A Study of the Toyota Production System From an Industrial Engineering Viewpoint
The DOI matches its Crossref record.
Abstract
This is the "green book" that started it all -- the first book in English on JIT, written from the engineer's viewpoint. When Omark Industries bought 500 copies and studied it companywide, Omark became the American pioneer in JIT.Here is Dr. Shingo's classic industrial engineering rationale for the priority of process-based over operational improvements in manufacturing. He explains the basic mechanisms of the Toyota production system, examines production as a functional network of processes and operations, and then discusses the mechanism necessary to make JIT possible in any manufacturing plant. Provides original source material on Just-ln-Time Demonstrates new ways to think about profit, inventory, waste, and productivity Explains the principles of leveling, standard work procedures, multi-machine handling, supplier relations, and much more If you are a serious student of manufacturing, you will benefit greatly from reading this primary resource on the powerful fundamentals of JIT.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Seven types of Muda exist [2]: defects, overproduction, transport, waits, useless stocks, useless movement, and useless or expensive processes.”
From Poka Yoke Meets Deep Learning: A Proof of Concept for an Assembly Line Application (2022) · cites this paper as [2]
Citations
Cites
Still being checked.
Cited by
Items 101–200 of 1,000
Shou, W., Wang, J., Wu, P., & Wang, X. (2019) · Production Planning & Control · doi:10.1080/09537287.2019.1629038 · Cited by 106
A decision framework for maximising lean manufacturing performance
Ramesh, V., & Kodali, R. (2011) · International Journal of Production Research · doi:10.1080/00207543.2011.564665 · Cited by 105
Extent of the use of Lean concepts proposed for a value stream mapping application
Serrano Lasa, I., Castro, R. D., & Laburu, C. O. (2009) · Production Planning & Control · doi:10.1080/09537280802685322 · Cited by 104
Continuous improvement in maintenance: a case study in the automotive industry involving Lean tools
Pinto, G., Silva, F. J. G., Campilho, R. D. S. G., Casais, R. C. B., Fernandes, A. J., & Baptista, A. (2019) · Procedia Manufacturing · doi:10.1016/j.promfg.2020.01.127 · Cited by 104
Internet of Things (IoT) driven kanban system for reverse logistics: solid waste collection
Thürer, M., Pan, Y., Qu, T., Luo, H., Li, C. D., & Huang, G. Q. (2016) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-016-1278-y · Cited by 102
Improving transparency in construction management: a visual planning and control model
Brady, D. A., Tzortzopoulos, P., Rooke, J. A., Formoso, C. T., & Tezel, A. (2018) · Engineering Construction & Architectural Management · doi:10.1108/ecam-07-2017-0122 · Cited by 102
Software process improvement through the Lean Measurement (SPI-LEAM) method
Petersen, K., & Wohlin, C. (2010) · Journal of Systems and Software · doi:10.1016/j.jss.2010.02.005 · Cited by 100
Positioning multiple decoupling points in a supply network
Sun, X., Ji, P., Sun, L., & Wang, Y. (2008) · International Journal of Production Economics · doi:10.1016/j.ijpe.2007.11.012 · Cited by 100
Lean Manufacturing Implementation through DMAIC Approach: A Case Study in the Automotive Industry
Rifqi, H., Zamma, A., Souda, S. B., & Hansali, M. (2021) · Quality Innovation Prosperity · doi:10.12776/qip.v25i2.1576 · Cited by 99
The impact of country culture on the adoption of new forms of work organization
Cagliano, R., Caniato, F. F. A., Golini, R., Longoni, A., & Micelotta, E. R. (2011) · International Journal of Operations & Production Management · doi:10.1108/01443571111111937 · Cited by 98
Towards TQM – integrating Japanese 5‐S principles with ISO 9001:2000 requirements
Pheng, L. S. (2001) · The TQM Journal · doi:10.1108/eum0000000005859 · Cited by 98
The functions of visual management
Tezel, B., Koskela, L., & Tzortzopoulos, P. (2009) · University of Huddersfield Repository (University of Huddersfield) · Cited by 108
