The DOI matches its Crossref record; 124 of the 124 references it cites were found in a registry or an index.
Building information modelling for off-site construction: Review and future directions
Abstract
Abstract Building Information Modelling (BIM) and off-site construction (OSC) are increasingly applied in the architecture, engineering and construction (AEC) industry due to their many benefits to project stakeholders, such as enhanced design visualization, improved data exchanges, reduced construction waste, improved productivity, and higher product quality. Substantial research efforts have thus been devoted to these topics in recent decades, resulting in a large amount of literature regarding BIM and OSC. This research explores the state-of-the-art in BIM for OSC by means of a bibliometric-qualitative review method. The objective of this research is to uncover the synthesis between BIM and OSC and to identify research trends as well as gaps in knowledge that can be addressed in future research on BIM for OSC. Science maps are constructed by means of bibliometric analysis in order to objectively identify the main research topics of these two fields both separately and jointly based on identified academic publications from Scopus (i.e., 4395 publications on BIM, 2841 publications on OSC, and 113 publications on BIM for OSC). A qualitative review is further conducted on 77 screened research publications (including articles, reviews, conference papers) with a particular focus on BIM for OSC. Through quantitative analysis and in-depth discussion of BIM for OSC, research gaps are identified, and future directions are further proposed as follows: BIM-based generative design for prefabrication, cloud BIM-based data exchange for OSC, robotics and 3D printing for OSC, BIM-enabled big data analytics toward best OSC practice, benefits and its assessment model of BIM for OSC. This research contributes to the body of knowledge by synthesizing the state of the art of BIM for OSC and exposing the research needs in this area in order to improve AEC practice.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Software survey: VOSviewer, a computer program for bibliometric mapping
van Eck, N. J., & Waltman, L. (2010) · Scientometrics · doi:10.1007/s11192-009-0146-3 · Cited by 21,484
Mixed Methods Research: A Research Paradigm Whose Time Has Come
Johnson, R. B., & Onwuegbuzie, A. J. (2004) · Educational Researcher · doi:10.3102/0013189x033007014 · Cited by 11,170
Toward a Conceptual Framework for Mixed-Method Evaluation Designs
Greene, J. C., Caracelli, V. J., & Graham, W. F. (1989) · Educational Evaluation and Policy Analysis · doi:10.3102/01623737011003255 · Cited by 5,687
The journal coverage of Web of Science and Scopus: A comparative analysis
Mongeon, P., & Paul-Hus, A. (2016) · Scientometrics · doi:10.1007/s11192-015-1765-5 · Cited by 5,274
Science mapping software tools: Review, analysis, and cooperative study among tools
Cobo, M. J., López-Herrera, A. G., Herrera-Viedma, E., & Herrera, F. (2011) · Journal of the American Society for Information Science and Technology · doi:10.1002/asi.21525 · Cited by 3,242
Building Information Modeling (BIM) for existing buildings — Literature review and future needs
Volk, R., Stengel, J., & Schultmann, F. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.10.023 · Cited by 2,199
Succar, B. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.10.003 · Cited by 1,741
The structure and dynamics of cocitation clusters: A multiple‐perspective cocitation analysis
Chen, C., Ibekwe‐SanJuan, F., & Hou, J. (2010) · Journal of the American Society for Information Science and Technology · doi:10.1002/asi.21309 · Cited by 1,585
Constructing bibliometric networks: A comparison between full and fractional counting
Perianes-Rodriguez, A., Waltman, L., & van Eck, N. J. (2016) · Journal of Informetrics · doi:10.1016/j.joi.2016.10.006 · Cited by 1,416
The project benefits of Building Information Modelling (BIM)
Bryde, D., Broquetas, M., & Volm, J. M. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.12.001 · Cited by 1,268
Systematic Approaches to a Successful Literature Review
