Time‐based competition
The DOI matches its Crossref record; 13 of the 13 references it cites were found in a registry or an index.
Abstract
This study reports the experience of management from 83 electronic plants located in the USA in dealing with time‐based performance. The general finding is that by managing time effectively, a firm is able to enjoy reductions in manufacturing cost, warranty cost, and more importantly increased market shares. Also, despite some prominent features offered by some of the more advanced quality related techniques, such as quality function deployment technique (QFD) and the Taguchi methods, our survey showed that very few electronic firms in the sample have actually adopted either of these two techniques. Yet consistent with the robustness of these theories, results indicate that those firms embracing these methods experienced a greater reduction in product development time. Thus, our study has important implications for manufacturing firms, particularly those which are still searching for better ways to improve their product development time. For example, according to Ray Stata, the president of Analog Device “The thing that hung us up for the longest time in the product development area is that we didn’t have anybody in the company who had a clue as to how to improve product development. It wasn’t that we didn’t think it was important, but how do you do it?”.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
INTEGRATED MANUFACTURING AND HUMAN RESOURCE MANAGEMENT: A HUMAN CAPITAL PERSPECTIVE.
Snell, S. A., & Dean, J. W. (1992) · Academy of Management Journal · doi:10.2307/256484 · Cited by 1,306
Time – The Next Source of Competitive Advantage
Stalk, G. (2012) · The Roots of Logistics · doi:10.1007/978-3-642-27922-5_16 · Cited by 1,187
(2012) · Routledge eBooks · doi:10.4324/9780080493084-11 · Cited by 1,102
Taguchi's Parameter Design: A Panel Discussion
Nair, V. N., Abraham, B., MacKay, J., Box, G., Kacker, R. N., Lorenzen, T. J., Lucas, J. M., Myers, R. H., Vining, G. G., Nelder, J. A., et al. (1992) · Technometrics · doi:10.1080/00401706.1992.10484904 · Cited by 713
RELATIONSHIP BETWEEN JIT AND TQM: PRACTICES AND PERFORMANCE.
Flynn, B. B., Sakakibara, S., & Schroeder, R. G. (1995) · Academy of Management Journal · doi:10.2307/256860 · Cited by 654
Innovation Action Research: Creating New Management Theory and Practice.
Kaplan, R. S. (1998) · Journal of Management Accounting Research · doi:10.2308/jmar-2720278 · Cited by 445
Sterman, J. D., Repenning, N. P., & Kofman, F. (1997) · Management Science · doi:10.1287/mnsc.43.4.503 · Cited by 361
Relevance Regained: From Top-down Control to Bottom-up Empowerment
Johnson, H. T. (1992) · Cited by 334
Accounting, “economic citizenship” and the spatial reordering of manufacture
Miller, P., & O'Leary, T. (1994) · Accounting, Organizations and Society · doi:10.1016/0361-3682(94)90011-6 · Cited by 329
Cited by
Product Development Decisions: A Review of the Literature
Krishnan, V., & Ulrich, K. T. (2001) · Management Science · doi:10.1287/mnsc.47.1.1.10668 · Cited by 1,701
Quality function deployment: A literature review
Chan, L.-K., & Wu, M.-L. (2002) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00178-9 · Cited by 1,087
Wong, C. Y., Boon‐itt, S., & Wong, C. W. Y. (2011) · Journal of Operations Management · doi:10.1016/j.jom.2011.01.003 · Cited by 1,083
Koufteros, X., Vonderembse, M., & Jayaram, J. (2005) · Decision Sciences · doi:10.1111/j.1540-5915.2005.00067.x · Cited by 855
Koufteros, X. A. (1999) · Journal of Operations Management · doi:10.1016/s0272-6963(99)00002-9 · Cited by 725
Zhang, Q., Vonderembse, M. A., & Lim, J. (2003) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00067-0 · Cited by 601
Koufteros, X. A., Edwin Cheng, T. C., & Lai, K. (2007) · Journal of Operations Management · doi:10.1016/j.jom.2006.10.009 · Cited by 514
Developing Market Specific Supply Chain Strategies
Christopher, M., & Towill, D. R. (2002) · The International Journal of Logistics Management · doi:10.1108/09574090210806324 · Cited by 474
Tracey, M., Vonderembse, M. A., & Lim, J. (1999) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00045-x · Cited by 461
Sila, I., & Ebrahimpour, M. (2002) · International Journal of Quality & Reliability Management · doi:10.1108/02656710210434801 · Cited by 441
The production performance benefits from JIT implementation
Fullerton, R. R., & McWatters, C. S. (2001) · Journal of Operations Management · doi:10.1016/s0272-6963(00)00051-6 · Cited by 405
The impact of organizational structure on time‐based manufacturing and plant performance
Nahm, A. Y., Vonderembse, M. A., & Koufteros, X. A. (2003) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00107-9 · Cited by 336
Ward, P., & Zhou, H. (2006) · Decision Sciences · doi:10.1111/j.1540-5915.2006.00121.x · Cited by 309
Mackelprang, A. W., & Nair, A. (2010) · Journal of Operations Management · doi:10.1016/j.jom.2009.10.002 · Cited by 302
Koufteros, X. A., Vonderembse, M. A., & Doll, W. J. (2002) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00018-9 · Cited by 274
Concurrent engineering and its consequences
Koufteros, X., Vonderembse, M., & Doll, W. (2001) · Journal of Operations Management · doi:10.1016/s0272-6963(00)00048-6 · Cited by 261
Sources of volume flexibility and their impact on performance
Jack, E. P., & Raturi, A. (2002) · Journal of Operations Management · doi:10.1016/s0272-6963(01)00079-1 · Cited by 237
Measuring the Effectiveness of Overlapping Development Activities
Terwiesch, C., & Loch, C. H. (1999) · Management Science · doi:10.1287/mnsc.45.4.455 · Cited by 229
Koufteros, X., & Marcoulides, G. A. (2006) · International Journal of Production Economics · doi:10.1016/j.ijpe.2005.08.004 · Cited by 218
The Impact of Organizational Culture on Time‐Based Manufacturing and Performance
Nahm, A. Y., Vonderembse, M. A., & Koufteros, X. A. (2004) · Decision Sciences · doi:10.1111/j.1540-5915.2004.02660.x · Cited by 212
Fox, M. S., Barbuceanu, M., & Gruninger, M. (1996) · Computers in Industry · doi:10.1016/0166-3615(95)00079-8 · Cited by 200
Developing measures of time‐based manufacturing
Koufteros, X. A., Vonderembse, M. A., & Doll, W. J. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(97)00027-2 · Cited by 191
Godinho Filho, M., Ganga, G. M. D., & Gunasekaran, A. (2016) · International Journal of Production Research · doi:10.1080/00207543.2016.1201606 · Cited by 182
Bevilacqua, M., Ciarapica, F. E., & De Sanctis, I. (2017) · International Journal of Production Research · doi:10.1080/00207543.2016.1211346 · Cited by 164
Metadata
- Authors
- Ling Sim, K., & Curatola, A. P.
- Venue
- International Journal of Quality & Reliability Management
- Publisher
- Emerald
- Published
- 1999-10-01
- Volume
- 16
- Issue
- 7
- Pages
- 659-674
- ISSN
- 0265-671X (ISSN-L)
- OpenAlex
- W2048867223
- Cited by
- 167
- References
- 13
- FWCI
- 36.56
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.