CoChat

Development of the time management environment (TiME) scale

Burt, Christopher D.B., Weststrate, Alexandra, Brown, Caroline, Champion, Felicity · 2010 · Journal of Managerial Psychology
Cited by 26

The DOI matches its Crossref record; 8 of the 8 references it cites were found in a registry or an index.

Abstract

Purpose: The purpose of this paper is to propose an integrative model of time management, and in particular develop a scale to measure organizational variables which would facilitate and support time management practices. The research also examined whether the time management environment is related to turnover intentions and stress. Design/methodology/approach: Three studies are reported. Study 1 sampled 262 employees from 20 organizations and these data were used for the initial factor analysis of the time management environment (TiME) scale. Study 2 sampled 205 employees from an aircraft maintenance organization, and these data were used to further refine the factor structure of the TiME scale, to conduct a CFA, examine the relationship between the TiME scale factors and turnover intentions, and to examine the test‐retest reliability of the TiME scale. Study 3 sampled 156 employees across eight organizations, and these data were used to examine the relationship between the TiME scale factors and stress. Findings: The TiME scale has five factors, and each has acceptable internal consistency and test‐retest reliability. TiME scale factor scores were negatively correlated with both turnover intentions and stress. Research limitations/implications: The research did not examine the convergent and discriminant validity of the TiME scale. Practical implications: The TiME scale provides for the assessment of whether an organization's environment is facilitating and supporting its employees' attempts to engage in time management, and can also be used as a measure of transfer climate for time management training interventions. Originality/value: The TiME scale addresses a gap in the time management literature. It has considerable applied value, and along with our integrative model should allow for the development of a more complex understanding of the time management process.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1108/02683941011056978

