Value stream mapping as a versatile tool for lean implementation: an Indian case study of a manufacturing firm
The DOI matches its Crossref record; 33 of the 35 references it cites were found in a registry or an index, and 1 are not checked yet.
Abstract
Through this case study, the existing stage of manufacturing is mapped and the biggest improvement areas like excessive WIP, lead time, cycle time, are identified.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Citations
Cites
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
Monden, Y. (1993) · Springer eBooks · doi:10.1007/978-1-4615-9714-8 · Cited by 1,303
Abdulmalek, F. A., & Rajgopal, J. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.09.009 · Cited by 1,046
Japanese Manufacturing Techniques: Nine Hidden Lessons in Simplicity
Mitchell, P. S., & Schonberger, R. J. (1983) · The Academy of Management Review · doi:10.2307/257841 · Cited by 976
The seven value stream mapping tools
Hines, P., & Rich, N. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710157989 · Cited by 944
Beyond Partnership: Strategies for Innovation and Lean Supply
Richardson, J. (1994) · Journal of International Business Studies · doi:10.1057/jibs.1994.42 · Cited by 916
(1994) · ORCA Online Research @Cardiff (Cardiff University) · Cited by 721
An initial classification of supply networks
Lamming, R., Johnsen, T., Zheng, J., & Harland, C. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010321667 · Cited by 472
Classification scheme for lean manufacturing tools
Pavnaskar, S. J., Gershenson, J. K., & Jambekar, A. B. (2003) · International Journal of Production Research · doi:10.1080/0020754021000049817 · Cited by 466
Hines, P., Rich, N., Bicheno, J., Brunt, D., Taylor, D., Butterworth, C., & Sullivan, J. (1998) · The International Journal of Logistics Management · doi:10.1108/09574099810805726 · Cited by 358
Research works printed but not linked: 9
- Adams, E.K. and Willetts, K.J. (1996), The Lean Communication Provider, McGraw‐Hill, New York, NY.
- Beesley, A. (1994), “A need for time based process mapping and its application in procurement”, Proceedings of 3rd Annual IPSERA Conference, University of Glamorgan, pp. 41‐56.
- Cusumano, M.A. and Nobeoka, K. (1998), Thinking Beyond Lean, Free Press, New York, NY.
- Forza, C., Vinelli, A. and Filippini, R. (1993), “Telecommunication services for quick response in the textile‐apparel industry”, Proceedings of the 1st International Symposium on Logistics, University of Nottingham, pp. 119‐26.
- Grewal, C.S. and Sareen, K.K. (2006), “Development of model for lean improvement: a case study of automobile industry”, Industrial Engineering Journal, Vol. xxxv No. 5, pp. 24‐7.
- Grewal, C. and Singh, B. (2006), “Application of value stream mapping in a traditional Indian environment: a case study”, International Conference on Advances in Mechanical Engineering – 2006 (AME 2006), December 1‐3, 2006, pp 127‐133(M‐III).
- Hines, P. (1999), “Value stream management: next frontier in supply chain”, Logistics Focus, Vol. 1 No. 3, pp. 36‐9.
- Jessop, D. and Jones, O. (1995), “Value stream process modeling: a methodology for creating competitive advantage”, Proceedings of 4th Annual IPSERA Conference, University of Birmingham.
- Rother, M. and Shook, J. (1999), Learning to See: Value Stream Mapping to Create Value and Eliminate Muda, Lean Enterprise Institute, Cambridge, MA.
Cited by
Lean manufacturing: literature review and research issues
Bhamu, J., & Singh Sangwan, K. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2012-0315 · Cited by 983
The impact of lean methods and tools on the operational performance of manufacturing organisations
Belekoukias, I., Garza-Reyes, J. A., & Kumar, V. (2014) · International Journal of Production Research · doi:10.1080/00207543.2014.903348 · Cited by 474
“Constructs/fitness indices NFI RFI IFI CFI RMSEA χ2/df Quality 0.997 0.930 1.002 1.000 0.000 0.6 Speed 0.997 0.945 1.003 1.000 0.000 0.5 Dependability 0.997 0.927 1.002 1.000 0.000 0.7 Flexibility 0.997 0.943 1.002 1.000 0.000 0.5 Cost 0.999 0.989 1.005 1.000 0.000 0.1 Singh and Sharma 2009).”
