Exploring software development at the very large-scale: a revelatory case study and research agenda for agile method adaptation
Open accessThe DOI matches its Crossref record; 54 of the 54 references it cites were found in a registry or an index.
Abstract
Agile development methods were believed to best suit small, co-located teams, but the success in small teams has inspired use in large and very large-scale software development. However, fundamental assumptions of agile development are challenged when applying the methods at a very large scale. An interpretative revelatory case study on one of the largest software development programmes in Norway shows how agile methods were adapted and complemented with practices from traditional methods to handle the scale. The programme ran over four years with 12 co-located development teams and a total of 175 people involved. The case study was conducted retrospectively using group interviews with 24 participants and documents. Findings on key challenging areas are reported: customer involvement, software architecture, and inter-team coordination. The revelatory study also suggests refinements of a research agenda for very large-scale agile development.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Communities of Practice: Learning, Meaning, and Identity
Wenger, E. (1998) · doi:10.1017/cbo9780511803932 · Cited by 23,500 · cited 1×
“Paasivaara and Lassenius (2014) describe a very large-scale development initiative at Ericsson with 40 teams where four types of communities of practice (Wenger 1998) are used to coordinate teams.”
BackgroundThe Coding Manual for Qualitative Researchers
Saldana, J. (2025) · SAGE Publications Ltd eBooks · doi:10.4135/9781036235611 · Cited by 17,944
A Set of Principles for Conducting and Evaluating Interpretive Field Studies in Information Systems1
Klein, H. K., & Myers, M. D. (1999) · MIS Quarterly · doi:10.2307/249410 · Cited by 5,263 · cited 2×
“We have chosen an interpretative embedded revelatory case study (Klein and Myers 1999; Runeson and Höst 2009; Yin 2014) to investigate the research question of how agile methods can be adapted in the very large scale .”
MethodGuidelines for conducting and reporting case study research in software engineering
Runeson, P., & Höst, M. (2009) · Empirical Software Engineering · doi:10.1007/s10664-008-9102-8 · Cited by 3,862 · cited 2×
“We have chosen an interpretative embedded revelatory case study (Klein and Myers 1999; Runeson and Höst 2009; Yin 2014) to investigate the research question of how agile methods can be adapted in the very large scale .”
MethodThe interdisciplinary study of coordination
Malone, T. W., & Crowston, K. (1994) · ACM Computing Surveys · doi:10.1145/174666.174668 · Cited by 3,504 · cited 1×
“Coordination can be defined as B the managing of dependencies ^ (Malone and Crowston 1994), where dependencies can be related to tasks, knowledge, resources, or technology.”
BackgroundEmpirical studies of agile software development: A systematic review
Dybå, T., & Dingsøyr, T. (2008) · Information and Software Technology · doi:10.1016/j.infsof.2008.01.006 · Cited by 2,668 · cited 1×
“Agile methods have been criticized for lack of focus on architecture, the little scientific support for claims in the agile community, and for being applicable only to small teams (Dybå and Dingsøyr 2008).”
MethodSelf-citationThe qualitative interview in IS research: Examining the craft
Myers, M. D., & Newman, M. (2007) · Information and Organization · doi:10.1016/j.infoandorg.2006.11.001 · Cited by 1,941 · cited 5×
“…each topic was that we knew from introductory meetings that there would be slightly different approaches in the three development subprojects, and having meetings in each organization might have led to more openness (and trust as discussed by Myers and Newman (2007)) than in joint group meetings.”
BackgroundMethodInfluentialWhat you Should Know about Megaprojects and Why: An Overview
Flyvbjerg, B. (2014) · Project Management Journal · doi:10.1002/pmj.21409 · Cited by 1,582 · cited 2×
“Such Bmegaprojects^ typically use traditional project management methods and are often associated with large cost overruns and delays as the considerable complexities are difficult to manage effectively (Flyvbjerg 2014; Giezen 2012).”
