Evolution of Electronic Procurement: Contemporary Review of Adoption and Implementation Strategies
Open accessThe DOI matches its Crossref record; 87 of the 87 references it cites were found in a registry or an index.
Abstract
Since the advent of the first form of electronic procurement (EP), the procurement process (i.e., the stages and underlying activities) has evolved to transform the world of commerce significantly. In the construction industry, EP has revolutionized the operational schema of traditional procurement and has paved the way for the development, advancement, and application of more intelligent tools for handling and executing procurement activities of infrastructure-related works. Although the development or adoption of EP-related tools has not been encouraging due to the industry’s conservative nature, in this study, we review the evolution and developments of EP to date. It explores the adoption and implementation strategies of extant and projected EP developments and develops a conceptual framework to explicate the developmental transitions of EP. While there are many studies on EP, there is still a long way to transition into a more intelligent execution of EP-related activities. A total of 64 EP-related manuscripts and other valuable studies were examined to realize the stipulated objective as well as identify the thematic constructs developed under the subject matter. The explorations conducted in this study are intended to contribute to the understanding of the extant discussion on both EP and smart procurement (SP), their adoption strategies, implementation, and applications in infrastructure projects. It elucidates the significant constructs that define and underpin the theoretical implications of EP and SP adoption and implementation. Lastly, the framework highlights the projected developments and transition phases of EP to intelligent procurement (IP).
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Figures






Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The cited source says what the claim attributes to it.
In the citing paper
“Chan et al. [84] provide a comprehensive overview of the evolution and development of e-procurement, highlighting its significance in optimizing the supply chain by reducing costs and improving efficiency.”
From Transformative Procurement Trends: Integrating Industry 4.0 Technologies for Enhanced Procurement Processes (2023) · cites this paper as [84]
Experimental — accuracy not yet measured
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Personal Computing: Toward a Conceptual Model of Utilization1
Thompson, R. L., Higgins, C. A., & Howell, J. M. (1991) · MIS Quarterly · doi:10.2307/249443 · Cited by 3,814
Understanding Technology Adoption: Theory and Future Directions for Informal Learning
Straub, E. T. (2009) · Review of Educational Research · doi:10.3102/0034654308325896 · Cited by 1,265
A motivational model of microcomputer usage
Igbaria, M., Parasuraman, S., & Baroudi, J. J. (1996) · Journal of Management Information Systems · doi:10.1080/07421222.1996.11518115 · Cited by 915
Osei-Kyei, R., & Chan, A. P. C. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.02.008 · Cited by 803 · cited 1×
“Prior to the commencement of any research project, it is necessary for researchers to acquaint themselves with the extant theories surrounding the subject matter to be ex‐ plored and critical to identifying relevant gaps highlighted or missing in the literature [48,49].”
BackgroundSelf-citationEriksson, P. E., & Westerberg, M. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.01.003 · Cited by 363 · cited 1×
“tems or methods have been developed to suit the specific needs and demands of a project [28,32,33].”
MethodTsai, C., & Lydia Wen, M. (2005) · International Journal of Science Education · doi:10.1080/0950069042000243727 · Cited by 307 · cited 1×
“Prior to the commencement of any research project, it is necessary for researchers to acquaint themselves with the extant theories surrounding the subject matter to be ex‐ plored and critical to identifying relevant gaps highlighted or missing in the literature [48,49].”
