Facades-as-a-Service: Systemic managerial, financial, and governance innovation to enable a circular economy for buildings. Lessons learnt from a full-scale pilot project in the Netherlands
Open accessAbstract
Introduction: The challenge of the energy transition in the built environment has, in recent years, been exacerbated by rising awareness of the material resource limitations we face on the path towards sustainable development. In this context the concepts of Circular Economy (CE) and Product-Service Systems (PSS) have emerged as potentially complementary industrial and business strategies to overcome the interdependent material resource and clean energy challenges. Research significance: Research in the field of circular and PSS-based construction frequently centres on the design and engineering of products, mainly through technical strategies such as design for disassembly and adaptability, and the use of the different “R’s” (Reuse, Repair, Remanufacturing, etc.) to extend and/or reset the service lives of building materials and components. Such an approach often ignores the fact that these strategies require changes in the management, financing, and governance aspects of products and therefore buildings, throughout their entire service-lives. This paper will focus on the systemic administrative (i.e. management, financing, and governance) challenges of the circular and servitisation transitions in the building and construction sector, to enable products which are “Circular by Design”, to effectively support regenerative processes. Research question: The paper asks how traditional building products’ management, financing, and governance processes prevent or delay the implementation of CE and PSS models. It explores the demand side’s perspective (commissioners, building owners and facility managers), taking a systemic view to the search for new practical, strategic, and scalable administrative models. Methodology: The research method applies the DAS model ( De Jonge et al., 2009 ; Van der Zwart et al., 2009 ; den Heijer, 2011 ; den Heijer et al., 2016 ) to data gathered from focus group discussion and co-design sessions involving multidisciplinary teams of experts from both academy and industry, as well as literature. The research was conducted within the context of the TU Delft Facades-as-a-Service full-scale pilot project. Results: The research has shown that, while PSS models to enable material circularity can be partially implemented within the current managerial, financial, and governance framework, this implementation is not efficient, effective, or scalable. This is because standard modes of operation in these disciplines are misaligned with that goal. The practical barriers resulting from this misalignment increase the complexity, risk perception, and therefore cost of PSS alternatives, and thus prevent their organic adoption despite increasing market interest. Recommendations are made for policymakers, financiers, suppliers, and building owners to overcome these barriers.
AI snapshot
Written from the paper’s full text.
TL;DR
The paper reports a full-scale Dutch pilot of Facades-as-a-Service (FaaS), a product-service system for circular deep renovation of the 3,000 m² CiTG East façade at TU Delft. It finds that traditional management, finance, and governance create systemic inertia that blocked a full PSS contract, although a performance-based service contract was developed and targeted actions could enable mainstream PSS.
Key findings
- A full PSS-based FaaS contracting and financing model covering all requirements was not entered; the final decision was not to implement full PSS because the building owner, not the façade provider, owns the façade. A service contract was still developed between building owner and façade provider, based on ongoing technical and strategic performance requirements.
- Financial evaluation showed Business-as-Usual was cheapest from a hard cost perspective; only over a 30-year horizon did this change. Direct purchasing was marginally cheaper from a Total Cost of Ownership perspective over 15 or 30 years, but leasing/PSS was more attractive from a cash-flow perspective. Target requirements included energy use from 214.3 to <50 kWh/m²/year, over K hours from >300 to <10, TCO from 100% to <120%, cost of capital from -0.5%/year to <1.5%/year, and residual value from depreciation to zero to depreciation to 10% of original cost.
- Barriers included transfer tax risk (6% for nonresidential buildings in the Netherlands) and 21% VAT uncertainty, which were crucial in the final decision not to implement full PSS; public TUD had preferential borrowing, making commercial SPV financing higher cost; and banks would not consider the façade’s residual value, increasing the FaaS model’s Total Cost of Service.
- The study concludes that systemic inertia across management, finance, and governance severely limits decision-making scope, but conditions enabling more mainstream PSS could be achieved through targeted action in the Netherlands; some current practices cannot support competitive PSS alternatives capable of being upscaled to the mainstream construction market.
Methods
- Design: one-decade-long ongoing research using a full-scale pilot testbed, the FaaS project, for deep energy renovation of the 3,000 m² high-end CiTG East façade at TU Delft; the consortium included building system suppliers, façade fabricator, facility managers, financiers, real estate developer/operators, and academic experts.
- Data: empirical evidence from the FaaS project plus secondary sources, including a detailed diary of dozens of co-development meetings, email threads with attachments, commented legal contracts and documents, three final reports per year, and a state-of-the-art review of circular business model research and pilot projects.
- Analysis: the DAS process model was applied to management, finance, and governance; Tasks 1–3 structured data collection, analysis, and evaluation, while Task 4 presented and discussed results; decision-making compared Business-as-Usual, traditional baseline renovation, and extended FaaS requirements, with TCO/TVO analyses over 15- and 30-year horizons.
Limitations
- The paper states that selecting a public entity as client/building owner created specific financial and fiscal conditions that influenced the model’s applicability and the pilot outcome; the requirements list omitted embodied carbon due to lack of broadly recognised methodologies and excluded operational carbon as beyond scope; only one façade was renovated, so guaranteeing whole-building performance was impossible; the legal ownership model was not certain until first potential litigation; the transfer tax question remained open until Dutch tax authorities could rule; and residual value could not be estimated, with banks unwilling to assume it.
- Evident from the text: the study is a single pilot in the Netherlands, so legal and fiscal findings are region-specific; full PSS was not implemented, so conclusions about full PSS rely partly on theoretical or partial implementation and a negotiated service contract.
Model-written summary. Check it against the paper before relying on it.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
3 of 28 cited sources checked · 1 supported · 0 flagged · accuracy not yet measured
- Premisecitation
At the current renovation rate of 1%, it will take around 100 years to renovate the European building stock.
“At the current rate of 1% it will take around 100 years to renovate the European building stock (Artola et al., 2016;European Commission, 2016;Magrini et al., 2020).”
Quote in the paperSubstantial claim1 of 3 sources checked- cites Artola et al., 2016
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites European Commission, 2016
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Magrini et al., 2020 source
- Premisecitation
PSS creates a financial incentive for more diligent material stewardship.
“By doing so PSS creates a financial incentive for more diligent material stewardship (Widmer et al., 2018).”
Quote in the paperSubstantial claim1 of 1 sources checked- cites Widmer et al., 2018 source
Section 3 (The rationale for circular PSS; page unavailable) says that providers of use- and result-oriented PSS may retain ownership and take responsibility for recovery and other end-of-life strategies. Section 4 (Value creation in circular PSS; page unavailable) links the choice of recovery strategy to value creation. The paper does not explicitly establish that PSS creates a financial incentive for more diligent material stewardship, and its account applies to particular PSS arrangements rather than PSS generally. (LLM, conf=0.78)
Experimental — accuracy not yet measured
- Findingnone given
Financial feasibility models tend to focus on a specific range of values and liabilities determined by the type and priorities of the commissioning organisation.
“From the initial planning of a new construction or renovation project, financial feasibility models tend to focus on a specific range of values and liabilities.These as determined by the type and priorities of commissioning organisation (Figure 3).”
Quote in the paperSubstantial claim - Findingnone given
Commissioning organisations are organised according to traditional and linear practices.
“Commissioning organisations are likewise organised according to traditional and linear practices.”
Quote in the paperSubstantial claim - Findingnone given
The service contract is based on the ongoing provision of the Technical and Strategic performance requirements specified in Table 2.
“An innovative aspect of this contract is that it is based on the ongoing provision of the Technical and Strategic performance requirements specified in Table 2.”
Quote in the paperNot a substantial claim
- Findingown data
TUD's Board of Directors recognised the long-term suboptimal nature of the BAU solution.
“TUD's Board of Directors recognised the long-term suboptimal nature of this comparatively inexpensive and fast but underperforming solution.”
Quote in the paperSubstantial claim - Findingnone given
Even when one single organisation is responsible for all phases, such organisations are frequently structured according to the same life-cycle stages common among independent parties.
“Even in instances when one single organisation is responsible for all phases, as is the case with TU Delft's Campus Real Estate, such organisations are frequently structured according to the same life-cycle stages common among independent parties (Figure 4).”
Quote in the paperNot a substantial claim - Findingown data
Residual (circular) value of components was excluded from the financial calculation because none of the involved parties could establish a reliable methodology for assigning a financial value or cost to the recovery of materials at the end of the PSS façade's service life.
“Residual (circular) value of components was also excluded from the calculation, as none of the involved parties could establish a reliable methodology for assigning a financial value (or cost) to the recovery of materials at the end of the PSS façade's service life.”
Quote in the paperSubstantial claim - Findingown data
The financial performance evaluation of the project was guided by hard costs and values related to capital costs, cleaning and maintenance schedules, financial costs and fiscal depreciation.
“Financial performance evaluation of the project was guided by the same procedural constraints identified above and illustrated in Figure 3.The decision-making process was guided by hard costs and values related to capital costs, cleaning and maintenance schedules (internal or externalised in the case of PSS), financial costs and fiscal depreciation.”
Quote in the paperNot a substantial claim - Findingown data
The difficulty of banking the residual value of materials is a crucial current hurdle to the implementation of PSS or the Circular Economy.
“Lastly but crucially, the difficulty of banking the residual value of materials is a crucial current hurdle to the implementation of PSS or the Circular Economy.”
Quote in the paperSubstantial claim - Findingreasoning
Transfer taxes are likely to result if the façade is transferred to the SPV or another FaaS-owner entity after its completion.
“Transfer taxes are likely to result if the façade is transferred (to the SPV or another FaaS-owner entity) after its completion.”
Quote in the paperNot a substantial claim - Findingreasoning
PSS alternative models are perceived from both a legal and financial perspective as riskier and therefore costlier.
“As such they are perceived, from both a legal and financial perspective, as riskier and therefore costlier.”
Quote in the paperSubstantial claim - Findingnone given
A service contract was developed and entered between the building owner and the façade provider.
“Still, a service contract was developed and entered between the building owner and the façade provider.”
Quote in the paperNot a substantial claim - Findingown data
Results have highlighted the interlinked nature of decisions and innovation pathways across involved disciplines and sectors.
“Crucially, results have highlighted the interlinked nature of decisions and innovation pathways across involved disciplines and sectors.”
Quote in the paperSubstantial claim - Findingreasoning
The building owner, as FaaS procurer, will have to pay VAT on the ongoing monthly service fees.
“The building owner, FaaS procurer, will then have to pay VAT on the ongoing monthly service fees.”
Quote in the paperNot a substantial claim - Findingown data
The CiTG building, constructed during the mid-1960s, displayed many of the performance issues and decision-making challenges common to buildings of that time.
“This representative building, constructed during the mid-1960s, displayed many of the performance issues and decision-making challenges common to buildings of that time: its envelope consisted of a painted, uninsulated steel frame with single glazing, and no active ventilation was present in the building.”
Quote in the paperSubstantial claim - Findingown data
From a hard value and cost perspective, the Business-as-Usual alternative (not renovating the façade) was calculated to be the most financially attractive (cheapest) alternative.
“From a hard value and cost perspective the Business-as-Usual alternative (i.e.not renovating the façade) was calculated to be the most financially attractive (i.e.cheapest) alternative.”
Quote in the paperSubstantial claim - Findingnone given
The decision was taken early in the process, in Q4.2017 and even before the project grant had been awarded, to temporarily suspend the planned minimum renovation project on the East façade of the CiTG building.
“The decision was taken early in the process, In Q4.2017 and even before the project grant had been awarded, to temporarily suspend the planned minimum renovation project on the East façade of the CiTG building.”
Quote in the paperNot a substantial claim - Findingreasoning
The 2018 minimal maintenance of the West façade did not contribute to improving the energy or comfort performance of the building envelope.
“This work did not contribute to improving the energy or comfort performance of the building envelope.”
Quote in the paperNot a substantial claim - Findingreasoning
Physical interphases between components and between interrelated building services are of special concern for demarcating technical and financial responsibility.
“Of special concern are physical interphases between components (e.g. the structural brackets linking the façade to the building structure) or between interrelated building services (e.g. the interrelation between building façade and heating or ventilation systems when delivering the final energy and user-comfort performance of the building).”
Quote in the paperSubstantial claim - Findingreasoning
Bankability of the FaaS alternative is currently a significant challenge.
“Bankability of the FaaS alternative is currently a significant challenge.”
Quote in the paperSubstantial claim - Findingnone given
Selecting a public entity as client/building owner resulted in specific financial and fiscal conditions which influenced the applicability of the model and the pilot project's outcome.
“The authors acknowledge that selecting a public entity as client/building owner resulted in specific financial and fiscal conditions which influenced the applicability of the model and the pilot project's outcome.”
Quote in the paperSubstantial claim - Findingnone given
A further challenge, once legal and economic ownership of physical components is overcome, is the demarcation of technical and financial responsibility over different building components and the technical requirements they aim to fulfil.