Booth, A., Sutton, A., Clowes, M., & Martyn-St James, M. (2022) · SAGE Publications Ltd eBooks · doi:10.4135/9781036232009 · Cited by 1,172
Tang, P., Huber, D., Akinci, B., Lipman, R., & Lytle, A. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.06.007 · Cited by 1,139
Application Areas and Data Requirements for BIM-Enabled Facilities Management
Becerik-Gerber, B., Jazizadeh, F., Li, N., & Calis, G. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000433 · Cited by 915
Understanding and facilitating BIM adoption in the AEC industry
Gu, N., & London, K. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.09.002 · Cited by 912
CitNetExplorer: A new software tool for analyzing and visualizing citation networks
van Eck, N. J., & Waltman, L. (2014) · Journal of Informetrics · doi:10.1016/j.joi.2014.07.006 · Cited by 696
Interaction of Lean and Building Information Modeling in Construction
Sacks, R., Koskela, L., Dave, B. A., & Owen, R. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000203 · Cited by 689
Enhancing environmental sustainability over building life cycles through green BIM: A review
Wong, J. K. W., & Zhou, J. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.06.003 · Cited by 671
Critical evaluation of off-site construction research: A Scientometric analysis
Hosseini, M. R., Martek, I., Zavadskas, E. K., Aibinu, A. A., Arashpour, M., & Chileshe, N. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.12.002 · Cited by 647
Life cycle performance of modular buildings: A critical review
Kamali, M., & Hewage, K. (2016) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2016.05.031 · Cited by 642
A theoretical framework of a BIM-based multi-disciplinary collaboration platform
Singh, V., Gu, N., & Wang, X. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.09.011 · Cited by 625
Building information modeling for sustainable design and LEED® rating analysis
Azhar, S., Carlton, W. A., Olsen, D., & Ahmad, I. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.09.019 · Cited by 607
Monahan, J., & Powell, J. C. (2011) · Energy and Buildings · doi:10.1016/j.enbuild.2010.09.005 · Cited by 580
Building Information Modeling (BIM) for green buildings: A critical review and future directions
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.024 · Cited by 555
Semantic web technologies in AEC industry: A literature overview
Pauwels, P., Zhang, S., & Lee, Y.-C. (2017) · Automation in Construction · doi:10.1016/j.autcon.2016.10.003 · Cited by 522
Critical review of the research on the management of prefabricated construction
Li, C. Z., Shen, Q., & Xue, X. (2014) · Habitat International · doi:10.1016/j.habitatint.2014.04.001 · Cited by 519
Mao, C., Shen, Q., Shen, L., & Tang, L. (2013) · Energy and Buildings · doi:10.1016/j.enbuild.2013.07.033 · Cited by 513
Critical review of bim-based LCA method to buildings
Soust-Verdaguer, B., Llatas, C., & García-Martínez, A. (2017) · Energy and Buildings · doi:10.1016/j.enbuild.2016.12.009 · Cited by 512
Barriers to promoting prefabricated construction in China: A cost–benefit analysis
Hong, J., Shen, G. Q., Li, Z., Zhang, B., & Zhang, W. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.10.171 · Cited by 503
Major Barriers to Off-Site Construction: The Developer’s Perspective in China
Mao, C., Shen, Q., Pan, W., & Ye, K. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000246 · Cited by 446
The building information modelling trajectory in facilities management: A review
Parn, E. A., Edwards, D. J., & Sing, M. C. P. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.12.003 · Cited by 435
A scientometric review of global BIM research: Analysis and visualization
Zhao, X. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.04.002 · Cited by 434
Li, C. Z., Xue, F., Li, X., Hong, J., & Shen, G. Q. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.01.001 · Cited by 420
Building information modelling (BIM) framework for practical implementation
Jung, Y., & Joo, M. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.09.010 · Cited by 419
Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review
Oraee, M., Hosseini, M. R., Papadonikolaki, E., Palliyaguru, R., & Arashpour, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.07.001 · Cited by 415
