Performance measurement systems in SMEs: A review for a research agenda
Open accessThe DOI matches its Crossref record; 58 of the 58 references it cites were found in a registry or an index.
Abstract
In recent years, literature has identified the increasing complexity of small and medium‐sized enterprises (SMEs) and highlighted their sensitivity to differences in managerial culture and management systems. Research has shown that performance measurement systems (PMSs) could play an important role in supporting managerial development in these companies. In this paper, the literature on performance measurement in manufacturing SMEs is reviewed and the diffusion, characteristics and determinants of performance measurement in SMEs are analysed. Shortcomings in the performance measurement systems are highlighted and the many factors that seem to constrain PMSs in manufacturing SMEs are defined, e.g. lack of financial and human resources, wrong perception of the benefits of PMS implementation, short‐term strategic planning. Moreover, using dimensions defined according to the information found in the literature, two PMS models specifically developed for SMEs are compared with generic PMS models. The comparison points out an evolution in PMS models over time; in particular, the models developed in the last 20 years are more horizontal, process‐oriented and focus on stakeholder needs. However, it is not clear whether these changes are due to the evolution of the generic models or an attempt to introduce models suited to the needs of SMEs. To clarify this matter and better to understand PMSs in SMEs, further theoretical and empirical studies are necessary. The main issues still requiring investigation are listed in a research agenda at the end of the paper.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(2010) · Cited by 24,023
Tranfield, D., Denyer, D., & Smart, P. (2003) · British Journal of Management · doi:10.1111/1467-8551.00375 · Cited by 15,386
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
(1992) · PubMed · Cited by 7,979
An introduction to cybernetics
Ashby, W. R. (1956) · doi:10.5962/bhl.title.5851 · Cited by 7,578 · cited 1×
“1997), and the need for a formal information system is not justified because the requisite information is already available (see Ashby’s (1956) laws of requisite variety).”
BackgroundUsing the balanced scorecard as a strategic management system
Kaplan, R. S., & Norton, D. P. (1996) · Harvard business review · Cited by 5,015
Exploitation, Exploration, and Process Management: The Productivity Dilemma Revisited
Benner, M. J., & Tushman, M. L. (2003) · The Academy of Management Review · doi:10.2307/30040711 · Cited by 4,371
Understanding the small business sector
(1995) · Long Range Planning · doi:10.1016/0024-6301(95)90953-2 · Cited by 4,190
Performance measurement system design: A literature review and research agenda
Neely, A., Gregory, M., & Platts, K. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510083622 · Cited by 3,259
Frontiers of Entrepreneurship Research
Harrison, R., Brush, C. G., Davidsson, P., Fiet, J. O., Greene, P. G., Lerner, M., Mason, C., Meyer, G. D., & Sohl, J. (2004) · Research Portal (Queen's University Belfast) · Cited by 3,209
Business Ethics: Corporate Responses to Scandal
Fombrun, C., & Foss, C. (2004) · Corporate Reputation Review · doi:10.1057/palgrave.crr.1540226 · Cited by 1,597
The performance measurement manifesto.
Eccles, R. G. (1991) · PubMed · Cited by 1,289
The performance measurement revolution: why now and what next?
Neely, A. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910247437 · Cited by 1,154
Designing, Implementing and Updating Performance Measurement Systems
Bourne, M., Mills, J., Wilcox, M., Neely, A., & Platts, K. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010330739 · Cited by 1,143 · cited 3×
“The lack of alignment between performance measurement and business strategy in traditional models has been found to be one of the main obstacles to achieving the expected results from a PMS (Atkinson and Waterhouse 1997; Bourne et al. 2000; Dixon et al. 1990; Goold 1991; Kaplan and Norton 1992, 1996; Keegan et al. 198…”
BackgroundThe Performance Prism: The Scorecard for Measuring and Managing Business Success
Neely, A. D., Adams, C., & Kennerley, M. (2003) · Cited by 1,028
Performance measurement system design: developing and testing a process‐based approach
Neely, A., Mills, J., Platts, K., Richards, H., Gregory, M., Bourne, M., & Kennerley, M. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010343708 · Cited by 922
Theory and practice in SME performance measurement systems
Hudson, M., Smart, A., & Bourne, M. (2001) · International Journal of Operations & Production Management · doi:10.1108/eum0000000005587 · Cited by 855
A Stakeholder Approach to Strategic Performance Measurement
Atkinson, A. A., Waterhouse, J. H., & Wells, R. B. (1997) · Sloan management review · Cited by 844
Performance measurement in service businesses
Brignall, T. J., Fitzgerald, L., Johnston, R., & Silvestro, R. (1991) · University of Warwick · doi:10.82444/warw.33720976 · Cited by 777
(2020) · Management Accounting · doi:10.24053/9783739880280-167 · Cited by 706
Integrated performance measurement systems: a development guide
Bititci, U. S., Carrie, A. S., & McDevitt, L. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710167230 · Cited by 694
Self-citationThe changing basis of performance measurement
Ghalayini, A. M., & Noble, J. S. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610125787 · Cited by 676
Innovations in Performance Measurement: Trends and Research Implications.
