Exploring the value of project management: Linking Project Management Performance and Project Success
The DOI matches its Crossref record; 53 of the 53 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Podsakoff, P. M., MacKenzie, S. B., Lee, J.-Y., & Podsakoff, N. P. (2003) · Journal of Applied Psychology · doi:10.1037/0021-9010.88.5.879 · Cited by 82,194
Coefficient Alpha and the Internal Structure of Tests
Cronbach, L. J. (1951) · Psychometrika · doi:10.1007/bf02310555 · Cited by 43,931
Discovering Statistics Using SPSS
Field, A. P., & Miles, J. N. V. (2000) · Medical Entomology and Zoology · Cited by 28,294
SPSS Survival Manual: A Step by Step Guide to Data Analysis using IBM SPSS
Pallant, J. (2020) · Routledge eBooks · doi:10.4324/9781003117407 · Cited by 5,201
A guide to the project management body of knowledge (PMBOK guide)
Pmbok (2004) · Cited by 4,316
Atkinson, R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00069-6 · Cited by 2,359
The “real” success factors on projects
Cooke-Davies, T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00067-9 · Cited by 1,837
Project management — A managerial approach
(1989) · European Journal of Operational Research · doi:10.1016/0377-2217(89)90451-7 · Cited by 1,547
Project Success: A Multidimensional Strategic Concept
Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001) · Long Range Planning · doi:10.1016/s0024-6301(01)00097-8 · Cited by 1,222 · cited 8×
“Shenhar et al. (2001) argue that projects are strategic and project success should be assessed according to short-term and long-term project objectives.”
BackgroundMethodInfluentialA new framework for determining critical success/failure factors in projects
Belassi, W., & Tukel, O. I. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00064-x · Cited by 1,187
Designing, Implementing and Updating Performance Measurement Systems
Bourne, M., Mills, J., Wilcox, M., Neely, A., & Platts, K. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010330739 · Cited by 1,143 · cited 2×
“Traditional PM systems which exclusively pursue the success criteria of cost, time, quality and meeting technical requirements have become considered ineffective (Bourne et al., 2000; Walton and Dawson, 2001).”
BackgroundMethodMeasurement of project success
de Wit, A. (1988) · International Journal of Project Management · doi:10.1016/0263-7863(88)90043-9 · Cited by 977
Key performance indicators for measuring construction success
Chan, A. P. C., & Chan, A. P. L. (2004) · Benchmarking: An International Journal · doi:10.1108/14635770410532624 · Cited by 968
Critical factors in successful project implementation
Pinto, J. K., & Slevin, D. P. (1987) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1987.6498856 · Cited by 966
On Uncertainty, Ambiguity, and Complexity in Project Management
Pich, M. T., Loch, C. H., & Meyer, A. D. (2002) · Management Science · doi:10.1287/mnsc.48.8.1008.163 · Cited by 942
The role of project management in achieving project success
Munns, A., & Bjeirmi, B. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00057-7 · Cited by 910
A Retrospective look at our Evolving Understanding of Project Success
Jugdev, K., & Müller, R. (2005) · Project Management Journal · doi:10.1177/875697280503600403 · Cited by 907 · cited 5×
“…Fortune et al., 2011; Müller and Turner, 2007; Turner, 2009; Wateridge, 1995) whereas others consider project success a complex, multi-dimensional concept encompassingmanymore attributes (Atkinson, 1999; Jugdev and Muller, 2005; Lim and Mohamed, 1999; Lipovetsky et al., 1997; Shenhar et al., 2001).”
BackgroundMethodInfluentialProject Management: Strategic Design and Implementation
Cleland, D. I. (1990) · Cited by 744
Criteria of project success: an exploratory re-examination
Lim, C. S., & Mohamed, M. Z. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00040-4 · Cited by 731
The Project Excellence Model®: linking success criteria and critical success factors
Westerveld, E. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00112-6 · Cited by 650
THE HANDBOOK OF PROJECT-BASED MANAGEMENT
Turner, J. R. (2008) · Cited by 628
Framing of project critical success factors by a systems model
Fortune, J., & White, D. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.07.004 · Cited by 616
Pinto, J. K., & Mantel, S. J. (1990) · IEEE Transactions on Engineering Management · doi:10.1109/17.62322 · Cited by 594
The Influence of Project Managers on Project Success Criteria and Project Success by Type of Project
Müller, R., & Turner, R. (2007) · European Management Journal · doi:10.1016/j.emj.2007.06.003 · Cited by 579
The TQM Paradox: Relations among TQM practices, plant performance, and customer satisfaction
Choi, T. Y., & Eboch, K. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00031-x · Cited by 543
Theory-W software project management principles and examples
BOEHM, B. W., & Ross, R. W. (1989) · IEEE Transactions on Software Engineering · doi:10.1109/32.29489 · Cited by 538
How can IS/IT projects be measured for success?
Wateridge, J. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00022-7 · Cited by 474
Do project managers practice what they preach, and does it matter to project success?
