Internet of Things (IoT), Building Information Modeling (BIM), and Digital Twin (DT) in Construction Industry: A Review, Bibliometric, and Network Analysis
Open accessThe DOI matches its Crossref record; 87 of the 87 references it cites were found in a registry or an index.
Abstract
The present study uses a bibliometric and systematic literature review (SLR) to examine the use of Building Information Modeling (BIM), the Internet of Things (IoT), and Digital Twins (DT) in the construction industry. The network visualization and other approaches based on the Web of Science (WOS) database and the patterns of research interactions were explored in 1879 academic publications using co-occurrence and co-citation investigations. Significant publications, conferences, influential authors, countries, organizations, and funding agencies have been recognized. Our study demonstrates that BIM, IoT, and DT in construction, Heritage BIM (HBIM), Smart Contracts, BIM, and Ontology, and VR and AR in BIM and DT are the main study themes. Finally, several prospective areas for future study are identified, including BIM and Metaverse technology, BIM and Artificial Intelligence (AI), Metaheuristic algorithms for optimization purposes in BIM, and the Circular Economy with BIM and IoT.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Software survey: VOSviewer, a computer program for bibliometric mapping
van Eck, N. J., & Waltman, L. (2010) · Scientometrics · doi:10.1007/s11192-009-0146-3 · Cited by 21,484
How to conduct a bibliometric analysis: An overview and guidelines
Donthu, N., Kumar, S., Mukherjee, D., Pandey, N., & Lim, W. M. (2021) · Journal of Business Research · doi:10.1016/j.jbusres.2021.04.070 · Cited by 14,329
Azuma, R. T. (1997) · Presence: Teleoperators and Virtual Environments · doi:10.1162/pres.1997.6.4.355 · Cited by 10,121
Co‐citation in the scientific literature: A new measure of the relationship between two documents
Small, H. (1973) · Journal of the American Society for Information Science · doi:10.1002/asi.4630240406 · Cited by 5,345
Recent advances in augmented reality
Azuma, R., Baillot, Y., Behringer, R., Feiner, S., Julier, S., & MacIntyre, B. (2001) · IEEE Computer Graphics and Applications · doi:10.1109/38.963459 · Cited by 4,148
The bibliometric analysis of scholarly production: How great is the impact?
Ellegaard, O., & Wallin, J. A. (2015) · Scientometrics · doi:10.1007/s11192-015-1645-z · Cited by 3,115
Building Information Modeling (BIM) for existing buildings — Literature review and future needs
Volk, R., Stengel, J., & Schultmann, F. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.10.023 · Cited by 2,199
Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry
Azhar, S. (2011) · Leadership and Management in Engineering · doi:10.1061/(asce)lm.1943-5630.0000127 · Cited by 2,192
Succar, B. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.10.003 · Cited by 1,741
Conducting systematic literature reviews and bibliometric analyses
Linnenluecke, M. K., Marrone, M., & Singh, A. K. (2020) · Australian Journal of Management · doi:10.1177/0312896219877678 · Cited by 1,649
Towards a semantic Construction Digital Twin: Directions for future research
Boje, C., Guerriero, A., Kubicki, S., & Rezgui, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103179 · Cited by 1,324
The art of crafting a systematic literature review in entrepreneurship research
Kraus, S., Breier, M., & Dasí-Rodríguez, S. (2020) · International Entrepreneurship and Management Journal · doi:10.1007/s11365-020-00635-4 · Cited by 1,319
The project benefits of Building Information Modelling (BIM)
Bryde, D., Broquetas, M., & Volm, J. M. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.12.001 · Cited by 1,268
Application Areas and Data Requirements for BIM-Enabled Facilities Management
Becerik-Gerber, B., Jazizadeh, F., Li, N., & Calis, G. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000433 · Cited by 915
Understanding and facilitating BIM adoption in the AEC industry
Gu, N., & London, K. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.09.002 · Cited by 912
How to measure the benefits of BIM — A case study approach