Cao, X., Li, X., Zhu, Y., & Zhang, Z. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.04.120 · Cited by 414
A BIM-based system for demolition and renovation waste estimation and planning
Cheng, J. C. P., & Ma, L. Y. H. (2013) · Waste Management · doi:10.1016/j.wasman.2013.01.001 · Cited by 402
Specifying parametric building object behavior (BOB) for a building information modeling system
Lee, G., Sacks, R., & Eastman, C. M. (2005) · Automation in Construction · doi:10.1016/j.autcon.2005.09.009 · Cited by 396
Prefabricated construction enabled by the Internet-of-Things
Zhong, R. Y., Peng, Y., Xue, F., Fang, J., Zou, W., Luo, H., Thomas Ng, S., Lu, W., Shen, G. Q. P., & Huang, G. Q. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.01.006 · Cited by 395
State of the Art on Timber-Concrete Composite Structures: Literature Review
Yeoh, D., Fragiacomo, M., De Franceschi, M., & Heng Boon, K. (2011) · Journal of Structural Engineering · doi:10.1061/(asce)st.1943-541x.0000353 · Cited by 388
Jaillon, L., & Poon, C. S. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.09.002 · Cited by 367
Park, C.-S., Lee, D.-Y., Kwon, O.-S., & Wang, X. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.09.010 · Cited by 367
Cerovsek, T. (2011) · Advanced Engineering Informatics · doi:10.1016/j.aei.2010.06.003 · Cited by 351
Mapping the managerial areas of Building Information Modeling (BIM) using scientometric analysis
He, Q., Wang, G., Luo, L., Shi, Q., Xie, J., & Meng, X. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.08.001 · Cited by 351
Building information modelling (BIM) for sustainable building design
Wong, K., & Fan, Q. (2013) · Facilities · doi:10.1108/02632771311299412 · Cited by 349
Ding, L., Zhou, Y., & Akinci, B. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.009 · Cited by 330
BIM for infrastructure: An overall review and constructor perspective
Bradley, A., Li, H., Lark, R., & Dunn, S. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.08.019 · Cited by 324
Du, J., Zou, Z., Shi, Y., & Zhao, D. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.10.009 · Cited by 324
A review of emerging trends in global PPP research: analysis and visualization
Song, J., Zhang, H., & Dong, W. (2016) · Scientometrics · doi:10.1007/s11192-016-1918-1 · Cited by 323
Systematic approaches to a successful literature review
Pearson, F. (2014) · Educational Psychology in Practice · doi:10.1080/02667363.2014.900913 · Cited by 318
Santos, R., Costa, A. A., & Grilo, A. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.03.005 · Cited by 318
Key constraints and mitigation strategies for prefabricated prefinished volumetric construction
Hwang, B.-G., Shan, M., & Looi, K.-Y. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.136 · Cited by 318
A study on software architecture for effective BIM/GIS-based facility management data integration
Kang, T. W., & Hong, C. H. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.03.019 · Cited by 317
Mapping the knowledge domains of Building Information Modeling (BIM): A bibliometric approach
Li, X., Wu, P., Shen, G. Q., Wang, X., & Teng, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.09.011 · Cited by 307
Design for Manufacture and Assembly-oriented parametric design of prefabricated buildings
Yuan, Z., Sun, C., & Wang, Y. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.12.021 · Cited by 293
Schedule risks in prefabrication housing production in Hong Kong: a social network analysis
Li, C. Z., Hong, J., Xue, F., Shen, G. Q., Xu, X., & Mok, M. K. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.02.123 · Cited by 282
A survey on modeling guidelines for quantity takeoff-oriented BIM-based design
Monteiro, A. M., & Martins, J. P. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.05.005 · Cited by 279
Kim, M.-K., Cheng, J. C. P., Sohn, H., & Chang, C.-C. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.07.010 · Cited by 275
Patterns and trends in Building Information Modeling (BIM) research: A Latent Semantic Analysis
Yalcinkaya, M., & Singh, V. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.07.012 · Cited by 272
Li, C. Z., Zhong, R. Y., Xue, F., Xu, G., Chen, K., Huang, G. G., & Shen, G. Q. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.07.156 · Cited by 272