BackgroundInfluentialLean manufacturing and sustainable performance: Trends and future challenges
Henao, R., Sarache, W., & Gómez, I. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.10.116 · Cited by 314
Lean implementation and its benefits to production industry
Singh, B., Garg, S. K., Sharma, S. K., & Grewal, C. (2010) · International Journal of Lean Six Sigma · doi:10.1108/20401461011049520 · Cited by 223
Self-citationForno, A. J. D., Pereira, F. A., Forcellini, F. A., & Kipper, L. M. (2014) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-014-5712-z · Cited by 222
Lean manufacturing performance in Indian manufacturing plants
Ghosh, M. (2012) · Journal of Manufacturing Technology Management · doi:10.1108/17410381311287517 · Cited by 201
Value stream mapping: literature review and implications for Indian industry
Singh, B., Garg, S. K., & Sharma, S. K. (2011) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-010-2860-7 · Cited by 194
Self-citationInternational Journal of Advance Engineering and Research Development
(2018) · International Journal of Advance Engineering and Research Development · doi:10.21090/ijaerd · Cited by 146
Lean manufacturing implementation using value stream mapping as a tool
Jasti, N. V. K., & Sharma, A. K. (2014) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-04-2012-0002 · Cited by 159
“to identify and remove the waste from any procedures (Shah and Ward, 2003, 2007; Singh and Sharma, 2009).”
Process improvement through Lean-Kaizen using value stream map: a case study in India
Kumar, S., Dhingra, A. K., & Singh, B. (2018) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-018-1684-8 · Cited by 184
Self-citationEmpirical assessment of the future adequacy of value stream mapping in manufacturing industries
Lugert, A., Batz, A., & Winkler, H. (2018) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-11-2017-0236 · Cited by 130
Applying Value Stream Mapping in Manufacturing: A Systematic Literature Review
Romero, L. F., & Arce, A. (2017) · IFAC-PapersOnLine · doi:10.1016/j.ifacol.2017.08.385 · Cited by 81
Improvement of laboratory turnaround time using lean methodology
Gupta, S., Kapil, S., & Sharma, M. (2018) · International Journal of Health Care Quality Assurance · doi:10.1108/ijhcqa-08-2016-0116 · Cited by 104
Andreadis, E., Garza‐Reyes, J. A., & Kumar, P. V. (2017) · International Journal of Production Research · doi:10.1080/00207543.2017.1347302 · Cited by 92
“…to other lean tools in order to explore whether VSM’s description as a simple, time-efficient and easy to comprehend tool stands valid in the modern manufacturing environment (Rother and Shook 1998; Abdulmalek and Rajgopal 2007; Singh and Sharma 2009; Chowdary and George 2011; Tyagi et al. 2015).”
BackgroundResultMatt, D. T. (2014) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-05-2012-0054 · Cited by 77
Schmidtke, D. C., Heiser, U., & Hinrichsen, O. (2014) · International Journal of Production Research · doi:10.1080/00207543.2014.917770 · Cited by 84
“Seth and Gupta (2005) as well as Singh and Sharma (2009) successfully applied VSM in the Indian automotive industry.”