Barlish, K., & Sullivan, K. T. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.02.008 · Cited by 894
Zhang, S., Teizer, J., Lee, J.-K., Eastman, C. M., & Venugopal, M. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.05.006 · Cited by 835
Conducting systematic literature review in operations management
Thomé, A. M. T., Scavarda, L. F., & Scavarda, A. J. (2016) · Production Planning & Control · doi:10.1080/09537287.2015.1129464 · Cited by 812
GhaffarianHoseini, A., Tookey, J., Ghaffarianhoseini, A., Naismith, N., Azhar, S., Efimova, O., & Raahemifar, K. (2016) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2016.11.083 · Cited by 804
BIM implementation throughout the UK construction project lifecycle: An analysis
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.09.001 · Cited by 749
The resource‐based theory: dissemination and main trends
Acedo, F. J., Barroso, C., & Galan, J. L. (2006) · Strategic Management Journal · doi:10.1002/smj.532 · Cited by 647
A BIM-data mining integrated digital twin framework for advanced project management
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103564 · Cited by 518
Miettinen, R., & Paavola, S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.03.009 · Cited by 480
Lee, D., Lee, S. H., Masoud, N., Krishnan, M. S., & Li, V. C. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103688 · Cited by 428
Deng, M., Menassa, C. C., & Kamat, V. R. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.005 · Cited by 422
Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review
Oraee, M., Hosseini, M. R., Papadonikolaki, E., Palliyaguru, R., & Arashpour, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.07.001 · Cited by 415
Sepasgozar, S. M. E. (2021) · Buildings · doi:10.3390/buildings11040151 · Cited by 367
Ding, L., Zhou, Y., & Akinci, B. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.009 · Cited by 330
Shahzad, M., Shafiq, M. T., Douglas, D., & Kassem, M. (2022) · Buildings · doi:10.3390/buildings12020120 · Cited by 325
Utilizing Industry 4.0 on the Construction Site: Challenges and Opportunities
Turner, C. J., Oyekan, J., Stergioulas, L., & Griffin, D. (2021) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2020.3002197 · Cited by 290
Sacks, R., & Pikas, E. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000759 · Cited by 262
Charef, R., Alaka, H., & Emmitt, S. (2018) · Journal of Building Engineering · doi:10.1016/j.jobe.2018.04.028 · Cited by 255
Construction risk knowledge management in BIM using ontology and semantic web technology
Ding, L. Y., Zhong, B. T., Wu, S., & Luo, H. B. (2016) · Safety Science · doi:10.1016/j.ssci.2016.04.008 · Cited by 254
Blockchain-Enabled IoT-BIM Platform for Supply Chain Management in Modular Construction
Li, X., Lu, W., Xue, F., Wu, L., Zhao, R., Lou, J., & Xu, J. (2022) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002229 · Cited by 241
Lu, Q., Won, J., & Cheng, J. C. P. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.09.004 · Cited by 235
Building information modeling (BIM): Benefits, risks and challenges
Baba, H. D. (2008) · Cited by 220
A review of digital twin applications in construction
Madubuike, O. C., Anumba, C. J., & Khallaf, R. (2022) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2022.008 · Cited by 218
Digital Twin for Supply Chain Coordination in Modular Construction
Lee, D., & Lee, S. (2021) · Applied Sciences · doi:10.3390/app11135909 · Cited by 218
Schiavi, B., Havard, V., Beddiar, K., & Baudry, D. (2022) · Automation in Construction · doi:10.1016/j.autcon.2021.104054 · Cited by 205
Tezel, A., Papadonikolaki, E., Yitmen, I., & Hilletofth, P. (2020) · Frontiers of Engineering Management · doi:10.1007/s42524-020-0110-8 · Cited by 190
Mannino, A., Dejaco, M. C., & Re Cecconi, F. (2021) · Applied Sciences · doi:10.3390/app11073062 · Cited by 188
Calabretta, G., Durisin, B., & Ogliengo, M. (2011) · Journal of Business Ethics · doi:10.1007/s10551-011-0924-8 · Cited by 186
Blockchain and Smart Contracts: A Solution for Payment Issues in Construction Supply Chains
