A Study of the Toyota Production System From an Industrial Engineering Viewpoint
The DOI matches its Crossref record.
Abstract
This is the "green book" that started it all -- the first book in English on JIT, written from the engineer's viewpoint. When Omark Industries bought 500 copies and studied it companywide, Omark became the American pioneer in JIT.Here is Dr. Shingo's classic industrial engineering rationale for the priority of process-based over operational improvements in manufacturing. He explains the basic mechanisms of the Toyota production system, examines production as a functional network of processes and operations, and then discusses the mechanism necessary to make JIT possible in any manufacturing plant. Provides original source material on Just-ln-Time Demonstrates new ways to think about profit, inventory, waste, and productivity Explains the principles of leveling, standard work procedures, multi-machine handling, supplier relations, and much more If you are a serious student of manufacturing, you will benefit greatly from reading this primary resource on the powerful fundamentals of JIT.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Seven types of Muda exist [2]: defects, overproduction, transport, waits, useless stocks, useless movement, and useless or expensive processes.”
From Poka Yoke Meets Deep Learning: A Proof of Concept for an Assembly Line Application (2022) · cites this paper as [2]
Citations
Cites
Still being checked.
Cited by
Items 701–800 of 1,000
Cochran, D. S., & Swinehart, K. D. (1991) · International Journal of Production Research · doi:10.1080/00207549108948020 · Cited by 4
A Framework for Total Productivity Management (TPMan) in a Resort Environment
Otto, E. R., Schutte, C., & Kennon, D. (2024) · Tourism and Hospitality · doi:10.3390/tourhosp5030049 · Cited by 3
The Industrial Relations Perspective on Lean Systems, Workers, and Unions
MacDuffie, J. P. (2021) · Cambridge University Press eBooks · doi:10.1017/9781108333870.005 · Cited by 3
Lean Production in Germany: A Contested Model
Krzywdzinski, M. (2021) · Cambridge University Press eBooks · doi:10.1017/9781108333870.022 · Cited by 3
Beyond lean manufacturing: the productivity, innovator's and proactivity dilemmas resolved
Shamshurin, A. (2012) · RMIT Research Repository (RMIT University Library) · doi:10.25439/rmt.27332613 · Cited by 3
Slack: What Is Lacking on Supply Chain Resilience Strategies?
Pereira, F. A., Fireman, M. C. T., & Etges, B. M. B. D. S. (2023) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2023/0181 · Cited by 3
Silvério, L., Trabasso, L. G., & Pessôa, M. V. P. (2020) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/859/1/012020 · Cited by 3
The Role of Just-In-Time Implementation in Relation to Performance: An Exploratory Study
Isa, C. R., & Keong, T. Y. (2008) · Asian Journal of Accounting Perspectives · doi:10.22452/ajap.vol1no1.1 · Cited by 3
Value Stream Mapping in an Automotive Industry
Pandhi, N., & Verma, S. (2012) · Cited by 3
Lean Manufacturing: Principles, Tools, and Practices
Roy, M. (2017) · Advances in logistics, operations, and management science book series · doi:10.4018/978-1-5225-2944-6.ch016 · Cited by 3
Manci, K. M., Gladwin, D. N., Villella, R. F., & Cavendish, M. M. (1988) · Cited by 3
Muniz, J., Neto, A. F., & Sá, H. S. (2011) · Journal of Operations and Supply Chain Management · doi:10.12660/joscmv4n2p99-109 · Cited by 3
The Role of Production Control in the Development of Burnout
Houben, G. J., & Nijhuis, F. J. N. (1996) · International Journal of Health Services · doi:10.2190/fgh3-eaxh-px0w-qxa1 · Cited by 3
A FRAMEWORK FOR ENHANCING THE RESPONSIVENESS TO DEFECTS VIA SPC AND WORKER EMPOWERMENT
Nada, O. A. (2019) · ERJ Engineering Research Journal · doi:10.21608/erjm.2019.66265 · Cited by 3
Case Study of Lean Manufacturing Application in a New Process Introduction into a Rail Company