BackgroundBalancing Agility and Discipline: A Guide for the Perplexed
Boehm, B. (2004) · Lecture Notes in Computer Science · doi:10.1007/978-3-540-24675-6_1 · Cited by 1,173
A decade of agile methodologies: Towards explaining agile software development
Dingsøyr, T., Nerur, S., Balijepally, V., & Moe, N. B. (2012) · Journal of Systems and Software · doi:10.1016/j.jss.2012.02.033 · Cited by 1,113 · cited 1×
“Since the formulation of the agile manifesto in 2001, agile methods have transformed software development practice by strongly emphasizing change tolerance, evolutionary delivery, and active end-user involvement (Dingsøyr et al. 2012).”
MethodSelf-citationChallenges of migrating to agile methodologies
Nerur, S., Mahapatra, R., & Mangalaraj, G. (2005) · Communications of the ACM · doi:10.1145/1060710.1060712 · Cited by 1,018 · cited 2×
“Nerur et al. (2005) described the fundamental assumption behind traditional methods to be that information systems are fully specifiable and built through meticulous and extensive planning.”
BackgroundGet ready for agile methods, with care
Boehm, B. (2002) · Computer · doi:10.1109/2.976920 · Cited by 902 · cited 2×
“Boehm argued that projects need to find a B sweet spot ^ between traditional and agile development based on the level of risk that the project is willing to take (Boehm 2002; Boehm and Turner 2003).”
BackgroundConboy, K. (2009) · Information Systems Research · doi:10.1287/isre.1090.0236 · Cited by 823 · cited 1×
“Learning and adaptation should be embraced (Conboy 2009).”
BackgroundContinuous software engineering: A roadmap and agenda
Fitzgerald, B., & Stol, K.-J. (2017) · Journal of Systems and Software · doi:10.1016/j.jss.2015.06.063 · Cited by 723 · cited 3×
“Such continuous planning ensures alignment between the needs of the business and software development (Fitzgerald and Stol 2017).”
BackgroundMethodAgile software development: it's about feedback and change
Williams, L., & Cockburn, A. (2003) · Computer · doi:10.1109/mc.2003.1204373 · Cited by 428
Customising agile methods to software practices at Intel Shannon
Fitzgerald, B., Hartnett, G., & Conboy, K. (2006) · European Journal of Information Systems · doi:10.1057/palgrave.ejis.3000605 · Cited by 403 · cited 1×
“Previous research on the use of development methods suggests that methods need to be adapted to the work context (Fitzgerald et al. 2006).”
MethodAgile requirements engineering practices and challenges: an empirical study
Ramesh, B., Cao, L., & Baskerville, R. (2010) · Information Systems Journal · doi:10.1111/j.1365-2575.2007.00259.x · Cited by 384
Theoretical reflections on agile development methodologies
Nerur, S., & Balijepally, V. (2007) · Communications of the ACM · doi:10.1145/1226736.1226739 · Cited by 349 · cited 2×
“Agile methods are people-centric and recognize the value that competent people and their relationships bring to software development (Nerur and Balijepally 2007).”
MethodThe psychology of self-management in organizations.
Hackman, J. R. (2004) · Psychology and work: Productivity, change, and employment. · doi:10.1037/10055-003 · Cited by 321
Agile portfolio management: An empirical perspective on the practice in use
Stettina, C. J., & Hörz, J. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.03.008 · Cited by 313 · cited 1×
“However, the iterative nature of agile methods introduces new challenges in portfolio management that necessitate different patterns of action (Nerur and Balijepally 2007; Stettina and Horz 2015).”
Toward a Theory of Coordinating: Creating Coordinating Mechanisms in Practice
Jarzabkowski, P. A., Lê, J. K., & Feldman, M. S. (2012) · Organization Science · doi:10.1287/orsc.1110.0693 · Cited by 311
Project portfolio management – There’s more to it than what management enacts
Blichfeldt, B. S., & Eskerod, P. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.06.004 · Cited by 303 · cited 1×
“For companies engaged in development programmes, effective portfolio management is critical for managing the exponential growth of interdependencies and mitigating associated risks (Blichfeldt and Eskerod 2008).”