BackgroundCritical factors that influence e-procurement implementation success in the public sector
Vaidya, K., Sajeev, A. S. M., & Callender, G. (2006) · Journal of Public Procurement · doi:10.1108/jopp-06-01-02-2006-b004 · Cited by 293
Professional ethics in the construction industry
Vee, C., & Skitmore, C. (2003) · Engineering, Construction and Architectural Management · doi:10.1108/09699980310466596 · Cited by 239
A service oriented framework for construction supply chain integration
Cheng, J. C. P., Law, K. H., Bjornsson, H., Jones, A., & Sriram, R. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.10.003 · Cited by 227
Sustainable procurement: Past, present and future
Walker, H., Miemczyk, J., Johnsen, T., & Spencer, R. (2012) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2012.11.003 · Cited by 202
Towards a theoretical model of technology adoption in hospitality organizations
Wang, Y., & Qualls, W. (2007) · International Journal of Hospitality Management · doi:10.1016/j.ijhm.2006.03.008 · Cited by 192
Ruparathna, R., & Hewage, K. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.07.007 · Cited by 191 · cited 3×
“Among these systems include fixed‐price contracting, total package options, design and construct, and on‐call contracting, among several others [28,29,36].”
BackgroundMethodCorruption Forms in the Construction Industry: Literature Review
Chan, A. P. C., & Owusu, E. K. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001353 · Cited by 190 · cited 1×
“tual irregularities to corrupt practices (such as solicitation, bid‐rigging, and patronage that lead to resource misappropriation, the procurement process is argued to be the most vul‐ nerable process to corruption globally [7,8].”
BackgroundSelf-citationLe, Y., Shan, M., Chan, A. P. C., & Hu, Y. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000886 · Cited by 159 · cited 2×
“tual irregularities to corrupt practices (such as solicitation, bid‐rigging, and patronage that lead to resource misappropriation, the procurement process is argued to be the most vul‐ nerable process to corruption globally [7,8].”
BackgroundSelf-citationChallenging electronic procurement in the AEC sector: A BIM-based integrated perspective
Grilo, A., & Jardim-Goncalves, R. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.09.008 · Cited by 158 · cited 1×
“Moreover, it also demonstrates the pattern of the industry’s conservative nature and how slow it is when it comes to the industry’s adoption, digitalization, or dig‐ ital transformation [44,53,54].”
BackgroundThe Purpose, Process, and Methods of Writing a Literature Review
Baker, J. D. (2016) · AORN Journal · doi:10.1016/j.aorn.2016.01.016 · Cited by 158 · cited 1×
“Per the views of [52], it is neces‐ sary to consider multiple data sources in conducting an SLR study in order to retrieve as many publications as possible.”
BackgroundAnalyses and evaluation of irregularities in public procurement in India
Tabish, S. Z. S., & Jha, K. N. (2011) · Construction Management and Economics · doi:10.1080/01446193.2010.549138 · Cited by 146 · cited 2×
“None of the activities and stages within the procurement is free from corruption and other procurement‐related irregularities [9].”
BackgroundAligning corporate strategy, procurement strategy and e‐procurement tools
Knudsen, D. (2003) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030310502894 · Cited by 138 · cited 1×
“stages, namely e‐sourcing, e‐tendering, e‐informing, e‐MRO (maintenance, repair, and op‐ erating materials), ERP (enterprise resource planning) and e‐collaboration [19].”
Ghadimi, P., Azadnia, A. H., Heavey, C., Dolgui, A. B., & Can, B. (2015) · International Journal of Production Research · doi:10.1080/00207543.2015.1079341 · Cited by 124
E-government policy and practice: A theoretical and empirical exploration of public e-procurement
Hardy, C. A., & Williams, S. P. (2007) · Government Information Quarterly · doi:10.1016/j.giq.2007.02.003 · Cited by 122
Are We Ready for the Challenge of Banks 4.0? Designing a Roadmap for Banking Systems in Industry 4.0
Mehdiabadi, A., Tabatabeinasab, M., Spulbar, C., Karbassi Yazdi, A., & Birau, R. (2020) · International Journal of Financial Studies · doi:10.3390/ijfs8020032 · Cited by 122
Optimized artificial intelligence models for predicting project award price
Chou, J., Lin, C.-W., Pham, A., & Shao, J.-Y. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.02.006 · Cited by 112 · cited 2×
“Other leading tools or techniques employed range from case‐based reasoning [55] to artificial neural networks (ANN) [56].”