Félix-Jácquez, R. H., Rentería, M. M. C., Celis, M. D. D., Negrete, A. A. L., Ramírez, D. T., & Martínez, C. L. D. (2021) · Springer eBooks · doi:10.1007/978-3-030-69314-5_18 · Cited by 3
Mishra, O. P., Kumar, V., & Garg, D. (2014) · International Journal of Procurement Management · doi:10.1504/ijpm.2014.063172 · Cited by 3
Sakai, H., & Li, J. (2020) · Universal Journal of Management · doi:10.13189/ujm.2020.080306 · Cited by 3
Лебедева, А. Е., & Каракозова, И. В. (2024) · Stroitel stvo nauka i obrazovanie [Construction Science and Education] · doi:10.22227/2305-5502.2024.2.178-194 · Cited by 3
Fernandes, L. L. A., Hastak, M., & Costa, D. B. (2024) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2024/0214 · Cited by 3
Minimizing the Cost of Lean Production Control Transition
Gahagan, S. M., & Herrmann, J. W. (2007) · Cited by 3
OPTIMISATION OF A PRODUCTION LINE USING SIMULATION AND LEAN TECHNIQUES
Ares, E., Peláez, G., Ferreira, L. P., Prieto, D. A., & Chao, A. (2012) · Cited by 3
Using ESSENCE ALPHAs in a CMMI level 5 software development organization
Morales-Trujillo, M. E., Oktaba, H., & Orozco, M. J. (2016) · Annals of Computer Science and Information Systems · doi:10.15439/2016f430 · Cited by 3
Shibiko, A. V. (2024) · Vestnik NSUEM · doi:10.34020/2073-6495-2023-4-190-203 · Cited by 3
Japanese Total Quality Control
Chiarini, A. (2012) · SpringerBriefs in business · doi:10.1007/978-88-470-2658-2_5 · Cited by 3
Hansen, P. B., Rocha, R. G. D., & Lemos, F. D. O. (2014) · Produto & Produção · doi:10.22456/1983-8026.32962 · Cited by 3
A LEAN PREBID PLANNING MODEL FOR CONSTRUCTION CONTRACTORS: A CASE STUDY IN VIETNAM
Tserng, H. P., Yin, S. Y.-L., & Ngo, T. L. (2013) · Journal of Marine Science and Technology · doi:10.6119/jmst-012-0709-1 · Cited by 3
A Four-Leaf Clover Shape Methodology for Prosumer Service Developments
Martín, D. R., Alcarria, R., Sánchez-Picot, Á., Robles, T., & de Rivera, D. S. (2014) · Lecture notes in computer science · doi:10.1007/978-3-319-13102-3_78 · Cited by 3
Dale, B. G., Papalexi, M., Bamford, D., & van der Wiele, A. (2016) · Wiley eBooks · doi:10.1002/9781119302735.ch2 · Cited by 3
Malikova, D. M. (2018) · Organizer of Production · doi:10.25065/1810-4894-2018-26-1-7-22 · Cited by 3
Design of a Continuous Improvement Model in a Portuguese Food Industry Company – A Case Study
Dias, A. S. M. D. E., Navas, H. V. G., & Abreu, A. J. P. D. C. F. (2020) · KnE Engineering · doi:10.18502/keg.v5i6.7034 · Cited by 3
Lean Construction Planning Subject to Variations in Detailed Features of Fabricated Bridge Girders
Shuvo, B. D., & Lü, M. (2020) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2020/0115 · Cited by 3
Lean, Green, and Agile Supply Chain Practices
Saeed, A., & Shoukat, R. (2022) · IGI Global eBooks · doi:10.4018/978-1-6684-6663-6.ch006 · Cited by 3
Gundlach, M. (2009) · TU repository (Lodz University of Technology) · Cited by 3
Mathematical Modeling of Production Operations and Processes for Product Design and Manufacturing
Tilindis, J., & Kleiza, V. (2014) · Applied Mechanics and Materials · doi:10.4028/www.scientific.net/amm.510.243 · Cited by 3
Working with JIT requires a Flexible Approach
Singh, S. K. (2013) · IOSR Journal of Mechanical and Civil Engineering · doi:10.9790/1684-0562428 · Cited by 3
Operations Strategy for Maintaining Competitiveness in a European Automotive Company
Koch, C., Bennett, D., & Markussen, T. (2015) · Chalmers Publication Library (Chalmers University of Technology) · doi:10.13140/rg.2.1.4874.5126 · Cited by 3
Marasin, R., Dean, J., & Dawood, N. N. (2007) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/40937(261)12 · Cited by 3
Paradigmatic Shifts in Automobile Manufacturing
Hiraoka, L. S. (1989) · Engineering Management Journal · doi:10.1080/10429247.1989.11414523 · Cited by 3
Tracking Regional Hrm Change: Researching the Toyota Effect
Winfield, I. (1993) · Human Resource Management Journal · doi:10.1111/j.1748-8583.1993.tb00333.x · Cited by 3
Team Network Evolution While Undergoing a Lean Transformation: A Missing Success Indicator?