BackgroundCan Agile and Traditional Systems Development Approaches Coexist? An Ambidextrous View
Vinekar, V., Slinkman, C. W., & Nerur, S. (2006) · Information Systems Management · doi:10.1201/1078.10580530/46108.23.3.20060601/93705.4 · Cited by 251 · cited 6×
“Adapting the method to the context will involve balance in a number of areas (Vinekar et al. 2006), as illustrated in Table 1.”
BackgroundMethodInfluentialOvercoming Barriers to Self-Management in Software Teams
Moe, N. B., Dingsøyr, T., & Dybå, T. (2009) · IEEE Software · doi:10.1109/ms.2009.182 · Cited by 215 · cited 2×
“Moe et al. (2009) describe challenges to self-management at the team level and highlight challenges at the organizational level, such as shared resources, organizational control, and specialist culture.”
BackgroundSelf-citationOverview and Guidance on Agile Development in Large Organizations
Barlow, J. B., Giboney, J. S., Keith, M. J., Wilson, D. W., Schuetzler, R. M., Lowry, P. B., & Vance, A. (2011) · Communications of the Association for Information Systems · doi:10.17705/1cais.02902 · Cited by 207
The challenges that challenge: Engaging with agile practitioners’ concerns
Gregory, P., Barroca, L., Sharp, H., Deshpande, A., & Taylor, K. (2016) · Information and Software Technology · doi:10.1016/j.infsof.2016.04.006 · Cited by 205 · cited 1×
“(Gregory et al. 2016).”
Paasivaara, M., & Lassenius, C. (2014) · Information and Software Technology · doi:10.1016/j.infsof.2014.06.008 · Cited by 199
Changing the paradigm of software engineering
Rajlich, V. (2006) · Communications of the ACM · doi:10.1145/1145287.1145289 · Cited by 191 · cited 1×
“Rajlich (2006) describes agile development as a paradigm shift in software engineering that B brings a host of new topics into the forefront of software engineering research ^ .”
BackgroundGiezen, M. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.01.010 · Cited by 188 · cited 2×
“Such Bmegaprojects^ typically use traditional project management methods and are often associated with large cost overruns and delays as the considerable complexities are difficult to manage effectively (Flyvbjerg 2014; Giezen 2012).”
BackgroundCoordination in co-located agile software development projects
Strode, D. E., Huff, S. L., Hope, B., & Link, S. (2012) · Journal of Systems and Software · doi:10.1016/j.jss.2012.02.017 · Cited by 183 · cited 1×
“Strode et al. (2012) explain coordination at the team level in agile teams and propose a model for coordination strategy and coordination effectiveness.”
BackgroundPetersen, K., & Wohlin, C. (2010) · Empirical Software Engineering · doi:10.1007/s10664-010-9136-6 · Cited by 182
Agile requirements prioritization in large-scale outsourced system projects: An empirical study
Daneva, M., van der Veen, E., Amrit, C., Ghaisas, S., Sikkel, K., Kumar, R., Ajmeri, N., Ramteerthkar, U., & Wieringa, R. (2013) · Journal of Systems and Software · doi:10.1016/j.jss.2012.12.046 · Cited by 177 · cited 1×
“A study on large-scale and distributed projects found that understanding requirement dependencies is of paramount importance in such projects (Daneva et al. 2013).”
BackgroundSoftware teams and their knowledge networks in large-scale software development
Šmite, D., Moe, N. B., Šāblis, A., & Wohlin, C. (2017) · Information and Software Technology · doi:10.1016/j.infsof.2017.01.003 · Cited by 176 · cited 1×
“Also, while the teams need to self-manage, team members need to have an effective knowledge network and collaborate closely with experts outside the team in large-scale agile environments (Moe et al. 2014; Šmite et al. 2017).”
BackgroundSelf-citationAgility and Architecture: Can They Coexist?
