The DOI matches its Crossref record; 76 of the 76 references it cites were found in a registry or an index.
Towards a semantic Construction Digital Twin: Directions for future research
Open accessAbstract
As the Architecture, Engineering and Construction sector is embracing the digital age, the processes involved in the design, construction and operation of built assets are more and more influenced by technologies dealing with value-added monitoring of data from sensor networks, management of this data in secure and resilient storage systems underpinned by semantic models, as well as the simulation and optimisation of engineering systems. Aside from enhancing the efficiency of the value chain, such information-intensive models and associated technologies play a decisive role in minimising the lifecycle impacts of our buildings. While Building Information Modelling provides procedures, technologies and data schemas enabling a standardised semantic representation of building components and systems, the concept of a Digital Twin conveys a more holistic socio-technical and process-oriented characterisation of the complex artefacts involved by leveraging the synchronicity of the cyber-physical bi-directional data flows. Moreover, BIM lacks semantic completeness in areas such as control systems, including sensor networks, social systems, and urban artefacts beyond the scope of buildings, thus requiring a holistic, scalable semantic approach that factors in dynamic data at different levels. The paper reviews the multi-faceted applications of BIM during the construction stage and highlights limits and requirements, paving the way to the concept of a Construction Digital Twin. A definition of such a concept is then given, described in terms of underpinning research themes, while elaborating on areas for future research.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Digital Twin in Industry: State-of-the-Art
Tao, F., Zhang, H., Liu, A., & Nee, A. Y. C. (2019) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2018.2873186 · Cited by 5,871
The Digital Twin Paradigm for Future NASA and U.S. Air Force Vehicles
Glaessgen, E., & Stargel, D. (2012) · 53rd AIAA/ASME/ASCE/AHS/ASC Structures, Structural Dynamics and Materials Conference 20th AIAA/ASME/AHS Adaptive Structures Conference 14th AIAA · doi:10.2514/6.2012-1818 · Cited by 3,395
Digital twin-driven product design, manufacturing and service with big data
Tao, F., Cheng, J., Qi, Q., Zhang, M., Zhang, H., & Sui, F. (2018) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-017-0233-1 · Cited by 2,920
Succar, B. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.10.003 · Cited by 1,741
Digital twin and big data towards smart manufacturing and Industry 4.0: 360 degree comparison
Qi, Q., & Tao, F. (2018) · IEEE Access · doi:10.1109/access.2018.2793265 · Cited by 1,716
The SSN ontology of the W3C semantic sensor network incubator group
Compton, M., Barnaghi, P., Bermudez, L., García-Castro, R., Corcho, O., Cox, S., Graybeal, J., Hauswirth, M., Henson, C., Herzog, A., et al. (2012) · Journal of Web Semantics · doi:10.1016/j.websem.2012.05.003 · Cited by 1,424
Shaping the digital twin for design and production engineering
Schleich, B., Anwer, N., Mathieu, L., & Wartzack, S. (2017) · CIRP Annals · doi:10.1016/j.cirp.2017.04.040 · Cited by 1,305
Digital Twin—The Simulation Aspect
Boschert, S., & Rosen, R. (2016) · Mechatronic Futures · doi:10.1007/978-3-319-32156-1_5 · Cited by 1,158
Reengineering aircraft structural life prediction using a digital twin
Tuegel, E. J., Ingraffea, A. R., Eason, T. G., & Spottswood, S. M. (2011) · International Journal of Aerospace Engineering · doi:10.1155/2011/154798 · Cited by 1,119
Leveraging Digital Twin Technology in Model-Based Systems Engineering
Madni, A. M., Madni, C. C., & Lucero, S. D. (2019) · Systems · doi:10.3390/systems7010007 · Cited by 1,050
American society of civil engineers
(1873) · Journal of the Franklin Institute · doi:10.1016/0016-0032(73)90450-x · Cited by 934
C2PS: A Digital Twin Architecture Reference Model for the Cloud-Based Cyber-Physical Systems
Alam, K. M., & El Saddik, A. (2017) · IEEE Access · doi:10.1109/access.2017.2657006 · Cited by 741
An application framework of digital twin and its case study
Zheng, Y., Yang, S., & Cheng, H. (2019) · Journal of Ambient Intelligence and Humanized Computing · doi:10.1007/s12652-018-0911-3 · Cited by 593
Haag, S., & Anderl, R. (2018) · Manufacturing Letters · doi:10.1016/j.mfglet.2018.02.006 · Cited by 559
Electrical load forecasting models: A critical systematic review