“A further challenge, once that of legal and economic ownership of physical components is overcome, is the demarcation of technical and financial responsibility over different building components and the technical requirements they aim to fulfil.”
Quote in the paperSubstantial claim - Findingown data
The main reason provided by decision-makers for the choice of the 2018 maintenance plan was a short available strategic planning horizon.
“The main reason provided by decision-makers for the choice of maintenance plan was a 'short available strategic planning horizon', because relevant stakeholders were debating whether the building would be generally decommissioned and replaced within a 10-15-year period.”
Quote in the paperNot a substantial claim - Findingreasoning
During the early stages of the project, it was concluded that most façade builders, except for perhaps the largest multinational companies, would be unable to finance and keep in their balance sheet more than a handful of FaaS projects.
“During the early stages of the project, it was concluded that most façade builders (except for perhaps the largest multinational companies) would be unable to finance and keep in their balance sheet more than a handful of FaaS projects.”
Quote in the paperSubstantial claim - Findingnone given
When looking at a 10-20-year planning horizon, as most building owners do, the decision to perform minimum maintenance and defer larger decisions to a later date is supported by the financial case.
“When looking at a 10-20-year planning horizon (as most building owners do), the decision to perform minimum maintenance and defer larger decisions to a later date is supported by the financial case.”
Quote in the paperSubstantial claim - Findingnone given
In the FaaS project an intermediate TCO/TVO method was pursued, in which a hard factor evaluation would lead the decision-making, but an estimate of selected soft values would be provided as supporting input.
“In the FaaS project an intermediate TCO/TVO method was pursued, in which a hard factor evaluation would lead the decision-making, but an estimate of selected soft values would be provided as supporting input.”
Quote in the paperNot a substantial claim - Findingreasoning
Strategic and organisational barriers were addressed in a relatively organic fashion, as evidence emerged of the need to innovate across several traditional organisational processes.
“Strategic and organisational barriers were addressed in a relatively organic fashion, as evidence emerged of the need to innovate across several traditional organisational processes.”
Quote in the paperNot a substantial claim - Findingnone given
In the case of energy consumption and user comfort, the FaaS supplier consortium would not bear the risk of energy price volatility, performance of the central building energy system, and extreme weather events.
“For example, in the case of energy consumption and user comfort, Faas supplier consortium would not bear the risk of energy price volatility, performance of the central building energy system, and extreme weather events.”
Quote in the paperNot a substantial claim - Findingreasoning
Some of the performance limitations could be attributed to the fact that only one of the building's facades had been renovated, so that guaranteeing performance over the whole building's functional requirements was impossible.
“It must be stressed that some of the performance limitations could be attributed to the fact that only one of the building's facades had been renovated, so that guaranteeing performance over the whole building's functional requirements (e.g.energy consumption and indoor comfort) was impossible.”
Quote in the paperSubstantial claim - Findingnone given
A link was created between the FaaS provider and the facility maintenance company awarded years before with a contract for the maintenance of the entire TUD campus.
“A link was created between the FaaS provider, and the facility maintenance company awarded years before with a contract for the maintenance of the entire TUD campus.”
Quote in the paperNot a substantial claim - Findingreasoning
Borrowing conditions resulted in a difficult barrier to overcome.
“Thirdly, borrowing conditions resulted a difficult barrier to overcome.”
Quote in the paperSubstantial claim - Findingown data
A PSS model is not necessarily more expensive than a traditional linear model from a long-term TVO perspective.
“Second, results show that a PSS model is not necessarily more expensive than a traditional linear model from a long-term TVO perspective.”
Quote in the paperSubstantial claim - Findingreasoning
In the FaaS project, the risk of lost value as collateral, while not fully confirmed, was deemed to be manageable, even in the case that the SPV model removed legal ownership of the façade entirely from the building owner.
“The risk of lost value as collateral, while not fully confirmed, was deemed to be manageable, even in the case that the SPV model removed legal ownership of the façade entirely from the building owner.”
Quote in the paperSubstantial claim - Findingnone given
The risk of transfer tax being due applied significant pressure that the SPV's corporate structure, financing application, and contractual definition were finalised before the CiTG's East façade was technically delivered.
“The risk of transfer tax being due applied significant pressure that the SPV's corporate structure, financing application, and contractual definition were finalised before the CiTG's East façade was technically delivered.”
Quote in the paperSubstantial claim - Findingreasoning
As a result of the higher cost of capital and the exclusion of material circularity value, the TCO analysis from the building owner's perspective was not in favour of the FaaS model.
“As a result of these two factors the TCO analysis, from the building owner's perspective, was not in favour of the FaaS model.”
Quote in the paperSubstantial claim - Findingreasoning
Only when soft values and the estimated opportunity cost of suboptimal user comfort are considered does the business case support a decision to renovate sooner rather than later.
“Only when soft values and the estimated opportunity cost of suboptimal user comfort are considered, does the business case support a decision to renovate sooner rather than later.”
Quote in the paperSubstantial claim - Findingnone given
The value of material circularity of the new façade could not be considered as part of the financial model because no bank would consider the residual value of the façade in their project financing model.
“The value of material circularity of the new façade could not be considered as part of the financial model because no bank would consider the residual value of the façade in their project financing model.”
Quote in the paperSubstantial claim - Findingreasoning
The results illustrate the wider reason why deep energy façade renovations are failing to reach mainstream volumes.
“First, the results illustrate the wider reason why deep energy façade renovations are failing to reach mainstream volumes.”
Quote in the paperSubstantial claim - Findingown data
Despite several discussions with diverse financiers during the FaaS project and several positive arguments presented, no final consensus could be reached on combining low-risk real estate investment with high-risk investment in building materials.
“While several discussions were held on the matter with diverse financiers during the FaaS project, and several positive arguments were presented, no final consensus could be reached.”
Quote in the paperNot a substantial claim - Premisecitation
The disappointing energy performance of buildings is the result of administrative barriers such as complex decision-making processes, split incentives, lack of access to finance, lack of leadership, and short-termist thinking.
“Rather, it is the result of administrative barriers such as complex decision-making processes, split incentives, lack of access to finance, lack of leadership, and shortterminist thinking (BPIE, 2011;The Economist Intelligence Unit, 2013).”
Quote in the paperSubstantial claim0 of 2 sources checked- cites BPIE, 2011
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites The Economist Intelligence Unit, 2013
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Interpretationcitation
The disappointing energy performance of buildings is not the result of technological insufficiency.
“This disappointing performance is not the result of technological insufficiency.”
Quote in the paperSubstantial claim - Premisecitation
The majority of buildings, even in developed countries, still have an energy performance significantly below the desired standard.
“the majority of buildings, even in developed countries, still have an energy performance significantly below the desired standard (BPIE, 2011).”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites BPIE, 2011
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Premisecitation
NZEBs increasingly demand high-value and critical materials such as those found in electric engines, electronic circuits, and renewable power generation and distribution technologies.
“NZEBs rely not only on the traditional building materials associated with the construction industry (steel, concrete, brick, wood, etc.), but increasingly demand high-value and critical materials such as those found in electric engines, electronic circuits, and renewable power generation and distribution technologies (BIO Intelligence Service, 2013;Fox-Penner, 2014;Abraham, 2015)”
Quote in the paperNot a substantial claim0 of 3 sources checked- cites BIO Intelligence Service, 2013
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Fox-Penner, 2014
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Abraham, 2015
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Interpretationreasoning
The added cost of capital hinders the upscalability of PSS solutions, limiting them only to early adopters with strategic interests and value hierarchies beyond the directly commercial.
“This hinders the upscalability of PSS solutions, limiting them only to early adopters with strategic interests and value hierarchies beyond the directly commercial (Figure 3).”
Quote in the paperSubstantial claim - Interpretationnone given
Across all the mentioned building-related disciplines, the momentum provided by traditional processes generates a systemic inertia which severely limits the actual decision-making scope of the key stakeholders involved in a construction project.
“It concludes that, across all the mentioned building-related disciplines, the momentum provided by traditional processes generates a systemic inertia which severely limits the actual decision-making scope of the key stakeholders involved in a construction project.”
Quote in the paperSubstantial claim - Interpretationreasoning
Innovative and relatively untested contracting models result in an added risk to all parties involved in the PSS project.
“Innovative and relatively untested contracting models result in an added risk to all parties involved in the PSS project.”
Quote in the paperSubstantial claim - Interpretationown data
At least in the case of the Netherlands, conditions enabling a more mainstream implementation of PSS models could be achieved through targeted action in each of the identified disciplinary fields.
“However, the study has also shown that, at least in the case of the Netherlands, conditions enabling a more mainstream implementation of PSS models could be achieved through targeted action in each of the identified disciplinary fields.”
Quote in the paperSubstantial claim - Interpretationreasoning
In the process of breaking down the building unit into its technical systems and performance attributes, a chance for new types of disputes exists when determining who must bear the technical responsibility and the financial expenses related to it.
“In the process of breaking down the building unit into its technical systems and performance attributes a chance for new types of disputes exists, when determining who must bear the technical responsibility and the financial expenses related to it.”
Quote in the paperSubstantial claim - Interpretationreasoning
The reason the final decision was not to enter a full PSS-based FaaS model is that the building owner and not the façade provider is the owner of the façade.
“This as the building owner and not the façade provider is the owner of the façade.”
Quote in the paperSubstantial claim - Interpretationreasoning
A narrow focus on short-term hard costs and values leads to a wide range of project choices being discarded from an early phase.
“A narrow focus on short-term hard costs and values lead to a wide range of project choices being discarded from an early phase.”
Quote in the paperSubstantial claim - Interpretationreasoning
The administrative conditions of a building project can be more determinant than the technical specifications of the building.
“This showcases how the administrative conditions of a building project can be more determinant than the technical specifications of the building.”
Quote in the paperSubstantial claim - Interpretationreasoning
Significant additional effort, motivation, and cost-and risk-bearing is necessary to overcome the systemic inertia.
“Significant additional effort, motivation, and cost-and risk-bearing is necessary to overcome this inertia.”
Quote in the paperSubstantial claim - Interpretationreasoning
The TUD 2020 budget constraint illustrates the types of constraints faced even by building owners with relatively extensive resources.
“This illustrates the types of constraints faced even by building owners with relatively extensive resources.”
Quote in the paperNot a substantial claim - Study design and conductnone given
These conclusions are specific to the accountancy practices of the commissioner organisation and the way in which local fiscal regulation and project finance treat the depreciation of a building asset.
“These conclusions are specific to the accountancy practices of the commissioner organisation, and the way in which local fiscal regulation and project finance treat the depreciation of a building asset.”
Quote in the paperSubstantial claim - Interpretationreasoning
In some cases, such as project financing, current practices cannot support competitive PSS alternatives capable of being upscaled to the mainstream construction market.
“In some cases (such as that of project financing) current practices cannot support competitive PSS alternatives capable of being upscaled to the mainstream construction market.”
Quote in the paperSubstantial claim - Interpretationreasoning
Even when all stakeholders are aligned from the start in motivations, long-term strategic sustainability goals and willingness to innovate, existing processes largely determine the outcome of financial and fiscal decisions, legal collaboration contracts, building techniques, and managerial organisation.
“Even in cases in which all stakeholders are aligned from the start in terms of motivations, long-term strategic sustainability goals and willingness to innovate, existing processes largely determine the outcome of financial and fiscal decisions, legal collaboration contracts, building techniques, and managerial organisation.”
Quote in the paperSubstantial claim - Interpretationreasoning
The added cost of capital from perceived novelty and risk results in PSS models being unlikely competitors with more traditional models of direct ownership.
“The added cost of capital from this perceived novelty and risk result in PSS models being unlikely competitors (from a cost perspective) with more traditional models of direct ownership.”
Quote in the paperSubstantial claim - Interpretationreasoning
The lack of standardised and comprehensive Total Value of Ownership models distorts the decision-making process in favour of well-known and well-tested choices.
“The lack of standardised and comprehensive Total Value of Ownership models, which include not only short-term, hard values and costs, but also long-term, softer parameters and externalities, distorts the decisionmaking process in the benefit of well-known and well-tested choices.”
Quote in the paperSubstantial claim - Interpretationnone given
EU and global waste management policies create a significant barrier by broadly cataloguing secondary materials as waste and limiting or fully restricting their transportation across international borders.
“A significant barrier is created by EU (and global) waste management policies, which broadly catalogue secondary materials as waste, and limit or fully restrict their transportation across international borders.”
Quote in the paperNot a substantial claim - Interpretationreasoning
Client organisations assume the risks associated with technical decision-making, component operation, building performance, user satisfaction, and final resource decommissioning and material treatment.
“Client organisations (commissioners) therefore assume the risks associated with technical decision-making, component operation, building performance, user satisfaction, and final resource decommissioning and (ideally circular) material treatment.”
