Abstract
This is the "green book" that started it all -- the first book in English on JIT, written from the engineer's viewpoint. When Omark Industries bought 500 copies and studied it companywide, Omark became the American pioneer in JIT.Here is Dr. Shingo's classic industrial engineering rationale for the priority of process-based over operational improvements in manufacturing. He explains the basic mechanisms of the Toyota production system, examines production as a functional network of processes and operations, and then discusses the mechanism necessary to make JIT possible in any manufacturing plant. Provides original source material on Just-ln-Time Demonstrates new ways to think about profit, inventory, waste, and productivity Explains the principles of leveling, standard work procedures, multi-machine handling, supplier relations, and much more If you are a serious student of manufacturing, you will benefit greatly from reading this primary resource on the powerful fundamentals of JIT.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Seven types of Muda exist [2]: defects, overproduction, transport, waits, useless stocks, useless movement, and useless or expensive processes.”
From Poka Yoke Meets Deep Learning: A Proof of Concept for an Assembly Line Application (2022) · cites this paper as [2]
Citations
Cites
Still being checked.
Cited by
Items 501–600 of 1,000
Cutcher‐Gershenfeld, J. (2003) · SSRN Electronic Journal · doi:10.2139/ssrn.395449 · Cited by 12
An information system for Just-In-Time
Yoo, S.-J. (1989) · Long Range Planning · doi:10.1016/0024-6301(89)90110-6 · Cited by 12
USING POKA-YOKE METHODS TO IMPROVE EMPLOYMENT POTENTIAL OF INTELLECTUALLY DISABLED WORKERS
Treurnicht, N., Blanckenberg, M., & Niekerk, H. G. V. (2011) · The South African Journal of Industrial Engineering · doi:10.7166/22-1-44 · Cited by 11
The influence of people management practices on a culture of lean manufacturing
Trentin, L., & Tontini, G. (2022) · Revista de Administração da UFSM · doi:10.5902/1983465965469 · Cited by 11
Elastyczność, wrażliwość i odporność jako cechy adaptacyjnych łańcuchów dostaw
Szymczak, M. (2015) · Studia Oeconomica Posnaniensia · doi:10.18559/z41zw704 · Cited by 11
Just-in-time methods for semiconductor manufacturing
Levitt, M. E., & Abraham, J. A. (2002) · ASMC proceedings · doi:10.1109/asmc.1990.111212 · Cited by 11
Lehtovaara, J., Seppänen, O., Peltokorpi, A., Lappalainen, E., & Uusitalo, P. (2022) · Frontiers in Built Environment · doi:10.3389/fbuil.2022.893790 · Cited by 11
Multi-criteria decision making for the selection of a production control policy
Sharma, S., & Agrawal, N. (2010) · International Journal of Industrial and Systems Engineering · doi:10.1504/ijise.2010.035015 · Cited by 11
Using Lean and Voice of Customers to Fulfil Needs in the Charity Sector – A Reflective Case Study
Tay, H. L., & See, J. (2022) · Operations and Supply Chain Management An International Journal · doi:10.31387/oscm0500348 · Cited by 11
Ravet, D. (2011) · HAL · Cited by 11
Pacemaker, Bottleneck and Order Decoupling Point in Lean Production Systems
Lasa, I. S., Vila, R. D. C., & Uriarte, A. G. (2009) · International journal of industrial engineering · Cited by 11
Dolgopyatova, T. G., & Khomyakova, Y. V. (2016) · Russian Management Journal · doi:10.21638/11701/spbu18.2016.203 · Cited by 11
ROADELS: discrete information objects for production planning and control of road construction
Haronian, E., & Sacks, R. (2020) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2020.015 · Cited by 11
Senan, N. A. M., & Alhebri, A. A. (2020) · Journal of Talent Development and Excellence · Cited by 11
Visual Management in Industrial Construction: A Case Study
Tezel, A., Koskela, L., & Tzortzopoulos, P. (2013) · University of Huddersfield Repository (University of Huddersfield) · Cited by 11