Backgrounde-Procurement use in the South African construction industry
Ibem, E. O., & Laryea, S. (2015) · Covenant University Repository (Covenant University) · Cited by 87
Procurement Routes in Public Building and Construction Projects
Lædre, O., Austeng, K., Haugen, T. I., & Klakegg, O. J. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:7(689 · Cited by 85
Public Procurement Auctions and Competition in Turkey
Onur, İ., Özcan, R., & Taş, B. K. O. (2011) · Review of Industrial Organization · doi:10.1007/s11151-011-9299-3 · Cited by 84
Yu, A. T. W., Yevu, S. K., & Nani, G. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.119493 · Cited by 81
Critical Success Factors (CSFs) for e-Procurement Adoption in the Nigerian Construction Industry
Afolabi, A. O., Ibem, E. O., Aduwo, E. B., Tunji-Olayeni, P. F., & Oluwunmi, A. O. (2019) · Buildings · doi:10.3390/buildings9020047 · Cited by 80
Owusu, E. K., Chan, A. P. C., & Ameyaw, E. E. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.01.124 · Cited by 72 · cited 1×
“Analogous to these stages presented by [26], other studies [27,28] present the stages in terms of their contrac‐ tual arrangements such as precontract stage, contract stage, contract administration stage, and postcontract stage.”
Self-citationAn Empirical Evaluation Of The Potential Of Public E-Procurement To Reduce Corruption
Neupane, A., Soar, J., & Vaidya, K. (2014) · Australasian Journal of Information Systems · doi:10.3127/ajis.v18i2.780 · Cited by 66 · cited 1×
“Such problems, coupled with the other needful reformations to improve transparency, accountability, expedited deliveries, and value for money, among other determining factors, led to the design, de‐ velopment, and implementation of digitalized systems, including the e‐procurement sys‐ tem [16].”
BackgroundPatterns of technological innovation in the use of e-procurement in construction
Laryea, S., & Ibem, E. O. (2014) · Covenant University Repository (Covenant University) · Cited by 63
Tran, Q., Zhang, C., Sun, H., & Huang, D. (2014) · Journal of Global Information Technology Management · doi:10.1080/1097198x.2014.928565 · Cited by 59
Towards secure and legal e-tendering
Betts, M., Black, P., Christensen, S., Dawson, E., Du, R., Duncan, W. D., Foo, E., & Nieto, J. M. G. (2006) · QUT ePrints (Queensland University of Technology) · Cited by 58
Vanier, D., Eadie, R., Perera, S., & Heaney, G. (2010) · Northumbria Research Link (Northumbria University) · Cited by 58
Solving a sealed-bid reverse auction problem by multiple-criterion decision-making methods
Cheng, C.-B. (2008) · Computers & Mathematics with Applications · doi:10.1016/j.camwa.2008.09.011 · Cited by 55 · cited 3×
“Such systems include enterprise resource planning (ERP) and electronic data in‐ terchange (EDD) [23,24].”
BackgroundDigitizing the grey areas in the Nigerian public procurement system using e-Procurement technologies
Afolabi, A. O., Ibem, E. O., Aduwo, E. B., & Tunji-Olayeni, P. F. (2020) · International Journal of Construction Management · doi:10.1080/15623599.2020.1774836 · Cited by 55
BIM‐Based E‐Procurement: An Innovative Approach to Construction E‐Procurement
Costa, A. A., & Grilo, A. (2015) · The Scientific World JOURNAL · doi:10.1155/2015/905390 · Cited by 54 · cited 2×
“Costa and Grilo presented a multiple‐staged process that encapsulated ten activities captured under the procurement process [38].”