Cites

8 of 8 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 8 references

Research works printed but not linked: 46

  1. Barling, J., Kelloway, E.K. and Cheung, D. (1996), “Time management and achievement striving interact to predict car sales performance”, Journal of Applied Psychology, Vol. 81, pp. 821‐6. · DOI · Paper page
  2. Bentler, P.M. and Chou, C.P. (1987), “Practical issues in structural modeling”, Sociological Methods and Research, Vol. 16, pp. 78‐117. · DOI · Paper page
  3. Bluedorn, A.C., Kaufman, C.F. and Lane, P.M. (1992), “How many things do you like to do at once? An introduction to monochronic and ploychronic time”, Academy of Management Executive, Vol. 6, pp. 17‐26. · DOI · Paper page
  4. Bond, M.J. and Feather, N.T. (1988), “Some correlates of structure and purpose in the use of time”, Journal of Personality and Social Psychology, Vol. 55, pp. 321‐9. · DOI · Paper page
  5. Breaugh, J.A. and Colihan, J.P. (1994), “Measuring facets of job ambiguity: construct validity evidence”, Journal of Applied Psychology, Vol. 79, pp. 191‐202. · doi:10.1037/0021-9010.79.2.191 · Paper page
  6. Browne, M.W. and Cudeck, R. (1993), “Alternative ways of assessing model fit”, in Bollen, K.A. and Long, J.S. (Eds), Testing Structural Equation Models, Sage, Newbury Park, CA, pp. 136‐62.
  7. Burt, C.D.B. and Forsyth, D.K. (2001), “Relationships between supervisor behaviour, family support, and perceived time management ability”, New Zealand Journal of Psychology, Vol. 30, pp. 4‐8.
  8. Claessens, B.J.C., Van Eerde, W., Rutte, C.R. and Roe, R.A. (2004), “Planning behavior and perceived control of time at work”, Journal of Organizational Behavior, Vol. 25, pp. 937‐50. · DOI · Paper page
  9. Cohen, S., Kamark, T. and Mermelstein, R. (1983), “A global measure of perceived stress”, Journal of Health and Social Behaviour, Vol. 24, pp. 385‐96. · DOI · Paper page
  10. Colarelli, S.M. (1984), “Methods of communication and mediating process in realistic job previews”, Journal of Applied Psychology, Vol. 69, pp. 633‐42. · doi:10.1037/0021-9010.69.4.633 · Paper page
  11. Dishon‐Berkovitis, M. and Koslowsky, M. (2002), “Determinants of employee punctually”, Journal of Social Psychology, Vol. 142, pp. 723‐39. · DOI
  12. Edwards, J.R., Cable, D.M., Williamson, I.O., Lambert, L.S. and Shipp, A.J. (2006), “The phenomenology of fit: linking the person and environment to the subjective experience of person‐environment fit”, Journal of Applied Psychology, Vol. 91, pp. 802‐27. · DOI · Paper page
  13. Francis‐Smythe, J.A. and Robertson, I.T. (2003), “The importance of time congruity in the organization”, Applied Psychology: An International Review, Vol. 52, pp. 298‐321. · DOI
  14. Francis‐Smythe, J.A. and Robertson, I.T. (1999), “Time‐related individual differences”, Time and Society, Vol. 8, pp. 273‐92. · DOI · Paper page
  15. Greenberg, J. (2002), “Time urgency and job performance: field evidence of an interactionist perspective”, Journal of Applied Social Psychology, Vol. 32, pp. 1964‐73. · DOI
  16. Griffeth, R.W., Hom, P.W. and Gaertner, S. (2000), “A meta‐analysis of antecedents and correlates of employee turnover: updated, moderator tests, and research implications for the next millennium”, Journal of Management, Vol. 26, pp. 463‐88. · DOI · Paper page
  17. Howell, D.C. (1997), Statistical Methods for Psychology, 4th ed., Duxbury Press, Belmont, CA.
  18. Idaszak, J.R. and Drasgow, F. (1987), “A revision of the Job Diagnostic Survey: elimination of a measurement artifact”, Journal of Applied Psychology, Vol. 72, pp. 69‐74. · doi:10.1037/0021-9010.72.1.69 · Paper page
  19. Janicik, G.A. and Bartel, C.A. (2003), “Talking about time: effects of temporal planning and time awareness norms on group coordination and performance”, Group Dynamics: Theory, Research and Practice, Vol. 7, pp. 122‐34. · DOI
  20. Jex, S.M. and Elacqua, T.C. (1999), “Time management as a moderator of relations between stressors and employee strain”, Work and Stress, Vol. 13, pp. 182‐91. · DOI · Paper page
  21. Johnston, M., Wright, S. and Weinman, J. (1995), Measures in Health Psychology: A User's Portfolio. Stress, Emotion and Life Events, Vol. 3, NFER‐Nelson, Windsor.
  22. Kaufman, C.F., Lane, P.M. and Lindquist, J.D. (1991), “Time congruity in the organisation: a proposed quality‐of‐life framework”, Journal of Business and Psychology, Vol. 6, pp. 79‐106. · DOI
  23. Kaufman‐Scarborough, C. and Lindquist, J.D. (1999), “Time management and polychronicity: comparisons, contrasts and insights for the workplace”, Journal of Managerial Psychology, Vol. 14, pp. 288‐312. · DOI · Paper page
  24. Kline, P. (2000), The Handbook of Psychological Testing, Routledge, London.
  25. Landy, F.J., Rastegary, H., Thayer, J. and Colvin, C. (1991), “Time urgency: the construct and its measurement”, Journal of Applied Psychology, Vol. 76, pp. 644‐57. · doi:10.1037/0021-9010.76.5.644 · Paper page
