A Study of the Toyota Production System From an Industrial Engineering Viewpoint
The DOI matches its Crossref record.
Abstract
This is the "green book" that started it all -- the first book in English on JIT, written from the engineer's viewpoint. When Omark Industries bought 500 copies and studied it companywide, Omark became the American pioneer in JIT.Here is Dr. Shingo's classic industrial engineering rationale for the priority of process-based over operational improvements in manufacturing. He explains the basic mechanisms of the Toyota production system, examines production as a functional network of processes and operations, and then discusses the mechanism necessary to make JIT possible in any manufacturing plant. Provides original source material on Just-ln-Time Demonstrates new ways to think about profit, inventory, waste, and productivity Explains the principles of leveling, standard work procedures, multi-machine handling, supplier relations, and much more If you are a serious student of manufacturing, you will benefit greatly from reading this primary resource on the powerful fundamentals of JIT.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Seven types of Muda exist [2]: defects, overproduction, transport, waits, useless stocks, useless movement, and useless or expensive processes.”
From Poka Yoke Meets Deep Learning: A Proof of Concept for an Assembly Line Application (2022) · cites this paper as [2]
Citations
Cites
Still being checked.
Cited by
Items 201–300 of 1,000
The internal bullwhip effect in car manufacturing
Klug, F. (2012) · International Journal of Production Research · doi:10.1080/00207543.2012.677551 · Cited by 54
Patterns of Control within Japanese Manufacturing Plants in China: Doubts about Japanization in Asia
Taylor, B. W. K. (1999) · Journal of Management Studies · doi:10.1111/1467-6486.00161 · Cited by 54
Converging production models: the STS versus lean production debate revisited
Dabhilkar, M., & Åhlström, P. (2013) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2012-0316 · Cited by 53
Insights and learnings from lean manufacturing implementation practices
Yadav, O. P., Nepal, B. P., Goel, P. S., Jain, R., & Mohanty, R. P. (2010) · International Journal of Services and Operations Management · doi:10.1504/ijsom.2010.032916 · Cited by 53
Raj, D., Ma, Y. J., Gam, H. J., & Banning, J. (2017) · International Journal of Fashion Design Technology and Education · doi:10.1080/17543266.2017.1280091 · Cited by 53
Rafiei, H., & Rabbani, M. (2011) · Computers & Industrial Engineering · doi:10.1016/j.cie.2011.04.010 · Cited by 53
How context factors influence lean production practices in manufacturing cells
Marodin, G. A., Saurin, T. A., Tortorella, G. L., & Denicol, J. (2015) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-015-6944-2 · Cited by 52
A novel approach to lean control for Taiwan-funded enterprises in mainland China
Huang, C., & Liu, S.-H. (2005) · International Journal of Production Research · doi:10.1080/00207540500047135 · Cited by 50
Dynamic analysis of a lean cell under uncertainty
Deif, A. M. (2011) · International Journal of Production Research · doi:10.1080/00207543.2011.556154 · Cited by 50
Lean Product Development: Nothing New Under the Sun?
Salgado, E. G., & Dekkers, R. (2017) · International Journal of Management Reviews · doi:10.1111/ijmr.12169 · Cited by 50
Johnston, R. B. (1995) · Journal of the Operational Research Society · doi:10.1057/jors.1995.166 · Cited by 50
The coopetition effect of learning-by-doing in outsourcing
Deng, S., Guan, X., & Xu, J. (2019) · International Journal of Production Research · doi:10.1080/00207543.2019.1696493 · Cited by 50
A Simulation Study of Sequencing Rules in a Kanban‐Controlled Flow Shop*