BackgroundSchryen, G., Wagner, G., & Benlian, A. (2015) · University of Regensburg Publication Server (University of Regensburg) · doi:10.5283/epub.32455 · Cited by 52
Nicoletti, B. (2018) · Agile Procurement · doi:10.1007/978-3-319-61085-6_8 · Cited by 50
Su, Y., Yang, S., Liu, K., Hua, K., & Yao, Q. (2019) · International Journal of Environmental Research and Public Health · doi:10.3390/ijerph16091511 · Cited by 48 · cited 1×
“Other leading tools or techniques employed range from case‐based reasoning [55] to artificial neural networks (ANN) [56].”
BackgroundE-PROCUREMENT IN THE ATLANTIC CANADIAN AEC INDUSTRY
Rankin, J. H., Chen, Y., & Christian, A. J. (2006) · Journal of Information Technology in Construction · Cited by 47
Mansi, M. (2015) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2014.12.002 · Cited by 46
Eadie, R., Perera, S., & Heaney, G. (2011) · Northumbria Research Link (Northumbria University) · Cited by 46
The impact of e-procurement systems on customer relationship management: a multiple case study
Smith, A. D. (2009) · International Journal of Procurement Management · doi:10.1504/ijpm.2009.024814 · Cited by 45
Graz University of Technology, A., Zunk, B. M., Marchner, M. J., Graz University of Technology, A., Uitz, I., Graz University of Technology, A., Lerch, C., Graz University of Technology, A., Schiele, H., & University of Twente, S. O. M. A. G. (2014) · International Journal of Industrial Engineering and Management · doi:10.24867/ijiem-2014-1-102 · Cited by 45
Yevu, S. K., & Yu, A. T. W. (2019) · Engineering Construction & Architectural Management · doi:10.1108/ecam-03-2019-0135 · Cited by 44
Exploring anti-corruption capabilities of e-procurement in construction project delivery in Nigeria
Aduwo, E., Ibem, E., Afolabi, A., Oluwunmi, A., Tunji-Olayeni, P., Ayo-Vaughan, E., Uwakonye, U., & Oni, A. (2020) · Construction Economics and Building · doi:10.5130/ajceb.v20i1.6964 · Cited by 44
Drivers and barriers to public sector e-procurement within Northern Ireland’s construction industry
Eadie, R., Perera, S., Heaney, G., & Carlisle, J. (2007) · Northumbria Research Link (Northumbria University) · Cited by 41
Owusu, E. K., Chan, A. P. C., & Wang, T. (2021) · Cities · doi:10.1016/j.cities.2021.103379 · Cited by 37 · cited 2×
“structured mechanism known as procurement [1,4].”
BackgroundSelf-citationEadie, R., Perera, S., & Heaney, G. (2010) · Northumbria Research Link (Northumbria University) · Cited by 35
E-procurement in Malaysian construction industry: benefits and challenges in implementation
(2017) · UTHM Institutional Repository (Universiti Tun Hussein Onn Malaysia) · Cited by 35
Implementing e-tendering to improve the efficiency of public construction contract in Saudi Arabia
Yahya, M. A., & Panuwatwanich, K. (2018) · International Journal of Procurement Management · doi:10.1504/ijpm.2018.10010968 · Cited by 33
Vitkauskaitė, E., & Gatautis, R. (2008) · Journal of Civil Engineering and Management · doi:10.3846/1392-3730.2008.14.28 · Cited by 32 · cited 1×
“In addi‐ tion, other studies such as [37] include other variants of e‐based models, including e‐Site and e‐Quality.”
MethodOwusu, E. K., Chan, A. P. C., Yang, Y., & Parn, E. A. (2019) · Cities · doi:10.1016/j.cities.2019.102435 · Cited by 32
Self-citationCosta, A. A., & Tavares, L. V. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.11.029 · Cited by 31 · cited 1×
“Other studies including [25] discusses some of these partitions comprehensively.”