  26. Lang, D. (1992), “Preventing short‐term strain through time‐management coping”, Work and Stress, Vol. 6, pp. 169‐76. · DOI
  27. Lay, C.H. and Schouwenburg, H.C. (1993), “Trait procrastination, time management, and academic behavior”, Journal of Social Behavior and Personality, Vol. 8, pp. 647‐62.
  28. Lee, H. and Liebenau, J. (1999), “Time in organizational studies: towards a new research direction”, Organizational Studies, Vol. 20, pp. 1035‐58. · DOI · Paper page
  29. McGrath, J.E. and Rotchford, N.L. (1983), “Time and behaviour in organizations”, in Staw, B.M. and Cummings, L.L. (Eds), Research in Organizational Behaviour, JAI Press, Greenwich, CT, pp. 57‐101.
  30. Moos, R. (1994), Work Environment Scale Manual, 3rd ed., Consulting Psychologists Press, Palo Alto, CA.
  31. Morgeson, F.P., Reider, M.H. and Campion, M.A. (2005), “Selecting individuals in team settings: the importance of social skills, personality characteristics and teamwork knowledge”, Personnel Psychology, Vol. 58, pp. 583‐611. · DOI · Paper page
  32. Nonis, S.A., Hudson, G.I., Logan, L.B. and Ford, C.W. (1998), “Influence of perceived control over time on college students' stress and stress‐related outcomes”, Research in Higher Education, Vol. 39, pp. 587‐605. · DOI
  33. Orlikowski, W.J. and Yates, J. (2002), “Its about time: temporal structuring in organizations”, Organizational Science, Vol. 13, pp. 684‐700. · DOI · Paper page
  34. Peeters, M.G.A. and Rutte, C.G. (2005), “Time management behavior as a moderator for the job‐demand‐control interaction”, Journal of Occupational Health Psychology, Vol. 10, pp. 64‐75. · DOI · Paper page
  35. Schriber, J.B. and Gutek, B.A. (1987), “Some time dimensions of work: measurement of an underlying aspect of organization culture”, Journal of Applied Psychology, Vol. 72, pp. 642‐50. · doi:10.1037/0021-9010.72.4.642 · Paper page
  36. Schriesheim, C.A., Solomon, E. and Kopelman, R.E. (1989), “Grouped versus randomized format: an investigation of scale convergent and discriminant validity using LISREL confirmatory factor analysis”, Applied Psychological Measurement, Vol. 13, pp. 19‐32. · DOI · Paper page
  37. Schuler, R.S. (1979), “Managing stress means managing time”, Personnel Journal, December, pp. 851‐4.
  38. Slaven, G. and Totterdell, P. (1993), “Time management training does it transfer to the workplace?”, Journal of Managerial Psychology, Vol. 8, pp. 20‐8. · DOI · Paper page
  39. Van Eerde, W. (2003), “Procrastination at work and time management training”, Journal of Psychology, Vol. 137, pp. 421‐34. · DOI · Paper page
  40. Waller, M.J., Conte, J.M., Gibson, C.B. and Carpenter, M.A. (2001), “The effect of individual perceptions of deadlines on team performance”, Academy of Management Review, Vol. 26, pp. 586‐600. · doi:10.5465/amr.2001.5393894 · Paper page
  41. Weldon, E., Jehn, K.A. and Pradhan, P. (1991), “Processes that mediate the relationship between a group goal and improved group performance”, Journal of Personality and Social Psychology, Vol. 61, pp. 555‐69. · doi:10.1037/0022-3514.61.4.555
  42. Wessman, A.E. (1973), “Personality and the subjective experience of time”, Journal of Personality Assessment, Vol. 37, pp. 103‐14. · DOI · Paper page
  43. Williams, R.L., Verble, J.S., Price, D.E. and Layne, B.H. (1995), “Relationships between support for time management processes and personality indices and types”, Journal of Psychological Type, Vol. 34, pp. 36‐42.
  44. Yelon, S. (1992), “M.A.S.S.: a model for producing transfer”, Performance Improvement Quarterly, Vol. 5, pp. 13‐23. · doi:10.1111/j.1937-8327.1992.tb00542.x
  45. Yelon, S.L. and Ford, J.K. (1999), “Pursuing a multi‐dimensional model of transfer”, Performance Improvement Quarterly, Vol. 12, pp. 58‐78. · DOI · Paper page
  46. Yitzhak, F. and Slowik, L.H. (2004), “Enriching goal‐setting theory with time: an integrated approach”, Academy of Management Review, Vol. 29, pp. 404‐22. · doi:10.5465/amr.2004.13670973 · Paper page

Cited by

See all 26

Metadata

Authors
Burt, C. D. B., Weststrate, A., Brown, C., & Champion, F.
Venue
Journal of Managerial Psychology
Publisher
Emerald
Published
2010-08-17
Volume
25
Issue
6
Pages
649-668
ISSN
0268-3946 (ISSN-L)
OpenAlex
W1995432464
Cited by
26
References
8
FWCI
1.24
Type
journal article
Language
en
Open access
closed
Licence
www.emerald.com/insight/site-policies (tdm)

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Development of the time management environment (TiME) scale. https://app.cochat.ai/papers/10.1108/02683941011056978
The paper
Burt, C. D. B., Weststrate, A., Brown, C., & Champion, F. (2010). Development of the time management environment (TiME) scale. Journal of Managerial Psychology. https://doi.org/10.1108/02683941011056978

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.