Andrade, R. S., Proctor, J. W., Slack, R., Marlowe, U., Ashby, K. R., & Schenken, L. L. (2010) · International Journal of Radiation Oncology*Biology*Physics · doi:10.1016/j.ijrobp.2009.09.002 · Cited by 11
The impact of capacity investments on work-in-process and inventories
Axsäter, S., & Olhager, J. (1985) · Engineering Costs and Production Economics · doi:10.1016/0167-188x(85)90018-7 · Cited by 11
Optimum production planning: an analytic framework
Houghton, E., & Portougal, V. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110400965 · Cited by 11
World Class Manufacturing in the 1990s: Integrating JIT, TQC, FA, and TPM with Worker Participation
Huang, P. Y. (1991) · Springer eBooks · doi:10.1007/978-3-642-76401-1_31 · Cited by 11
Oehmen, J. (2005) · DSpace@MIT (Massachusetts Institute of Technology) · Cited by 11
Mazur, L. M., Chen, S. J. G., & Prescott, B. (2008) · LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas) · doi:10.3926/jiem..v1n2.p240-268 · Cited by 10
Understanding Lean—Statistical Analysis of Perceptions and Self-Deception Regarding Lean Management
Pearce, A., Pons, D. J., & Neitzert, T. R. (2023) · Operations Research Forum · doi:10.1007/s43069-023-00198-4 · Cited by 10
A Framework for Extending Lean Accounting into a Supply Chain
Hines, P., Silvi, R., Bartolini, M., & Raschi, A. (2002) · Physica-Verlag eBooks · doi:10.1007/978-3-662-11377-6_4 · Cited by 10
Wikner, J. (2018) · Production & Manufacturing Research · doi:10.1080/21693277.2018.1528904 · Cited by 10
Applying Value Stream Mapping to Identify and Evaluate Waste in a Company of the Ceramic Sector
Luna, L. B., Klökner, P. E. D., & Ferreira, J. C. E. (2013) · Lecture notes in mechanical engineering · doi:10.1007/978-3-319-00557-7_122 · Cited by 10
Lean and TRIZ: From the Problems to Creative and Sustainable Solutions
Alves, A. C., Sousa, P. F., & Navas, H. V. G. (2020) · Lecture notes in networks and systems · doi:10.1007/978-3-030-41429-0_11 · Cited by 10
Integrated evaluation of resource efficiency and cost effectiveness in production systems
Lieder, M. (2014) · KTH Publication Database DiVA (KTH Royal Institute of Technology) · Cited by 10
Data Quality and Data Management in Banking Industry. Empirical Evidence from Small Italian Banks
Bruno, E., Iacoviello, G., & Lazzini, A. (2017) · Lecture notes in information systems and organisation · doi:10.1007/978-3-319-49538-5_2 · Cited by 10
Modeling just-in-time arrival effects on short sea shipping
Tsioumas, V., Lyridis, D. V., Stavroulakis, P. J., & Papadimitriou, S. (2025) · Maritime Business Review · doi:10.1108/mabr-01-2025-0011 · Cited by 10
Al‐Matari, E. M., & Al-Hibari, A. A. (2019) · Cited by 10
Avoiding the capacity cost trap: Three means of smoothing under cyclical production planning
Hedenstierna, P., & Disney, S. M. (2018) · International Journal of Production Economics · doi:10.1016/j.ijpe.2018.04.008 · Cited by 10
Cunha, E. P. (2019) · Verinotio – Revista on-line de Filosofia e Ciências Humanas · doi:10.36638/1981061x.2019.25.1.452/88-128 · Cited by 10
Swanson, L. (2008) · Decision Sciences Journal of Innovative Education · doi:10.1111/j.1540-4609.2007.00163.x · Cited by 10
Operating Levels in Product and Process Design
Toni, A. F. D., & Zipponi, L. (1991) · International Journal of Operations & Production Management · doi:10.1108/01443579110005965 · Cited by 10
Duda, J. W., Cochran, D. S., Castaneda-Vega, J., Baur, M., Anger, R., & Taj, S. (1999) · SAE technical papers on CD-ROM/SAE technical paper series · doi:10.4271/1999-01-1620 · Cited by 10
Rule-based approach to just-in-time manufacturing
Pegler, H. C., & Kochhar, A. K. (1990) · Computer Integrated Manufacturing Systems · doi:10.1016/0951-5240(90)90166-c · Cited by 10
Pardi, T. (2021) · Cambridge University Press eBooks · doi:10.1017/9781108333870.009 · Cited by 9