BackgroundLean road transportation – a systematic method for the improvement of road transport operations
Villarreal, B., Garza‐Reyes, J. A., & Kumar, P. V. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1152405 · Cited by 61
“…case study suggest that VSM, a lean tool that has successfully been applied to study the value streams of manufacturing (e.g. Seth and Gupta 2005; Singh and Sharma 2009), service (e.g. Barber and Tietje 2008), health care (e.g. Lummus, Vokurka, and Rodeghiero 2006; Teichgräber and de Bucourt…”
BackgroundMethodResultInfluentialImproving road transport operations through lean thinking: a case study
Villarreal, B., Garza‐Reyes, J. A., Kumar, P. V., & Lim, M. K. (2016) · International Journal of Logistics Research and Applications · doi:10.1080/13675567.2016.1170773 · Cited by 59
“The use of VSM to document, visualise, quantify and comprehend the material and information flows of value streams in manufacturing operations (e.g. Singh and Sharma, 2009; Seth and Gupta, 2005), healthcare operations (e.g. Lumus et al., 2006; Teichgräber and de Bucourt, 2012), environmental-based…”
MethodApplication of lean manufacturing using value stream mapping in an auto‐parts manufacturing unit
Singh, H., & Singh, A. (2013) · Journal of Advances in Management Research · doi:10.1108/09727981311327776 · Cited by 58
Scope for lean implementation: a survey of 127 Indian industries
Singh, B., Garg, S. K., & Sharma, S. K. (2010) · International Journal of Rapid Manufacturing · doi:10.1504/ijrapidm.2010.034253 · Cited by 53
Self-citationA value stream mapping and simulation hybrid approach: application to glass industry
Atieh, A. M., Kaylani, H. A., Almuhtady, A., & Al-Tamimi, O. (2015) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-015-7805-8 · Cited by 63
“It was initially developed with an underlying rationale for the collection and use of the suite of tools as being “to help researchers or practitioners to identify waste in individual value streams and, hence, find an appropriate route to its removal” [10].”
BackgroundEmpirical assessment of the causal relationships among lean criteria using DEMATEL method
Sharma, V., Dixit, A. R., & Qadri, M. A. (2016) · Benchmarking An International Journal · doi:10.1108/bij-08-2014-0078 · Cited by 57
A VSM improvement-based approach for lean operations in an Indian manufacturing SME
Saboo, A., Garza‐Reyes, J. A., Er, A., & Kumar, V. (2014) · International Journal of Lean Enterprise Research · doi:10.1504/ijler.2014.062281 · Cited by 61
Bhamu, J., Kumar, J. V. S., & Sangwan, K. S. (2012) · International Journal of Productivity and Quality Management · doi:10.1504/ijpqm.2012.048751 · Cited by 52
Lean manufacturing implementation in an automated production line: a case study
Bhamu, J., Khandelwal, A., & Sangwan, K. S. (2013) · International Journal of Services and Operations Management · doi:10.1504/ijsom.2013.054883 · Cited by 52
Exploring the Greening of the Food Supply Chain with Lean Thinking Techniques
Folinas, D. K., Aidonis, D., Triantafillou, D. J., & Μαλινδρέτος, Γ. (2013) · Procedia Technology · doi:10.1016/j.protcy.2013.11.054 · Cited by 58
“Reader can check the following studies for more details [40, 41, 42, 43, 44, 45, 46].”
BackgroundApplication of lean manufacturing in automotive manufacturing unit
Singh, J., & Singh, H. (2019) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-06-2018-0060 · Cited by 78
(2011) · Cited by 46
Alaya, L. B. F. B. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1165305 · Cited by 49
“…it should be noticed that a large number of VSM analysis research has used case studies (Seth and Gupta 2005; Abdulmalek and Rajgopal 2007; Ramesh, Sreenivasa Prasad, and Srinivas 2008; Serrano et al., 2008, 2009; Seth, Seth, and Goel 2008; Singh and Sharma 2009; Lacerda, Xambre, and Alvelos 2016).”
Sunk, A., Kuhlang, P., Edtmayr, T., et al. (2016) · International Journal of Production Research · doi:10.1080/00207543.2016.1272764 · Cited by 42
“(Singh and Sharma 2009; Chen, Li, and Shady 2010; Green, Lee, and Kozman 2010; Seyedhosseini et al. 2013) in production, logistics, trade, textile industry and medical services (Saleeshya and Raghuram 2012; Villarreal 2012; Xie and Peng 2012).”