Nanayakkara, S., Perera, S., Senaratne, S., Weerasuriya, G. T., & Bandara, H. M. N. D. (2021) · Informatics · doi:10.3390/informatics8020036 · Cited by 177
Safikhani, S., Keller, S., Schweiger, G., & Pirker, J. (2022) · International Journal of Digital Earth · doi:10.1080/17538947.2022.2038291 · Cited by 176
Sigalov, K., Ye, X., König, M., Hagedorn, P., Blum, F., Severin, B., Hettmer, M., Hückinghaus, P., Wölkerling, J., & Groß, D. (2021) · Applied Sciences · doi:10.3390/app11167653 · Cited by 175
Enhancing Facility Management through BIM 6D
Nicał, A. K., & Wodyński, W. (2016) · Procedia Engineering · doi:10.1016/j.proeng.2016.11.623 · Cited by 173
An investigation for integration of deep learning and digital twins towards Construction 4.0
Kor, M., Yitmen, I., & Alizadehsalehi, S. (2023) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-08-2021-0148 · Cited by 172
Teisserenc, B., & Sepasgozar, S. (2021) · Buildings · doi:10.3390/buildings11120670 · Cited by 171
Digital Twins for Construction Sites: Concepts, LoD Definition, and Applications
Zhang, J., Cheng, J. C. P., Chen, W., & Chen, K. (2022) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000948 · Cited by 167
IoT Open-Source Architecture for the Maintenance of Building Facilities
Villa, V., Naticchia, B., Bruno, G., Aliev, K., Piantanida, P., & Antonelli, D. (2021) · Applied Sciences · doi:10.3390/app11125374 · Cited by 165
Yang, L., Cheng, J. C. P., & Wang, Q. (2020) · Automation in Construction · doi:10.1016/j.autcon.2019.103037 · Cited by 164
Augmented reality and digital twin system for interaction with construction machinery
Hasan, S. M., Lee, K., Moon, D., Kwon, S., Jinwoo, S., & Lee, S. (2022) · Journal of Asian Architecture and Building Engineering · doi:10.1080/13467581.2020.1869557 · Cited by 163
A Review of the Digital Twin Technology in the AEC‐FM Industry
Hosamo, H. H., Imran, A., Cardenas-Cartagena, J., Svennevig, P. R., Svidt, K., & Nielsen, H. K. (2022) · Advances in Civil Engineering · doi:10.1155/2022/2185170 · Cited by 158
Analytical review and evaluation of civil information modeling
Cheng, J. C. P., Lu, Q., & Deng, Y. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.02.006 · Cited by 155
Sepasgozar, S. M. E., Hui, F. K. P., Shirowzhan, S., Foroozanfar, M., Yang, L., & Aye, L. (2020) · Sustainability · doi:10.3390/su13010161 · Cited by 146
Integration of Laser Scanner and Photogrammetry for Heritage BIM Enhancement
Alshawabkeh, Y., Baik, A., & Miky, Y. H. (2021) · ISPRS International Journal of Geo-Information · doi:10.3390/ijgi10050316 · Cited by 141
Collaboration and Risk in Building Information Modelling (BIM): A Systematic Literature Review
Ali, K. N., Alhajlah, H. H., & Kassem, M. A. (2022) · Buildings · doi:10.3390/buildings12050571 · Cited by 140
A shared ontology suite for digital construction workflow
Zheng, Y., Törmä, S., & Seppänen, O. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103930 · Cited by 136
Lin, Y.-C., & Cheung, W.-F. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000760 · Cited by 134
Cybersecurity for digital twins in the built environment: current research and future directions
Alshammari, K., Beach, T., & Rezgui, Y. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.010 · Cited by 123
Marocco, M., & Garofolo, I. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103917 · Cited by 108
Options for and Challenges of Employing Digital Twins in Construction Management
Salem, T., & Dragomir, M. (2022) · Applied Sciences · doi:10.3390/app12062928 · Cited by 107
Development of a Cognitive Digital Twin for Building Management and Operations
Mokhtari, K. E., Panushev, I. S., & McArthur, J. J. (2022) · Frontiers in Built Environment · doi:10.3389/fbuil.2022.856873 · Cited by 99
Ye, X., Zeng, N., & König, M. (2022) · Frontiers of Engineering Management · doi:10.1007/s42524-022-0188-2 · Cited by 96
Sun, H., & Liu, Z. (2022) · Advances in Civil Engineering · doi:10.1155/2022/8273451 · Cited by 88
Doing research in business and management: An essential guide to planning your project
Reed, J. W. (2012) · Action Learning Research and Practice · doi:10.1080/14767333.2012.687917 · Cited by 86
A Framework for Prefabricated Component Hoisting Management Systems Based on Digital Twin Technology