Dibia, I. K. (2012) · OpenGrey (Institut de l'Information Scientifique et Technique) · Cited by 9
A customised lean model for a Chinese aerospace OEM (Original Equipment Manufacturer)
Li, C. (2011) · CERES (Cranfield University) · Cited by 9
Network Effects of Lean Production Implementation
Dolgopyatova, T. G., & Shilyaeva, Y. V. (2017) · Upravlenets · doi:10.29141/2218-5003-2017-6-4-2 · Cited by 9
An Evaluation of the NERJIT Priority Rule in a Kanban‐Controlled Flowshop
Ardalan, A., & Díaz, R. (2012) · Production and Operations Management · doi:10.1111/j.1937-5956.2012.01323.x · Cited by 9
Lean Six Sigma as a Source of Competitive Advantage
Cavallini, A. G. (2008) · ScholarsArchive (Brigham Young University) · Cited by 9
Application of Dynamic Spreadsheets in the Analysis of Waste by Making-Do
do Amaral, T. G., Braga, P. B., & Neto, J. P. B. (2020) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2020/0077 · Cited by 9
Lean Management: Review of Lean Consciousness for the Clinical Laboratory
Prakash, P., Joshi, A., Jahan, A., Sharma, S. K., Yadav, S. K., Gupta, R., Singh, H. V., Sarin, N., & Singh, S. (2020) · Annals of Pathology and Laboratory Medicine · doi:10.21276/apalm.2934 · Cited by 9
Dynamic method to identify and analyze waste by making-do in construction sites
do Amaral, T. G., Braga, P. B., Elias, K. V., & Brandão, C. M. (2021) · Gestão & Produção · doi:10.1590/1806-9649-2021v28e5676 · Cited by 9
Supporting Value Stream Design Using S-BPM
Kannengiesser, U. (2014) · Lecture notes in business information processing · doi:10.1007/978-3-319-06065-1_11 · Cited by 9
A conceptual model for disruption causes: A personnel and organization perspective
Ericsson, J., & Dahlén, P. (1997) · International Journal of Production Economics · doi:10.1016/s0925-5273(96)00055-2 · Cited by 9
Aplicação do mecanismo da função produção ao planejamento da produção seriada na construção
Isatto, E. L., & Zuchetti, M. (2014) · Anais do ... Encontro Nacional de Tecnologia do Ambiente Construído · doi:10.17012/entac2014.519 · Cited by 9
Zúñiga, J. A., & Chiaro, F. M. R. D. (2017) · Revista de Investigación · doi:10.29097/2011-639x.85 · Cited by 9
Socially responsible supply chains with cost learning effects
Kong, J., Yang, F. Y., & Liu, T. (2020) · RAIRO - Operations Research · doi:10.1051/ro/2019094 · Cited by 9
Research of Enterprise Management Systems: Essence, Methods and Problems
Абдуллаев, А., Kurpayanidi, K. I., Teshabaev, A., & Солиева, Д. А. (2020) · Bulletin of Science and Practice · doi:10.33619/2414-2948/51/18 · Cited by 9
Magnaye, R. B., Chaudhry, S. S., Sauser, B. J., & Varma, N. (2020) · International Journal of Operations and Quantitative Management · doi:10.46970/2020.26.1.3 · Cited by 9
Card-based delivery date promising in pure flow shops with order release control
Thürer, M., & Stevenson, M. (2016) · International Journal of Production Research · doi:10.1080/00207543.2016.1177672 · Cited by 9
Understanding and managing uncertainty in lean aerospace product development
Bresnahan, S. M. (2006) · DSpace@MIT (Massachusetts Institute of Technology) · Cited by 9
Organizational Practices Lean Enterprises Adopt to Focus on Value Streams
Nadal, J. O., & Gregorio, R. (2014) · Journal of Enterprise Transformation · doi:10.1080/19488289.2014.919973 · Cited by 8
Concepts, Applications and Emerging Opportunities in Industrial Engineering
Moynihan, G. P. (2020) · IntechOpen eBooks · doi:10.5772/intechopen.83281 · Cited by 8
The Cambridge International Handbook of Lean Production
Shulzhenko, E. (2021) · Cambridge University Press eBooks · doi:10.1017/9781108333870 · Cited by 8
de Menezes, L. M., & Wood, S. (2015) · Evidence-based HRM a Global Forum for Empirical Scholarship · doi:10.1108/ebhrm-05-2014-0016 · Cited by 8
Transformational Performance Improvement: Why Is Progress so Slow?