Berkley, B. J., & Kiran, A. S. (1991) · Decision Sciences · doi:10.1111/j.1540-5915.1991.tb01281.x · Cited by 50
Jadhav, J. R., Mantha, S. S., & Rane, S. B. (2015) · Journal of Industrial Engineering International · doi:10.1007/s40092-014-0092-4 · Cited by 49
Alves, A. C., Ferreira, A. C., Maia, L. C., Leão, C. P., & Carneiro, ́. (2019) · International Journal of Industrial Engineering and Management · doi:10.24867/ijiem-2019-4-244 · Cited by 49
Improving the NPD Process by Applying Lean Principles: A Case Study
Nepal, B. P., Yadav, O. P., & Solanki, R. (2011) · Engineering Management Journal · doi:10.1080/10429247.2011.11431910 · Cited by 49
Embedding Knowledge Management into Business Processes
Massingham, P. R., & Al-Holaibi, M. A. (2017) · Knowledge and Process Management · doi:10.1002/kpm.1534 · Cited by 49
Lean Six Sigma in Brazil: a literature review
Walter, O. M. F. C., & Paladini, E. P. (2019) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-09-2017-0103 · Cited by 49
A new model to implement Six Sigma in small- and medium-sized enterprises
Romdhane, T. B., Badreddine, A., & Sansa, M. (2016) · International Journal of Production Research · doi:10.1080/00207543.2016.1249430 · Cited by 49
Barbosa, G. F., de Carvalho, J., & Filho, E. V. G. (2014) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-014-5729-3 · Cited by 48
Journey to Lean: Making Operational Change Stick
Reinertsen, D. G. (2005) · Journal of Product Innovation Management · doi:10.1111/j.1540-5885.2005.00150_2.x · Cited by 48
Singh, P. L., Sindhwani, R., Dua, N. K., Jamwal, A., Aggarwal, A., Iqbal, A., & Gautam, N. (2019) · Lecture notes in mechanical engineering · doi:10.1007/978-981-13-6412-9_62 · Cited by 47
On decoupling points and decoupling zones
Wikner, J. (2014) · Production & Manufacturing Research · doi:10.1080/21693277.2014.898219 · Cited by 47
Implementation of hybrid Kanban-CONWIP system: a case study
Leonardo, D. G., Sereno, B., da Silva, D. S. A., Sampaio, M., Massote, A. A., & Simões, J. C. (2017) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-03-2016-0043 · Cited by 47
Increasing the production rate of a just-in-time production system with variable operation times
Villeda, R., Dudek, R. A., & Smith, M. L. (1988) · International Journal of Production Research · doi:10.1080/00207548808947989 · Cited by 47
Schumacher, S., Hall, R., Bildstein, A., & Bauernhansl, T. (2022) · International Journal of Production Research · doi:10.1080/00207543.2022.2159562 · Cited by 46
A competitive progression perspective of JIT systems: evidence from early US implementations
White, R. E., Ojha, D., & Kuo, C. (2009) · International Journal of Production Research · doi:10.1080/00207540903226914 · Cited by 46
Artificial Intelligence in Green Management and the Rise of Digital Lean for Sustainable Efficiency
Ayoubi, H., Tabaa, Y., & Kharrim, M. E. (2023) · E3S Web of Conferences · doi:10.1051/e3sconf/202341201053 · Cited by 47
The development of a lean resource mapping framework: introducing an 8th waste
Gibbons, P. M., Kennedy, C., Burgess, S. C., & Godfrey, P. (2012) · International Journal of Lean Six Sigma · doi:10.1108/20401461211223704 · Cited by 45
Gamification technique for supporting transparency on construction sites: a case study
Leite, R. M. C., Costa, D. B., Neto, H. M. M., & Dur�ão, F. A. (2016) · Engineering Construction & Architectural Management · doi:10.1108/ecam-12-2015-0196 · Cited by 45
Ballé, F., & Ballé, M. (2005) · London Business School Review · doi:10.1111/j.0955-6419.2005.00369.x · Cited by 45
Eliminating Transportation Waste in Food Distribution: A Case Study
Villarreal, B., GARCIA, D., & ROSAS, I. (2009) · Transportation Journal · doi:10.2307/25702543 · Cited by 45
Logística de resíduos da construção civil atendendo à resolução CONAMA 307.