Kim, M.-K., Wang, Q., Park, J.-W., Cheng, J. C. P., Sohn, H., & Chang, C.-C. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.08.035 · Cited by 269
Exchange Model and Exchange Object Concepts for Implementation of National BIM Standards
Eastman, C. M., Jeong, Y.-S., Sacks, R., & Kaner, I. (2009) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2010)24:1(25 · Cited by 267
Eleftheriadis, S., Mumovic, D., & Greening, P. (2017) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2016.09.028 · Cited by 257
The use of a BIM-based framework to support safe facility management processes
Wetzel, E. M., & Thabet, W. Y. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.09.004 · Cited by 253
Alwan, Z., Jones, P., & Holgate, P. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.12.085 · Cited by 252
Building information modeling and safety management: A systematic review
Martínez-Aires, M. D., López-Alonso, M., & Martínez-Rojas, M. (2018) · Safety Science · doi:10.1016/j.ssci.2017.08.015 · Cited by 252
Bridging BIM and building: From a literature review to an integrated conceptual framework
Chen, K., Lu, W., Peng, Y. M., Rowlinson, S., & Huang, G. Q. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.03.006 · Cited by 245
Parametric 3D modeling in building construction with examples from precast concrete
Sacks, R., Eastman, C. M., & Lee, G. (2004) · Automation in Construction · doi:10.1016/s0926-5805(03)00043-8 · Cited by 241
The Organizational Taxonomy: Definition and Design
Rich, P. (1992) · The Academy of Management Review · doi:10.2307/258807 · Cited by 239
Saieg, P., Sotelino, E. D., Nascimento, D., & Caiado, R. G. G. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.11.030 · Cited by 237
BIM in off-site manufacturing for buildings
Abanda, F. H., Tah, J. H. M., & Cheung, F. K. T. (2017) · Journal of Building Engineering · doi:10.1016/j.jobe.2017.10.002 · Cited by 236
Cost analysis for sustainable off-site construction based on a multiple-case study in China
Mao, C., Xie, F., Hou, L., Wu, P., Wang, J., & Wang, X. (2016) · Habitat International · doi:10.1016/j.habitatint.2016.08.002 · Cited by 226
Won, J., & Cheng, J. C. P. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.02.002 · Cited by 221
Structural and Economic Benefits of Precast/Prestressed Concrete Construction
Yee, A. A., & D., H. (2001) · PCI Journal · doi:10.15554/pcij.07012001.34.42 · Cited by 215
Wang, Q., Kim, M.-K., Cheng, J. C. P., & Hoon Sohn, A. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.03.014 · Cited by 210
Antwi-Afari, M. F., Li, H., Pärn, E. A., & Edwards, D. J. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.010 · Cited by 210
Lee, P.-C., & Su, H.-N. (2010) · Innovation · doi:10.5172/impp.12.1.26 · Cited by 209
BIM-based integrated approach for detailed construction scheduling under resource constraints
Liu, H., Al-Hussein, M., & Lu, M. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.03.008 · Cited by 205
Self-citationThe Organizational Taxonomy: Definition and Design
Rich, P. (1992) · Academy of Management Review · doi:10.5465/amr.1992.4279068 · Cited by 199
Semantic Enrichment for Building Information Modeling
Belsky, M., Sacks, R., & Brilakis, I. (2016) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/mice.12128 · Cited by 191
A BIM-enabled information infrastructure for building energy Fault Detection and Diagnostics
Dong, B., O'Neill, Z., & Li, Z. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.007 · Cited by 186
Li, C. Z., Hong, J., Xue, F., Shen, Q., Xu, X., & Luo, L. (2016) · Habitat International · doi:10.1016/j.habitatint.2016.07.002 · Cited by 177
Elastic and ductile design of multi-storey crosslam massive wooden buildings under seismic actions
Fragiacomo, M., Dujic, B., & Sustersic, I. (2011) · Engineering Structures · doi:10.1016/j.engstruct.2011.05.020 · Cited by 173
Analysis of Citation Networks in Building Information Modeling Research
Hosseini, M. R., Maghrebi, M., Akbarnezhad, A., Martek, I., & Arashpour, M. (2018) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001492 · Cited by 166
Zou, P. X. W., Sunindijo, R. Y., & Dainty, A. (2014) · Safety Science · doi:10.1016/j.ssci.2014.07.005 · Cited by 162