Ittner, C. D., & Larcker, D. F. (1998) · Journal of Management Accounting Research · doi:10.2308/jmar-2720283 · Cited by 619
Neubauer, F., & Lank, A. G. (1998) · Palgrave Macmillan UK eBooks · doi:10.1007/978-1-349-14465-5 · Cited by 615
The New Performance Challenge: Measuring Operations for World-Class Competition
Dixon, J. R., Nanni, A. J., & Vollmann, T. E. (1990) · Cited by 591
Understanding Enterprise, Entrepreneurship and Small Business
Bridge, S., O’Neill, K., & Cromie, S. (1998) · Palgrave Macmillan UK eBooks · doi:10.1007/978-1-349-26171-0 · Cited by 573
The Performance and Competitive Advantage of Small Firms: A Management Perspective
Jennings, P., & Beaver, G. (1997) · International Small Business Journal: Researching Entrepreneurship · doi:10.1177/0266242697152004 · Cited by 568
Measure Up!: Yardsticks for Continuous Improvement
Lynch, R., & Cross, K. F. (1991) · Cited by 455
Customer orientation and performance: a study of SMEs
Appiah‐Adu, K., & Singh, S. (1998) · Management Decision · doi:10.1108/00251749810223592 · Cited by 441
Dynamics of performance measurement systems
Bititci, U. S., Turner, U., & Begemann, C. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010321676 · Cited by 436
Self-citationPerformance measurement systems - Models, characteristics and measures
De Toni, A., & Tonchia, S. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110358459 · Cited by 426
An integrated dynamic performance measurement system for improving manufacturing competitiveness
Ghalayini, A. M., Noble, J. S., & Crowe, T. J. (1997) · International Journal of Production Economics · doi:10.1016/s0925-5273(96)00093-x · Cited by 415
Ghobadian, A., & Gallear, D. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710158023 · Cited by 389
A dynamic performance measurement system: evidence from small Finnish technology companies
Laitinen, E. K. (2002) · Scandinavian Journal of Management · doi:10.1016/s0956-5221(00)00021-x · Cited by 319
Issues in developing a performance criteria system for an organization
GLOBERSON, S. (1985) · International Journal of Production Research · doi:10.1080/00207548508904734 · Cited by 263
Quantitative models for performance measurement system
Suwignjo, P., Bititci, U. S., & Carrie, A. S. (2000) · International Journal of Production Economics · doi:10.1016/s0925-5273(99)00061-4 · Cited by 256
Self-citationRealizing Strategy through Measurement
Neely, A., Mills, J., Platts, K., Gregory, M., & Richards, H. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410058603 · Cited by 219
Getting the measure of your business
Neely, A. D. (2002) · OpenGrey (Institut de l'Information Scientifique et Technique) · Cited by 195
Sustainability and Performance
Funk, K. (2003) · Dialnet (Universidad de la Rioja) · Cited by 183
Beretta, S. (2002) · Business Process Management Journal · doi:10.1108/14637150210428961 · Cited by 183
Driving blind: Strategic decisionmaking in small companies
Brouthers, K. D., Andriessen, F., & Nicolaes, I. (1998) · Long Range Planning · doi:10.1016/s0024-6301(97)00099-x · Cited by 179
McAdam, R., & Bailie, B. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210440492 · Cited by 175
Cagliano, R., Blackmon, K., & Voss, C. (2001) · Integrated Manufacturing Systems · doi:10.1108/eum0000000006229 · Cited by 173
Financial information and the management of small private companies
Collis, J., & Jarvis, R. (2002) · Journal of Small Business and Enterprise Development · doi:10.1108/14626000210427357 · Cited by 164
Performance Indicators — Why, Where and How?