BackgroundA Process-Based Analysis of e-Procurement Adoption
Abu-Elsamen, A. A., Chakraborty, G., & Warren, D. (2010) · Journal of Internet Commerce · doi:10.1080/15332861.2010.526489 · Cited by 31
Electronic (e-) Procurement Adoption and Users’ Experience in the Nigerian Construction Sector
Ibem, E. O., Aduwo, E. B., Afolabi, A. O., Oluwunmi, A. O., Tunji-Olayeni, P. F., Ayo-Vaughan, E. A., & Uwakonye, U. O. (2021) · International Journal of Construction Education and Research · doi:10.1080/15578771.2020.1730527 · Cited by 29
(2010) · Routledge eBooks · doi:10.4324/noe0415394048 · Cited by 29
e-Tendering readiness in construction: the posterior model
Yahya, M. A., Skitmore, M., Bridge, A., Nepal, M., & Cattell, D. W. (2018) · Construction Innovation · doi:10.1108/ci-06-2017-0051 · Cited by 24
E-Procurement, The Golden Key To Optimizing The Supply Chains System
Farzin, S., & Nezhad, H. T. (2010) · Zenodo (CERN European Organization for Nuclear Research) · doi:10.5281/zenodo.1075437 · Cited by 23
Adoption of LMS in Higher Educational Institutions of the Middle East
Khan, R., & Qudrat-Ullah, H. (2021) · Advances in Science, Technology & Innovation/Advances in science, technology & innovation · doi:10.1007/978-3-030-50112-9 · Cited by 23
Barthorpe, S., Chien, H.-J., & Shih, J. K. C. (2004) · International Journal of Computer Applications in Technology · doi:10.1504/ijcat.2004.003840 · Cited by 19 · cited 1×
“the choice of an appropriate procurement system in addition to an existing well‐calculated strategy to execute the process and the assessment of any potential risks or irregularities [17,34].”
BackgroundGauging parameters for e-procurement acquisition in construction businesses in Nigeria
Afolabi, A. O., Ibem, E. O., Aduwo, E. B., Tunji-Olayeni, P. F., Oluwunmi, A. O., & Ayo-Vaughan, E. A. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2019.1627504 · Cited by 19
Developing Internet Online Procurement Frameworks for Construction Firms
Deraman, R., Chen, W., Yap, J. B. H., Li, H., & Mohd-Rahim, F. A. (2019) · Future Internet · doi:10.3390/fi11060136 · Cited by 19
Paradigm shift in main contractor-subcontractor partnerships with an e-procurement framework
Eom, S.-J., Kim, S., & Jang, W. (2015) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-015-0179-5 · Cited by 18 · cited 1×
“Captured under the generic construct of electronic commerce (EC), electronic pro‐ curement (EP) can simply be defined as a business‐to‐consumer (B2C), business‐to‐busi‐ ness (B2B), or a business‐to‐government (B2G) purchases as well as the sales of goods, services, works, or supplies [21,22] via the Internet and other…”
BackgroundAfolabi, A. O., Owolabi, J. D., Ojelabi, R. A., Oyeyipo, O. O., & Aina, D. A. (2017) · Covenant University Repository (Covenant University) · Cited by 17
Santoso, D. S., & Bourpanus, N. (2018) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-05-2018-0025 · Cited by 17
E-readiness of construction contract forms and e-tendering software
Perera, S., Heaney, G., Barton, G., Eadie, R., & Millar, P. (2011) · International Journal of Procurement Management · doi:10.1504/ijpm.2012.044151 · Cited by 16
Integrated E-Bidding Framework for Construction
Nesan, L. J. (2011) · International Journal of Construction Education and Research · doi:10.1080/15578771.2011.584340 · Cited by 15
Zouhar, Y., Jellema, J., Lustig, N. C., & Trabelsi, M. A. (2021) · doi:10.1093/oso/9780192846938.003.0013 · Cited by 14
Non-contractible Factors as Determinants of Electronic Market Adoption
Mithas, S., Jones, J. L., & Mitchell, W. (2002) · AIS Electronic Library (AISeL) · Cited by 13
Synergising R&D initiatives for e-enhancing management support systems
Kumaraswamy, M. M., Palaneeswaran, E., Rahman, M. M., Ugwu, O. O., & Ng, S. T. (2005) · Automation in Construction · doi:10.1016/j.autcon.2005.10.001 · Cited by 12
E-PROCUREMENT USE IN THE NIGERIAN BUILDING INDUSTRY
(2017) · International Journal of Electronic Commerce Studies · doi:10.7903/ijecs.1524 · Cited by 12
Developing distributed design capabilities in the construction supply chain
Elliman, T., & Orange, G. (2003) · Construction Innovation · doi:10.1108/14714170310814828 · Cited by 11
Suresh, M., Dutta, P., & Jain, K. (2011) · International Journal of Industrial and Systems Engineering · doi:10.1504/ijise.2011.041372 · Cited by 11 · cited 2×
“For instance, [6] used the genetic algorithm to estimate an optimum schedule for an EPC project (i.”