Benchmark tests for BIM data exchanges of precast concrete
Jeong, Y.-S., Eastman, C. M., Sacks, R., & Kaner, I. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.11.001 · Cited by 159
Altaf, M. S., Bouferguene, A., Liu, H., Al-Hussein, M., & Yu, H. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.09.009 · Cited by 159
Self-citationIntegrating resource production and construction using BIM
Babić, N. Č., Podbreznik, P., & Rebolj, D. (2009) · Automation in Construction · doi:10.1016/j.autcon.2009.11.005 · Cited by 157
Shou, W., Wang, J., Wang, X., & Chong, H. (2014) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-014-9125-9 · Cited by 154
Mixed Methods and Systematic Reviews: Examples and Emerging Issues
Harden, A., & Thomas, J. (2010) · Sage eBooks · doi:10.4135/9781506335193.n29 · Cited by 150
The advantages of information management through building information modelling
Demian, P., & Walters, D. (2013) · Construction Management and Economics · doi:10.1080/01446193.2013.777754 · Cited by 148
BIM Standard in Off-Site Construction
Nawari, N. O. (2012) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000056 · Cited by 148
Proceedings -- The 27th International Symposium on Automation and Robotics in Construction
Caldas, C. H., O’Brien, W. J., Chi, S., Gong, J., & Luo, X. (2010) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2010 · Cited by 140
Lü, N., & Korman, T. M. (2010) · ASCE Construction Research Congress (CRC) · doi:10.1061/41109(373)114 · Cited by 139
Lean and agile integration within offsite construction using discrete event simulation
Mostafa, S. F., Chileshe, N., & Abdelhamid, T. S. (2016) · Construction Innovation · doi:10.1108/ci-09-2014-0043 · Cited by 139
A review of cloud-based BIM technology in the construction sector
Wong, J. K. W., Wang, X., Li, H., Chan, G., & Li, H. (2014) · ORCA Online Research @Cardiff (Cardiff University) · Cited by 123
VOSviewer: A Computer Program for Bibliometric MappingPreprint
van Eck, N. J., & Waltman, L. (2009) · RePEc: Research Papers in Economics · Cited by 118
A methodology for the optimal modularization of building design
Isaac, S., Bock, T. A., & Stoliar, Y. (2016) · Automation in Construction · doi:10.1016/j.autcon.2015.12.017 · Cited by 115
Case studies of BIM adoption for precast concrete design by mid-sized structural engineering firms
Kaner, I., Sacks, R., Kassian, W., & Quitt, T. (2008) · Cambridge University Engineering Department Publications Database · Cited by 113
Supply-chain transparency within industrialized construction projects
Babić, N. Č., Rebolj, D., Nekrep, M. P., & Podbreznik, P. (2014) · Computers in Industry · doi:10.1016/j.compind.2013.12.003 · Cited by 111
Proactive training system for safe and efficient precast installation
Li, H., Lu, M., Chan, G., & Skitmore, M. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.10.010 · Cited by 110
Validations for ensuring the interoperability of data exchange of a building information model
Lee, Y.-C., Eastman, C. M., & Lee, J.-K. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.07.010 · Cited by 102
Kim, H., Shen, Z., Kim, I., et al. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.04.002 · Cited by 102
BIM-based automated design and planning for boarding of light-frame residential buildings
Liu, H., Singh, G., Lu, M., Bouferguène, A., & Al‐Hussein, M. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.02.001 · Cited by 101
Self-citationConstruction Research Congress 2018
Wang, C., Harper, C., Lee, Y.-C., Harris, R., & Berryman, C. W. (2018) · doi:10.1061/9780784481271 · Cited by 97
Construction Research Congress 2014
Castro‐Lacouture, D., Irizarry, J., & Ashuri, B. (2014) · doi:10.1061/9780784413517 · Cited by 85
Lee, J., & Kim, J.-J. (2017) · Sustainability · doi:10.3390/su9030426 · Cited by 79
Virtual reality-based cloud BIM platform for integrated AEC projects
Goulding, J. S., Rahimian, F. P., & Wang, X. (2014) · TeesRep (Teesside University) · Cited by 76
A Target Benchmark of the Impact of Three-Dimensional Parametric Modeling in Precast Construction
Sacks, R., Eastman, C. M., Lee, G., & Orndorff, D. (2005) · PCI Journal · doi:10.15554/pcij.07012005.126.139 · Cited by 74
Computing in Civil Engineering 2015