Abrahamsson, P., Babar, M. A., & Kruchten, P. (2010) · IEEE Software · doi:10.1109/ms.2010.36 · Cited by 174 · cited 1×
“How and when to make architectural decisions have been the subject of major debate in the software engineering field (Abrahamsson et al. 2010).”
BackgroundInter-team coordination in large-scale globally distributed scrum: do scrum-of-scrums really work?
Paasivaara, M., Lassenius, C., & Heikkilä, V. T. (2012) · Proceedings of the ... ACM-IEEE International Symposium on Empirical Software Engineering and Measurement/International Symposium on Empirical Software Engineering and Measurement · doi:10.1145/2372251.2372294 · Cited by 157
How product owner teams scale agile methods to large distributed enterprises
Bass, J. M. (2014) · Empirical Software Engineering · doi:10.1007/s10664-014-9322-z · Cited by 154 · cited 2×
“Many refer to this as Benterprise agile^ (Bass 2015; Fitzgerald and Stol 2017).”
BackgroundDingsøyr, T., & Moe, N. B. (2014) · Lecture notes in business information processing · doi:10.1007/978-3-319-14358-3_1 · Cited by 152 · cited 3×
“…on Agile Software Development (XP) has worked to define a research agenda where topics with high priority include B organization of large development efforts ^ , B variability factors in scaling ^ , B inter-team coordination ^ , and B release planning and architecture ^ Dingsøyr and Moe 2014).”
BackgroundMethodInfluentialSelf-citationBatra, D., Xia, W., VanderMeer, D. E., & Dutta, K. (2010) · Communications of the Association for Information Systems · doi:10.17705/1cais.02721 · Cited by 136 · cited 3×
“One of the very few studies on large projects combining traditional and agile methods examined a project to develop a web-based customer booking engine for an American cruise company (Batra et al. 2010).”
BackgroundProblematizing agile in the large: alternative assumptions for large-scale agile development
Rolland, K. H., Fitzgerald, B. F., Dingsøyr, T., & Stol, K.-J. (2016) · Arrow@dit (Dublin Institute of Technology) · doi:10.34961/571 · Cited by 97
Self-citationTowards a governance framework for chains of Scrum teams
Vlietland, J., & van der Vliet, H. J. (2014) · Information and Software Technology · doi:10.1016/j.infsof.2014.08.008 · Cited by 95 · cited 2×
“A model organizing development as chains of Scrum teams (the output of one team is the input of the next) is described in a study of three cases of organizations with 150, 34, and 5 Scrum teams (Vlietland and van Vliet 2015).”
BackgroundMethodBjarnason, E., Wnuk, K., & Regnell, B. (2012) · Information and Software Technology · doi:10.1016/j.infsof.2012.04.006 · Cited by 90
Lagerberg, L., Skude, T., Emanuelsson, P., Sandahl, K., & Ståhl, D. (2013) · Proceedings of the ... ACM-IEEE International Symposium on Empirical Software Engineering and Measurement/International Symposium on Empirical Software Engineering and Measurement · doi:10.1109/esem.2013.53 · Cited by 87 · cited 1×
“Another study from Ericsson finds that agile principles in large scale contributed to knowledge-sharing, and led to increased project visibility and effectiveness in coordination (Lagerberg et al. 2013).”
BackgroundA general theory of software engineering: Balancing human, social and organizational capitals
Wohlin, C., Šmite, D., & Moe, N. B. (2015) · Journal of Systems and Software · doi:10.1016/j.jss.2015.08.009 · Cited by 83
Self-citationCoordination in Large-Scale Agile Software Development: A Multiteam Systems Perspective
Scheerer, A., Hildenbrand, T., & Kude, T. (2014) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2014.587 · Cited by 83
What is large in large-scale? A taxonomy of scale for agile software development
Dingsøyr, T., Fægri, T. E., & Itkonen, J. (2014) · NORA - Norwegian Open Research Archives · Cited by 75
Self-citationCoordination in large-scale software teams
Begel, A., Nagappan, N., Poile, C., & Layman, L. M. (2009) · International Workshop on Cooperative and Human Aspects of Software Engineering (CHASE) · doi:10.1109/chase.2009.5071401 · Cited by 71 · cited 1×
“A survey on coordination in large-scale software teams found that respondents wished more effective and efficient communication, as well as the importance of good personal relationships for coordination (Begel et al. 2009).”
