CoChat

Lean implementation and its benefits to production industry

Singh, Bhim, Garg, S.K., Sharma, S.K., Grewal, Chandandeep · 2010 · International Journal of Lean Six Sigma

The DOI matches its Crossref record; 35 of the 36 references it cites were found in a registry or an index.

Abstract

Purpose – The purpose of this paper is to discuss the lean implementation process and its quantified benefits for the production industry with the help of value stream mapping (VSM). Both current and future state maps of the organization's shop floor scenarios are discussed using VSM techniques in order to highlight improvement areas and to bridge the gap between the existing state and the proposed state of shop floor of the selected industry.

Overview

Integrity signals

Registry

Crossref · 10.1108/20401461011049520

Cites

35 of 35 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Verification

Claims the paper makes

This paper’s full text isn’t openly available, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Citations

Cites

Show all 35 references

Research works printed but not linked: 8

  1. Beesley, A. (1994), “A need for time based process mapping and its application in procurement”,Proceedings of 3rd Annual IPSERA Conference, University of Glamorgan, Pontypridd, pp. 41‐56.
  2. Childerhouse, P., Disney, S.M. and Towill, D.R. (2000), “The uncertainty circle as a value stream audit tool”,Proceedings of the 11th International Working Seminar on Production Economics, Innsbruck, Austria, pp. 119‐30.
  3. Forza, C., Vinelli, A. and Filippini, R. (1993), “Telecommunication services for quick response in the textile‐apparel industry”,Proceedings of the 1st International Symposium on Logistics, University of Nottingham, Nottingham, pp. 119‐26.
  4. Grewal, C.S. and Sareen, K.K. (2006), “Development of model for lean implementation: a case study of automobile industry”,Industrial Engineering Journal, No. 5, pp. 24‐7.
  5. Grewal, C.S. and Singh, B. (2006), “Application of value stream mapping in a traditional Indian environment: a case study”,International Conference on Advances in Mechanical Engineering, Fatehgarh Sahib, December 1‐3, pp. 127‐133(M‐III).
  6. Hines, P. (1999), “Value stream management: next frontier in supply chain”,Logistics Focus, Vol. 1 No. 3, pp. 36‐9.
  7. Jessop, D. and Jones, O. (1995), “Value stream process modeling: a methodology for creating competitive advantage”,Proceedings of 4th Annual IPSERA Conference, University of Birmingham, Birmingham.
  8. Zayko, M., Broughman, D. and Hancock, W. (1997), “Lean manufacturing yields world class improvements for small manufacturer”,IIE Solutions, Vol. 29 No. 4, pp. 46‐64.

Cited by

See all 223

Metadata

Authors
Singh, B., Garg, S. K., Sharma, S. K., & Grewal, C.
Affiliations
  • Galgotias College of Engineering & Technology (IN)
  • Delhi Technological University (IN)
  • National Institute of Technology Kurukshetra (IN)
  • University of Calgary (CA)
Venue
International Journal of Lean Six Sigma
Publisher
Emerald
Published
2010-05-28
Volume
1
Issue
2
Pages
157-168
ISSN
2040-4166 (ISSN-L)
OpenAlex
W1984348823
Cited by
223
References
36
Citations by year
2026: 6 · 2025: 6 · 2024: 7 · 2023: 11 · 2022: 10 · 2021: 21 · 2020: 18 · 2019: 21 · 2018: 29 · 2017: 15 · 2016: 8 · 2015: 20 · 2014: 19 · 2013: 17 · 2012: 12
FWCI
19.59
Type
journal article
Language
en
Open access
closed
Licence
www.emeraldinsight.com/page/tdm (tdm)
Locations
International Journal of Lean Six Sigma (publishedVersion)
Topics
  • Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
  • Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
  • Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Digital Transformation in Industry
Keywords
lean implementation, value stream mapping, manufacturing industry

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Lean implementation and its benefits to production industry. https://app.cochat.ai/papers/10.1108/20401461011049520
The paper
Singh, B., Garg, S. K., Sharma, S. K., & Grewal, C. (2010). Lean implementation and its benefits to production industry. International Journal of Lean Six Sigma. https://doi.org/10.1108/20401461011049520

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.