Value stream mapping as a versatile tool for lean implementation: an Indian case study of a manufacturing firm
The DOI matches its Crossref record; 33 of the 35 references it cites were found in a registry or an index, and 1 are not checked yet.
Abstract
Through this case study, the existing stage of manufacturing is mapped and the biggest improvement areas like excessive WIP, lead time, cycle time, are identified.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Citations
Cites
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
Monden, Y. (1993) · Springer eBooks · doi:10.1007/978-1-4615-9714-8 · Cited by 1,303
Abdulmalek, F. A., & Rajgopal, J. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.09.009 · Cited by 1,046
Japanese Manufacturing Techniques: Nine Hidden Lessons in Simplicity
Mitchell, P. S., & Schonberger, R. J. (1983) · The Academy of Management Review · doi:10.2307/257841 · Cited by 976
The seven value stream mapping tools
Hines, P., & Rich, N. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710157989 · Cited by 944
Beyond Partnership: Strategies for Innovation and Lean Supply
Richardson, J. (1994) · Journal of International Business Studies · doi:10.1057/jibs.1994.42 · Cited by 916
(1994) · ORCA Online Research @Cardiff (Cardiff University) · Cited by 721
An initial classification of supply networks
Lamming, R., Johnsen, T., Zheng, J., & Harland, C. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010321667 · Cited by 472
Classification scheme for lean manufacturing tools
Pavnaskar, S. J., Gershenson, J. K., & Jambekar, A. B. (2003) · International Journal of Production Research · doi:10.1080/0020754021000049817 · Cited by 466
Hines, P., Rich, N., Bicheno, J., Brunt, D., Taylor, D., Butterworth, C., & Sullivan, J. (1998) · The International Journal of Logistics Management · doi:10.1108/09574099810805726 · Cited by 358
Research works printed but not linked: 9
- Adams, E.K. and Willetts, K.J. (1996), The Lean Communication Provider, McGraw‐Hill, New York, NY.
- Beesley, A. (1994), “A need for time based process mapping and its application in procurement”, Proceedings of 3rd Annual IPSERA Conference, University of Glamorgan, pp. 41‐56.
- Cusumano, M.A. and Nobeoka, K. (1998), Thinking Beyond Lean, Free Press, New York, NY.
- Forza, C., Vinelli, A. and Filippini, R. (1993), “Telecommunication services for quick response in the textile‐apparel industry”, Proceedings of the 1st International Symposium on Logistics, University of Nottingham, pp. 119‐26.
- Grewal, C.S. and Sareen, K.K. (2006), “Development of model for lean improvement: a case study of automobile industry”, Industrial Engineering Journal, Vol. xxxv No. 5, pp. 24‐7.
- Grewal, C. and Singh, B. (2006), “Application of value stream mapping in a traditional Indian environment: a case study”, International Conference on Advances in Mechanical Engineering – 2006 (AME 2006), December 1‐3, 2006, pp 127‐133(M‐III).
- Hines, P. (1999), “Value stream management: next frontier in supply chain”, Logistics Focus, Vol. 1 No. 3, pp. 36‐9.
- Jessop, D. and Jones, O. (1995), “Value stream process modeling: a methodology for creating competitive advantage”, Proceedings of 4th Annual IPSERA Conference, University of Birmingham.
- Rother, M. and Shook, J. (1999), Learning to See: Value Stream Mapping to Create Value and Eliminate Muda, Lean Enterprise Institute, Cambridge, MA.
Cited by
Lean manufacturing: literature review and research issues
Bhamu, J., & Singh Sangwan, K. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2012-0315 · Cited by 983
The impact of lean methods and tools on the operational performance of manufacturing organisations
Belekoukias, I., Garza-Reyes, J. A., & Kumar, V. (2014) · International Journal of Production Research · doi:10.1080/00207543.2014.903348 · Cited by 474
“Constructs/fitness indices NFI RFI IFI CFI RMSEA χ2/df Quality 0.997 0.930 1.002 1.000 0.000 0.6 Speed 0.997 0.945 1.003 1.000 0.000 0.5 Dependability 0.997 0.927 1.002 1.000 0.000 0.7 Flexibility 0.997 0.943 1.002 1.000 0.000 0.5 Cost 0.999 0.989 1.005 1.000 0.000 0.1 Singh and Sharma 2009).”
BackgroundInfluentialLean manufacturing and sustainable performance: Trends and future challenges
Henao, R., Sarache, W., & Gómez, I. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.10.116 · Cited by 314
Lean implementation and its benefits to production industry
Singh, B., Garg, S. K., Sharma, S. K., & Grewal, C. (2010) · International Journal of Lean Six Sigma · doi:10.1108/20401461011049520 · Cited by 223
Self-citationForno, A. J. D., Pereira, F. A., Forcellini, F. A., & Kipper, L. M. (2014) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-014-5712-z · Cited by 222
Metadata
- Authors
- Singh, B., & Sharma, S. K.
- Affiliations
- Galgotias University (IN)
- National Institute of Technology Kurukshetra (IN)
- Venue
- Measuring Business Excellence
- Publisher
- Emerald
- Published
- 2009-08-28
- Volume
- 13
- Issue
- 3
- Pages
- 58-68
- ISSN
- 1368-3047 (ISSN-L)
- OpenAlex
- W2022826076
- Cited by
- 133
- References
- 35
- Citations by year
- 2026: 3 · 2025: 3 · 2024: 4 · 2023: 3 · 2022: 5 · 2021: 8 · 2020: 6 · 2019: 15 · 2018: 23 · 2017: 10 · 2016: 7 · 2015: 7 · 2014: 17 · 2013: 8 · 2012: 7
- FWCI
- 8.74
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emerald.com/insight/site-policies (tdm)
- Locations
- Measuring Business Excellence (publishedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Digital Transformation in Industry
- Keywords
- value stream mapping, lean manufacturing, lean implementation, work-in-process reduction, lead time reduction, cycle time reduction, takt time, continuous improvement, production process improvement
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Value stream mapping as a versatile tool for lean implementation: an Indian case study of a manufacturing firm. https://app.cochat.ai/papers/10.1108/13683040910984338
- The paper
- Singh, B., & Sharma, S. K. (2009). Value stream mapping as a versatile tool for lean implementation: an Indian case study of a manufacturing firm. Measuring Business Excellence. https://doi.org/10.1108/13683040910984338
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.