BackgroundMethodProcurement selection criteria for projects in the public sector: evidence from Nigeria
Jimoh, R. A., Oyewobi, L. O., & Aliu, N. O. (2016) · Independent Journal of Management & Production · doi:10.14807/ijmp.v7i4.481 · Cited by 11 · cited 1×
“Among these systems include fixed‐price contracting, total package options, design and construct, and on‐call contracting, among several others [28,29,36].”
BackgroundOwusu, E. K., Chan, A. P. C., Nani, G., & Agyemang, D. Y. (2020) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784482865.027 · Cited by 10 · cited 4×
“The PLR provides the researcher with the idea of the study’s topic and other tentative structures of the study background and problem statement [50].”
BackgroundInfluentialSelf-citationAfolabi, A. O., Oyeyipo, O. O., Ojelabi, R. A., & Tunji-Olayeni, P. F. (2017) · Covenant University Repository (Covenant University) · Cited by 9
A SURVEY OF PUBLIC CONSTRUCTION MANAGEMENT AGENCIES READINESS FOR E-PROCUREMENT ADOPTION
AbdulAzeez, A. D., Yusuf, B. Y., & Gabriel, B. B. (2015) · Jurnal Teknologi · doi:10.11113/jt.v77.6535 · Cited by 7
Baladhandayutham, T., & Venkatesh, S. (2012) · SSRN Electronic Journal · Cited by 6
AN EMPIRICAL SURVEY OF THE UK CONSTRUCTION SMEs' E-PROCUREMENT READINESS FROM THE E-LEGAL ASPECTS
Wong, C. H., & SLOAN, B. (2006) · Journal of Restructuring Finance · doi:10.1142/s160994510600044x · Cited by 5
Smart procurement for Jurassic park
Kincaid, B. (1997) · The RUSI Journal · doi:10.1080/03071849708446204 · Cited by 5
Corruption in Infrastructure Procurement
Owusu, E. K., & Chan, A. P. C. (2020) · Routledge eBooks · doi:10.1201/9781003036975 · Cited by 5
Self-citationSmart procurement: The European dimension
Hayward, K. (1998) · The RUSI Journal · doi:10.1080/03071849808446250 · Cited by 4
Development of a Secure and Private Electronic Procurement System based on Blockchain Implementation
Thio-ac, A. (2019) · International Journal of Advanced Trends in Computer Science and Engineering · doi:10.30534/ijatcse/2019/115852019 · Cited by 4 · cited 1×
“5 trillion US dollars) apportioned to public procurement, the United Nations estimates about 10% to as high as 25% lost to corruption on an annual basis [10].”