Misiurek, K., & Misiurek, B. (2016) · Safety Science · doi:10.1016/j.ssci.2016.10.017 · Cited by 97
(2014) · Routledge eBooks · doi:10.4324/9781315772226 · Cited by 96
Accounting for the Growth of MNC-based Trade using a Structural Model of U.S. MNCs
Feinberg, S., & Keane, M. P. (2003) · SSRN Electronic Journal · doi:10.2139/ssrn.374103 · Cited by 95
A complex systems theory perspective of lean production
Saurin, T. A., Rooke, J., & Koskela, L. (2013) · International Journal of Production Research · doi:10.1080/00207543.2013.796420 · Cited by 94
Cheung, W. M., Leong, J. T., & Vichare, P. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.08.208 · Cited by 94
Whose Experience Do We Care About? Analysis of the Fitness of Scrum and Kanban to User Experience
Law, E. L., & Larusdottir, M. K. (2015) · International Journal of Human-Computer Interaction · doi:10.1080/10447318.2015.1065693 · Cited by 94
Development of a lean maturity model for operational level planning
Maasouman, M. A., & Demirli, K. (2015) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-015-7513-4 · Cited by 94
From Taylorism to post‐Taylorism: Simultaneously pursuing several management objectives
Peaucelle, J. (2000) · Journal of Organizational Change Management · doi:10.1108/09534810010377426 · Cited by 92
Dinis‐Carvalho, J., Moreira, F., Bragança, S., Costa, E., Alves, A. C., & Sousa, R. M. (2014) · Production Planning & Control · doi:10.1080/09537287.2014.891059 · Cited by 90
Rosso, C. B., & Saurin, T. A. (2018) · Applied Ergonomics · doi:10.1016/j.apergo.2018.04.004 · Cited by 89
Improving the NPD Process by Applying Lean Principles: A Case Study
Nepal, B. P., Yadav, O. P., & Solanki, R. (2011) · Engineering Management Journal · doi:10.1080/10429247.2011.11431886 · Cited by 89
How takt production contributes to construction production flow: a theoretical model
Lehtovaara, J., Seppänen, O., Peltokorpi, A., Kujansuu, P., & Grönvall, M. (2020) · Construction Management and Economics · doi:10.1080/01446193.2020.1824295 · Cited by 89
Relationship among organizational support, JIT implementation, and performance
Chong, H., White, R. E., & Prybutok, V. (2001) · Industrial Management & Data Systems · doi:10.1108/eum0000000005576 · Cited by 88
Thürer, M., Fernandes, N. O. G., & Stevenson, M. (2020) · International Journal of Production Research · doi:10.1080/00207543.2020.1849847 · Cited by 88
Industry 4.0 Enhanced Lean Manufacturing
Lai, N. Y. G., Wong, K. H., Halim, D., Lu, J., & Kang, H. S. (2019) · International Conference on Industrial Technology and Management (ICITM) · doi:10.1109/icitm.2019.8710669 · Cited by 86
Reinertsen, D. G., & Shaeffer, L. (2005) · Research-Technology Management · doi:10.1080/08956308.2005.11657325 · Cited by 85
Lean Production and the Toyota Production System Or, the Case of the Forgoften Production Concepts
Hampson, I. (1999) · Economic and Industrial Democracy · doi:10.1177/0143831x99203003 · Cited by 85
Development of a framework for lean manufacturing systems
Anand, G., & Kodali, R. (2009) · International Journal of Services and Operations Management · doi:10.1504/ijsom.2009.025121 · Cited by 84
Lean Construction Conformance among Construction Contractors in Turkey
Tezel, A., & Nielsen, Y. (2012) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000145 · Cited by 84
Implementation of a Lean Model for Carrying out Value Stream Mapping in a Manufacturing Industry
Ramesh, V., Prasad, K. V., & Srinivas, T. R. (2008) · Journal of industrial and systems engineering. · Cited by 83
Facilitating Lean Learning and Behaviors in Hospitals During the Early Stages of Lean Implementation
Mazur, L. M., McCreery, J. K., & Rothenberg, L. (2012) · Engineering Management Journal · doi:10.1080/10429247.2012.11431925 · Cited by 83
Visual Management in Brazilian Construction Companies: Taxonomy and Guidelines for Implementation
Tezel, A., Koskela, L., Tzortzopoulos, P., Formoso, C. T., & Alves, T. D. C. L. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000354 · Cited by 83
Just-In-Time supplier inventory: an empirical implementation model