Colazo, J. (2016) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2016.65 · Cited by 3
Stand und Entwicklungstendenzen der strategischen Planung
Hahn, D. (1997) · Physica-Verlag eBooks · doi:10.1007/978-3-662-41482-8_1 · Cited by 3
Dima, T., Vitzilaiou, M., & Glykas, M. (2022) · International scientific business conference LIMEN Leadership, innovation, manag. economics: Integrated politics of research · doi:10.31410/limen.2022.167 · Cited by 3
Lean enterprise in the construction industry
Marchini-Blanco, J. (2004) · DSpace@MIT (Massachusetts Institute of Technology) · Cited by 3
Mbithuka, L. M. (2014) · Cited by 3
De paradoxale gezondheidseffecten van arbeid : van gezondheidsbedreiging naar gezondheidsbevordering
Nijhuis (1995) · Research Publications (Maastricht University) · doi:10.26481/spe.19950428fn · Cited by 3
Thürer, M., Stevenson, M., & Protzman, C. W. (2016) · Springer eBooks · doi:10.1007/978-3-658-12508-0_1 · Cited by 3
Challenges to Lean Implementation from a True Lean Toyota Production System Perspective
Maginnis, M. A., Cooper, W. R., & Parsley, D. M. (2021) · Cambridge University Press eBooks · doi:10.1017/9781108333870.008 · Cited by 2
Overview on Existing Learning Factory Application Scenarios
Tisch, M., Abele, E., & Metternich, J. (2018) · Springer eBooks · doi:10.1007/978-3-319-92261-4_7 · Cited by 2
Lean Production from the View of Management Theory: Functional, Critical, and Paradox Approaches
Aoki, K. (2021) · Cambridge University Press eBooks · doi:10.1017/9781108333870.003 · Cited by 2
Rubin, R., & Ehsanifar, F. (2011) · Chalmers Publication Library (Chalmers University of Technology) · Cited by 2
How Does Flow Impact Data Center Roofing Durations? A Case Study
Apgar, B., Smith, J. P., & Copenhaver, D. (2022) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2022/0175 · Cited by 2
de Almeida, V. C., de Oliveira, M. E. C. P., Marinho, B. A., & dos Santos, I. M. (2021) · Editora Poisson eBooks · doi:10.36229/978-65-5866-016-3.cap.03 · Cited by 2
Gestão da Produção em Foco – Volume 45
Pedrosa, R. A. (2021) · Editora Poisson eBooks · doi:10.36229/978-65-5866-016-3 · Cited by 2
Práticas do lean warehouse em centros de distribuição: evidências de múltiplos estudos de caso
Pereira, C. M. (2018) · doi:10.47749/t/unicamp.2018.1060058 · Cited by 2
Design and Implementation of a Supplier Kanban System in the Automotive Sector: An Empirical Study
Pereira, T., Lyra, R., Moreira, M. Â. L., Oliveira, M., Fereira, F. A., & Silva, F. J. G. (2024) · Lecture notes in mechanical engineering · doi:10.1007/978-3-031-61582-5_1 · Cited by 2
Chin, Y. K., Marques, P. A., & Silva, A. (2026) · Information · doi:10.3390/info17040357 · Cited by 2
Azizi, M. B. E. (2014) · theses.fr (ABES) · doi:10.70675/5caca3abzb07dz4221zb529z80607a1c4d7a · Cited by 2
Krasko, A. S., Filin, M. A., & Bazarov, I. I. (2024) · Journal of Machinery Manufacture and Reliability · doi:10.1134/s1052618824700717 · Cited by 2
Mitchell, L. N. (2011) · Sunderland Repository (University of Sunderland) · Cited by 2
The application of form postponement in manufacturing
Skipworth, H. D. (2003) · OpenGrey (Institut de l'Information Scientifique et Technique) · Cited by 2
THE ROLE OF INVENTORY IN ENABLING SUPPLY CHAIN RESPONSIVENESS
Reichhart, A., Framiñán, J. M., & Holweg, M. (2006) · IFAC Proceedings Volumes · doi:10.3182/20060517-3-fr-2903.00169 · Cited by 2
Dhindsa, J. S. (2012) · Louisiana State University · doi:10.31390/gradschool_theses.536 · Cited by 2
Kusuma, A. D., & Winarsih, N. (2024) · Industrika Jurnal Ilmiah Teknik Industri · doi:10.37090/indstrk.v8i2.1275 · Cited by 2