BackgroundThe Role of Supplier Quality in e-Procurement Negotiation
Delina, R., Michňová, M., Húska, P., & Spišák, J. (2020) · Quality Innovation Prosperity · doi:10.12776/qip.v24i1.1388 · Cited by 3
E-readiness of construction contract forms and e-tendering software
Eadie, R., Millar, P., Perera, S., Heaney, G., & Barton, G. (2012) · RePEc: Research Papers in Economics · Cited by 3
The Classification of Types of Business-to-Business Electronic Commerce
Choe, J.-M. (2017) · Journal of information and organizational sciences · doi:10.31341/jios.41.1.1 · Cited by 2 · cited 2×
“[21] classifies the types of B2B EC under four partitions from the perspectives of supplier’s power and the exchange of information, namely e‐procurement, e‐marketplace, e‐partnerships, and e‐distribution.”
Background
Research works printed but not linked: 5
- Sutt, J. (2011). Manual of Construction Project Management: For Owners and Clients, Wiley.
- Egbu, C., Vines, M., and Tookey, J. (2003, January 3–5). The Role of Knowledge Management in e-Procurement Initiatives for Construction Organisations. Proceedings of the 19th Annual ARCOM Conference, Brighton, UK.
- 2017, Online reverse auctions in construction industry, Građevinar, 69, 821
- Issa, 2003, A survey of e-business implementation in the US construction industry, J. Inf. Technol. Constr. ITcon, 8, 15
- Rogers, E.M. (1983). Diffusion of Innovations, Free Press.
Cited by
Althabatah, A., Yaqot, M., Menezes, B., & Kerbache, L. (2023) · Logistics · doi:10.3390/logistics7030063 · Cited by 108
“Chan et al. [84] provide a comprehensive overview of the evolution and development of e-procurement, highlighting its significance in optimizing the supply chain by reducing costs and improving efficiency.”
BackgroundDeveloping legal frameworks for successful engineering, procurement, and construction projects
Latilo, A., Uzougbo, N. S., Ugwu, M. C., Oduro, P., & Aziza, O. R. (2024) · International Journal of Applied Research in Social Sciences · doi:10.51594/ijarss.v6i8.1430 · Cited by 21
WELL Building: Key Design Features for Office Environments
Tan, C. Y. M., & Rahman, R. A. (2023) · Journal of Architectural Engineering · doi:10.1061/jaeied.aeeng-1544 · Cited by 12
Addy, M. N., Addo, E. T., Abdulai, S. F., Kwofie, T. E., Aigbavboa, C. O., & Adade-Boateng, A. O. (2024) · Journal of Engineering Design and Technology · doi:10.1108/jedt-08-2023-0373 · Cited by 20
Advanced Analytics and Data Management in the Procurement Function: An Aviation Industry Case Study
Altundag, A., & Wynn, M. G. (2024) · Electronics · doi:10.3390/electronics13081554 · Cited by 20
Metadata
- Authors
- Chan, A. P. C., & Owusu, E. K.
- Affiliations
- Hong Kong Polytechnic University (HK)
- Corresponding author
- Chan, Albert P. C.
- Venue
- Buildings
- Publisher
- MDPI AG
- Published
- 2022-02-09
- Volume
- 12
- Issue
- 2
- Pages
- 198
- ISSN
- 2075-5309 (ISSN-L)
- OpenAlex
- W4211076466
- Cited by
- 34
- References
- 87
- Citations by year
- 2026: 7 · 2025: 11 · 2024: 10 · 2023: 5 · 2022: 1
- FWCI
- 5.04
- Type
- journal article
- Language
- en
- Open access
- gold
- doi.org
- Licence
- Locations
- Buildings (publishedVersion, cc-by)
- DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
- PolyU Institutional Research Archive (Hong Kong Polytechnic University) (submittedVersion, cc-by)
- Funders
- Hong Kong Polytechnic University
- Topics
- Social Sciences › Business, Management and Accounting › Strategy and Management › Public Procurement and Policy
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Keywords
- e-procurement, technology adoption strategies, implementation strategies, construction industry, infrastructure projects, conceptual framework
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.