Chapman, S. N. (1989) · International Journal of Production Research · doi:10.1080/00207548908942669 · Cited by 83
Iwao, S. (2017) · Evolutionary and Institutional Economics Review · doi:10.1007/s40844-017-0067-4 · Cited by 83
Jetley, S. K., & Catalano, J. (2002) · IEEE Electrical Insulation Conference (EIC) · doi:10.1109/eeic.1993.631202 · Cited by 82
Implementing Lean Practices: Managing the Transformation Risks
Pearce, A., & Pons, D. J. (2013) · Journal of Industrial Engineering · doi:10.1155/2013/790291 · Cited by 81
Restricted work-in-process: A study of differences between Kanban and CONWIP
Pettersen, J.-A., & Segerstedt, A. (2008) · International Journal of Production Economics · doi:10.1016/j.ijpe.2008.08.043 · Cited by 81
Oportunidades da aplicação do Lean Thinking na construção
Picchi, F. A. (2008) · LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas) · Cited by 81
Wortmann, J. C. (1998) · IFIP advances in information and communication technology · doi:10.1007/978-0-387-35321-0_2 · Cited by 80
van Driel, H., & Dolfsma, W. A. (2009) · Journal of Organizational Change Management · doi:10.1108/09534810910933906 · Cited by 80
A case study of VSM and SMED in the food processing industry
Maalouf, M. M., & Zaduminska, M. (2019) · Management and Production Engineering Review · doi:10.24425/mper.2019.129569 · Cited by 79
Waste identification diagram and value stream mapping: A comparative analysis
Dinis‐Carvalho, J., Guimarães, L. D. S., Sousa, R. M., & Leão, C. P. (2018) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-04-2017-0030 · Cited by 79
Introducing a customer order decoupling zone in logistics decision-making
Wikner, J., & Rudberg, M. (2005) · International Journal of Logistics Research and Applications · doi:10.1080/13675560500282595 · Cited by 78
Bateman, N., Hines, P., & Davidson, P. (2014) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-04-2013-0067 · Cited by 80
Demand chain management: an integrative approach in automotive retailing
Hines, P., Silvi, R., & Bartolini, M. (2002) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00036-0 · Cited by 76
Librelato, T. P., Lacerda, D. P., Rodrigues, L. H., & Veit, D. R. (2014) · Business Process Management Journal · doi:10.1108/bpmj-07-2013-0098 · Cited by 75
Evaluation and revision of performance measurement systems
Tangen, S. (2004) · KTH Publication Database DiVA (KTH Royal Institute of Technology) · Cited by 75
Klein, L. L., Vieira, K. M., Feltrin, T. S., Pissutti, M., & Ercolani, L. D. (2022) · SAGE Open · doi:10.1177/21582440221088837 · Cited by 75
Production strategies for pre-engineering in house-building: exploring product development platforms
Johnsson, H. (2013) · Construction Management and Economics · doi:10.1080/01446193.2013.828846 · Cited by 75
Improvement of Production Line in the Automotive Industry Through Lean Philosophy
Azevedo, J., Sá, J. C., Ferreira, L. P., Santos, G., Cruz, F. M., Jiménez-Delgado, G. I., & Silva, F. J. G. (2019) · Procedia Manufacturing · doi:10.1016/j.promfg.2019.10.029 · Cited by 75
Khanzode, A. G., Sarma, P. R. S., & Goswami, M. (2021) · Production Planning & Control · doi:10.1080/09537287.2021.1980908 · Cited by 74
Klein, L. L., Alves, A. C., Abreu, M. F., & Feltrin, T. S. (2022) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2022.130868 · Cited by 77
AN APPLICATION OF THE LEAN PRODUCTION TOOL STANDARD WORK
Bragança, S., & Costa, E. (2015) · Jurnal Teknologi · doi:10.11113/jt.v76.3659 · Cited by 74
On the development of a method for cognitive load assessment in manufacturing
Thorvald, P., Lindblom, J., & Andreasson, R. (2019) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2019.04.012 · Cited by 74
Yamamoto, K., Milstead, M., & LIoyd, R. (2019) · International management review · Cited by 72
Ocampo, L. A. (2018) · Environment Development and Sustainability · doi:10.1007/s10668-018-0129-8 · Cited by 72
On the meaning of ‘Waste’: review and definition
Thürer, M., Tomašević, I., & Stevenson, M. (2017) · Production Planning & Control · doi:10.1080/09537287.2016.1264640 · Cited by 71