Pucci, R. B. (2006) · Digital Library of Theses and Dissertations (Universidade de São Paulo) · doi:10.11606/d.3.2006.tde-05092006-141310 · Cited by 48
Exploring organizational translation : A case study of changes toward Lean Production
Langstrand, J. (2012) · DiVA (Linkoping University) · Cited by 51
Lean Thinking: An Essential Mindset
Alves, A. C. (2022) · IEEE Engineering Management Review · doi:10.1109/emr.2022.3215062 · Cited by 44
Wacker, J. G. (1987) · Journal of Operations Management · doi:10.1016/0272-6963(87)90010-6 · Cited by 44
Chiarini, A. (2013) · International Journal of Productivity and Quality Management · doi:10.1504/ijpqm.2013.052023 · Cited by 44
TQM as an Arbitrary Sign for Play: Discourse and Transformation
Xu, Q. (1999) · Organization Studies · doi:10.1177/0170840699204007 · Cited by 44
Card-based workload control for job shops: Improving COBACABANA
Thürer, M., Land, M., & Stevenson, M. (2013) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.09.015 · Cited by 44
Sequences of manufacturing improvement initiatives: the case of delayering
Åhlström, P., & Karlsson, C. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010348244 · Cited by 43
Lead‐time Models of Business Processes
Bartezzaghi, E., Spina, G., & Verganti, R. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410056768 · Cited by 43
Exploratory study of lean construction : assessment of lean implementation
Kim, D.-Y. (2002) · Texas ScholarWorks (Texas Digital Library) · Cited by 43
Ojha, D., White, R. E., & Rogers, P. P. (2013) · International Journal of Production Research · doi:10.1080/00207543.2012.748230 · Cited by 42
Conceição, S. V., Rodrigues, I. A., de Azevedo, A. A., Almeida, J. F. D. F., Ferreira, F. N., & de Morais, A. V. (2009) · Gestão & Produção · doi:10.1590/s0104-530x2009000300004 · Cited by 42
Batista, C. R., Modesto, E. C. B., Silva, M. D. N., Silva, M. P. D., & Oliveira, W. A. D. (2021) · Revista Científica do UBM · doi:10.52397/rcubm.v20i38.958 · Cited by 42
Quality improvement through Poka-Yoke: from engineering design to information system design
Zhang, A. (2014) · International Journal of Six Sigma and Competitive Advantage · doi:10.1504/ijssca.2014.064260 · Cited by 41
Knop, K. (2020) · Production Engineering Archives · doi:10.30657/pea.2020.26.22 · Cited by 41
Thürer, M., Stevenson, M., & Protzman, C. W. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1188224 · Cited by 41
Organizational Approaches to the Implementation of Simultaneous Engineering
Shenas, D. G., & Derakhshan, S. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410067234 · Cited by 41
Swamidass, P. M. (2000) · Springer eBooks · doi:10.1007/1-4020-0612-8_998 · Cited by 41
Non‐human resistance in changes towards lean
Langstrand, J., & Elg, M. (2012) · Journal of Organizational Change Management · doi:10.1108/09534811211280609 · Cited by 42
Mapping Strategy to Best Practices for Sustainable Food Manufacturing Using Fuzzy DEMATEL-ANP-TOPSIS
Ocampo, L. A., Deiparine, C. B., & Go, A. L. (2020) · Engineering Management Journal · doi:10.1080/10429247.2020.1733379 · Cited by 40
Operations flow effectiveness: a systems approach to measuring flow performance
Afy-Shararah, M., & Rich, N. (2018) · International Journal of Operations & Production Management · doi:10.1108/ijopm-09-2016-0575 · Cited by 40
Reponen, E., Jokela, R. M., Blodgett, J. C., Rundall, T. G., Shortell, S. M., Nuutinen, M., Skants, N., Mäkijärvi, M. A., & Torkki, P. M. (2021) · BMC Health Services Research · doi:10.1186/s12913-021-07322-2 · Cited by 40
Cochran, D. S., & Rauch, E. (2020) · Procedia Manufacturing · doi:10.1016/j.promfg.2020.10.173 · Cited by 40
Wellsprings of Creation: How Perturbation Sustains Exploration in Mature OrganizationsPreprint
Brunner, D. J., Staats, B. R., Tushman, M. L., & Upton, D. M. (2009) · SSRN Electronic Journal · doi:10.2139/ssrn.1420900 · Cited by 39
Improving overall equipment efficiency using a Lean Six Sigma approach
Gibbons, P. M. (2006) · International Journal of Six Sigma and Competitive Advantage · doi:10.1504/ijssca.2006.010110 · Cited by 39
Integrating Lean Design and Lean Construction: Processes and methods
Jørgensen, B. H. (2006) · Cited by 39