Fortuin, L. (1987) · DGOR · doi:10.1007/978-3-642-72557-9_44 · Cited by 164
The use of quantitative and qualitative criteria in the measurement of performance in small firms
Jarvis, R., Curran, J., Kitching, J., & Lightfoot, G. (2000) · Journal of Small Business and Enterprise Development · doi:10.1108/eum0000000006834 · Cited by 158
Performance indicators — Why, where and how?
Fortuin, L. (1988) · European Journal of Operational Research · doi:10.1016/0377-2217(88)90449-3 · Cited by 155
Dynamics of performance measurement systems
Bititci, U., Carrie, A. S., Turner, T. J., & Suwignjo, P. (1999) · Springer eBooks · doi:10.1007/978-0-387-35569-6_8 · Cited by 151
Self-citationQuality models in an SME context
McAdam, R. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010306166 · Cited by 144
Lean organization, management by process and performance measurement
Toni, A. F. D., & Tonchia, S. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610109947 · Cited by 128
Performance measurement in service industries : making it work
Fitzgerald, L., & Moon, P. (1996) · Medical Entomology and Zoology · Cited by 116
Performance measurement in strategic change
Feurer, R., & Chaharbaghi, K. (1995) · Benchmarking for Quality Management & Technology · doi:10.1108/14635779510090472 · Cited by 97
Sinclair, D., & Zairi, M. (2000) · International Journal of Management Reviews · doi:10.1111/1468-2370.00035 · Cited by 90
Unlocking the potential of performance measurement: A practical implementation guide
Meekings, A. (1995) · Public Money & Management · doi:10.1080/09540969509387888 · Cited by 86
Web enabled performance measurement systems
Bititci, U., Nudurupati, S., Turner, T. J., & Creighton, S. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210450310 · Cited by 72
Self-citationWilliamson, D. T. (1973) · Personnel Review · doi:10.1108/eb055237 · Cited by 68
Vinten, G. (2000) · Management Decision · doi:10.1108/00251740010373089 · Cited by 54
Integrated Performance Measurement Systems: A Reference Model
Bititci, U., Carrie, A. S., & Turner, T. J. (1998) · Springer eBooks · doi:10.1007/978-0-387-35295-4_15 · Cited by 46
Self-citation
Cited by
The industrial management of SMEs in the era of Industry 4.0
Moeuf, A., Pellerin, R., Lamouri, S., Tamayo-Giraldo, S., & Barbaray, R. (2018) · International Journal of Production Research · doi:10.1080/00207543.2017.1372647 · Cited by 1,188
“Finally, the Tranfield method has been exploited and validated in other research on SMEs (Garengo, Biazzo, and Bititci 2005).”
MethodAdams, R. J., Smart, P., & Huff, A. S. (2017) · International Journal of Management Reviews · doi:10.1111/ijmr.12102 · Cited by 995
Performance Measurement: Challenges for Tomorrow*
Bititci, U., Garengo, P., Dörfler, V., & Nudurupati, S. (2012) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2011.00318.x · Cited by 685
Self-citationState of the art literature review on performance measurement
Nudurupati, S. S., Bititci, U. S., Kumar, V., & Chan, F. T. S. (2011) · Computers & Industrial Engineering · doi:10.1016/j.cie.2010.11.010 · Cited by 467
Self-citationCOVID ‐19 crisis and SMEs responses: The role of digital transformation
Klein, V. B., & Todesco, J. L. (2021) · Knowledge and Process Management · doi:10.1002/kpm.1660 · Cited by 446
“…for facing COVID-19 and DT are summarized in Figure 1, and counter-pointed and explained in detail below: (cid:129) Scarcity of Financial Resources : SMEs have limited capital resources (Garengo et al., 2005; International Trade Centre, 2020; Moeuf, Tamayo, Lamouri, Pellerin, & Lelievre, 2016).”
BackgroundMethod
Metadata
- Authors
- Garengo, P., Biazzo, S., & Bititci, U. S.
- Venue
- International Journal of Management Reviews
- Publisher
- Wiley
- Published
- 2005-03
- Volume
- 7
- Issue
- 1
- Pages
- 25-47
- ISSN
- 1460-8545 (ISSN-L)
- 1468-2370
- OpenAlex
- W2163882273
- Cited by
- 733
- References
- 58
- FWCI
- 19.71
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.