Quote in the paperSubstantial claim - Study design and conductreasoning
The requirements list for the CiTG East façade renovation is missing critical parameters related to carbon performance.
“The authors of the paper acknowledge that the requirements list is missing critical parameters related to carbon performance.”
Quote in the paperNot a substantial claim - Interpretationreasoning
Decisions are constrained to a narrow range due to prescriptive financial evaluation models, organisational structures, and contracting mechanisms.
“Decisions are constrained to a narrow range due to prescriptive financial evaluation models, organisational structures, and contracting mechanisms.”
Quote in the paperSubstantial claim - Interpretationreasoning
If the FaaS supplier was to become legal owner after construction has started, then transfer tax must most likely and in most cases be paid.
“If the FaaS supplier was to become legal owner after construction has started, then transfer tax must (most likely and in most cases) be paid.”
Quote in the paperSubstantial claim - Interpretationreasoning
A solution in which the FaaS provider arranges the financing would lack scalability.
“This solution would therefore lack scalability.”
Quote in the paperSubstantial claim - Interpretationreasoning
In the case of commercial real estate the financial case for deferring renovation is exacerbated by the likelihood that the current building owner might decide to sell the property before a major renovation point is reached.
“In the case of commercial real estate this is exacerbated by the likelihood that the current building owner might decide to sell the property before a mayor renovation point is reached.”
Quote in the paperSubstantial claim - Interpretationreasoning
The current system of building law and project financing cannot easily deal with a full PSS proposition where the contracting party does not have legal and economic ownership of the operating assets.
“The current system of building law and project financing cannot easily deal with such a proposition.”
Quote in the paperSubstantial claim - Interpretationreasoning
The complexity of defining leasehold could become a challenge for building systems that are not spatially contained but are widely integrated throughout the building.
“The complexity of such a definition could become a challenge in the case of building systems which are not spatially contained but are instead widely integrated throughout the building (i.e.centralised builder service installations).”
Quote in the paperNot a substantial claim - Premisereasoning
A building loan will always have a shorter term than the expected service life of the building.
“This loan, however, will always have a shorter term than the expected service life of the building.”
Quote in the paperSubstantial claim - Premisecitation
The argument for split ownership of building layers and systems clashes with the legal framework under which the real estate sector has been traditionally regulated.
“In the context of applying PSS models to the construction sector, as has been discussed by (Chao-Duivis 2018) and (Ploeger et al. 2018), the argument for split ownership of building layers and systems clashes with the legal framework under which the real estate sector has been traditionally regulated.”
Quote in the paperSubstantial claim0 of 2 sources checked- cites Chao-Duivis 2018
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Ploeger et al. 2018
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Premisenone given
Technical performance in traditional product-based offerings is largely constrained to limited warranties against certain types of manufacturing or installation defects, typically below the expected service-life of the product, thus transferring a large part of the component's operational failure risk to the client.
“Technical performance in traditional product-based offerings is largely constrained to limited warranties against certain types of defects in manufacturing or installation.These warranties tend to be limited to several years, typically below the expected service-life of the product, thus essentially transferring a large part of the component's operational failure risk to the client.”
Quote in the paperSubstantial claim - Interpretationreasoning
To account for the residual value of materials, the financier would have to invest in the future value of secondary material markets.
“To account for the residual value of materials, the financier would have to essentially invest in the future value of secondary material markets.”
Quote in the paperSubstantial claim - Premisecitation
The 'rule of accession' provides ownership of all immovable structures and fixtures to the owner of the land or structure to which they are fixed, in the Dutch context and throughout a large part of the world whose legal codes have been inspired by the Roman legal system.
“The”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Van der Walt and Sono 2016
- Premisecitation
Retention of legal ownership by the service provider of tangible material products needed to deliver an intangible performance service provides additional legal and economic incentives to reprocess materials and components through reuse, repair, remanufacturing, and/or recycling.
“It is however desirable, as the retention of legal ownership -by the service provider -of any tangible material products needed to deliver an intangible performance service will provide the additional legal and economic incentives to effectively reprocess materials and components through reuse, repair, remanufacturing, and/ or recycling activities (Baines andLightfoot 2013, Stahel 2016).”
Quote in the paperSubstantial claim0 of 2 sources checked- cites Baines andLightfoot 2013
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Stahel 2016 source
- Premisereasoning
In the current construction market, the residual value of materials found in buildings does not contribute to the value of the building as collateral when securing a loan.
“In the current construction market, the residual value of materials found in buildings is therefore of no positive consequence to financial or real estate markets, which means that it does not contribute to the value of the building as collateral when securing a loan.”
Quote in the paperSubstantial claim - Premisecitation
The cited authors find no fundamental reason or precedent preventing a lease-law construct from being applied to vertical surfaces such as a façade, as has been the case for the FaaS project.
“In principle, however, the cited authors find no fundamental reason or precedent preventing such a construct from being applied to vertical surfaces as in the case of a façade, which has been the case for the FaaS project.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Van der Plank and de Jong (2019)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- May combine two claims. 73
- Classified as probably not a substantial claim. 89
May combine two claims.
PremisecitationIf performance requirements include environmental and CE indicators, PSS allow decoupling value-creation from resource consumption while promoting regenerative industrial practices.
“If the performance requirements include environmental and CE indicators, PSS allow decoupling value-creation from resource consumption while promoting regenerative industrial practices (Fischer et al., 2012;Vezzoli et al., 2017).”
Quote in the paperSubstantial claim1 of 2 sources checked- cites Fischer et al., 2012
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites Vezzoli et al., 2017 source
Chapter 2 describes PSS as creating value without increasing resource consumption, and section 2.1 discusses reuse, remanufacturing, recycling, and resource savings. The design-criteria appendix includes environmental criteria and resource-conservation measures, but our copy does not establish that including environmental and circular-economy indicators in performance requirements is sufficient to produce the claimed outcomes. Section 2.1.7 cautions that not all PSS deliver environmental benefits. (LLM, conf=0.84)
Experimental — accuracy not yet measured
Probably not a substantial claim: may not pass S3 (load-bearing).
Findingown dataA full decision for a FaaS renovation couldn't yet be taken, as it required further research.
“A full decision for a FaaS renovation couldn't yet be taken, as it required further research, but once the BAU scenario was placed on hold, a decision would have to be made on whether the CiTG's East façade would be renovated by Q4.2019, or the BaU scenario would be reinstated to prevent damage to the façade.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S2 (checkable).
FindingreasoningIn several instances, circular arguments spanning across disciplines block progress for the whole industry.
“In several instances, circular arguments spanning across disciplines block progress for the whole industry.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based).
Findingnone givenAlternative models for financing and managing PSS alternatives, such as the SPV model, rely on customized and untested interpretations of building, rental, and property laws.
“Alternative models for financing and managing PSS alternatives, such as the SPV model illustrated in Figure 5, rely on customized and untested interpretations of building, rental, and property laws.”
Quote in the paperNot a substantial claimMay combine two claims.
FindingreasoningThe financing of the façade is not backed by a complete real estate asset, as would be the case in a traditional mortgage-backed loan, and since the value of the façade as an independent asset at any given time is difficult to estimate, the financial construction is backed largely by the solidity of the building owner as FaaS customer, resulting in capital costs similar to those of a business loan
“The financing of the façade is not backed by a complete real estate asset, as would be the case in a traditional mortgage-backed loan.Since the value of the façade, as an independent asset, at any given time is difficult to estimate, the financial construction is backed largely by the solidity of the building owner as FaaS customer.This results in capital costs similar to those of a business loan,”
Quote in the paperSubstantial claimMay combine two claims.
Findingown dataDirect purchasing of the façade would be marginally cheaper from a Total Cost of Ownership perspective over 15 or 30 years, but leasing (or PSS contracting) of the façade would be more attractive from a cash-flow perspective.
“Direct purchasing of the façade would be marginally cheaper from a Total Cost of Ownership perspective over 15 or 30 years, but leasing (or PSS contracting) of the façade would result more attractive from a cash-flow perspective.”
Quote in the paperSubstantial claimMay combine two claims.
Findingnone givenThe residual value of the FaaS components could not be estimated or considered in the financial evaluation model, and the consulted banks were unwilling to assume any risks related to the residual value of physical components.
“The residual value of the FaaS components could not be estimated or considered in the financial evaluation model, and the consulted banks were unwilling to assume any risks related to the residual value of physical components.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S3 (load-bearing). May combine two claims.
Findingown dataThe choice was made to split the decision in two: in Q3.2019 green light was given to the technical CiTG East façade renovation project, and the decision whether to implement the FaaS model would be delayed until further research was carried out in early 2020.
“The choice was then made to split the decision in two: In Q3.2019 green light was given to the technical CiTG East façade renovation project, so that planning and fabrication could start, and the façade could be replaced between late Q2.2020 and Q4.2020.The decision whether to implement the FaaS model would be delayed until further research was carried out in early 2020.”
Quote in the paperNot a substantial claimMay combine two claims.
Findingnone givenSeveral constraints resulted difficult to overcome, and the final decision was not to enter a full PSS-based FaaS contracting and financing model covering all requirements from Table 1.
“Several constraints resulted difficult to overcome, and the final decision was not to enter a full PSS-based FaaS contracting and financing model covering all requirements from Table 1.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S4 (based).
Findingnone givenBuilding projects are frequently transferred from short-term parties responsible for developing and building the project to long-term parties responsible for operating it.
“Building projects are frequently transferred from short-term parties responsible for developing and building the project, to long-term parties responsible for operating it.”
Quote in the paperNot a substantial claimMay combine two claims.
FindingreasoningSince no energy performance or user comfort improvement was expected from a minimal intervention, there was no pressure from the end-user to schedule these measures sooner.
“On the other hand, since no energy performance or user comfort improvement was expected from a minimal intervention, there was no pressure from the end-user (the CiTG faculty) to schedule these measures sooner.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
FindingreasoningA minimum scheduled maintenance could not be put on hold indefinitely because corrosion would start affecting the window frames to an irreversible extent.
“However, on the one hand, a minimum scheduled maintenance could not be put on hold indefinitely while other options were weighted, because corrosion would start affecting the window frames to an irreversible extent.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing). May combine two claims.
FindingreasoningVAT must be paid by the FaaS owner but can be deducted since the façade is a business operating asset.
“VAT must be paid by the FaaS owner but can be deducted since the façade is a business operating asset.”
Quote in the paperNot a substantial claim- Rests on an assumption: VAT can be deducted since the façade is a business operating asset.
Probably not a substantial claim: may not pass S3 (load-bearing), S4 (based).
Findingnone givenContracting models aim to minimise disputes by concentrating ownership.
“Contracting models, which are closely related to project finance and bankability, aim to minimise disputes by concentrating ownership.”
Quote in the paperNot a substantial claimClassified as probably not a substantial claim. May combine two claims.
Findingnone givenAt the time of façade construction completion the façade would usually become legal and economic ownership of the building owner, so that its transfer to a third-party entity would result in property transfer taxes.
“At the time of the façade construction completion the façade would usually become legal and economic ownership of the building owner, so that its transfer to a third-party entity would result in property transfer taxes.”
Quote in the paperSubstantial claim- Rests on an assumption: At the time of façade construction completion the façade would usually become legal and economic ownership of the building owner.
Classified as probably not a substantial claim. May combine two claims.
Findingnone givenAt the time (2020) TUD had to make decisions on the renovation of three of its largest buildings, and resources allocated to these projects in that year's budget were only sufficient for one of them.
“At the time (2020) TUD had to make decisions on the renovation of three of its largest buildings, and resources allocated to these projects in that year's budget was only sufficient for one of them.”
Quote in the paperSubstantial claimMay combine two claims.
FindingreasoningVAT and property transfer tax have a significant impact on the PSS contracting of building components and are the object of some uncertainty due to their fiscal novelty.
“Value Added Tax (VAT) and property transfer tax have a significant impact on the PSS contracting of building components and are the object of some uncertainty due to their fiscal novelty.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based).
Findingnone givenFrom a policy and legislative perspective, the implementation of PSS contracting models represents a significant change from a status quo built on centuries or even millennia of legal precedence.
“From a policy and legislative perspective, the implementation of PSS contracting models represents a significant change from a status quo built on centuries or even millennia of legal precedence.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based).
Findingnone givenThe procurement process traditionally focuses on specifying technical solutions rather than establishing functional requirements.
“The procurement process traditionally focuses on specifying technical solutions, rather than establishing functional requirements.”
Quote in the paperNot a substantial claimMay combine two claims.
Findingnone givenAdditional softer values such as expected energy savings and estimated productivity value of increased user comfort were calculated as a reference and considered in the decision-making process, but were not prioritised.
“Additional softer values such as expected energy savings and the estimated productivity value of increased user comfort were calculated as a reference, and considered in the decision-making process, but were not prioritised.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based).