Lean Management and Hospital Performance: Adoption vs. Implementation
Shortell, S. M., Blodgett, J. C., Rundall, T. G., Henke, R. M., & Reponen, E. (2021) · The Joint Commission Journal on Quality and Patient Safety · doi:10.1016/j.jcjq.2021.01.010 · Cited by 71
James, R., & Jones, R. (2013) · The International Journal of Human Resource Management · doi:10.1080/09585192.2013.862290 · Cited by 71
Visual management in construction: Study report on Brazilian cases
Tezel, A., Koskela, L., & Tzortzopoulos, P. (2010) · University of Salford Institutional Repository (University of Salford) · Cited by 71
Lean production: mistakes and limitations of accounting systems inside the SME sector
Chiarini, A. (2012) · Journal of Manufacturing Technology Management · doi:10.1108/17410381211234462 · Cited by 70
Production Management Techniques: Push‐Pull Classification and Application Conditions
Toni, A. F. D., Caputo, M., & Vinelli, A. (1988) · International Journal of Operations & Production Management · doi:10.1108/eb054818 · Cited by 70
Cochran, D. S., Foley, J. T., & Bi, Z. (2016) · International Journal of Production Research · doi:10.1080/00207543.2016.1218088 · Cited by 69
L’adoption des pratiques de gestion lean
Beauvallet, G., & Houy, T. (2009) · Revue française de gestion · doi:10.3166/rfg.197.83-106 · Cited by 69
5 “S” and TQM status in Indian organizations
Khanna, V. K. (2009) · The TQM Journal · doi:10.1108/17542730910983407 · Cited by 69
JIT, system integration and customer service
White, R. E., & Pearson, J. N. (2001) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/eum0000000005515 · Cited by 69
Chia, R., & Holt, R. (2008) · Management Learning · doi:10.1177/1350507607087579 · Cited by 67
Implementing lean office: A successful case in public sector
Monteiro, M., Pacheco, C., Dinis‐Carvalho, J., & Paiva, F. (2015) · FME Transaction · doi:10.5937/fmet1504303m · Cited by 67
State of art perspectives of lean and sustainable manufacturing
Ruben, R. B., Vinodh, S., & Asokan, P. (2018) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-11-2016-0070 · Cited by 65
A measure of federalism: assessing manufacturing technology centers
Sabel, C. F. (1996) · Research Policy · doi:10.1016/0048-7333(95)00851-9 · Cited by 65
Development of a methodology to assist manufacturing SMEs in the selection of appropriate lean tools
Alaskari, O., Ahmad, M. M., & Pinedo-Cuenca, R. (2016) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-02-2015-0005 · Cited by 64
Business Process Quality Management
Reijers, H. A., Mendling, J., & Recker, J. (2014) · Springer eBooks · doi:10.1007/978-3-642-45100-3_8 · Cited by 69
The Impact of Just-In-Time Implementation and ISO 9000 Certification on Total Quality Management
Dreyfus, P., Ahire, S. L., & Ebrahimpour, M. (2004) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2004.826024 · Cited by 64
Concerning Workload Control and Order Release: The Pre‐Shop Pool Sequencing Decision
Thürer, M., Land, M., Stevenson, M., Fredendall, L. D., & Filho, M. G. (2015) · Production and Operations Management · doi:10.1111/poms.12304 · Cited by 64
Maintenance – identification and analysis of the competency gap
Antosz, K. (2018) · Eksploatacja i Niezawodnosc - Maintenance and Reliability · doi:10.17531/ein.2018.3.19 · Cited by 63
House of lean for food processing SMEs
Dora, M. K., & Gellynck, X. (2015) · Trends in Food Science & Technology · doi:10.1016/j.tifs.2015.03.008 · Cited by 63
Wacker, J. G. (1996) · Decision Sciences · doi:10.1111/j.1540-5915.1996.tb00861.x · Cited by 63
Vázquez, X. H. (2004) · Organization Science · doi:10.1287/orsc.1040.0082 · Cited by 63
A Review of Problem Solving Capabilities in Lean Process Management
Puvanasvar, A. P., Megat, M. H. M. A., Tang, S. H., Muhamad, M. R., & Hamouda, A. M. S. (2008) · American Journal of Applied Sciences · doi:10.3844/ajassp.2008.504.511 · Cited by 63
A unified modeling of Kanban systems using petri nets
Mascolo, M. D., Frein, Y., Dallery, Y., & David, R. (1991) · International Journal of Flexible Manufacturing Systems · doi:10.1007/bf00170210 · Cited by 62