BackgroundCombining factory simulation with value stream mapping: a critical discussion
Antonelli, D., & Stadnicka, D. (2018) · Procedia CIRP · doi:10.1016/j.procir.2017.12.171 · Cited by 42
“There are occurrences of the method in manufacturing processes (Rahani and al-Ashraf, 2012; Jeyaray et al., 2013; Grewal 2008; Singh and Sharma, 2009), in business processes (Teichgräber and de Bucourt, 2012) and in administrative ones (Joseph and Ronald, 2012).”
MethodRafique, M. Z., Rahman, M. N. A., Saibani, N., & Arsad, N. (2017) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2017.1308818 · Cited by 46
“which helps in detection and reduction of wastes 38 Timans, Ahaus, van Solingen, Kumar, and Antony (2016) Implementation of continuous improvement based on Lean Six Sigma in small- and medium-sized enterprises Literature review Not mentioned Implementation framework Theproposed framework was the upgradation of a previ…”
BackgroundModelo metodológico de implementación de lean manufacturing
Yépez, M. P. S., Villamarín, G. A. F., & Bocanegra-Herrera, C. C. (2017) · Revista Escuela de Administración de Negocios · doi:10.21158/01208160.n83.2017.1825 · Cited by 118
Interpretive framework for analyzing lean implementation using ISM and IRP modeling
Chaple, A. P., Narkhede, B. E., Akarte, M., & Raut, R. D. (2018) · Benchmarking An International Journal · doi:10.1108/bij-07-2017-0177 · Cited by 36
Lean manufacturing implementation using value stream mapping at excavator manufacturing company
Masuti, P. M., & Dabade, U. (2019) · Materials Today Proceedings · doi:10.1016/j.matpr.2019.07.740 · Cited by 35
Tripathi, V., Chattopadhyaya, S., Mukhopadhyay, A., Saraswat, S., Sharma, S. K., Li, C., Rajkumar, S., & Georgise, F. B. (2022) · Mathematical Problems in Engineering · doi:10.1155/2022/6424869 · Cited by 51
“Singh Sharma [38] 2009 VSM LT, processing time, WIP Manpower”
BackgroundMethodInfluentialSelf-citationDhingra, A. K., Kumar, S., & Singh, B. (2019) · International Journal of Systems Assurance Engineering and Management · doi:10.1007/s13198-019-00810-z · Cited by 43
Self-citationAl‐Hakimi, M. A., Goaill, M. M., Al‐Hattami, H. M., Murshid, M. A., Saleh, M. H., & Moghalles, S. A. M. (2022) · International Journal of Quality & Reliability Management · doi:10.1108/ijqrm-12-2021-0443 · Cited by 44
Esfandyari, A., Osman, M. R., Ismail, N. B., et al. (2011) · International Journal of Industrial and Systems Engineering · doi:10.1504/ijise.2011.041371 · Cited by 34
“11 days (Singh and Sharma, 2009).”
Yusof, M. M., Khodambashi, S., & Mokhtar, A. M. (2012) · BMC Medical Informatics and Decision Making · doi:10.1186/1472-6947-12-150 · Cited by 55
“Tools and techniques are available that enhance the Lean concept, such as Value Stream Mapping (VSM) and A3 reports [7,8,15-20].”