Findingnone givenIf the façade wasn't improved at the time, another 6-10 years would pass before the BAU maintenance had depreciated down to zero, and a decision could once again be considered.
“If the façade wasn't improved at the time, another 6-10 years would pass before the BAU maintenance had depreciated down to zero, and a decision could once again be considered.”
Quote in the paperNot a substantial claim- Rests on an assumption: The BAU maintenance would depreciate down to zero in 6-10 years.
Probably not a substantial claim: may not pass S4 (based). May combine two claims.
Findingnone givenLong-term performance is frequently beyond producer responsibility, as is environmentally responsible or circular treatment of material resources.
“Long-term performance is frequently beyond the producer responsibility, as is environmentally responsible or circular treatment of material resources.”
Quote in the paperNot a substantial claimMay combine two claims.
FindingreasoningSeveral models exist for circumventing the legal barrier of accession, but these models are based on innovative interpretations of rental and real estate law and therefore carry a risk in the case of litigation.
“While several models exist for circumventing this legal barrier, these models are based on innovative interpretations of rental and real estate law, and therefore carry a risk in the case of litigation.”
Quote in the paperSubstantial claim- Rests on an assumption: In the Netherlands and many other nations built on Western European and Roman law, the rule of accession gives building owners ownership of all fixtures attached to a building that can't be removed without damaging the building or affecting its performance.
Probably not a substantial claim: may not pass S4 (based).
Findingnone givenAccording to most fiscal advisors consulted, once the first fabricated façade modules are being fixed onto the building, the building owner will automatically become legal owner of the façade panels.
“According to most fiscal advisors consulted, once the first fabricated façade modules are being fixed onto the building, then the building owner will automatically become legal owner of the façade panels.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
Findingnone givenSeveral tax advisors provided conflicting views on how the Dutch tax authorities would react to the question of transfer tax in the PSS scenario.
“Several tax advisors provided conflicting views on how the Dutch tax authorities would react to the question of transfer tax in the PSS scenario.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
Findingnone givenThe smart façade technical systems algorithm controls operating conditions for the façade's external sun-shading system and night-cooling system and is therefore determinant to the correct functioning of the façade in relation to the technical service requirements established in the service agreement, such as user comfort.
“The smart façade technical systems algorithm controls operating conditions for the façade's external sun-shading system and night-cooling system and is therefore determinant to the correct functioning of the façade in relation to the technical service requirements established in the service agreement, such as user comfort.”
Quote in the paperNot a substantial claimMay combine two claims.
Findingnone givenA company was found with a new method for separating asbestos from steel, but their processing plant was under construction and would not be ready for another 2 years, during which time TUD would remain legally responsible for the correct management of the asbestos-containing steel frames.
“A company was found with a new method for separating asbestos from steel, however their processing plant was under construction and would not be ready for another 2 years, during which time TUD would remain legally responsible for the correct management of the asbestos-containing steel frames.”
Quote in the paperSubstantial claimMay combine two claims.
Findingnone givenThe project manager's experience as a technical building consultant enabled him to negotiate the FaaS service agreement with the FaaS provider, shifting the procurement process from the prescription of technical solution to an agreement based on functional requirements, including sustainability and circularity.
“The project manager's experience as a technical building consultant enabled him to negotiate the FaaS service agreement with the FaaS provider, shifting the procurement process from the prescription of technical solution to an agreement based on functional requirements, including sustainability and circularity.”
Quote in the paperSubstantial claimClassified as probably not a substantial claim.
Findingnone givenA clear demarcation had to be found on which factors the FaaS supplier consortium could be held liable for.
“On the other hand, a clear demarcation had to be found on which factors the FaaS supplier consortium could be held liable for.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S3 (load-bearing). May combine two claims.
Findingown dataThe evaluation included a cash-flow and a TVO analysis, both performed with planning horizons of 15 and 30 years.
“The evaluation thus included a cash-flow and a TVO analysis, both studies we performed with planning horizons of 15 and 30 years.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing). May combine two claims.
Findingown dataIn the case of the CiTG façade, no valuator could commit to a final response, but rather three arguments emerged.
“In the case of the CiTG façade, no valuator could commit to a final response, but rather three arguments emerged which are summarised below.”
Quote in the paperNot a substantial claimMay combine two claims.
Findingnone givenThe solution found overcomes contractual and financial barriers by integrating bank, client, and FaaS provider with a fourth stakeholder: a Special Purpose Vehicle (SPV), created in most likelihood by a real estate investment and management fund used to dealing with long-term building projects.
“The solution found, as summarized in the Figure 5 diagram, overcomes these contractual and financial barriers by integrating bank, client, and FaaS provider with a fourth stakeholder: a Special Purpose Vehicle (SPV), created in most likelihood by a real estate investment and management fund used to dealing with long-term building projects.”
Quote in the paperNot a substantial claimMay combine two claims.
FindingreasoningThe commissioner considered the risk too high and decided to traditionally dispose of the equipment in a way that is safe but prevents the recovery of the contaminated materials.
“This was considered too high a risk by the commissioner, and the decision was made to traditionally dispose of the equipment in a way that is safe but prevents the recovery of the contaminated materials.”
Quote in the paperSubstantial claimMay combine two claims.
FindingreasoningThis process was impossible within the remaining timeframe, exacerbated by time constraints established by the CiTG façade's technical replacement planning, and its strict delivery deadline before the end of Q4 2020.
“This process was impossible within the remaining timeframe, exacerbated by time constraints established by the CiTG façade's technical replacement planning, and its strict delivery deadline before the end of Q4.2020.”
Quote in the paperSubstantial claimMay combine two claims.
Findingnone givenAs a public organisation TUD has access to direct government borrowing at preferential rates, so that financing the project via a commercial third party (the SPV FaaS provider) would involve a higher Cost of Capital.
“As a public organisation TUD has access to direct government borrowing at preferential rates, so that financing the project via a commercial third party (the SPV FaaS provider) would involve a higher Cost of Capital.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
Findingnone givenTo what extent externalising the façade legal and/or economic ownership would affect the value of the building as collateral was the subject of significant academic and professional debate in the FaaS project.
“To what extent would externalising the façade legal and/or economic ownership affect the value of the building as collateral was the subject of significant academic and professional debate in the FaaS project.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing). May combine two claims.
Findingnone givenAfter reviewing these results, the building owner TUD decided to undergo a deep energy renovation, but not to finance it through PSS because as a public university they did not expect a significant financial performance from an alternative investment, rendering one of the key values behind a PSS model invalid.
“After reviewing these results, the building owner TUD decided to undergo a deep energy renovation, but not to finance it through PSS because as a publicly university they did not expect a significant financial performance from an alternative investment, rendering one of the key values behinds a PSS model invalid.”
Quote in the paperNot a substantial claimMay combine two claims.
FindingreasoningIn the case of the CiTG building, the existing façade included asbestos, so that the deconstruction of the façade was not practically possible.
“In the case of the CiTG building, the existing façade included asbestos (as was usual at the time of construction), so that the deconstruction of the façade was not practically possible.”
Quote in the paperSubstantial claimMay combine two claims.
Findingown dataThe FaaS pilot project showcased both sides of the innovation push/pull argument: to enter a full PSS contract, TUD's commissioners had to integrate the scope, expertise, and budget of the project development and facility management teams, and even of the end-user faculty, in order to provide a complete list of functional requirements.
“The FaaS pilot project showcased both sides of the innovation push/pull argument: to enter a full PSS contract, on the one hand TUD's commissioners had to integrate the scope, expertise, and budget of the project development and facility management teams, and even of the end-user faculty, in order to provide a complete list of functional requirements.”
Quote in the paperSubstantial claimMay combine two claims.
FindingreasoningThis resulted in an unknown and unexpected risk for TUD as commissioner and was a crucial point in the final decision not to implement a full PSS model for the CiTG façade renovation.
“This resulted in an unknown and unexpected risk for TUD as commissioner and was a crucial point in the final decision not to implement a full PSS model for the CiTG façade renovation.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S3 (load-bearing). May combine two claims.
FindingreasoningSome tax advisors suggested that transfer tax would not be applicable if the façade was transferred to the FaaS SPV before the project officially concluded and technically delivered, but this could not be verified until it was implemented, resulting in a 6% risk for TUD over the entire new façade's transactional value.
“Some tax advisors suggested that transfer tax would not be applicable if the façade was transferred to the FaaS SPV before the project officially concluded and technically delivered, but this could not be verified until it was implemented (resulting in a 6% risk for TUD over the entire new façade's transactional value).”
Quote in the paperNot a substantial claimMay combine two claims.
FindingcitationThe CiTG project's relatively small scale and tight construction schedule made it impossible to develop and integrate new technical solutions for a more circular façade system in time, but the consortium involved in the project, together with other industry parties, continued working on these technical challenges and developed the Ciskin façade system beyond the scope of the project.
“The CiTG project's relatively small scale and tight construction schedule made it impossible to develop and integrate new technical solutions for a more circular façade system in time, however, the consortium involved in the project, together with other industry parties, continued working on these technical challenges and developed the Ciskin façade system beyond the scope of the project (Alkondor”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Alkondor, de Groot & Visser, and Wicona 2022
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing), S4 (based). May combine two claims.
Findingnone givenNo references could be found in either literature or case law, rendering the question open until the Dutch tax authorities ruled a decision on the matter.
“However, no references could be found in either literature or case law, rendering the question open until the Dutch tax authorities ruled a decision on the matter.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
Findingnone givenA state-of-the-art curtain wall consisting of framing, glazing, panelling, and other potentially integrated decentralised components could be clearly defined as a self-contained physical object.
“The curtain wallwhich consists of framing, glazing, panelling, and other potentially integrated decentralised components such as solar shading, actuators, or BiPV unitscould be clearly defined as a self-contained physical object.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based). May combine two claims.
Findingnone givenAs a result of the ongoing Dutch housing crisis these values have changed and exceptions have been created since the CiTG project; these changes would influence the extent to which fiscal policy could hinder a FaaS model.
“As a result of the ongoing Dutch housing crisis these values have changed, and exceptions have been created since the period during which the CiTG project was ongoing.These changes are not directly relevant to the present study, but they would influence the extent to which fiscal policy could hinder a FaaS model.”
Quote in the paperNot a substantial claimMay combine two claims.
FindingreasoningBecause the loan for financing the project would be granted to the FaaS provider (consortium), it would not be guaranteed by the client's building, and the value of the façade is uncertain; several combinable options to secure servicing of the loan were explored (financial insurance, buy-out option, and FaaS take-over option).
“• Since the loan for financing the project would be granted to the FaaS provider (consortium), it would not be guaranteed by the client's building.Meanwhile, as described above, the value of the façade is uncertain.In order to secure servicing of the loan several (combinable) options were explored: A financial insurance on the loan servicing, granted to the FaaS provider, but eventually paid for”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S4 (based). May combine two claims.
FindingreasoningThese aspects resulted in partial implementation of PSS for the façade of the CiTG building; in theory, with full envelope PSS, these aspects could be overcome.
“As mentioned in Task 3, these aspects resulted in partial implementation of PSS for the façade of the CiTG building.In theory, with full envelope PSS, these aspects could be overcome.”
Quote in the paperNot a substantial claimMay combine two claims.
Findingnone givenIn the case of a FaaS contract, parties will seek securities to protect them if other stakeholders voluntarily exit or are forced to exit by unforeseeable events such as bankruptcy; such securities did not exist in the current construction and real estate market and had to be developed during the CiTG project.
“In the case of a FaaS contract, parties will seek securities to protect them in case any of the other stakeholders wish to voluntarily exit the agreement or are forced to exit by unforeseeable events such as bankruptcy.Such securities don't exist in the current construction and real estate market and had to be developed during the CiTG project.”
Quote in the paperSubstantial claim- Rests on an assumption: The individuals representing organisations that enter a decades-long contractual relation will no longer be part of these organisations by the end of the contract.
May combine two claims.
FindingreasoningThe biggest challenge to physical demarcation lies in cabling and piping, which could be largely interconnected with the centralized building services infrastructure; as the PSS in FaaS was only partially implemented, this aspect was left unresolved.
“Probably the biggest challenge to this physical demarcation lies in cabling (e.g.electricity and ICT) and piping (e.g.heating and ventilation), which could in many cases be largely interconnected with the centralized building services infrastructure.As the PSS in FaaS was only partially implemented (as a service contract without lease), this aspect was left unresolved.”
Quote in the paperNot a substantial claimMay combine two claims.
Findingown dataNone of the financiers consulted would consider a loan longer than a traditional mortgage, nor would they consider a positive balance in the project's cashflow resulting from the potentially recoverable value of (potentially more circular) components and materials.
“None of the financiers consulted would consider a loan longer than a traditional mortgage, nor would they consider a positive balance in the project's cashflow as a result of the potentially recoverable value of (potentially more circular) components and materials.”