Keane, M. P., & Feinberg, S. (2007) · Journal of Industrial Economics · doi:10.1111/j.1467-6451.2007.00323.x · Cited by 39
A structural framework for closed‐loop supply chains
Wikner, J., & Tang, O. (2008) · The International Journal of Logistics Management · doi:10.1108/09574090810919198 · Cited by 39
Hassanain, M. M. (2017) · INQUIRY The Journal of Health Care Organization Provision and Financing · doi:10.1177/0046958017707872 · Cited by 39
Shih, L. C., & Gurnani, H. (1997) · Total Quality Management · doi:10.1080/09544129710413 · Cited by 39
Hoss, M., & ten Caten, C. S. (2013) · International Journal of Production Research · doi:10.1080/00207543.2012.762130 · Cited by 38
Military Airframe Acquisition Costs: The Effects of Lean Manufacturing
Cook, C. R., & Graser, J. C. (2001) · RAND Corporation eBooks · doi:10.7249/mr1325 · Cited by 38
Real time facility performance monitoring system using RFID technology
Chen, K., Chen, J. C., & Cox, R. A. (2012) · Assembly Automation · doi:10.1108/01445151211212334 · Cited by 38
Improving the design process for factories: Modeling human performance variation
Mason, S., Baines, T. S., Kay, J., & Ladbrook, J. (2005) · Journal of Manufacturing Systems · doi:10.1016/s0278-6125(05)80006-8 · Cited by 38
Inventory diagnosis for flow improvement—A design science approach
Land, M., Thürer, M., Stevenson, M., Fredendall, L. D., & Scholten, K. (2021) · Journal of Operations Management · doi:10.1002/joom.1133 · Cited by 37
Basu, D. R., & Miroshnik, V. W. (1999) · Journal of Management Development · doi:10.1108/02621719910300775 · Cited by 37
SMED Methodology Implementation in an Automotive Industry Using a Case Study Method
Bidarra, T. F. T., Godina, R., Matias, J. C. O., & Azevedo, S. G. (2018) · International Journal of Industrial Engineering and Management · doi:10.24867/ijiem-2018-1-101 · Cited by 37
Flow index based line balancing: a tool to improve the leanness of assembly line design
Eswaramoorthi, M., Kathiresan, G. R., Jayasudhan, T. J., Prasad, P. S. S., & Mohanram, P. V. (2011) · International Journal of Production Research · doi:10.1080/00207543.2011.575895 · Cited by 37
Continuous improvement in Vietnam: unique approaches for a unique culture
Nguyen, P. A., & Robinson, A. G. (2015) · Journal of Asia Business Studies · doi:10.1108/jabs-11-2014-0093 · Cited by 36
Cochran, D. S., & Dobbs, D. C. (2001) · Journal of Manufacturing Systems · doi:10.1016/s0278-6125(01)80059-5 · Cited by 36
Framework for Lean Implementation Through Fuzzy AHP-COPRAS Integrated Approach
Kumar, M. B., Parameshwaran, R., Antony, J., & Cudney, E. A. (2021) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2021.3089691 · Cited by 35
On the Way to Knowledge: Making a Discourse at Quality
Xu, Q. (2000) · Organization · doi:10.1177/135050840073004 · Cited by 35
Data-Driven Requirements Engineering in Agile Projects: The Q-Rapids Approach
Franch, X., Ayala, C. P., López, L., Martínez‐Fernández, S., Rodríguez, P., Gómez, C., Jedlitschka, A., Oivo, M., Partanen, J. O., Raty, T., et al. (2017) · IEEE International Requirements Engineering Conference Workshops (REW) · doi:10.1109/rew.2017.85 · Cited by 35
Stamm, M., Neitzert, T. R., & Singh, D. (2009) · Tuwhera (Auckland University of Technology) · Cited by 35
BENEFITS OF LEAN MANAGEMENT: RESULTS FROM SOME INDUSTRIAL CASES IN PORTUGAL
Alves, A. C., Sousa, R. M., Dinis‐Carvalho, J., Moreira, F., & Lima, R. M. (2011) · Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT) · Cited by 35
Pinhatti, E. D. G., Vannuchi, M. T. O., Sardinha, D. D. S. S., & Haddad, M. D. C. F. L. (2017) · Texto & Contexto - Enfermagem · doi:10.1590/0104-07072017001180015 · Cited by 35
Simulation and production planning for manufacturing cells
Taj, S., Cochran, D. S., Duda, J. W., & Linck, J. (2002) · Winter Simulation Conference · doi:10.1109/wsc.1998.745801 · Cited by 35
Towards a Framework for Reducing Cognitive Load in Manufacturing Personnel
Lindblom, J., & Thorvald, P. (2019) · AHFE international · doi:10.54941/ahfe100234 · Cited by 34
Shtub, A., & Karni, R. (2010) · Springer eBooks · doi:10.1007/978-0-387-74526-8 · Cited by 34
Toyota UK Ltd: Model HRM Practices?