Papke-Shields, K. E., Beise, C., & Quan, J. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.11.002 · Cited by 393
Müller, R., & Jugdev, K. (2012) · International Journal of Managing Projects in Business · doi:10.1108/17538371211269040 · Cited by 390
Developing project management competency: perspectives from the construction industry
Edum-Fotwe, F. T., & McCaffer, R. (2000) · International Journal of Project Management · doi:10.1016/s0263-7863(98)90075-8 · Cited by 360
The maturity of project management in different industries
Cooke-Davies, T. J., & Arzymanow, A. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00084-4 · Cited by 336
Jugdev, K., & Thomas, J. L. (2002) · Project Management Journal · doi:10.1177/875697280203300402 · Cited by 284
Success in IT projects: A matter of definition?
Thomas, G., & Fernández, W. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.06.003 · Cited by 275
IT projects: a basis for success
Wateridge, J. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00020-q · Cited by 264
New Possibilities for Project Management Theory: A Critical Engagement
Cicmil, S., & Hodgson, D. (2006) · Project Management Journal · doi:10.1177/875697280603700311 · Cited by 235
Performance measurement frameworks: a review
Neely, A., Kennerley, M., & Adams, C. (2007) · Business Performance Measurement · doi:10.1017/cbo9780511488481.010 · Cited by 215
The Perceived Value and Potential Contribution of Project Management Practices to Project Success
Besner, C., & Hobbs, B. (2006) · Project Management Journal · doi:10.1177/875697280603700305 · Cited by 214
Maylor, H. (2001) · European Management Journal · doi:10.1016/s0263-2373(00)00074-8 · Cited by 207
Dvir, D., Sadeh, A., & Malach-Pines, A. (2006) · Project Management Journal · doi:10.1177/875697280603700505 · Cited by 201
Thomas, J. L., & Mullaly, M. (2007) · Project Management Journal · doi:10.1002/pmj.20007 · Cited by 192
Lee, G., & Xia, W. (2005) · European Journal of Information Systems · doi:10.1057/palgrave.ejis.3000523 · Cited by 183
Perceptions of the impact of project sponsorship practices on project success
Bryde, D. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.12.001 · Cited by 182
An empirical investigation of project evaluation criteria
Tukel, O. I., & Rom, W. O. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110364704 · Cited by 171
Modelling project management performance
Bryde, D. (2003) · International Journal of Quality & Reliability Management · doi:10.1108/02656710310456635 · Cited by 169
Why Does Project Management Fail?
Avots, I. (1969) · California Management Review · doi:10.2307/41164208 · Cited by 167
Significance of project management performance assessment (PMPA) model
Qureshi, T. M., Warraich, A. S., & Hijazi, S. T. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.05.001 · Cited by 166
Methods for Managing Different Perspectives of Project Success
Bryde, D. (2005) · British Journal of Management · doi:10.1111/j.1467-8551.2005.00438.x · Cited by 166
Project management maturity models: The silver bullets of competitive advantage.
Jugdev, K., & Thomas, J. L. (2002) · Libraries and Cultural Resources (University of Calgary) · doi:10.11575/prism/30195 · Cited by 157
Project management concepts, methods and application
Bryde, D. (2003) · International Journal of Operations & Production Management · doi:10.1108/01443570310481559 · Cited by 155
Effective Project Management for Strategic Innovation and Change in an Organizational Context
Kenny, J. D. (2003) · Project Management Journal · doi:10.1177/875697280303400106 · Cited by 145
Understanding the Role of “Vision” in Project Success
Christenson, D., & Walker, D. H. T. (2004) · Project Management Journal · doi:10.1177/875697280403500306 · Cited by 135
El-Saboni, M., Aouad, G. F., & Sabouni, A. R. (2008) · Advanced Engineering Informatics · doi:10.1016/j.aei.2008.07.005 · Cited by 65
The Project Management Institute, project management handbook
Pinto, J. K. (1998) · Jossey-Bass Publishers eBooks · Cited by 52
Cited by
Transformational leadership and project success: The mediating role of team-building
Aga, D. A., Noorderhaven, N., & Vallejo, B. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.02.012 · Cited by 486
Musawir, A. U., Serra, C. E. M., Zwikael, O., & Ali, I. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.07.007 · Cited by 316
Impact of integration management on construction project management performance
Demirkesen, S., & Ozorhon, B. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.09.008 · Cited by 259
Project Management Success Factors
Radujković, M., & Sjekavica, M. (2017) · Procedia Engineering · doi:10.1016/j.proeng.2017.08.048 · Cited by 223
Linking trust and collaboration in project teams to project management success
Bond-Barnard, T. J., Fletcher, L., & Steyn, H. (2018) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-06-2017-0068 · Cited by 208
“Project performance is an important determinant of PM success, as the effectiveness of projects needs to be considered on a regular basis throughout the course of the project to establish the project’s relative success (Dalcher and Societies, 2009; Mir and Pinnington, 2014).”
Background
Metadata
- Authors
- Mir, F. A., & Pinnington, A. H.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2014-02
- Volume
- 32
- Issue
- 2
- Pages
- 202-217
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W1970020852
- Cited by
- 602
- References
- 53
- FWCI
- 44.88
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.