Quote in the paperSubstantial claimMay combine two claims.
Findingnone givenA façade reuse/remanufacturing broker can facilitate the transaction between one FaaS contract and the next, so that a FaaS system removed from a building can be adjusted to fit onto another one; such parties are starting to emerge in the Dutch context.
“• A façade reuse/remanufacturing broker can facilitate the transaction between one FaaS contract and the next, so that a FaaS system removed from a building can be adjusted to fit onto another one.Such parties are starting to emerge in the Dutch context.”
Quote in the paperNot a substantial claimMay combine two claims.
Findingown dataA party was found willing to purchase a future buy-option on the FaaS; this option was not attractive in the CiTG case because TUD would most likely want to continue using the façade for a longer period, and because a buy-option is not an obligation for the buyer while it is for the seller, so the concept was considered too risky.
“In fact, a party was found who was willing to purchase a future buy-option on the FaaS, so that it would have the right to purchase the façade at a given time in the future for a certain price.This option was not attractive in the CiTG case because TUD would in most likelihood want to continue contacting the façade for a longer period.Also, a buy-option is not an obligation for the buyer to”
Quote in the paperNot a substantial claimMay combine two claims.
FindingreasoningIn the FaaS project, the challenge of legal ownership was considered addressed with sufficient certainty and risk-avoidance by the model in which the FaaS provider rents the contact points from the building owner and a right of leasehold is established, avoiding automatic transfer of legal ownership under the rule of accession; the model was considered sufficient by legal academic and practice专家.
“In the FaaS project, the challenge of legal ownership was considered addressed with sufficient certainty and risk-avoidance when the model was proposed in which the FaaS provider would rent the contact points on which the façade would be connected to the structure, from the building owner.A right of leasehold could be established by which the building owner would lease from the FaaS provider the”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
Findingnone givenIn terms of technical guarantees that the FaaS system would continue to be serviced even in the event of the Façade Builder's bankruptcy, the Dutch Metal Façade Branch Organisation would commit to finding a new party willing to take over the contract with the SPV.
“• In terms of technical guarantees that the FaaS system would continue to be serviced, even in the event of the Façade Builder's bankruptcy, the Dutch Metal Façade Branch Organisation would commit to finding a new party willing to take over the contract with the SPV.The new party would then continue to perform technical maintenance on, as well as end-of-service processing of, the FaaS system.”
Quote in the paperNot a substantial claimMay combine two claims.
InterpretationreasoningThe construction and real estate market is failing to assign a fair value to climate-change mitigation strategies, or to fairly appraise the risks of non-mitigation.
“The construction and real estate market is, in other words, failing to assign a fair value to climate-change mitigation strategies, or to fairly appraise the risks of non-mitigation.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
PremisecitationPSS have gained increasing traction as a potential instrument to enable the Circular Economy transition.
“Product-Service Systems (PSS) have gained increasing traction (Camilleri, 2019) as a potential instrument to enable the Circular Economy transition.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Camilleri, 2019 source
Probably not a substantial claim: may not pass S2 (checkable), S4 (based).
PremisereasoningThe redistribution of incentives, responsibilities, and risks proposed by PSS models could support addressing the administrative systemic challenges previously mentioned.
“This since the redistribution of incentives, responsibilities, and risks proposed by PSS models could support addressing the administrative systemic challenges previously mentioned.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based).
Premisenone givenA limitation of studies on PSS for the built environment so far is their theoretical nature.
“A limitation of the studies so far is their theoretical nature.”
Quote in the paperNot a substantial claimMay combine two claims.
InterpretationreasoningThese risks may translate into disputes during the decades-long contracting periods required from built environment technical components, or may currently translate into added complexity and cost of financing.
“These risks may translate into disputes during the decades-long contracting periods required from built environment technical components, or which may -and currently does-translate into added complexity and cost of financing.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S2 (checkable), S4 (based).
Interpretationnone givenThe hurdles and conditions described are common to different types of real estate owners and project investment decisions around the world.
“The hurdles and conditions described are common to different types of real estate owners and project investment decisions around the world.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing). May combine two claims.
InterpretationreasoningDue to extensive similarities between tax policies, a transfer tax is expected to result in considerable additional costs and should be considered in the project's financial and fiscal planning.
“This is unique to each country's tax code, but due to the extensive similarities between tax policies such a transfer tax is expected to result in considerable additional costs and should be considered in the project's financial and fiscal planning.”
Quote in the paperNot a substantial claimClassified as probably not a substantial claim.
Interpretationnone givenThe implementation of performance-based models currently faces significant practical hurdles.
“However, their implementation currently faces significant practical hurdles.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S2 (checkable), S4 (based). May combine two claims.
Interpretationnone givenPerformance-based models can be an administrative alternative that addresses internal organisation challenges (flexibility and ease of decision-making) and external societal challenges (environmental sustainability).
“On the matter of scalability of these results we consider that performance-based models can be an administrative alternative which addresses internal organisation challenges (flexibility and ease of decision-making) and external societal challenges (environmental sustainability).”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S2 (checkable), S4 (based).
InterpretationreasoningThe shift from valuing buildings as full functional units to valuing them as temporary material depositories puts into question the entire solidity of real estate investment markets.
“The shift from valuing buildings as full functional units, to valuing them as temporary material depositories, puts into question the entire solidity of real estate investment markets.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based).
Premisenone givenThe lifecycle of a building project is guided by traditional and well-established processes which aim to minimise uncertainty and risk.
“The lifecycle of a building project -from its initial conceptualisation through its commissioning, operation, and final decommissioning -is guided by traditional and well-established processes which aim to minimise uncertainty and risk.”
Quote in the paperNot a substantial claimMay combine two claims.
InterpretationreasoningThe traditional linear structuring of organisations results in a loss of potential knowledge exchange between specialists responsible for different lifecycle stages, loss of decision-making complexity, and embedding a linear mentality into the construction management process.
“This results in a loss of potential knowledge exchange between specialists responsible for the different lifecycle stages, loss of decision-making complexity which would benefit choices with a positive performance over the longer term, while embedding a linear mentality into the construction management process.”
Quote in the paperSubstantial claimClassified as probably not a substantial claim.
Interpretationnone givenThe key challenge highlighted by the study is the broad restructuring and rethinking of the ways in which buildings are developed, managed, financed, and legally protected.
“Perhaps the key challenge highlighted by this study is the broad restructuring and rethinking of the ways in which buildings are developed, managed, financed, and legally protected.”
Quote in the paperSubstantial claimClassified as probably not a substantial claim.
InterpretationreasoningTraditional processes result in systemic inertia across the built environment, resulting in the slow rate of change commonly associated with the construction sector.
“These traditional processes result in systemic inertia across the built environment, resulting in the slow rate of change commonly associated with the construction sector.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
InterpretationreasoningThe omission of embodied carbon requirements is due to the lack of broadly recognised methodologies for calculating the embodied carbon of circular technical solutions.
“This omission of embodied carbon requirements is due to the lack of broadly recognised methodologies for calculating the embodied carbon of circular technical solutions.”
Quote in the paperNot a substantial claimMay combine two claims.
Study design and conductreasoningThe CiTG building selected for the FaaS project exemplifies the mismatch between the building sector and climate neutrality/long-term sustainability and is an appropriate testbed for the analysis.
“The CiTG building selected for the FaaS project exemplifies this mismatch and is thus an appropriate testbed for our analysis.”
Quote in the paperSubstantial claim- Rests on an assumption: The CiTG building is representative of buildings of its time and an appropriate testbed for analysing barriers to FaaS.
May combine two claims.
InterpretationreasoningEU and global waste management policies make the economics of material recovery unfeasible, particularly in countries with high labour costs where such processes fail to generate subsistence-level value.
“This makes the economics of material recover unfeasible, particularly in countries with high labour costs were such processes fail to generate subsistence-level value”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based).
Premisenone givenRetrofit decisions are a challenge common to TUD and other universities due to their relatively old and/or heritage building portfolios.
“Due to their relatively old and/or heritage building portfolios, retrofit decisions are a challenge common to TUD and other universities.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
Study design and conductreasoningOperational carbon requirements are excluded because they are determined by the building's and TU Delft campus' central energy systems, which are beyond the scope of the CiTG East façade renovation project.
“Operational carbon requirements are also excluded since they are determined by the building's and the TU Delft campus' central energy systems, which are beyond the scope of the CITG's East façade renovation project.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based). May combine two claims.
Premisenone givenMost often buildings are demolished, leading to significant material leakage and loss, but in some cases they will be deconstructed in a way that material value can be recovered.
“Most often buildings are demolished, leading to significant 'material leakage' and loss, but in some cases, they will be deconstructed in a way that material value can be recovered.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based). May combine two claims.
InterpretationreasoningImproved quality and performance of the building, energy savings, and user comfort would contribute to a higher transactional value of the building and therefore render it a more valuable guarantee as collateral.
“All these factors would contribute to a higher transactional value of the building and therefore would render it a more valuable guarantee as collateral.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based). May combine two claims.
Premisenone givenThe procurement process is not only defined by the strategic priorities, value hierarchy, and organisational structure of the project commissioner, but it is bounded by the range of possible solutions the market presently offers.
“The procurement process is not only defined by the strategic priorities / objectives, value hierarchy, and organisational structure of the project commissioner (the problem-owner), but it is bounded by the range of possible solutions the market presently offers.”
Quote in the paperNot a substantial claimMay combine two claims.
PremisecitationProject briefing processes that are too technically prescriptive result in inefficiencies such as commoditised suppliers and products, focus on delivery of prescribed physical products rather than performance, static and depreciating buildings, and failure to factor in service-life performance, end-of-service scenarios, and residual value of components.
“Several authors on project commissioning theory have highlighted the drawbacks in project briefing processes being too technically prescriptive, resulting in inefficiencies such as:”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based).
InterpretationreasoningThe higher project cost of a FaaS alternative would result in a lower debt-bearing capacity of the building owner.
“The higher project cost of a FaaS alternative would result in a lower debt-bearing capacity of the building owner.”
Quote in the paperNot a substantial claimClassified as probably not a substantial claim. May combine two claims.
Interpretationnone givenThe SPV would retain legal and economic ownership of the façade, arranging financing and managing the service contract with the FaaS provider in the final interest of the building owner.
“It would retain legal and economic ownership of the façade, arranging financing and managing the service contract with the FaaS provider in the final interest of the building owner (client).”
Quote in the paperSubstantial claimClassified as probably not a substantial claim.
Interpretationnone givenThe SPV would act as a mediator between the collaborating partners.
“The SPV would act as a mediator between the collaborating partners.”
Quote in the paperSubstantial claimMay combine two claims.
Interpretationnone givenThe long term of the eventual FaaS contract (15-30 years) means that even if the building were sold, the FaaS contract and the underlying façade would be transferred with it and the building's functional unity would be preserved.
“Also, the long term of the eventual FaaS contract (15-30 years), would mean that even in the case that the building was sold the FaaS contract (and the underlying façade) would be transferred with it and the building's functional unity would be preserved.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
PremisecitationGielingh and co-authors make a distinction between the functional requirements needed by the building owner and end user, and the technical solutions offered by suppliers to fulfil these requirements.
“Gielingh andco-authors (Gielingh 2008, Gielingh et al. 2008) make a distinction between the functional requirements needed by the building owner and end user, and the technical solutions offered by suppliers to fulfil these requirements.”
Quote in the paperNot a substantial claim0 of 2 sources checked- cites Gielingh 2008
- cites Gielingh et al. 2008
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S4 (based).
Interpretationnone givenThe traditional linear project flow consisting of development, management & exploitation, and decommissioning phases is deeply engrained in the real estate discipline and the structure of building commissioning organisations.
“The traditional linear project flowwhich consists of the development, management & exploitation, and decommissioning phasesis deeply engrained in the real estate discipline and the structure of buildingcommissioning organisations (Figure 4).”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based).
Interpretationnone givenAn asset with a relatively long service-life, such as a façade, is not an easy object to finance for a bank or leasing company, as they would with industrial or office equipment with shorter (<10-year) service lives.
“An asset with a relatively long service-life, such as a façade, is not an easy object to finance for a bank or leasing company, as they would with industrial or office equipment with shorter (<10-year) service lives.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based).
Premisenone givenThe monthly costs of a PSS are higher than those of a purchased façade.
“As the monthly costs of a PSS are higher than in a purchased façade, while the gains from an alternative investments are most likely not considered in the building-specific financial evaluation linked to the project's bankability.”
Quote in the paperNot a substantial claimMay combine two claims.
InterpretationreasoningIn the absence of a refinancing option the building owner would be forced to purchase the façade, and the PSS model would become ineffective and its circularity potential lost.
“In the absence of a refinancing option the building owner would be forced to purchase the façade, and the PSS model would become ineffective and its circularity potential lost.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S4 (based).