BackgroundSmolander, K. (2003) · International Symposium on Empirical Software Engineering · doi:10.1109/isese.2002.1166942 · Cited by 67 · cited 1×
“Smolander (2002) suggested that the four metaphors blueprints, literature, language, and decisions capture the meaning of software architecture for different actors involved in software development.”
BackgroundAutonomous work groups and the challenge of inter-group coordination
Ingvaldsen, J. A., & Rolfsen, M. (2012) · Human Relations · doi:10.1177/0018726712448203 · Cited by 66 · cited 3×
“Self-management is a central principle in agile methods, but studies from fields other than software development indicate that self-management can reduce the ability to coordinate across teams effectively (Ingvaldsen and Rolfsen 2012).”
BackgroundInfluentialAgile in Distress: Architecture to the Rescue
Nord, R. L., Özkaya, İ., & Kruchten, P. B. (2014) · Lecture notes in business information processing · doi:10.1007/978-3-319-14358-3_5 · Cited by 65 · cited 1×
“…(Rolland et al. 2016), which have B more than two teams ^ and very large-scale as " agile development efforts with more than ten teams" (Dingsøyr et al. 2014) , These definitions exclude agile methods applied in large organizations (Barlow et al. 2011) from B large-scale agile ^ ,…”
BackgroundSoftware architecture awareness in long-term software product evolution
Unphon, H., & Dittrich, Y. (2010) · Journal of Systems and Software · doi:10.1016/j.jss.2010.06.043 · Cited by 54 · cited 1×
“In a study on software product companies, Unphon and Dittrich (2010) found that architectural knowledge was transferred by face-to-face communication with chief architects taking the role of a B walking architecture ^ .”
BackgroundArchitects as Service Providers
Faber, R. (2010) · IEEE Software · doi:10.1109/ms.2010.37 · Cited by 38 · cited 1×
“The assumption is that the value of good architectural decisions will surface at a later point in time in forms such as more easily maintainable code and scalability (Faber 2010).”
BackgroundArchitecture in Large Scale Agile Development
Eckstein, J. (2014) · Lecture notes in business information processing · doi:10.1007/978-3-319-14358-3_3 · Cited by 21 · cited 1×
“Having an emerging architecture (Eckstein 2014) could hamper project progress when many teams are working in parallel.”
BackgroundAgile Requirements Can We Have Our Cake and Eat It Too?
Maiden, N., & Jones, S. (2010) · IEEE Software · doi:10.1109/ms.2010.67 · Cited by 19 · cited 1×
“A key pillar in any agile method is the close and continual collaboration between clients and developers (Maiden and Jones 2010).”
MethodExploring Coordination in Large-Scale Agile Software Development: A Multiteam Systems Perspective
Scheerer, A., & Kude, T. (2014) · MADOC (University of Mannheim) · Cited by 10
Cited by
Scaling agile in large organizations: Practices, challenges, and success factors
Kalenda, M., Hyna, P., & Rossi, B. (2018) · Journal of Software: Evolution and Process · doi:10.1002/smr.1954 · Cited by 186
How affordances of chatbots cross the chasm between social and traditional enterprise systems
Stoeckli, E., Dremel, C., Uebernickel, F., & Brenner, W. (2020) · Electronic Markets · doi:10.1007/s12525-019-00359-6 · Cited by 55
Metadata
- Authors
- Dingsøyr, T., Moe, N. B., Fægri, T. E., & Seim, E. A.
- Venue
- Empirical Software Engineering
- Published
- 2017-06-02
- Volume
- 23
- Issue
- 1
- Pages
- 490-520
- ISSN
- 1382-3256 (ISSN-L)
- 1573-7616
- OpenAlex
- W2620722923
- Cited by
- 230
- References
- 54
- FWCI
- 42.28
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.