Kuster, C., Rezgui, Y., & Mourshed, M. (2017) · Sustainable Cities and Society · doi:10.1016/j.scs.2017.08.009 · Cited by 536
Self-citationExperimentable Digital Twins—Streamlining Simulation-Based Systems Engineering for Industry 4.0
Schluse, M., Priggemeyer, M., Atorf, L., & Rossmann, J. (2018) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2018.2804917 · Cited by 524
Semantics for the Internet of Things: Early Progress and Back to the Future
Barnaghi, P., Wang, W., Henson, C., & Taylor, K. (2012) · International Journal on Semantic Web and Information Systems · doi:10.4018/jswis.2012010101 · Cited by 522
Semantic web technologies in AEC industry: A literature overview
Pauwels, P., Zhang, S., & Lee, Y.-C. (2017) · Automation in Construction · doi:10.1016/j.autcon.2016.10.003 · Cited by 522
EXPRESS to OWL for construction industry: Towards a recommendable and usable ifcOWL ontology
Pauwels, P., & Terkaj, W. (2016) · Automation in Construction · doi:10.1016/j.autcon.2015.12.003 · Cited by 475
BIM-based fall hazard identification and prevention in construction safety planning
Zhang, S., Sulankivi, K., Kiviniemi, M., Romo, I., Eastman, C. M., & Teizer, J. (2015) · Safety Science · doi:10.1016/j.ssci.2014.08.001 · Cited by 447
Zhang, S., Boukamp, F., & Teizer, J. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.02.005 · Cited by 392
Automated progress tracking using 4D schedule and 3D sensing technologies
Turkan, Y., Bosche, F., Haas, C. T., & Haas, R. (2012) · Automation in Construction · doi:10.1016/j.autcon.2011.10.003 · Cited by 374
Ding, L., Zhou, Y., & Akinci, B. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.009 · Cited by 330
BIM for infrastructure: An overall review and constructor perspective
Bradley, A., Li, H., Lark, R., & Dunn, S. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.08.019 · Cited by 324
Automated construction progress measurement using a 4D building information model and 3D data
Kim, C., Son, H., & Kim, C. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.11.041 · Cited by 317
IfcOWL: A case of transforming EXPRESS schemas into ontologies
Beetz, J., van Leeuwen, J., & de Vries, B. (2009) · Artificial Intelligence for Engineering Design, Analysis and Manufacturing · doi:10.1017/s0890060409000122 · Cited by 304
Howell, S., Rezgui, Y., Hippolyte, J.-L., Jayan, B., & Li, H. (2017) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2017.03.107 · Cited by 289
Self-citationA semantic rule checking environment for building performance checking
Pauwels, P., Van Deursen, D., Verstraeten, R., De Roo, J., De Meyer, R., Van de Walle, R., & Van Campenhout, J. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.11.017 · Cited by 277
Tongal, H., & Booij, M. J. (2018) · Journal of Hydrology · doi:10.1016/j.jhydrol.2018.07.004 · Cited by 267
Mohammadi, N., & Taylor, J. E. (2017) · 2017 IEEE Symposium Series on Computational Intelligence (SSCI) · doi:10.1109/ssci.2017.8285439 · Cited by 260
Charef, R., Alaka, H., & Emmitt, S. (2018) · Journal of Building Engineering · doi:10.1016/j.jobe.2018.04.028 · Cited by 255
Big Data: The Next Big Thing in Innovation
Gobble, M. M. (2013) · Research-Technology Management · doi:10.5437/08956308x5601005 · Cited by 251
Han, K. K., & Golparvar-Fard, M. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.02.007 · Cited by 246
Lu, Q., Won, J., & Cheng, J. C. P. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.09.004 · Cited by 235
Linking building data in the cloud: Integrating cross-domain building data using linked data
Curry, E., O’Donnell, J., Corry, E., Hasan, S., Keane, M. M., & O’Riain, S. (2012) · Advanced Engineering Informatics · doi:10.1016/j.aei.2012.10.003 · Cited by 233
Visualization of Work Flow to Support Lean Construction
Sacks, R., Treckmann, M., & Rozenfeld, O. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000102 · Cited by 226
Han, K. K., & Golparvar-Fard, M. (2017) · Automation in Construction · doi:10.1016/j.autcon.2016.11.004 · Cited by 214
Golparvar-Fard, M., Peña-Mora, F., & Savarese, S. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000371 · Cited by 210
BIM-based integrated approach for detailed construction scheduling under resource constraints
Liu, H., Al-Hussein, M., & Lu, M. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.03.008 · Cited by 205
Kim, H., Anderson, K., Lee, S. H., & Hildreth, J. C. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.05.020 · Cited by 192
Wang, D., Chen, J., Zhao, D., Dai, F., Zheng, C., & Wu, X. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.02.001 · Cited by 189