Interpretationnone givenRetaining, maximizing, and extending the value of materials indefinitely by applying re-life options with both retroactive and proactive circularity leads to positive long-term spill-over effects, such as stabler supply and value chains, savings in pollution taxes or fees, and preventing loss of end-of-service value.
“Retaining, maximizing, and extending the value of materials indefinitely by applying re-life options with both 'retroactive' and 'proactive' circularity leads to positive long-term spill-over effects, such as stabler supply and value chains, savings in pollution taxes / fees, preventing loss of endof-service value, etc.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based).
InterpretationreasoningThe loss of physical material value of functional unity would be offset by the higher building utility and transactional value.
“The loss of physical material value of functional unity would be offset by the higher building utility and transactional value.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
InterpretationreasoningInstead, a 21% VAT would be charged on the monthly FaaS service fees charged by the SPV to the building owner.
“Instead, a 21% VAT would be charged on the monthly FaaS service fees charged by the SPV to the building owner.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based).
Interpretationnone givenMost likely, as in the case of taxation, whether the building owner kept or could easily contractually recover legal and/or economic ownership of the façade would also determine how the FaaS construction would be treated in a valuation assessment.
“Most likely, as in the case of taxation, whether the building owner kept (or could easily contractually recover) legal and/or economic ownership of the façade would also determine how the FaaS construction would be treated in a valuation assessment.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
InterpretationreasoningDue to the uncertain nature of the legal model in the case of a dispute and the lack of precedents in legal literature or case law, a certain and final answer on the legal model could not be provided.
“Due to the uncertain nature of the legal model in the case of a dispute, as will be described below, and the lack of precedents in either legal literature or case law, a certain and final answer could not be provided.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based).
Interpretationnone givenThe financier would have to commit to a 50-to-70-year financing period, the usual service-life of a façade.
“The financier would have to commit to a 50-to-70-year financing period (the usual service-life of a façade).”
Quote in the paperNot a substantial claimClassified as probably not a substantial claim. May combine two claims.
InterpretationreasoningThe SPV can retain a long-term planning horizon, knowing that the facade will probably remain in place for decades, but otherwise brokering a new location where it can be installed.
“The SPV can retain a long-term planning horizon, knowing that the facade will probably remain in place for decades, but otherwise brokering a new location where it can be installed.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S4 (based). May combine two claims.
Interpretationnone givenExisting technical solutions, such as framing systems and façade-integrated technologies, are already quite capable of allowing a certain degree of updating and reprocessing, so that the field is ripe for this transition.
“It must be noted that existing technical solutions (i.e.framing systems and façade-integrated technologies) are already quite capable of allowing certain degree of updating and reprocessing, so that the field is ripe for this transition.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based).
Interpretationnone givenThe nature of the building project's commissioner's activities has a determinant influence on the prioritisation of values.
“The nature of the building project's commissioner's activities has a determinant influence on the prioritisation of values.”
Quote in the paperNot a substantial claimClassified as probably not a substantial claim. May combine two claims.
PremisereasoningValuation standards and practices are generally risk adverse, and slow to change.
“As a result of this, valuation standards and practices are generally risk adverse, and slow to change.”
Quote in the paperSubstantial claimMay combine two claims.
InterpretationreasoningLoan terms will be longer and interest rates lower, in particular for (semi)public organisations able to borrow directly from the government at national central bank rates.
“Loan terms will be longer and interest rates lower, in particular for (semi)public organisations able to borrow directly from the government at national central bank rates.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based).
InterpretationreasoningConditions would have been expectedly different for a commercial building owner, for whom Cost of Capital is generally higher and more similar to what the SPV FaaS entity could apply for.
“Conditions would have been expectedly different for a commercial building owner (for whom Cost of Capital is generally higher, and more similar to what the SPV FaaS entity could apply for).”
Quote in the paperNot a substantial claimMay combine two claims.
InterpretationreasoningDevelopment teams are in most cases different from facility management and decommissioning teams, which leads to a conflict between initial cost short-termism, long-term cost effectiveness, and circularity requirements.
“Development teams are in most cases different from facility management and decommissioning teams.This leads to a conflict between initial cost short-termism, long-term costeffectiveness, and circularity requirements.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S2 (checkable).
InterpretationreasoningThe conclusions of the process highlight the need for a holistic planning process which integrates all relevant fields of knowledge.
“Because of this, the conclusions of this process highlight once again the need for a holistic planning process which integrates all relevant fields of knowledge.”
Quote in the paperNot a substantial claimClassified as probably not a substantial claim.
InterpretationreasoningThe higher project costs of a FaaS alternative could be positively counter-balanced, in a valuation, by the gained benefits to the building and its occupiers.
“This higher project costs could be positively counter-balanced, in a valuation, by the gained benefits to the building and its occupiers.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S4 (based).
Premisenone givenIn a full Product-Service System model the contracting party prefers not to have legal and economic ownership of the operating assets but would rather outsource these to the third-party service provider.
“In a full Product-Service System model the contracting party prefers not to have legal and economic ownership of the operating assets but would rather outsource these to the third-party service provider.”
Quote in the paperNot a substantial claimMay combine two claims.
InterpretationreasoningBuilding owner, financier, and even FaaS provider can be replaced if the building is sold to a new owner, the first financing term concludes, or the FaaS provider faces bankruptcy or stops providing façade services for any reason.
“Building owner, financier, and even FaaS provider can be replaced if the building is sold to a new owner, the first financing term concludes, or the FaaS provider faces bankruptcy or stops providing façade services for any reason.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S4 (based).
Premisenone givenThe gains from alternative investments are most likely not considered in the building-specific financial evaluation linked to the project's bankability.
“As the monthly costs of a PSS are higher than in a purchased façade, while the gains from an alternative investments are most likely not considered in the building-specific financial evaluation linked to the project's bankability.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based).
Premisenone givenThe building owner must traditionally hire a demolition or deconstruction company to remove the materials before a replacing building system can be installed.
“The building owner must traditionally hire a demolition or deconstruction company to remove the materials before a replacing building system can be installed.”
Quote in the paperNot a substantial claimClassified as probably not a substantial claim.
InterpretationreasoningSuch performance limitations would not apply in the case of a full building envelope PSS intervention.
“It would be expected that such limitations would not apply in the case of a full building envelope PSS intervention.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S4 (based). May combine two claims.
Premisenone givenAs part of their due-process obligations, valuators are responsible and liable for following existing valuation standards and for securing to the financial institution guaranteeing the loan that the collateral value of the building has been correctly assessed.
“As part of their due-process obligations, valuators are responsible and liable for following existing valuation standards and securing to the financial institution aiming to guarantee the loan that the collateral value of the building has been correctly assessed.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based).
Interpretationnone givenThe legal model used to commission the FaaS would have an impact on the (split) ownership of the building, and therefore on the building's value as collateral.
“The legal model used to commission the FaaS would have an impact on the (split) ownership of the building, and therefore the building's value as collateral.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S4 (based).
Interpretationnone givenIt is unrealistic to assume that an already 60-year-old and technically inadequate façade system can remain in place for an additional 30 years, no matter how frequently it is given minimum maintenance.
“This as it is unrealistic to assume that an already 60year-old and technically inadequate façade system can remain in place for an additional 30 years, no matter how frequently it is given minimum maintenance.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S2 (checkable), S4 (based).
Interpretationnone givenThe systemic innovation proposed in the paper could facilitate a shift from Total Cost of Ownership to Total Value of Service.
“The systemic innovation proposed in this paper could facilitate a shift from Total Cost of Ownership to Total Value of Service.”
Quote in the paperNot a substantial claimClassified as probably not a substantial claim. May combine two claims.
Interpretationnone givenAlternatively, a shorter financing period could be agreed, but re-financing risk would have to be borne by the building owner.
“Alternatively, a shorter financing period could be agreed, but re-financing risk would have to be borne by the building owner.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S2 (checkable), S3 (load-bearing).
InterpretationreasoningConditions could have also improved if the residual value of the façade was considered in the project's financial evaluation.
“Conditions could have also improved if the residual value of the façade was considered in the project's financial evaluation.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based).
Premisenone givenIn recent years the discussion around Total Cost of Ownership (TCO) and Total Value of Ownership (TVO) has emphasised the relevance of softer values and liabilities.
“In recent years the discussion around Total Cost of Ownership (TCO) and Total Value of Ownership (TVO) has emphasised the relevance of softer values and liabilities.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based).
InterpretationreasoningIn the case of a PSS model, the 21% VAT would be deducted by the FaaS SPV as a commercial business expense, and would therefore not be charged to the building owner up front.
“In the case of a PSS model, the 21% VAT would be deducted by the FaaS SPV (as a commercial business expense), and would therefore not be charged to the building owner up front.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
InterpretationreasoningLoss of income related to the building's operation would lead to incapacity to service the loan.
“Loss of income related to the building's operation would lead to incapacity to service the loan.”
Quote in the paperNot a substantial claimClassified as probably not a substantial claim.
PremisecitationSolid real estate that is inflexible to changes could be acknowledged as a liability when compared with more flexible and 'liquid real estate'.
“Solid real estate, inflexible to changes, could be acknowledged as a liability when compared with more flexible and 'liquid real estate' (den Heijer et al., 2016).”
Quote in the paperSubstantial claim0 of 1 sources checked- cites den Heijer et al., 2016
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
InterpretationreasoningAs a result of the higher risk profile of commercial organisations, loans tend to be for a shorter period and involve a higher interest rate.
“As a result of this, loans tend to be for a shorter period and involve a higher interest rate.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S4 (based).
Premisenone givenThe key circular value proposition in the built environment is to convert a building owner's liability to manage their building materials in a circular way into a financial incentive or an asset for the providing entities.
“The key circular value proposition in the built environment is to convert a building owner's 'liability' to manage their building materials in a circular way, into a financial incentive or an asset for the providing entities.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based). May combine two claims.
Premisenone givenTransfer tax is not charged if less than 6 months have passed between a previous ownership change and a new one, in which case the buyer in the second transaction covers the transfer taxes paid by the buyer in the first; double transfer taxation can thus be avoided but must be paid when more than 6 months have passed between the first and second transfer.
“Transfer tax is not charged if less than 6 months have passed between a previous ownership change and a new one, in which case the buyer in the second transaction will cover the transfer taxes paid by the buyer in the first transaction.Thus, can double transfer taxation be avoided, but it must be paid when more than 6 months have passed between the first and second transfer.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
PremisecitationVan der Plank and de Jong (2019) recognise a distinction between tenancy (apartment) law and lease law.
“Van der Plank and de Jong (2019) recognise a distinction between tenancy (apartment) law and lease law.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Van der Plank and de Jong (2019)
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Classified as probably not a substantial claim.
PremisecitationAs PSS offerings approach 'result oriented' offerings, the definition of technical performance expands to include not only the technical integrity and direct output of components but the final operational outcome the system should deliver to the client's processes.
“As we approach”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Tukker 2004 source
May combine two claims.
PremisecitationMaterial markets are generally volatile and have seen particularly unprecedented fluctuations as a result of recent crises such as the COVID-19 pandemic and the consequences of geopolitical conflicts and tension.
“• Material markets: Which are generally volatile, but which have seen particularly unprecedented fluctuations as a result of recent crises such as the ongoing COVID-19 pandemic and the consequences of geopolitical conflicts and tension (World Economic Forum 2022).”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites World Economic Forum 2022
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing), S4 (based). May combine two claims.
InterpretationreasoningIn a 'functional result' based FaaS contract, the expected contribution of the façade to the client's processes would be the delivery of a specified energy performance, a determined indoor comfort, and a certain degree of circularity.
“In the case of a”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing). May combine two claims.
PremisecitationThe purpose of property law is to offer legal security, to minimise transaction costs, and to maximise and preserve real estate values in society.
“As stated by (Ploeger et al. 2018):”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites Ploeger et al. 2018
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing). May combine two claims.
PremisereasoningWith the rising complexity of buildings and building systems, the essential nature of any individual component can be disputed, so the law has focused on a broad definition of essential components as 'fixtures'.
“With the rising complexity of buildings and building systems, the essential nature of any individual component can be disputed.The law has therefore focused on a broad definition of essential components as”
Quote in the paperNot a substantial claimMay combine two claims.
PremisecitationLong-term material value trends have changed and in fact reversed since around the year 2000, so that no long-term historical data can be counted upon during the financial evaluation.
“Also, several studies have shown that longterm material value trends have changed, and in fact reversed, since around the year 2000, so that no long-term historical data can be counted upon during the financial evaluation (Ellen MacArthur Foundation 2013).”
Quote in the paperSubstantial claim0 of 1 sources checked- cites Ellen MacArthur Foundation 2013
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
Premisenone givenIn states with a European systemic heritage, buildings are financed based on their value as a complete functional unit and can be used as collateral to guarantee a loan (mortgage-based financing).