Winfield, I. (1994) · Employee Relations · doi:10.1108/01425459410054916 · Cited by 34
Pinto, J. L. Q., Matias, J. C. O., Pimentel, C., Azevedo, S. G., & Govindan, K. (2018) · Management for professionals · doi:10.1007/978-3-319-77016-1_4 · Cited by 35
Modular simulation tool for modelling JIT manufacturing
Martínez, F. M., & Bedia, L. M. A. (2002) · International Journal of Production Research · doi:10.1080/00207540110119081 · Cited by 34
Frank George Woollard: forgotten pioneer of flow production
Emiliani, M. L., & Seymour, P. J. (2010) · Journal of Management History · doi:10.1108/17511341111099538 · Cited by 34
Razmi, J., Rahnejat, H., & Khan, M. K. (1998) · International Journal of Operations & Production Management · doi:10.1108/01443579810231705 · Cited by 34
Mason, R. L., & Lalwani, C. (2008) · International Journal of Production Economics · doi:10.1016/j.ijpe.2007.09.013 · Cited by 34
Extended-CONWIP-Kanban System: Control and Performance Analysis
Boonlertvanich, K. (2005) · UPT. Syiah Kuala University Library (Syiah Kuala University) · Cited by 34
Going back to the roots of W.A. Shewhart (and further) and introduction of a new CPD cycle
Saier, M. C. (2017) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-11-2015-0111 · Cited by 33
Possik, J., Amrani, A. Z., Vallespir, B., & Zacharewicz, G. (2021) · International Journal of Computer Integrated Manufacturing · doi:10.1080/0951192x.2021.1972468 · Cited by 33
Jylhä, T. (2021) · Routledge eBooks · doi:10.1201/9781003128786-13 · Cited by 33
Wan, S. K. M., Kumaraswamy, M. M., & Liu, D. T. C. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:7(637 · Cited by 33
Resource flexibility for lean manufacturing: SAP-LAP analysis of a case study
Chauhan, G., & Singh, T. P. (2013) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-10-2012-0010 · Cited by 33
Marin-Garcia, J. A., Garcia-Sabater, J. P., Ruiz, A. B., Maheut, J., & Sabater, J. J. G. (2020) · Journal of Industrial Engineering and Management · doi:10.3926/jiem.3190 · Cited by 33
Just-In-Time and Small Business Evolution
Winston, R., & Heiko, L. (1990) · Entrepreneurship Theory and Practice · doi:10.1177/104225879001400408 · Cited by 33
Klug, F. (2017) · Springer eBooks · doi:10.1007/978-3-662-55873-7_7 · Cited by 33
Manufacturing delivery performance for supply chain management
Choi, J., Bai, S. X., Geunes, J., & Romeijn, H. E. (2006) · Mathematical and Computer Modelling · doi:10.1016/j.mcm.2005.07.008 · Cited by 33
A Systematic Literature Review of Poka-Yoke and Novel Approach to Theoretical Aspects
Lazarevic, M., Mandic, J., Sremcev, N., Vukelic, D., & Debevec, M. (2019) · Strojniški vestnik – Journal of Mechanical Engineering · doi:10.5545/sv-jme.2019.6056 · Cited by 32
Lean in the Public Sector : Possibilities and Limitations
Drotz, E. (2014) · Linköping University Electronic Press eBooks · doi:10.3384/lic.diva-110660 · Cited by 32
Investigating waste on New Product Development: case study
Salgado, E. G., Mello, C. H. P., Leal, F., & da Silva, C. E. S. (2015) · Product Management & Development · doi:10.4322/pmd.2015.004 · Cited by 32
Metadata
- Authors
- Shingo, S., & Bodek, N.
- Venue
- Routledge eBooks
- Publisher
- Routledge
- Published
- 2019-05-20
- OpenAlex
- W2904659199
- Cited by
- 1,064
- References
- 0
- Citations by year
- 2026: 4 · 2025: 20 · 2024: 18 · 2023: 27 · 2022: 25 · 2021: 94 · 2020: 66 · 2019: 45
- FWCI
- 68.32
- Type
- book
- Language
- en
- Open access
- closed
- Locations
- Routledge eBooks (publishedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
- Social Sciences › Decision Sciences › Management Science and Operations Research › Operations Management Techniques
- Keywords
- Toyota Production System, just-in-time, industrial engineering, process improvement, inventory reduction, waste reduction, productivity, leveling, supplier relationships, manufacturing operations
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.