BIM-based approach for optimizing life cycle costs of sustainable buildings
Marzouk, M., Azab, S., & Metawie, M. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.03.280 · Cited by 189
BIM & the 5D Project Cost Manager
Smith, P. (2014) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2014.03.053 · Cited by 179
An integrated safety management with construction management using 4D CAD model
Benjaoran, V., & Bhokha, S. (2009) · Safety Science · doi:10.1016/j.ssci.2009.09.009 · Cited by 177
GhaffarianHoseini, A., Zhang, T., Nwadigo, O., GhaffarianHoseini, A., Naismith, N., Tookey, J., & Raahemifar, K. (2017) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2016.12.061 · Cited by 155
Interior construction state recognition with 4D BIM registered image sequences
Kropp, C., Koch, C., & König, M. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.10.027 · Cited by 148
Automatic Generation of a Simulation-Based Digital Twin of an Industrial Process Plant
Martínez, G. S., Sierla, S., Karhela, T. A., & Vyatkin, V. V. (2018) · Annual Conference of the IEEE Industrial Electronics Society (IECON) · doi:10.1109/iecon.2018.8591464 · Cited by 139
Decision support for tower crane selection with building information models and genetic algorithms
Marzouk, M. M., & Abubakr, A. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.09.008 · Cited by 131
4D CAD model updating using image processing-based construction progress monitoring
Kim, C., Kim, B.-I., & Kim, H. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.03.005 · Cited by 127
Three-Dimensional Tracking of Construction Resources Using an On-Site Camera System
Park, M.-W., Koch, C., & Brilakis, I. (2011) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000168 · Cited by 125
An Innovative Framework of 5D BIM Solutions for Construction Cost Management: A Systematic Review
Vigneault, M.-A., Boton, C., Chong, H., & Cooper-Cooke, B. (2019) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-019-09341-z · Cited by 125
Cyber-physical systems integration of building information models and the physical construction
Akanmu, A., & Anumba, C. J. (2015) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-07-2014-0097 · Cited by 122
Hamledari, H., Azar, E. R., & McCabe, B. Y. (2017) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000727 · Cited by 117
Cyber-physical systems for temporary structure monitoring
Yuan, X., Anumba, C., & Parfitt, M. K. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.02.005 · Cited by 108
Validations for ensuring the interoperability of data exchange of a building information model
Lee, Y.-C., Eastman, C. M., & Lee, J.-K. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.07.010 · Cited by 102
Structural performance monitoring using a dynamic data-driven BIM environment
Delgado, J. M. D., Butler, L., Brilakis, I., Elshafie, M. Z. E. B., & Middleton, C. R. (2018) · UWE Research Repository (UWE Bristol) · doi:10.1061/%28asce%29cp.1943-5487.0000749 · Cited by 92
Beyond digital twins – A commentary
Tomko, M., & Winter, S. (2018) · Environment and Planning B Urban Analytics and City Science · doi:10.1177/2399808318816992 · Cited by 91
Optimizing construction planning schedules by virtual prototyping enabled resource analysis
Li, H., Chan, N. K. Y., Huang, T., Guo, H., Lu, W., & Skitmore, M. (2009) · Automation in Construction · doi:10.1016/j.autcon.2009.04.002 · Cited by 90
Pargmann, H., Euhausen, D., & Faber, R. (2018) · 2018 IEEE 3rd International Conference on Cloud Computing and Big Data Analysis (ICCCBDA) · doi:10.1109/icccbda.2018.8386518 · Cited by 84
Enhanced Machine Learning Classification Accuracy for Scaffolding Safety Using Increased Features
Sakhakarmi, S., Park, J., & Cho, C. (2018) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001601 · Cited by 68
A framework for an integrated nuclear digital environment
Patterson, E. A., Taylor, R. J., & Bankhead, M. (2015) · Progress in Nuclear Energy · doi:10.1016/j.pnucene.2015.11.009 · Cited by 64
Smart steel bridge construction enabled by BIM and Internet of Things in industry 4.0: A framework
Ding, K., He, S., Hui, J., Liu, Y., Zhu, B., Zhang, F., & Cao, W. (2018) · IEEE International Conference on Networking, Sensing and Control (ICNSC) · doi:10.1109/icnsc.2018.8361339 · Cited by 59
BIM-enhanced collaborative smart technologies for LEAN construction processes
Guerriero, A., Kubicki, S., Berroir, F., et al. (2017) · International Conference on Engineering, Technology and Innovation (ICE/ITMC) · doi:10.1109/ice.2017.8279994 · Cited by 48
Self-citationBIM for Construction Site Logistics Management.