BackgroundEvaluation of value stream mapping (VSM) applicability to the oil and gas chain processes
Lobo, C. V. F., Calado, R. D., & da Conceição, R. D. P. (2018) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-05-2018-0049 · Cited by 39
Singh, J., Singh, H., Singh, A., & Singh, J. (2019) · Management Decision · doi:10.1108/md-04-2017-0332 · Cited by 32
Lappeman, J., Ransome, K., & Louw, Z. (2019) · European Business Review · doi:10.1108/ebr-01-2018-0027 · Cited by 38
Jeyaraj, K. L., Muralidharan, C., Mahalingam, D. R., & Deshmukh, S. G. (2013) · Journal of The Institution of Engineers (India) Series C · doi:10.1007/s40032-012-0053-x · Cited by 30
“Bhim and Sharma [12] have implemented lean concepts in a manufacturing firm with the help of VSM. Current state and future state of manufacturing of a firm are compared and witnessed: 92.58 % reduction in lead time, 2.17 % reduction in processing time, 97.1 % reduction in WIP and 26.08 % reduction in manpower requirem…”
BackgroundInfluentialAn Implementation Framework to Attain 6R-Based Sustainable Lean Implementation—A Case Study
Maqbool, Y., Rafique, M. Z., Hussain, A., Ali, H., Javed, S., Amjad, M. S., Khan, M. A., Mumtaz, S., Haider, S. M., & Atif, M. (2019) · IEEE Access · doi:10.1109/access.2019.2936056 · Cited by 42
Aziz, Z., Qasim, R. M., & Wajdi, S. (2017) · Construction Innovation · doi:10.1108/ci-11-2016-0058 · Cited by 27
Basu, P., Chatterjee, D., Ghosh, I., & Dan, P. K. (2020) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-12-2019-0455 · Cited by 32
Use of Value Mapping Tools for Manufacturing Systems Redesign
Dessens, L. F. R., & López, Z. I. C. (2012) · Springer eBooks · doi:10.1007/978-1-4471-2321-7_27 · Cited by 23
“Reference [12] summarized the guidelines needed for the definition of the future state map with base on lean thinking principles which match the statements from [2]:”
BackgroundGarza‐Reyes, J. A., Villarreal, B., Kumar, P. V., et al. (2018) · International Journal of Logistics Research and Applications · doi:10.1080/13675567.2018.1513997 · Cited by 23
“In this line, VSM is a lean tool that has been widely utilised to quantify, document, comprehend and visualise the flows of material and information (Andreadis et al., 2017) of manufacturing (e.g. Singh and Sharma, 2009) and service (e.g. Barber and Tietje, 2008) value streams.”
MethodSaraswat, P., Kumar, D., & Sain, M. K. (2015) · International Journal of Managing Value and Supply Chains · doi:10.5121/ijmvsc.2015.6203 · Cited by 23
Sustainable competitive advantage by implementing lean manufacturing “A Case study for Indian SME”
Verma, N., & Sharma, V. (2017) · Materials Today Proceedings · doi:10.1016/j.matpr.2017.07.279 · Cited by 22
Application of value stream mapping (VSM) in low-level technology organizations: a case study
Reda, H., & Dvivedi, A. (2021) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-03-2021-0118 · Cited by 32
Value Stream Maps for Industrial Energy Efficiency
Keskin, C., Asan, U., & Kayakutlu, G. (2013) · Green energy and technology · doi:10.1007/978-1-4471-5143-2_17 · Cited by 32
“The procedure for value stream mapping and the calculation of parameters is designed by Singh and Sharma [15].”
MethodBizuneh, B., & Omer, R. (2024) · Cogent Engineering · doi:10.1080/23311916.2024.2341538 · Cited by 50
“Takt time, the rate at which a company must produce a product to satisfy its customer demand (B. Singh & Sharma, 2009), is commonly used as a target (Reda & Dvivedi, 2021; Rohani & Zahraee, 2015).”
Patil, A., Pisal, M. V., & Suryavanshi, C. T. (2021) · Journal of Applied Research and Technology · doi:10.22201/icat.24486736e.2021.19.1.1488 · Cited by 18
“It usually starts with customer delivery and works its way back through the entire process documenting the process graphically and collecting data along the way (Singh & Sharma, 2009).”