A VSM improvement-based approach for lean operations in an Indian manufacturing SME
Saboo, A., Garza‐Reyes, J. A., Er, A., & Kumar, V. (2014) · International Journal of Lean Enterprise Research · doi:10.1504/ijler.2014.062281 · Cited by 61
Olesen, P., Powell, D. J., Hvolby, H., & Fraser, K. (2015) · Journal of Facilities Management · doi:10.1108/jfm-09-2014-0030 · Cited by 61
Determining the number of kanbans: a step toward non-stock-production
Wang, H., & Wang, H. (1990) · International Journal of Production Research · doi:10.1080/00207549008942856 · Cited by 61
Implementation of lean production systems in small and medium-sized pharmaceutical enterprises
Sieckmann, F., Ngoc, H. N., Helm, R., & Kohl, H. (2018) · Procedia Manufacturing · doi:10.1016/j.promfg.2018.02.188 · Cited by 60
Advancing lean management: The missing quantitative approach
Pearce, A., & Pons, D. J. (2019) · Operations Research Perspectives · doi:10.1016/j.orp.2019.100114 · Cited by 59
Extending value stream mapping through waste definition beyond customer perspective
Khurum, M., Petersen, K., & Gorschek, T. (2014) · Journal of Software Evolution and Process · doi:10.1002/smr.1647 · Cited by 59
Lean Engineering for Global Development
Alves, A. C., Flumerfelt, S., & Siriban‐Manalang, A. B. (2019) · Springer eBooks · doi:10.1007/978-3-030-13515-7 · Cited by 59
Two New Dimensions in the Cost of Quality
Modarress, B., & Ansari, A. M. (1987) · International Journal of Quality & Reliability Management · doi:10.1108/eb002886 · Cited by 59
JIT Manufacturing: Industry Analysis and a Methodology for Implementation
Sohal, A. S., Ramsay, L., & Samson, D. A. (1993) · International Journal of Operations & Production Management · doi:10.1108/eum0000000001313 · Cited by 59
Benchmarking the Lean Enterprise: Organizational Learning at Work
Knuf, J. (2000) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2000)16:4(58 · Cited by 60
Knowledge‐based integrated production management model
Muniz, J., Batista, E. D., & Loureiro, G. (2010) · Journal of Knowledge Management · doi:10.1108/13673271011084907 · Cited by 57
Lean Construction: From Theory to Practice
Conte, A. (2002) · Cited by 57
Chapter 12 The just-in-time system
Groenevelt, H. (1993) · Handbooks in operations research and management science · doi:10.1016/s0927-0507(05)80192-6 · Cited by 56
Music as a framework to better understand Lean leadership
Emiliani, M. L., & Emiliani, M. L. (2013) · Leadership & Organization Development Journal · doi:10.1108/lodj-11-0088 · Cited by 56
Postponement: an inter-organizational perspective
Yang, B., Yang, Y., & Wijngaard, J. (2006) · International Journal of Production Research · doi:10.1080/00207540600698886 · Cited by 56
Team performance management: enhancement through Japanese 5‐S principles
Sui‐PPheng, L., & Khoo, S. D. (2001) · Team Performance Management · doi:10.1108/13527590110411000 · Cited by 56
Principles From Toyota’s Set-Based Concurrent Engineering Process
Sobek, D. K., & Ward, A. C. (1996) · doi:10.1115/96-detc/dtm-1510 · Cited by 56
An Exploratory Study on Issues and Challenges of Agile Software Development with Scrum
Cho, J. J. (2010) · Digital Commons - USU (Utah State University) · doi:10.26076/4055-b875 · Cited by 55
Metadata
- Authors
- Shingo, S., & Bodek, N.
- Venue
- Routledge eBooks
- Publisher
- Routledge
- Published
- 2019-05-20
- OpenAlex
- W2904659199
- Cited by
- 1,064
- References
- 0
- Citations by year
- 2026: 4 · 2025: 20 · 2024: 18 · 2023: 27 · 2022: 25 · 2021: 94 · 2020: 66 · 2019: 45
- FWCI
- 68.32
- Type
- book
- Language
- en
- Open access
- closed
- Locations
- Routledge eBooks (publishedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
- Social Sciences › Decision Sciences › Management Science and Operations Research › Operations Management Techniques
- Keywords
- Toyota Production System, just-in-time, industrial engineering, process improvement, inventory reduction, waste reduction, productivity, leveling, supplier relationships, manufacturing operations
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.