Haris, S. P. R., Sofianti, T. D., & Pratama, A. T. (2025) · Jurnal Media Teknik dan Sistem Industri · doi:10.35194/jmtsi.v9i1.4346 · Cited by 2
Aspects of a knowledge-based tool for manufacturing systems design
Pegler, H. C., & Kochhar, A. K. (1988) · Computer Integrated Manufacturing Systems · doi:10.1016/0951-5240(88)90054-7 · Cited by 2
de Oliveira, K. B., dos Santos, E. F., & Veraldo, L. G. (2015) · Cited by 2
O KAIZEN CONSTRUINDO O CONCEITO DE KAIZEN EM DIFERENTES CONTEXTOS
de Souza, G. W. P., Santos, C. A. N., Viviane Jesus da Silva, A., & de Lima, O. P. (2025) · Amazon Business Research · doi:10.59666/abr.v0i3.3902 · Cited by 2
Modeling and Analyzing Performance of a Production Unit Using Dynamic Bayesian Networks
Tchangani, A. P., & Pérès, F. (2017) · Advances in intelligent systems and computing · doi:10.1007/978-3-319-64465-3_28 · Cited by 2
Krasko, A. S., Kovalev, A. A., Filin, M. A., Mukhin, K. S., & Baranova, N. S. (2023) · Journal of Machinery Manufacture and Reliability · doi:10.1134/s1052618823100060 · Cited by 2
Application of analytic hierarchy process in just-in-time manufacturing systems: a review
Sharma, S., & Agrawal, N. (2010) · International Journal of Data Analysis Techniques and Strategies · doi:10.1504/ijdats.2010.034057 · Cited by 2
Benchmark generation algorithm for stochastic mixed model assembly shop simulation and optimization
Cave, A., Nahavandi, S., & Creighton, D. (2006) · International Journal of Production Research · doi:10.1080/00207540500362286 · Cited by 2
Illustration of value creation in real estate business
Luoma, T., Junnila, S., & Forsman, L. (2011) · Annual European Real Estate Society Conference (ERES) · doi:10.15396/eres2011_250 · Cited by 2
The Human Supply Chain: Mapping and Modeling the Flow of Human Capital for Navy ‘Seabees’
Allen, D. G., Amini, A., Janz, B. D., Nichols, E. L., & Racer, M. J. (2013) · Journal of Supply Chain and Customer Relationship Management · doi:10.5171/2013.175961 · Cited by 2
Change Management from a Stakeholder Perspective
Isaksson, R., Hallencreutz, J., Turner, D., & Garvare, R. (2011) · Uppsala University Publications (Uppsala University) · Cited by 2
Implementation Strategy for a Flexibility Oriented Production System
Kempf, F. A. G., Aurich, J. C., & Drews, O. (2008) · Springer eBooks · doi:10.1007/978-1-84800-267-8_64 · Cited by 2
Muchfirodin, M., Yuliando, H., & Guritno, A. J. (2013) · Jurnal Agritech · doi:10.22146/agritech.9571 · Cited by 2
Just in Time, Six Sigma y Teoría de las Limitaciones:
Biglieri, J. (2003) · Partida doble · Cited by 2
Determination of the number of kanbans in JIT systems: A Petri-net approach
Wang, H. P., Zeng, L., & Jin, S. (1992) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/bf02602951 · Cited by 2
Application of Toyota production system for cycle time reduction of Eaton line: a case study
Barua, M. K., Chaporkar, P., Nagarajan, S., & Malairajan, R. A. (2010) · International Journal of Electronic Customer Relationship Management · doi:10.1504/ijecrm.2010.036187 · Cited by 2
The Manufacturing System Design Decomposition in the Automotive Electronics Industry
Oropeza, G., Tapia, C., & Cochran, D. S. (2001) · Cited by 2
The Ways of Building Information Modeling to Improve the Value Chain of Building Process
Wang, G., & Zhang, Y. (2009) · International Conference on Management and Service Science (MASS) · doi:10.1109/icmss.2009.5304453 · Cited by 2
Lessons Learned from the Comparison and Discussion
Chiarini, A. (2012) · SpringerBriefs in business · doi:10.1007/978-88-470-2658-2_12 · Cited by 2