O’Brien, W. J., & Ponticelli, S. (2015) · doi:10.1061/9780784479247 · Cited by 74
A BIM and UWB integrated Mobile Robot Navigation System for Indoor Position Tracking Applications
Park, J., Cho, Y. K., & Martinez, D. (2016) · Journal of Construction Engineering and Project Management · doi:10.6106/jcepm.2016.6.2.030 · Cited by 71
Product-Oriented Information Delivery Framework for Multistory Modular Building Projects
Ramaji, I. J., Memari, A. M., & Messner, J. (2017) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000649 · Cited by 64
Integrated BIM/Lean Base Production Line Schedule Model for Modular Construction Manufacturing
Moghadam, M., Alwisy, A., & Al‐Hussein, M. (2012) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784412329.128 · Cited by 54
Self-citationFlexible field factory for construction industry
Martínez, S., Jardón, A., Victores, J. G., et al. (2013) · Assembly Automation · doi:10.1108/01445151311306708 · Cited by 53
USE OF EMBEDDED RFID TAGS IN CONCRETE ELEMENT SUPPLY CHAINS
Ikonen, J., Knutas, A., Hämäläinen, H., Ihonen, M., Porras, J., & Kallonen, T. (2013) · Journal of Information Technology in Construction · Cited by 42
Hybrid project delivery processes observed in constructor BIM innovation adoption
Gledson, B. (2016) · Construction Innovation · doi:10.1108/ci-04-2015-0020 · Cited by 42
Modular and Offsite Construction of Piping: Current Barriers and Route
Li, X., Li, Z., & Wu, G. (2017) · Applied Sciences · doi:10.3390/app7060547 · Cited by 42
Integrated Collaborative Tools for Precast Supply Chain Management
Abedi, M. R., Fathi, M. S., Mirasa, A. K., & Rawai, N. M. (2016) · Scientia Iranica · doi:10.24200/sci.2016.2129 · Cited by 41
Building information modelling and its effect on off-site construction in UK civil engineering
Vernikos, V. K., Goodier, C. I., Broyd, T. W., Robery, P. C., & Gibb, A. (2014) · Proceedings of the Institution of Civil Engineers - Management Procurement and Law · doi:10.1680/mpal.13.00031 · Cited by 35
Nawi, M. N. M., Tarmizi, H. A., Hamid, Z. A., Anuar, M. K. K., & Yusnizam, B. (2014) · Cited by 31
Chi, H.-L., Wang, J., Wang, X., et al. (2014) · Journal of Intelligent & Robotic Systems · doi:10.1007/s10846-014-0123-9 · Cited by 20
Integration of Offsite and Onsite Schedules in Modular Construction
Salama, T., Salah, A., & Moselhi, O. (2017) · Proceedings of the ... ISARC · doi:10.22260/isarc2017/0107 · Cited by 18
The 12th International conference on scientometrics and informetrics
Leta, J., Larsen, B., Rousseau, R., & Glänzel, W. (2010) · Scientometrics · doi:10.1007/s11192-010-0219-3 · Cited by 17
TOWARD AUTOMATED DIMENSIONAL QUALITY CONTROL OF PRECAST CONCRETE ELEMENTS USING DESIGN BIM
Puri, N., & Türkan, Y. (2017) · WIT transactions on the built environment · doi:10.2495/bim170191 · Cited by 12
Recommender System for Improving BIM Efficiency: An Interior Finishing Case Study
Zhang, Y., Liu, H., & Al‐Hussein, M. (2018) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784481264.003 · Cited by 10
Self-citation
Cited by
Paolini, A., Kollmannsberger, S., & Rank, E. (2019) · Additive Manufacturing · doi:10.1016/j.addma.2019.100894 · Cited by 673
Darko, A., Chan, A. P. C., Adabre, M. A., Edwards, D. J., Hosseini, M. R., & Ameyaw, E. E. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103081 · Cited by 603
Wang, Z., Wang, T., Hu, H., Gong, J., Ren, X., & Xiao, Q. (2020) · Automation in Construction · doi:10.1016/j.autcon.2019.103063 · Cited by 481
Integrating BIM and AI for Smart Construction Management: Current Status and Future Directions
Pan, Y., & Zhang, L. (2023) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-022-09830-8 · Cited by 441
Virtual reality applications for the built environment: Research trends and opportunities
Zhang, Y., Liu, H., Kang, S.-C., & Al-Hussein, M. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103311 · Cited by 361
Self-citation
Metadata
- Authors
- Yin, X., Liu, H., Chen, Y., & Al-Hussein, M.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2019-05
- Volume
- 101
- Pages
- 72-91
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2911311605
- Cited by
- 420
- References
- 124
- FWCI
- 30.89
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.