Hung, D. Y., Lee, J., & Rundall, T. G. (2022) · Emerald Group Publishing Limited eBooks · doi:10.1108/s1474-823120220000021002 · Cited by 8
The Human Side of Total Quality Management
Cooney, R., & Sohal, A. S. (2002) · Wiley eBooks · doi:10.1002/9780470713365.ch3 · Cited by 8
Noles, M. A. A., Guevara-Viejó, F., Aguilar, P. J. F., Varón, M. J. R., & Velosa-García, E. (2025) · Frontiers in Education · doi:10.3389/feduc.2025.1582771 · Cited by 8
The problem with planning : the significance of theories of activity for operations management
Johnston., R. B. (2021) · Figshare · doi:10.26180/14928531 · Cited by 8
SÁNCHEZ, J. E. J. (2006) · RiuNet (Universitat Politècnica de València) · doi:10.4995/thesis/10251/1906 · Cited by 8
Investigation of the Philosophy Practised in Green and Lean Manufacturing Management
Aminuddin, A. S. A., & Nawawi, M. K. M. (2013) · International Journal of Customer Relationship Marketing and Management · doi:10.4018/jcrmm.2013010101 · Cited by 8
Efficiency analysis of Lean Six Sigma projects: insights for selection and prioritisation
Pacagnella, A. C., Vallati, S. F., & Ignácio, P. S. D. A. (2023) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2023.2201426 · Cited by 8
Soliman, M., Saurin, T. A., & Werle, N. J. B. (2017) · Revista Ingeniería Industrial · doi:10.22320/s07179103/2017.06 · Cited by 8
Analysing the Benefits of Value Stream Mapping in Mining Industry
Kumar, N. P. (2014) · International Journal of Innovative Research in Science Engineering and Technology · doi:10.15680/ijirset.2014.0310035 · Cited by 8
da Silva, C. M. C., de Oliveira, M. A., Veroneze, G. D. M., & da Silva, P. A. (2021) · European Journal of Engineering and Technology Research · doi:10.24018/ejeng.2021.6.6.2565 · Cited by 8
Logistics implications of electric car manufacturing
Klug, F. (2014) · International Journal of Services and Operations Management · doi:10.1504/ijsom.2014.059573 · Cited by 8
Lean manufacturing implantation impacts: a study on a large logistics operator
Jeunon, E. E., Júnior, F. D. O., Duarte, L. D. C., & Guimarães, E. H. R. (2020) · Revista Gestão & Tecnologia · doi:10.20397/2177-6652/2020.v20i3.1986 · Cited by 8
A metodologia de Lean Office aplicada em uma gerência de projetos
Souza, A. M. C. E., Gonçalves, I. C. M., Ribeiro, L., & Santos, R. A. D. (2023) · Revista de Gestão e Projetos · doi:10.5585/gep.v14i2.23494 · Cited by 8
Implementation of Standard Work in Healthcare Industry
Patkal, P. S., & Anasane, S. S. (2022) · International Conference on Industrial Engineering and Operations Management (IEOM) · doi:10.46254/in02.20220339 · Cited by 8
Major elements of just-in-time production
Demmy, W. S., & Constable, G. K. (2003) · IEEE International Engineering Management Conference (IEMC) · doi:10.1109/iemc.1988.34929 · Cited by 8
Gestaltungsprinzipien Ganzheitlicher Produktionssysteme
Dombrowski, U., & Mielke, T. (2015) · Springer eBooks · doi:10.1007/978-3-662-46164-8_2 · Cited by 8
KANBAN SHARING AND OPTIMIZATION IN BOSCH PRODUCTION SYSTEM
Salgado, P., & Varela, L. (2010) · International Conference on Knowledge Management and Information Sharing (KMIS) · doi:10.5220/0003102600810091 · Cited by 8
Reducing Errors in the Practices of Pathology and Laboratory Medicine
Novis, D. A., & Konstantakos, G. (2006) · Pathology Patterns Reviews · doi:10.1309/myjea036edqqeh4x · Cited by 8
Indoor localization system based on galvanometer-laser-scanning for numerous mobile tags (GaLocate)
Kokert, J., Höflinger, F., & Reindl, L. M. (2012) · International Conference on Indoor Positioning and Indoor Navigation · doi:10.1109/ipin.2012.6418945 · Cited by 8
Transcending the theory-practice problem of technology
Reich, Y., & Center., C. M. U. E. D. R. (1992) · KiltHub Repository · doi:10.1184/r1/6469493 · Cited by 8
Constraints to quick response systems in the implosive industries
Lehtonen, J., Holmström, J., & Slotte, J. (1999) · Supply Chain Management An International Journal · doi:10.1108/13598549910255095 · Cited by 8
Architectures of Control in Consumer Product DesignPreprint
Lockton, D. (2006) · SSRN Electronic Journal · doi:10.2139/ssrn.908493 · Cited by 8