MethodStadnicka, D., & Antonelli, D. (2015) · FME Transaction · doi:10.5937/fmet1504279s · Cited by 17
“The method can be implemented for manufacturing processes (MPs) [8,9,10,11], as well as for business [12] and administrative processes [13].”
MethodCherie, N., Berta, D. M., Tamir, M., Abriham, Z. Y., Angelo, A. A., Mekuanint, A., Chane, E., Nigus, M., & Teketelew, B. B. (2024) · PLoS ONE · doi:10.1371/journal.pone.0312033 · Cited by 31
Capacity augmentation with VSM methodology for lean manufacturing
Basu, P., & Dan, P. K. (2014) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-07-2013-0036 · Cited by 16
A systematic literature review on the stochastic analysis of value streams
Luz, G. P., Tortorella, G. L., Narayanamurthy, G., Gaiardelli, P., & Sawhney, R. S. (2020) · Production Planning & Control · doi:10.1080/09537287.2020.1713414 · Cited by 17
A Study on Implementation of Various Approaches for Shop Floor Management
Tripathi, V., Saraswat, S., & Gautam, G. D. (2021) · Lecture notes in electrical engineering · doi:10.1007/978-981-16-1476-7_35 · Cited by 17
Prakash, R. K., Singhal, S., & Agarwal, A. (2018) · Benchmarking An International Journal · doi:10.1108/bij-06-2016-0092 · Cited by 15
Tripathi, V., Chattopadhyaya, S., Mukhopadhyay, A., Sharma, S. K., Li, C., Singh, S., Saleem, W., Salah, B., & Mohamed, A. (2022) · Processes · doi:10.3390/pr10081587 · Cited by 30
Self-citationLINKEDIN AND ITS IMPACT ON MARKETING STRATEGY IN BUSINESS
Vykydalová, N. (2018) · International Bata Conference for Ph.D. Students and Young Researchers (DOKBAT) · doi:10.7441/dokbat.2018.26 · Cited by 12
Extended value stream mapping to enhance sustainability: A literature review
Hartini, S., Ciptomulyono, U., & Anityasari, M. (2017) · AIP conference proceedings · doi:10.1063/1.5010647 · Cited by 15
Industrial Engineering: Innovative Networks
Sethi, S. P., Bogataj, M., & McDonnell, L. R. (2012) · Springer eBooks · doi:10.1007/978-1-4471-2321-7 · Cited by 16
Development of additional indicators for quotation preparation performance management
Stadnicka, D., & Ratnayake, R. M. C. (2018) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-01-2017-0016 · Cited by 12
Simple approach for Value Stream Mapping for business process analysis
Stadnicka, D., & Ratnayake, R. M. C. (2015) · doi:10.1109/ieem.2015.7385614 · Cited by 11
Ondra, P. (2018) · International Bata Conference for Ph.D. Students and Young Researchers (DOKBAT) · doi:10.7441/dokbat.2018.18 · Cited by 9
Islam, A. S. M. T. (2019) · Manufacturing Letters · doi:10.1016/j.mfglet.2019.06.002 · Cited by 9
Investigation and implementation of VSM in water distillation plant
Rathi, R., Jagadeeswaran, M., Imran, G. M., et al. (2021) · Materials Today Proceedings · doi:10.1016/j.matpr.2021.05.274 · Cited by 9
Impact of Lean Manufacturing Practices on Clothing Industry PerformancePreprint
Kumar, B. S., & Thavaraj, S. (2015) · SSRN Electronic Journal · doi:10.2139/ssrn.2703903 · Cited by 9
“Due to small order quantities and complex d signs, the garment industry has to produce multiple styles even within a day; this needs higher flexibility in volume and style change over Impact Factor (JCC): 2.9594 Index Copernicus Value (ICV): 3.0 (Singh and sharma 2009).”
BackgroundInfluentialAdel, R. (2010) · International Journal of Productivity and Quality Management · doi:10.1504/ijpqm.2010.035119 · Cited by 8
“According to Singh and Sharma (2009), waste takes many forms and can be found at any time and in any place.”