“The fundamental philosophy in states with a European systemic heritage, which underlies building law since its roots in Roman jurisprudence, is that buildings are financed based on their value as a complete functional unit.As such, they can be used as collateral to guarantee a loan, in other words mortgagebased financing.”
Quote in the paperNot a substantial claimClassified as probably not a substantial claim. May combine two claims.
PremisereasoningIn most buildings, the delivery of indoor comfort results from interaction between the building envelope and integrated decentralized systems and centralized building services, which could lead to an uncertain demarcation of performance responsibility between contractors or between owned and leased components.
“-Interaction between the façade system and centralized building services: in most buildings, the delivery of indoor comfort is the result of interaction between the building envelope and integrated decentralized systems and centralized building services (such as ventilation, lighting, heating and cooling).This division could lead to an uncertain demarcation of performance responsibility between”
Quote in the paperSubstantial claimMay combine two claims.
PremisereasoningThe argument for concentrated ownership is based on the concept that the whole is more valuable than the sum of its parts, and that a real estate object is more likely to lose value or face transactional disputes if ownership of its essential components is divided among several legal entities with diverse or conflicting economic interests.
“The argument for concentrated ownership is therefore based on the concept that the whole is more valuable than the sum of its parts, and that a real estate object is more likely to lose value or face transactional disputes if ownership of its essential components is divided among several legal entities with diverse or even conflicting economic interests.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S2 (checkable).
InterpretationreasoningAs long as a clear physical distinction can be made between components owned by the landowner and those leased from a third party, a right of leasehold should be definable.
“As long as a clear physical distinction can be made between those buildings, systems, or components which are owned by the landowner, and those which are being leased from a third party, a right of leasehold should be definable.”
Quote in the paperNot a substantial claimMay combine two claims.
PremisereasoningThe loan must be fully repaid before major renovation reinvestments or End-of-Life processes are reasonably expected, which would lead to a change in the utility value of the building.
“The loan must thus be fully repaid before major renovation reinvestments or EoL processes are to be reasonably expected which would lead to a change in the utility value of the building.”
Quote in the paperSubstantial claim- Rests on an assumption: Lenders do not want to assume any risk over the maintenance of the building by its owner/manager, or over the building's End-of-Life scenarios.
Probably not a substantial claim: may not pass S3 (load-bearing). May combine two claims.
Premisenone givenDocumentation of the role of user behaviour on actual energy savings shows the potential disruptive effect of negative user behaviour on final energy performance, which could lead to conflict between provider and client regarding the reason for not achieving the expected energy performance.
“-User behaviour and user preference: documentation of the role of user behaviour on actual energy savings (i.e., after a deep building energy renovation), show the potential disruptive effect of negative user behaviour on final energy performance.This could lead to conflict between provider and client regarding the reason for not achieving the expected energy performance.”
Quote in the paperNot a substantial claimMay combine two claims.
Premisenone givenIn most cases the residual value of materials does not provide the building owner with an expected recoverable income at decommissioning; most frequently building owners must pay for demolition and removal of used or obsolete components, so removal costs remain a liability on the owner's balance sheet.
“In most cases, it does not even provide the building owner with an expected recoverable income at the time of decommissioning.In fact, most frequently, building owners will need to pay for the demolition and removal of used or obsolete components, so that the removal costs remain a liability which should be considered in the balance-sheet of the building owner.”
Quote in the paperSubstantial claim
The paper relies on this without support.
Access to ever more crucial raw materials is under constant and growing pressure.
“For reasons ranging from dwindling volume of global deposits to increasing difficulty and cost of extraction, or geo-political and financial limitations, access to ever more crucial raw materials is under constant and growing pressure.”
The paper relies on this without support.
In the Netherlands and many other nations built on Western European and Roman law, the rule of accession gives building owners ownership of all fixtures attached to a building that can't be removed without damaging the building or affecting its performance.
“In the case of Netherlands, and many other nations built on Western European and Roman law, the rule of accession gives building owners ownership of all fixtures attached to a building, and which can't be removed without damaging the building or affecting its performance.”
The paper relies on this without support.
The CiTG building is representative of buildings of its time and an appropriate testbed for analysing barriers to FaaS.
“The CiTG building selected for the FaaS project exemplifies this mismatch and is thus an appropriate testbed for our analysis.”
“This representative building, constructed during the mid-1960s, displayed many of the performance issues and decision-making challenges common to buildings of that time”
The paper relies on this without support.
At the time of façade construction completion the façade would usually become legal and economic ownership of the building owner.
“At the time of the façade construction completion the façade would usually become legal and economic ownership of the building owner, so that its transfer to a third-party entity would result in property transfer taxes.”
The paper relies on this without support.
VAT can be deducted since the façade is a business operating asset.
“VAT must be paid by the FaaS owner but can be deducted since the façade is a business operating asset.”
The paper relies on this without support.
The BAU maintenance would depreciate down to zero in 6-10 years.
“If the façade wasn't improved at the time, another 6-10 years would pass before the BAU maintenance had depreciated down to zero, and a decision could once again be considered.”
The paper relies on this without support.
The building owner and not the façade provider is the owner of the façade.
“This as the building owner and not the façade provider is the owner of the façade.”
The paper relies on this without support.
Over the 10-to-50-year period which a PSS contract in the built environment might span, innumerable events could occur which would result in the exit of a partner or the reorganization or transfer of part or the whole of the PSS structure.
“Over the 10-to 50year period which a PSS contract in the built environment might span, innumerable events could occur which would result in the exit of a partner or the reorganization or transfer of part or the whole of the PSS structure.”
The paper relies on this without support.
For commercial property developers and owners, the building itself is the core business activity, and a positive balance between hard values (operational income) and hard costs (operational expenses) is a necessary condition to render the project feasible from a business and finance perspective.
“For commercial property developers and owners, the building itself is the core business activity: a positive balance between hard values (operational income) and hard costs (operational expenses) is a necessary condition to render the project feasible from a business and finance perspective.”
The paper relies on this without support.
Traditional project structures rely on the contracting party, generally a real estate developer or operator, securing financial resources to initiate, retrofit, maintain, etc. a construction project.
“Traditional project structures rely on the contracting party generally a real estate developer or operator securing financial resources to initiate, retrofit, maintain, etc. a construction project.”
The paper relies on this without support.
Resources are secured usually through a property-backed mortgage, depending on the type of client, acquired through public fiscal funding (public and semi-public clients), corporate revenue, equity, and debt (corporate clients), and project financing through equity and debt (commercial clients).
“Resources are secured usually through a property-backed mortgage, depending on the type of client, acquired through public fiscal funding (public and semi-public clients), corporate revenue, equity, and debt (corporate clients), and project financing through equity and debt (commercial clients).”
The paper relies on this without support.
Façade companies are usually SMEs, with limited loan-bearing capacity and a corporate and financial structure meant for manufacturing and/or assembly, and not for real estate investment.
“However, façade companies are usually SME's, with limited loan-bearing capacity and a corporate and financial structure meant for manufacturing and/or assembly, and not for real estate investment.”
The paper relies on this without support.
Tax policy is highly dependent on geographic region, and even within the European Union each member state has different rules regarding construction projects and real estate property taxation.
“Tax policy is highly dependent on geographic region.Even within the European Union, despite general trends and shared basic concepts, each member state has different rules regarding construction projects and real estate property taxation.”
The paper relies on this without support.
In a traditional construction project a 21% VAT would be applied to the cost of materials and labour delivered by the façade supplier to the building owner.
“In a traditional construction project a 21% VAT would be applied to the cost of materials and labour delivered by the façade supplier to the building owner.”
The paper relies on this without support.
The valuation of a building is of primary importance to the building owner, regardless of whether the owner is a commercial, corporate, or (semi)public party, because it will determine its effectiveness as collateral in a loan application.
“The valuation of a building is of primary importance to the building owner, regardless of whether the owner is a commercial, corporate, or (semi)public party, because it will determine its effectiveness as collateral in a loan application.”
The paper relies on this without support.
In the present economic system, the value as collateral of real estate is among the most secure guarantees a lender can have, and thus contributes to lower interest rates than other types of collateral securities.
“In the present economic system, the value as collateral of real estate is among the most secure guarantees a lender can have, and thus contributes to lower interest rates than other types of collateral securities.”
The paper relies on this without support.
If the loan is not serviced then the building can be foreclosed and, except during downturns in real estate cycles, the principal on the loan can be for the most part recovered by the lender.
“If the loan is not serviced then the building can be foreclosed and, except during downturns in real estate cycles, the principal on the loan can be for the most part recovered by the lender.”
The paper relies on this without support.
The building façade is usually around 20% of the initial cost of a building project, while a building is not usable if it doesn't have a façade.
“The building façade is usually around 20% of the initial cost of a building project, while a building-for most purposes-is not usable if it doesn't have a façade.”
The paper relies on this without support.
Organisations of all types use the value of their owned buildings as collateral to secure low-interest loans.
“Organisations of all types use the value of their owned buildings as collateral to secure low-interest loans.”
The paper relies on this without support.
A broad difference exists in the loan conditions (e.g. loan terms and interest rates) accessible to different types of organisations.
“A broad difference exists, however, in the loan conditions (e.g.loan terms and interest rates) accessible to different types of organisations.”
The paper relies on this without support.
Commercial organisations have a higher risk profile since the building itself is at the core of the clients' business model and its source of revenue.
“Commercial organisations have a higher risk profile since the building itself is at the core of the clients' business model and its source of revenue.”
The paper relies on this without support.
Corporate and (semi)public clients have additional sources of revenue, since the building is only an operating asset facilitating their core activities, and are therefore more secured borrowers.
“Corporate and (semi)public clients, meanwhile, have additional sources of revenue, since the building is only an operating asset facilitating their core activities, and are therefore more secured borrowers.”
The authors state this as an assumption.
In the case of the 30-year study it is assumed that the façade will have to be replaced on year 15.
“In the case of the 30-year study it is assumed that the façade will have to be replaced on year 15.”
The paper relies on this without support.
Lenders do not want to assume any risk over the maintenance of the building by its owner/manager, or over the building's End-of-Life scenarios.
“The lender does not want to assume any risk over the maintenance of the building by its owner/manager, or over the building's End-of-Life (EoL) scenarios.”
The paper relies on this without support.
The individuals representing organisations that enter a decades-long contractual relation will no longer be part of these organisations by the end of the contract.
“The case of a contractual relation expected to last decades means, for example, that the individuals representing the organisations which have entered the contractual relation will no longer be part of these organisations by the end of the contract.”
Cites
Stahel, W. R. (2016) · Nature · doi:10.1038/531435a · Cited by 2,555 · see citing works
Eight types of product–service system: Eight ways to sustainability? Experiences from SusProNet
Tukker, A. (2004) · Business Strategy and the Environment · doi:10.1002/bse.414 · Cited by 2,456 · cited 1× · see citing works
“As we approach “result oriented” PSS offerings (Tukker 2004), the definition of technical performance expands to include not only the technical integrity and direct output of these components, but the final operational outcome which the system should deliver to the client’s processes.”
BackgroundTukker, A., & Tischner, U. (2006) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2006.01.022 · Cited by 979 · see citing works
Krausmann, F., Lauk, C., Haas, W., & Wiedenhofer, D. (2018) · Global Environmental Change · doi:10.1016/j.gloenvcha.2018.07.003 · Cited by 415 · see citing works
The material basis of the global economy
Behrens, A., Giljum, S., Kovanda, J., & Niza, S. (2007) · Ecological Economics · doi:10.1016/j.ecolecon.2007.02.034 · Cited by 289 · cited 1× · see citing works
“In the construction sector, CE theory aims to address the material challenge presented by the need to meet demands for increasing housing and infrastructure pressure fuelled by a growing global urban population, by the urgent need to renovate the existing building stock, and by rising living standards across the devel…”
BackgroundMagrini, A., Lentini, G., Cuman, S., Bodrato, A., & Marenco, L. (2020) · Developments in the Built Environment · doi:10.1016/j.dibe.2020.100019 · Cited by 214 · cited 1× · see citing works
“At the current rate of 1% it will take around 100 years to renovate the European building stock (Artola et al., 2016; European Commission, 2016; Magrini et al., 2020).”
BackgroundSmart power: climate change, the smart grid and the future of electric utilities.
Fox-Penner, P. S. (2010) · Cited by 208 · see citing works
Made to Serve How Manufacturers can Compete Through Servitization and Product Service Systems
Baines, T. S., & Lightfoot, H. W. (2013) · doi:10.1002/9781119207955 · Cited by 186
Stahel, W. R. (2010) · Palgrave Macmillan UK eBooks · doi:10.1057/9780230274907 · Cited by 153 · see citing works
Camilleri, M. A. (2019) · Sustainable Development · doi:10.1002/sd.1909 · Cited by 149 · cited 1× · see citing works
“Product-Service Systems (PSS) have gained increasing traction (Camilleri, 2019) as a potential instrument to enable the Circular Economy transition.”