Yamada, K., & Tracey, M. W. (2005) · SAE technical papers on CD-ROM/SAE technical paper series · doi:10.4271/2005-01-1798 · Cited by 2
А study on increasing the energy efficiency of buildings on rail transport
Parunakyan, V. (2018) · Modern Problems of Russian Transport Complex · doi:10.18503/2222-9396-2018-8-2-4-21 · Cited by 2
Mofokeng, V., & Sukdeo, N. (2019) · IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) · doi:10.1109/ieem44572.2019.8978805 · Cited by 2
La aplicación de Lean Manufacturing: casos de Polonia (modelos, práctica, experiencia)
Bednarek, M., & Villagra, J. M. S. (2017) · doi:10.32457/isbn97895684541592007-ed1 · Cited by 2
Research in the Field of Enterprise Management
Shakhriyor, M. (2021) · Baltic Journal of Real Estate Economics and Construction Management · doi:10.2478/bjreecm-2021-0005 · Cited by 2
Peixoto, A. C., Dinis‐Carvalho, J., Colim, A., Sousa, N., Rocha, L. A., & Oliveira, J. (2021) · Studies in systems, decision and control · doi:10.1007/978-3-030-89617-1_40 · Cited by 2
Use Participation to Share Information and Distribute Knowledge
Wagner, J. A. (2017) · Wiley eBooks · doi:10.1002/9781405164047.ch21 · Cited by 2
Grundlegende Steuerungsverfahren im heterogenen Logistiknetz mit Kanban
Dickmann, P., Zäh, M. F., Möller, N., Lödding, H., Rücker, T., Schneider, H. M., Dickmann, E., Hirsch, J., Schliederer, C., Wendlinger, C., et al. (2015) · Springer eBooks · doi:10.1007/978-3-662-44869-4_2 · Cited by 2
Productividad empresarial. Factores condicionantes
Bustos, C. (2022) · VISIÓN GERENCIAL · doi:10.53766/vigeren/2022.21.02.09 · Cited by 2
Models of Leveling for Lean Manufacturing Systems
Furmans, K., & Veit, M. (2013) · International series in management science/operations research/International series in operations research & management science · doi:10.1007/978-1-4614-6777-9_4 · Cited by 2
Total Quality Management — eine herausfordernde Chance
Kamiske, G. F., Malorny, C., Kirstein, H., Jürgens, U., & Steger, U. (1994) · Springer eBooks · doi:10.1007/978-3-642-93549-7_1 · Cited by 2
OMM: A Força dos Índices de Custo Aplicado ao Gerenciamento Baseado em Atividades - ABM
Lobo, Y. R. D. O., de Souza, A. C., & Lima, P. C. (2000) · Anais do Congresso Brasileiro de Custos - ABC · Cited by 2
Aoki, K., & Mouer, R. (2015) · Wiley eBooks · doi:10.1002/9781118989463.wbeccs154 · Cited by 2
Ferreira, N. F. F. (2012) · Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT) · Cited by 2
Barker, J., & Finnie, G. R. (2010) · Springer eBooks · doi:10.1007/978-3-642-04313-0_12 · Cited by 2
Strategic Perspectives for Implementation of FMS, Robotics and CIM
Brandon, J. A. (1992) · doi:10.1007/978-1-349-12433-6_31 · Cited by 2
Stand und Entwicklungstendenzen der strategischen Planung
Hahn, D. (1983) · Gabler Verlag eBooks · doi:10.1007/978-3-322-84362-3_2 · Cited by 2
Metadata
- Authors
- Shingo, S., & Bodek, N.
- Venue
- Routledge eBooks
- Publisher
- Routledge
- Published
- 2019-05-20
- OpenAlex
- W2904659199
- Cited by
- 1,064
- References
- 0
- Citations by year
- 2026: 4 · 2025: 20 · 2024: 18 · 2023: 27 · 2022: 25 · 2021: 94 · 2020: 66 · 2019: 45
- FWCI
- 68.32
- Type
- book
- Language
- en
- Open access
- closed
- Locations
- Routledge eBooks (publishedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
- Social Sciences › Decision Sciences › Management Science and Operations Research › Operations Management Techniques
- Keywords
- Toyota Production System, just-in-time, industrial engineering, process improvement, inventory reduction, waste reduction, productivity, leveling, supplier relationships, manufacturing operations
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.