BackgroundValue Stream Mapping as a Tool for Lean Implementation: A Case Study
Manjunath, M., Prasad, H. C. S., Kumar, K. S. K., & Puthran, D. (2014) · International Journal of Innovative Research and Development · Cited by 8
Applying Value Stream Mapping for Productivity Improvement of a Metal Stamping Industry
Karim, A., Jaafar, A. A., Abdullah, M. A. I., et al. (2012) · Advanced materials research · doi:10.4028/www.scientific.net/amr.576.727 · Cited by 7
Wube, W., Berhan, E., Kitaw, D., & Tesfaye, G. (2024) · Cogent Engineering · doi:10.1080/23311916.2024.2375423 · Cited by 7
“On the one hand, for example, using this tool, Singh and Sharma (2009) reduced the lead time, processing time, work-in-process inventory (WIP), and manpower requirement of a manufacturing firm; Venkataraman et al. (2014) reduced manufacturing lead time and defects in automotive manufacturing…”
Application of Value Stream Mapping for Lean Operation: An Indian Case Study of a Dairy Firm
Kumar, U., & Shankar, R. (2022) · Global Business Review · doi:10.1177/09721509221113002 · Cited by 6
“This shows that VSM is an excellent tool for implementing LM in any industry (Singh & Sharma, 2009).”
Organizational Practices Lean Enterprises Adopt to Focus on Value Streams
Nadal, J. O., & Gregorio, R. (2014) · Journal of Enterprise Transformation · doi:10.1080/19488289.2014.919973 · Cited by 8
Kamala, V., Vijaya Sunder, M., Sreedharan, V. R., Chargui, K., Zouadi, T., & Tortorella, G. L. (2023) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2023.3267040 · Cited by 6
Value Stream Mapping as a Tool for Lean Manufacturing Implementation- A Review
Tomar, B. P., & Tiwari, A. N. (2016) · Journal of Emerging Technologies and Innovative Research · Cited by 4
INCREASING THE PROCESS CYCLE EFFICIENCY OF A MEN TROUSERS ASSEMBLY LINE
Karabay, G., & KANSUL, D. S. (2019) · TEKSTİL VE KONFEKSİYON · doi:10.32710/tekstilvekonfeksiyon.498921 · Cited by 4
“In order to be competitive and to fulfil the orders on time, the companies have to be flexible to produce a high variety of models [1].”
BackgroundApplication of Value Stream Mapping in HEESCO
Jebur, Z. T., Ibrahim, S. K., & Dawood, L. M. (2021) · Journal of Physics Conference Series · doi:10.1088/1742-6596/1818/1/012108 · Cited by 4
“Finally it results in a single page map called ‘‘Value stream’’, these maps contains data such as cycle time, work-in-process (WIP) levels, equipment performance data , and quality levels.[5] M.”