BackgroundMade to serve. How manufacturers can compete through servitization and product-service systems
Vladimirova, D. (2014) · Production Planning & Control · doi:10.1080/09537287.2014.936698 · Cited by 130 · cited 1× · see citing works
“…tangible material products needed to deliver an intangible performance service will provide the additional legal and economic incentives to effectively reprocess materials and components through reuse, repair, remanufacturing, and/ or recycling activities (Baines and Lightfoot 2013, Stahel 2016).”
BackgroundManaging the University Campus: Information to Support Real Estate Decisions
Troost, S. (2012) · Planning for higher education · Cited by 82 · see citing works
Product-Service System Design for Sustainability
Vezzoli, C., Kohtala, C., Srinivasan, A., Diehl, J., Fusakul, S. M., Xin, L., & Sateesh, D. (2017) · doi:10.4324/9781351278003 · Cited by 66 · cited 1× · see citing works
“If the performance requirements include environmental and CE indicators, PSS allow decoupling value-creation from resource consumption while promoting regenerative industrial practices (Fischer et al., 2012; Vezzoli et al., 2017).”
Background(2016) · Choice Reviews Online · doi:10.5860/choice.195009 · Cited by 59 · see citing works
Aguerre, J. F. A., Conci, M., Zils, M., et al. (2022) · Construction Management and Economics · doi:10.1080/01446193.2022.2094434 · Cited by 50 · see citing works
Self-citationDefining value creation in the context of circular PSS
Widmer, T., Tjahjono, B., & Bourlakis, M. (2018) · Procedia CIRP · doi:10.1016/j.procir.2018.03.329 · Cited by 35 · cited 1× · see citing works
“By doing so PSS creates a financial incentive for more diligent material stewardship (Widmer et al., 2018).”
BackgroundFacades-as-a-Service: The Role of Technology in the Circular Servitisation of the Building Envelope
Aguerre, J. F. A., Klein, T., Konstantinou, T., & Veerman, M. (2022) · Applied Sciences · doi:10.3390/app12031267 · Cited by 34 · see citing works
Self-citationCircular economy and real estate: the legal (im)possibilities of operational lease
Ploeger, H. D., Prins, M., Straub, A., & den Brink, R. V. (2019) · Facilities · doi:10.1108/f-01-2018-0006 · Cited by 27 · cited 2× · see citing works
“In the context of applying PSS models to the construction sector, as has been discussed by (Chao-Duivis 2018) and (Ploeger et al. 2018), the argument for split ownership of building layers and systems clashes with the legal framework under which the real estate sector has been traditionally regulated.”
BackgroundMethodWays to study corporate real estate management in healthcare : An analytical framework
van der Zwart, J., van der Voordt, D. J. M., & Arkesteijn, M. H. (2009) · Data Archiving and Networked Services (DANS) · Cited by 12 · see citing works
Self-citation(2008) · Journal of Information Technology in Construction · Cited by 7 · see citing works
Façade Leasing: Drivers and barriers to the delivery of integrated Façades-as-a-Service
Aguerre, J. F. A., Klein, T., den Heijer, A. C., et al. (2018) · Research Repository (Delft University of Technology) · Cited by 6 · see citing works
Self-citationAssessing facade value - how clients make business cases in changing real estate markets
den Heijer, A. C. (2013) · Journal of Facade Design and Engineering · doi:10.3233/fde-130004 · Cited by 5 · see citing works
(2016) · SSRN Electronic Journal · Cited by 3 · see citing works
Instrumenteel gebruik van het recht van erfpacht in het kader van circulair bouwen
van der Plank (2019) · Cited by 3 · see citing works
Circular Business Models : Building a Database of Case Studie
Vergara, L. M., Arkesteijn, M. H., Aguerre, J. F. A., et al. (2019) · Cited by 2 · see citing works
Self-citationSustainability and the Performance Economy
Stahel, W. R. (2010) · The Performance Economy · doi:10.1057/9780230288843_5
Product-Service System design for sustainability
Vezzoli, C., Kohtala, C., Srinivasan, A., et al. (2017) · Product-Service System Design for Sustainability · doi:10.4324/9781351278003-4
Flagged first, then by citations
Research works printed but not linked: 14
- 2022, Ciskin: Circular facade company
- Artola, 2016, Boosting building renovation: What potential and value for Europe
- Azcarate-Aguerre, Façade leasing demonstrator project: Final business delivery report
- Azcarate-Aguerre, Façade leasing demonstrator project: Final dissemination activities report
- Azcarate-Aguerre, Façade leasing demonstrator project: Final technical delivery report
- 2013, Sectoral resource maps, prepared in response to an information hub request
- 2011, Europe’s buildings under the microscope. Brussels, Belgium, building performance insitute europe
- Chao-Duivis, 2018, Privaatrechtelijke aspecten van de circulaire economie in het bijzonder circulair bouwen (Deel III). Het aanbestedingsrecht
- 2013, Towards the circular economy, J. Industrial Ecol., 23
- 2016, Proposal for a directive of the European parliament and ofthe Council amending directive 2010/31/EU on the energy performance of buildings,impact assessment, commission staff working document
- Fischer, 2012, Leasing society: Study
- Gielingh, 2008, Business innovation in construction through value oriented product/service offerings for living buildings
- 2013, Investing in energy efficiency in europe's buildings: A view from construction and real estate sectors, committed by GPBN
- 2022, How to reinvent supply chains in a new global economic order
Cited by
Sorted by citations
Barriers to adopting circular procurement in the construction industry: The way forward
Sajid, Z. W., Aftab, U., & Ullah, F. (2024) · Sustainable Futures · doi:10.1016/j.sftr.2024.100244 · Cited by 61 · see citing works
Barriers to circular economy implementation in the construction industry: causal assessment model
Durdyev, S., Koç, K., Tleuken, A., Budayan, C., Ekmekcioğlu, Ö., & Karaca, F. (2023) · Environment Development and Sustainability · doi:10.1007/s10668-023-04061-8 · Cited by 52 · see citing works
“Other researchers (Azcárate-Aguerre et al., 2023; Coenen et al., 2023; Osei-Tutu et al., 2023), however, did not highlight the developing countries’ perspective.”
Giganti, P., & Falcone, P. M. (2025) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2025.108318 · Cited by 36 · see citing works
Johl, S. K., Ali, K., Shirahada, K., & Oyelakin, I. O. (2024) · Business Strategy and the Environment · doi:10.1002/bse.3950 · Cited by 31 · see citing works
Unpacking financial aspects of circular economy: A systematic literature review
Ma, Q., Xu, B. L., & Bititci, U. (2025) · Journal of Environmental Management · doi:10.1016/j.jenvman.2025.125507 · Cited by 17 · see citing works
How to deploy the PSS towards a circular economy in housing? A multiple-case study
Ghafoor, S., Kocatürk, T., Hosseini, M. R., Weiss, M., & Barnett, M. R. (2024) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2024.143821 · Cited by 14 · see citing works
Hernández, H. (2025) · Buildings · doi:10.3390/buildings15132174 · Cited by 14 · see citing works
Corsini, L. (2025) · Sustainable Production and Consumption · doi:10.1016/j.spc.2025.05.019 · Cited by 12 · see citing works
Pierzchlewicz, D., Woźniak, A., & Widera, B. (2025) · Sustainability · doi:10.3390/su17177580 · Cited by 13 · see citing works
Local business environment and firm innovation: evidence from China
Wu, J., Gao, D., Xu, C., & Sun, Y. (2024) · Kybernetes · doi:10.1108/k-01-2023-0164 · Cited by 10 · see citing works
Ghafoor, S., Kocatürk, T., Hosseini, M. R., et al. (2024) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-06-2024-0213 · Cited by 9 · see citing works
Technical Barriers and Challenges to Circular Strategies Implementation
Marchesi, M., Salles, A., Buzatu, R., et al. (2025) · Springer tracts in civil engineering · doi:10.1007/978-3-032-02834-1_1 · Cited by 4 · see citing works
Kolagar, M., Vahidi, A., Kirchherr, J., & Scholten, V. E. (2026) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2026.148275 · Cited by 5 · see citing works
Jemal, K. M., Aibinu, A., & Oraee, M. (2026) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-07-2025-0431 · Cited by 3 · see citing works
Exploring the Sustainability Performance of Circular Business Models in the Built Environment
Rahla, K. M., Bragança, L., & Mateus, R. (2024) · IOP Conference Series: Earth and Environment · doi:10.1088/1755-1315/1402/1/012031 · Cited by 2 · see citing works
Reuse of Façade Materials Across Benefits, Challenges and Potential Opportunities
Rota, A., Lamberti, V., & Fiorito, F. (2024) · Lecture notes in civil engineering · doi:10.1007/978-3-031-71867-0_44 · Cited by 2 · see citing works
Navigating complexity: systems thinking insights on deploying the PSS for circular economy housing
Ghafoor, S., Kocatürk, T., Hosseini, M. R., Weiss, M., & Barnett, M. R. (2025) · Architectural Engineering and Design Management · doi:10.1080/17452007.2025.2529418 · Cited by 3 · see citing works
“…Neij, Johansson, Benner, & Sandin, 2021) and poses various challenges, such as misaligned management, financing and governance frameworks (Azcarate Aguerre, Den Heijer, Arkesteijn, Vergara, & Klein, 2023), regulatory, normative and cultural-cognitive institutional resistance (Ghafoor,…”
Jemal, K. M., Aibinu, A., & Oraee, M. (2026) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-02-2026-0126
Aguerre, J. F. A. (2023) · Architecture and the Built Environment · doi:10.59490/abe.2023.11.7061 · Cited by 1 · see citing works
Conceptualising sustainable servitization
Kovacic-Lukic, M., & Arıkan, E. (2026) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2026.148440
A lifecycle mapping of circular economy principles and implementation strategies in construction
Dizaye, F., Yevu, S. K., Ayinla, K. O., et al. (2026) · Building and Environment · doi:10.1016/j.buildenv.2026.114907
Accelerating sustainable circularity for construction products: from concepts to practice
Nwonu, D. C., Okoh, W. N., & Balogun, F. (2026) · Sustainable Cities and Society Advances · doi:10.1016/j.scsadv.2026.100096
Akbarieh, A., O’Donnell, J., & Teferle, F. N. (2026) · Architectural Engineering and Design Management · doi:10.1080/17452007.2026.2701468
Business and Value Chain Logics for Reusable Structural Components
Annala, J., Joensuu, T., Alkki, L., Uotila, U., & Saari, A. (2026) · Circular Economy and Sustainability · doi:10.1007/s43615-026-01126-4 · Cited by 1 · see citing works
“At a broader industry level, conservatism and systemic inertia hinder the diffusion of new CE models in the construction sector [ 84 ].”
Charles, K. A. (2026) · SSRN Electronic Journal · doi:10.2139/ssrn.7440698
- Authors
- Azcárate-Aguerre, J. F., den Heijer, A. C., Arkesteijn, M. H., Vergara d’Alençon, L. M., & Klein, T.
- Affiliations
- Delft University of Technology (NL)
- Venue
- Frontiers in Built Environment
- Publisher
- Frontiers Media SA
- Published
- 2023-04-25
- Volume
- 9
- ISSN
- 2297-3362 (ISSN-L)
- OpenAlex
- W4366989568
- Semantic Scholar
- 7233a2c85fac8cbc6f89686de8479eb0f43db842
- Cited by
- 25
- References
- 24
- Citations by year
- 2026: 9 · 2025: 7 · 2024: 7 · 2023: 2
- FWCI
- 5.37
- Type
- journal article
- Language
- en
- Open access
- gold
- doi.org
- Licence
- Locations
- Frontiers in Built Environment (publishedVersion, cc-by)
- DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
- Research Repository (Delft University of Technology) (submittedVersion)
- Data Archiving and Networked Services (DANS) (submittedVersion, cc-by)
- Funders
- EIT Climate-KIC
- Topics
- Social Sciences › Business, Management and Accounting › Strategy and Management › Sustainable Supply Chain Management
- Physical Sciences › Engineering › Building and Construction › Sustainable Building Design and Assessment
- Physical Sciences › Engineering › Building and Construction › Sustainable Design and Development
- Keywords
- circular economy, product-service systems, facade, servitization, building management, construction financing, governance, material circularity, building owners, facility managers, barriers to adoption, co-design, pilot project, policy recommendations, risk perception
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Claims read by deepseek-v4.1-flash under definition version 3 (extract-v3) on 2026-10-18.
Classified by jev-1.13-20260917 (gold-guideline-v0.2) on 2026-10-18.
Cited sources are checked by gpt-6-sol.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review