexing issues facing organizations in the construction industry is their inability to become quality focused. As a result sub-standard products and services often emanate, which inadvertently result in rework. Typically, rework is caused by errors made during the design process. These errors appear downstream in the procurement process and therefore have a negative impact on a project's performance. The lack of attention to quality, especially during the design process, has meant that rework has become an inevitable feature of the procurement process, and the costs have been found to be as high as 12.4% of total project costs. Such costs could be even higher because they do not represent schedule delays, litigation costs and other intangible costs of poor quality. To reduce the cost and effect of rework, an understanding of its causal structure is needed so that effective prevention strategies can be identified and the effects of rework reduced or eliminated. A case study approach based upon deductive and inductive reasoning is used to identify the major factors that influence rework in projects. From the findings and with reference to recent literature, the concept of system dynamics is used to develop a series of influence diagrams, which are then integrated to develop a conceptual causal loop model that is used to determine the overall causal structure of rework. Once an understanding of the causal structure of rework events has been acquired, effective strategies for rework prevention can be designed and implemented in order to improve project performance. This paper contributes to study of quality in construction by capturing the complexity and dynamism of those factors that influence rework and project performance in a holistic manner.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1984) · Cited by 81,983
The Discovery of Grounded Theory: Strategies for Qualitative Research.
Wagner, H. R., Glaser, B. G., & Strauss, A. L. (1968) · Social Forces · doi:10.2307/2575405 · Cited by 46,361
The Discovery of Grounded Theory: Strategies for Qualitative Research
Glaser, B. G., & Strauss, A. L. (2017) · Aldine (Routledge reprint) · doi:10.4324/9780203793206 · Cited by 25,789
The fifth discipline, the art and practice of the learning organization
Senge, P. M. (1991) · Performance + Instruction · doi:10.1002/pfi.4170300510 · Cited by 20,060
Building Theories from Case Study Research
Eisenhardt, K. M. (1989) · The Academy of Management Review · doi:10.2307/258557 · Cited by 17,455
Qualitative Data Analysis: A Sourcebook of New Methods
Lotto, L. S., Miles, M. B., & Huberman, A. M. (1986) · Educational Evaluation and Policy Analysis · doi:10.2307/1163741 · Cited by 10,315
Deming, W. E. (1982) · Medical Entomology and Zoology · Cited by 7,297
Mixing Qualitative and Quantitative Methods: Triangulation in Action.
Jick, T. D. (1979) · Administrative Science Quarterly · doi:10.2307/2392366 · Cited by 7,103
Systems Thinking, Systems Practice
Checkland, P. B. (1981) · Cumulative Index of Computer Aided Architectural Design · Cited by 6,256
Systems thinking, systems practice
(1982) · European Journal of Operational Research · doi:10.1016/0377-2217(82)90206-5 · Cited by 3,545
Management research: An introduction
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90354-5 · Cited by 3,032
Qualitative data analysis: A sourcebook of new methods
Dijkstra, L. (1985) · European Journal of Operational Research · doi:10.1016/0377-2217(85)90239-5 · Cited by 2,880
New rules of sociological method
Giddens, A. (1976) · Andalas University Repository (Andalas University) · Cited by 2,673
J, M., & A, A. K. (2020) · Skyfox Publishing Group eBooks · doi:10.22573/spg.020.bk/s/026 · Cited by 2,013
Zikmund, W. G. (1984) · Repository of the University of Ljubljana (University of Ljubljana) · Cited by 1,805
What is total quality control the japanese way
Ishikawa, K. (1985) · Cited by 1,790
The management and control of quality
Evans, J. R., & Lindsay, W. M. (1989) · Cited by 1,633
Application of the New Production Philosophy to Construction
Koskela, L., & Koskela, L. (1992) · Cited by 1,398
Juran's Quality Control Handbook
Ziegel, E. R. (1990) · Technometrics · doi:10.1080/00401706.1990.10484602 · Cited by 1,384
Parkhe, A. (1993) · The Academy of Management Review · doi:10.2307/258759 · Cited by 959
Product Quality, Cost Position and Business Performance: A Test of Some Key Hypotheses
Phillips, L. W., Chang, D. R., & Buzzell, R. D. (1983) · Journal of Marketing · doi:10.1177/002224298304700204 · Cited by 911
Schoderbek, P. P. (1971) · Cited by 527
The causes and costs of defects in construction
Josephson, P.-E., & Hammarlund, Y. (1999) · Automation in Construction · doi:10.1016/s0926-5805(98)00114-9 · Cited by 410
Doing research that is useful for theory and practice
Lawler, E. E. (1985) · Deep Blue (University of Michigan) · Cited by 372
From Practice to Grounded Theory: Qualitative Research in Nursing
WOLF, Z. R. (1987) · Nursing Research · doi:10.1097/00006199-198711000-00005 · Cited by 291
The role of system dynamics in project management
Rodrigues, A., & Bowers, J. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00075-5 · Cited by 240
Introduction to system dynamics
Shearer, J. L., Murphy, A. T., & Richardson, H. H. (1967) · Addison-Wesley eBooks · Cited by 223
The culture of the industry and the culture of research
Seymour, D., & Rooke, J. A. (1995) · Construction Management and Economics · doi:10.1080/01446199500000059 · Cited by 165
The Effects of Design Changes and Delays on Project Costs
Williams, T., Eden, C., Ackermann, F., et al. (1995) · Journal of the Operational Research Society · doi:10.1057/jors.1995.114 · Cited by 131
Vicious circles of parallelism
Williams, T., Eden, C., Ackermann, F., & Tait, A. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00034-n · Cited by 69
Manufacturing systems: foundations of world-class practice
(1992) · Choice Reviews Online · doi:10.5860/choice.29-6372 · Cited by 58
International Business Journal
(2015) · International Business Journal · doi:10.14365/ibj · Cited by 58
Kwok, T., & Hampson, K. D. (1997) · QUT ePrints (Queensland University of Technology) · Cited by 16
Cited by
Simulation in manufacturing and business: A review
Jahangirian, M., Eldabi, T., Naseer, A., Stergioulas, L. K., & Young, T. (2010) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.06.004 · Cited by 598
Quantifying the causes and costs of rework in construction
Love, P. E. D., & Li, H. (2000) · Construction Management and Economics · doi:10.1080/01446190050024897 · Cited by 486
Self-citationInfluence of Project Type and Procurement Method on Rework Costs in Building Construction Projects
Love, P. E. D. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:1(18 · Cited by 463
Self-citationMeasuring the Impact of Rework on Construction Cost Performance
Hwang, B.-G., Thomas, S. R., Haas, C. T., & Caldas, C. H. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:3(187 · Cited by 352
Taxonomy for change causes and effects in construction projects
Sun, M., & Meng, X. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.10.005 · Cited by 331
Metadata
- Authors
- LOVE, P. E. D., MANDAL, P., & LI, H.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 1999-07
- Volume
- 17
- Issue
- 4
- Pages
- 505-517
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W1967311507
- Cited by
- 211
- References
- 33
- FWCI
- 8.80
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.