BackgroundAsif, A. K. M. A. H., Hasan, M. Z., Babur, J. U. M., Sheikh, M. M. I., Biswas, A., Uddin, M. K., & Rana, S. (2019) · International Journal of Textile Science · Cited by 4
Değer Akışı Haritalama İle Süreçlerin İyileştirilmesi: Yalın Organizasyonda Bir Vaka Çalışması
Aydin, H., & Çetin, C. (2020) · Business and Economics Research Journal · doi:10.20409/berj.2020.260 · Cited by 3
Banerjee, S., & Shaikh, A. (2020) · Review of Marketing Science · doi:10.1515/roms-2020-0006 · Cited by 4
Lean Manufacturing Implementation in a Plastic Molding Industry
Rosnah, M. Y., & Othman, A. (2013) · Applied Science and Engineering Progress · Cited by 3
Santos, L. C., Gohr, C. F., & dos Santos, E. J. (2012) · Revista Gestão Industrial · doi:10.3895/s1808-04482011000400006 · Cited by 3
Key Performance Indicators for Lean: Literature Review and Recommendations
(2019) · International Journal of Modern Studies in Mechanical Engineering · doi:10.20431/2454-9711.0501002 · Cited by 3
Process Optimization Methods for Shop Floor Planning : A Study
Tripathi, V., Gautam, G. D., & Saraswat, S. (2020) · Cited by 2
LITERATURE SEARCH CONSISTING OF THE AREAS OF LEAN SIX SIGMA USAGE IN INDIAN SMES
Patel, S. H., & Desai, D. A. (2018) · doi:10.26488/iej.11.1.1035 · Cited by 2
Is the Lean Approach Beneficial for the Manufacturing Sector: Review on Literature
Kumar, V., Mangal, D., & Pandy, P. (2019) · doi:10.1109/smart46866.2019.9117411 · Cited by 2
Ngadono, T. S., Rokhim, M., & Ikatrinasari, Z. F. (2020) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/852/1/012104 · Cited by 2
Identifying and Eliminating Waste in a Coal Mining Industry: The Value Stream Mapping Analysis
Indriati, M. Y., Rasi, R. Z., Setiaji, B., Hadiwinata, S. D., & Magister of Informatics, U. A. Y. (2023) · International Journal of Sustainable Construction Engineering Technology · doi:10.30880/ijscet.2023.14.05.023 · Cited by 7
Applied Procedures for Lead Time Reduction: A Review
A, R. S. K., & Jawagar Shrehari, J. (2017) · International Journal of Engineering Trends and Technology · doi:10.14445/22315381/ijett-v43p228 · Cited by 2
Visualization of Environmental Waste by Manufacturing : Equip VSM with Green Perspective
Hu, J., & Lu, S. (2011) · Diva portal (Dalarna University Library) · Cited by 2
Aspectos de inovação e de redes que afetam a imagem da marca: o caso Harley-Davidson e Buell
Rimoli, C. A., Noronha, L. E. P., & Serralvo, F. A. (2013) · REAd Revista Eletrônica de Administração (Porto Alegre) · doi:10.1590/s1413-23112013000200006 · Cited by 1
Singh, R., Chopra, A., & Kalra, P. (2014) · Cited by 1
INSURANCE DISTRIBUTION IN THE FUTURE
Fichter, A. (2018) · International Bata Conference for Ph.D. Students and Young Researchers (DOKBAT) · doi:10.7441/dokbat.2018.06 · Cited by 1
Fulasa, M. G., & Singh, A. P. (2025) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-03-2025-0064 · Cited by 2
Analysis of Material Handling Flow Process on Tin Smelting: a Case Study in Indonesia
Eko Zunianto, S., & Adhiutama, A. (2014) · Jurnal Aplikasi Manajemen · Cited by 1
Metadata
- Authors
- Singh, B., & Sharma, S. K.
- Affiliations
- Galgotias University (IN)
- National Institute of Technology Kurukshetra (IN)
- Venue
- Measuring Business Excellence
- Publisher
- Emerald
- Published
- 2009-08-28
- Volume
- 13
- Issue
- 3
- Pages
- 58-68
- ISSN
- 1368-3047 (ISSN-L)
- OpenAlex
- W2022826076
- Cited by
- 133
- References
- 35
- Citations by year
- 2026: 3 · 2025: 3 · 2024: 4 · 2023: 3 · 2022: 5 · 2021: 8 · 2020: 6 · 2019: 15 · 2018: 23 · 2017: 10 · 2016: 7 · 2015: 7 · 2014: 17 · 2013: 8 · 2012: 7
- FWCI
- 8.74
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emerald.com/insight/site-policies (tdm)
- Locations
- Measuring Business Excellence (publishedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Digital Transformation in Industry
- Keywords
- value stream mapping, lean manufacturing, lean implementation, work-in-process reduction, lead time reduction, cycle time reduction, takt time, continuous improvement, production process improvement
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.