Whitlock, K., Abanda, F. H., Manjia, M. B., Pettang, C., Nkeng, G. E., & Publics, É. N. S. D. T. (2018) · Journal of Engineering Project and Production Management · doi:10.32738/jeppm.201801.0006 · Cited by 45
Mawlana, M., Vahdatikhaki, F., Doriani, A., & Hammad, A. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.09.005 · Cited by 44
Kubicki, S., Guerriero, A., Schwartz, L., Daher, E., & Idris, B. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.12.009 · Cited by 42
Self-citationInterpretation and automatic integration of geospatial data into the Semantic Web
Prudhomme, C., Homburg, T., Ponciano, J.-J., Boochs, F., Cruz, C., & Roxin, A. (2019) · Computing · doi:10.1007/s00607-019-00701-y · Cited by 29
Towards Digitalization of Building Operations with BIM
Krämer, M., & Besenyői, Z. (2018) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/365/2/022067 · Cited by 28
Srewil, Y., & Scherer, R. J. (2013) · IFIP advances in information and communication technology · doi:10.1007/978-3-642-40543-3_19 · Cited by 27
Digital Twins in the Built Environment
Lu, Q., Xie, X., Parlikad, A. K., Schooling, J. M., & Pitt, M. (2022) · doi:10.1680/dtbe.65802 · Cited by 15
Remund, D. L., & Aikat, D. “. (2012) · Wiley eBooks · doi:10.1002/9781118360491.ch11 · Cited by 14
Zhang, Z., Hamledari, H., Billington, S. L., & Fischer, M. A. (2018) · Journal of Information Technology in Construction · Cited by 14
Comparing Mindfulness in Manual and 4D-Supported Coordination Practices
Scholtenhuis, L. O., Hartmann, T., & Dorée, A. G. (2014) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784413517.017 · Cited by 7
Cited by
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
Digital twin paradigm: A systematic literature review
Semeraro, C., Lezoche, M., Panetto, H., & Dassisti, M. (2021) · Computers in Industry · doi:10.1016/j.compind.2021.103469 · Cited by 986
Digital twin application in the construction industry: A literature review
Opoku, D.-G. J., Perera, S., Osei-Kyei, R., & Rashidi, M. (2021) · Journal of Building Engineering · doi:10.1016/j.jobe.2021.102726 · Cited by 753
Digital Twin for maintenance: A literature review
Errandonea, I., Beltrán, S., & Arrizabalaga, S. (2020) · Computers in Industry · doi:10.1016/j.compind.2020.103316 · Cited by 741
Construction with digital twin information systems
Sacks, R., Brilakis, I., Pikas, E., Xie, H. S., & Girolami, M. (2020) · Data-Centric Engineering · doi:10.1017/dce.2020.16 · Cited by 609
Metadata
- Authors
- Boje, C., Guerriero, A., Kubicki, S., & Rezgui, Y.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2020-06
- Volume
- 114
- Pages
- 103179
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W3013120860
- Cited by
- 1,324
- References
- 76
- FWCI
- 72.11
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.