Manajemen Strategik (Teori dan Analisis)Preprint
Sudarni, A. A. C., Faisol, F., Suhadarliyah, Irwansyah, R., Ibadurrahman, I., Supriadi, Y. N., Anwar, A., Yusuf, S. Y. M., Sijabat, F. N., Sushardi, et al. (2023) · Thesis Commons (OSF Preprints) · doi:10.31237/osf.io/4sxez · Cited by 8
Skinnarland, S. (2013) · NVA (Nasjonalt vitenarkiv) · Cited by 7
Li, D., & Zheng, L. (2025) · Engineering Management Journal · doi:10.1080/10429247.2025.2510224 · Cited by 7
Suggestion of Model Change Work Improvement by REBA and Therblig
Lee, S.-K., & Park, P. (2011) · Journal of the Ergonomics Society of Korea · doi:10.5143/jesk.2011.30.6.757 · Cited by 7
Using collective system design to define and communicate organization goals and related solutions
Cochran, D. S., Schmidt, G. B., Oxtoby, J., Hensley, M., & Barnes, J. (2017) · Journal of Enterprise Transformation · doi:10.1080/19488289.2017.1339746 · Cited by 7
LEAN PRODUCTION ASSESSMENT IN A SUGARCANE AGRIBUSINESS: A CASE STUDY IN BRAZIL
Satolo, E. G., Hiraga, L. E. D. M., Goes, G. A., & Lourenzani, W. L. (2016) · Independent Journal of Management & Production · doi:10.14807/ijmp.v7i3.471 · Cited by 7
Yuan, W., Li, Z., Han, J., Chu, H., Lu, S., Gu, S., & Shen, N. (2023) · BMC Medical Education · doi:10.1186/s12909-023-04118-2 · Cited by 7
JUST-IN-TIME MANUFACTURING AND PURCHASING PRACTICES AND BUSINESS PERFORMANCE: AN EXPLORATORY STUDY
Isa, C. R. (2008) · UiTM Institutional Repositories (Universiti Teknologi MARA) · Cited by 7
Lean Manufacturing Practices and Environmental Performance
Genç, R. (2021) · IntechOpen eBooks · doi:10.5772/intechopen.96973 · Cited by 7
Wikner, J., & Noroozi, S. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1220649 · Cited by 7
IMPROVING PUBLIC SERVICE DELIVERY IN TANZANIA THROUGH KAIZEN: A REVIEW OF EMPIRICAL EVIDENCE
Bwemelo, G. S. (2016) · Business Education Journal · doi:10.54156/cbe.bej.2.1.83 · Cited by 7
Lean Thinking Implementation in The Public Healthcare: Results From Italy
Chiarini, A. (2014) · Cited by 7
A hybrid push/pull design of kanban systems during production ramp-up phase
Klug, F. (2016) · International Journal of Services and Operations Management · doi:10.1504/ijsom.2016.076907 · Cited by 7
Sivaraman, A., & Varghese, K. (2016) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784479827.172 · Cited by 7
A Lean Approach to Improve Productivity in a Coke Oven Refurbishment Project: A Case Study
Etges, B. M. B. D. S., Pereira, B. D. M. C., & da Silveira, T. J. S. (2018) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2018/0254 · Cited by 7
Рєпіна, І. (2024) · Management · doi:10.30857/2415-3206.2023.1.4 · Cited by 7
The development process for innovative concepts in supply chain management
Göpfert, I., & Wellbrock, W. (2013) · International Journal of Logistics Systems and Management · doi:10.1504/ijlsm.2013.053765 · Cited by 7
Utilising buffer management to manage uncertainty and focus improvement
Stratton, R., Robey, D., & Allison, I. K. (2008) · Nottingham Trent University's Institutional Repository (Nottingham Trent Repository) · Cited by 7
Theory building: relating variation, uncertainty, buffering mechanisms and trade-offs
Stratton, R. (2008) · Nottingham Trent University's Institutional Repository (Nottingham Trent Repository) · Cited by 7
Metadata
- Authors
- Shingo, S., & Bodek, N.
- Venue
- Routledge eBooks
- Publisher
- Routledge
- Published
- 2019-05-20
- OpenAlex
- W2904659199
- Cited by
- 1,064
- References
- 0
- Citations by year
- 2026: 4 · 2025: 20 · 2024: 18 · 2023: 27 · 2022: 25 · 2021: 94 · 2020: 66 · 2019: 45
- FWCI
- 68.32
- Type
- book
- Language
- en
- Open access
- closed
- Locations
- Routledge eBooks (publishedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
- Social Sciences › Decision Sciences › Management Science and Operations Research › Operations Management Techniques
- Keywords
- Toyota Production System, just-in-time, industrial engineering, process improvement, inventory reduction, waste reduction, productivity, leveling, supplier relationships, manufacturing operations
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.