Zhao, Y., Cao, C., & Liu, Z. (2022) · Buildings · doi:10.3390/buildings12030276 · Cited by 84
Earned Green Value management for project management: A systematic review
Heinbach, B., & Moehler, R. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.05.079 · Cited by 76
Self-citationOpportunities and Challenges to Develop Digital Twins for Subsea Pipelines
Chen, B.-Q., Videiro, P. M., & Soares, C. G. (2022) · Journal of Marine Science and Engineering · doi:10.3390/jmse10060739 · Cited by 75
Structure Monitoring with BIM and IoT: The Case Study of a Bridge Beam Model
Scianna, A., Gaglio, G. F., & La Guardia, M. (2022) · ISPRS International Journal of Geo-Information · doi:10.3390/ijgi11030173 · Cited by 71
Characterizing interactions with BIM tools and artifacts in building design coordination meetings
Mehrbod, S., Staub‐French, S., Mahyar, N., & Tory, M. K. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.10.025 · Cited by 71
Alfadil, M. O., Kassem, M. A., Ali, K. N., & Alaghbari, W. (2022) · Sustainability · doi:10.3390/su14031135 · Cited by 69
Wei, Y., Lei, Z., & Altaf, M. S. (2022) · Buildings · doi:10.3390/buildings12050566 · Cited by 61
Barriers to the Implementation of Building Information Modeling among Jordanian AEC Companies
Hyarat, E., Hyarat, T., & Kuisi, M. A. (2022) · Buildings · doi:10.3390/buildings12020150 · Cited by 61
Keskin, B., Salman, B., & Köseoğlu, O. (2022) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002271 · Cited by 58
Deng, L., Lai, S., Ma, J., Lei, L., Zhong, M., Liao, L., & Zhou, Z. W. (2021) · Journal of Asian Architecture and Building Engineering · doi:10.1080/13467581.2020.1869013 · Cited by 58
Chen, C.-A., & Lai, H.-I. (2021) · Science Progress · doi:10.1177/00368504211059045 · Cited by 56
Li, J. Y.-M., Greenwood, D. J., & Kassem, M. (2018) · Springer eBooks · doi:10.1007/978-3-030-00220-6_7 · Cited by 45
Nikolić, D., & Whyte, J. K. (2021) · Buildings · doi:10.3390/buildings11110546 · Cited by 42
Ershadi, M., Jefferies, M. C., Davis, P. R., & Mojtahedi, M. (2022) · International journal of information systems and project management · doi:10.12821/ijispm090403 · Cited by 37
Digital Twin in the Architecture, Engineering, and Construction Industry: A Bibliometric Review
Almatared, M., Liu, H., Tang, S., Sulaiman, M., Lei, Z., & Li, H. (2022) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784483961.070 · Cited by 35
Integrating BIM and GIS in railway projects: A critical review
Kurwi, S., Demian, P., & Hassan, T. M. (2017) · Loughborough University Institutional Repository (Loughborough University) · Cited by 24
Rapid development of Virtual Reality based construction sequence simulations: a case study
Lucas, J. (2020) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2020.004 · Cited by 23
Utilization of BIM in Steel Building Projects: A Systematic Literature Review
Avendaño, J. I., Zlatanova, S., Cabo, A. D., Pérez, P., & Correa, C. L. (2022) · Buildings · doi:10.3390/buildings12060713 · Cited by 20
Wu, S., & Zhang, X. (2022) · Wireless Communications and Mobile Computing · doi:10.1155/2022/4326437 · Cited by 14
Construction site design planning using 4D BIM modeling
Caldart, C. W., & Scheer, S. (2022) · Gestão & Produção · doi:10.1590/1806-9649-2022v29e5312 · Cited by 10
Overview: the opportunity of BIM in railway
Bensalah, M., Elouadi, A., & Mharzi, H. (2019) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-11-2017-0060
Cited by
A review of drivers and barriers of Digital Twin adoption in building project development processes
Jahangir, M. F., Schultz, C. P. L., & Kamari, A. (2024) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2024.008 · Cited by 34
Metadata
- Authors
- Baghalzadeh Shishehgarkhaneh, M., Keivani, A., Moehler, R. C., Jelodari, N., & Roshdi Laleh, S.
- Venue
- Buildings
- Publisher
- MDPI AG
- Published
- 2022-09-22
- Volume
- 12
- Issue
- 10
- Pages
- 1503
- ISSN
- 2075-5309 (ISSN-L)
- OpenAlex
- W4296638810
- Cited by
- 242
- References
- 87
- FWCI
- 19.71
- Type
- journal article
- Language
- en
- Open access
- gold
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.