Implementation of environmental management in the Hong Kong construction industry
The DOI matches its Crossref record; 5 of the 5 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Implementing a waste management plan during the construction phase of a project: a case study
Mcdonald, B., & Smithers, M. (1998) · Construction Management and Economics · doi:10.1080/014461998372600 · Cited by 157
Resource Use and Environmental Emissions of U.S. Construction Sectors
Hendrickson, C., & Horvath, A. (2000) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2000)126:1(38 · Cited by 139
MANAGEMENT AND RECYCLING OF DEMOLITION WASTE IN HONG KONG
Poon, C. S. (1997) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1006/wmre.1996.0111 · Cited by 136
KEIN, A. T. T., Ofori, G., & BRIFFETT, C. (1999) · Construction Management and Economics · doi:10.1080/014461999371376 · Cited by 118
Bank, W. (1998) · World Bank, Washington, DC eBooks · doi:10.1596/9780195211184_overview · Cited by 18
Cited by
Govindan, K., Kaliyan, M., Kannan, D., & Haq, A. N. (2014) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.08.018 · Cited by 837
An ISM approach for the barrier analysis in implementing green supply chain management
Mathiyazhagan, K., Govindan, K., NoorulHaq, A., & Geng, Y. (2013) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2012.10.042 · Cited by 788
Removal of cement mortar remains from recycled aggregate using pre-soaking approaches
Tam, V. W. Y., Tam, C. M., & Le, K. N. (2007) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2006.05.012 · Cited by 732
Self-citationKabirifar, K., Mojtahedi, M., Wang, C., & Tam, V. W. Y. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.121265 · Cited by 695
Self-citationTowards adoption of prefabrication in construction
Tam, V. W. Y., Tam, C. M., Zeng, S. X., & Ng, W. C. Y. (2007) · Building and Environment · doi:10.1016/j.buildenv.2006.10.003 · Cited by 628
Self-citationThe drivers for contractors’ green innovation: an industry perspective
Qi, G. Y., Shen, L. Y., Zeng, S. X., & Jorge, O. J. (2010) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2010.04.017 · Cited by 468
Self-citationShen, L.-Y., Tam, V. W. Y., Tam, L., & Ji, Y.-B. (2010) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2009.10.014 · Cited by 426
Self-citationIdentification and analysis of reverse logistics barriers using fuzzy Delphi method and AHP
Bouzon, M., Govindan, K., Rodriguez, C. M. T., & Campos, L. M. S. (2016) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.05.021 · Cited by 415
Eriksson, P. E., & Westerberg, M. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.01.003 · Cited by 363
Estimation of construction waste generation and management in Thailand
Kofoworola, O. F., & Gheewala, S. H. (2009) · Waste Management · doi:10.1016/j.wasman.2008.07.004 · Cited by 346
Alzahrani, J. I., & Emsley, M. W. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.06.006 · Cited by 344
Attitude and behavioral factors in waste management in the construction industry of Malaysia
Begum, R. A., Siwar, C., Pereira, J. J., & Jaafar, A. H. (2009) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2009.01.005 · Cited by 315
A framework to overcome barriers to green innovation in SMEs using BWM and Fuzzy TOPSIS
Gupta, H., & Barua, M. K. (2018) · Science of The Total Environment · doi:10.1016/j.scitotenv.2018.03.173 · Cited by 294
Tam, V. W. Y. (2009) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2008.11.015 · Cited by 286
Self-citationBegum, R. A., Siwar, C., Pereira, J. J., & Jaafar, A. H. (2006) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2006.01.004 · Cited by 274
On the effectiveness in implementing a waste-management-plan method in construction
Tam, V. W. Y. (2008) · Waste Management · doi:10.1016/j.wasman.2007.04.007 · Cited by 263
Self-citationMapping Approach for Examining Waste Management on Construction Sites
Shen, L. Y., Tam, V. W. Y., Tam, C. M., & Drew, D. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2004)130:4(472 · Cited by 261
Self-citationFrom a literature review to a multi-perspective framework for reverse logistics barriers and drivers
Govindan, K., & Bouzon, M. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.03.040 · Cited by 256
Economic comparison of concrete recycling: A case study approach
Tam, V. W. Y. (2008) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2007.12.001 · Cited by 254
Self-citationMajumdar, A., & Sinha, S. K. (2019) · Sustainable Production and Consumption · doi:10.1016/j.spc.2018.10.005 · Cited by 238
Yuan, H. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.04.137 · Cited by 225
Best practice of prefabrication implementation in the Hong Kong public and private sectors
Tam, V. W. Y., Fung, I. W. H., Sing, M. C. P., & Ogunlana, S. O. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.09.045 · Cited by 212
Self-citationExamining the determinants of green innovation adoption in SMEs: a PLS-SEM approach
Jun, W., Ali, W., Bhutto, M. Y., Hussain, H., & Khan, N. A. (2019) · European Journal of Innovation Management · doi:10.1108/ejim-05-2019-0113 · Cited by 211
Critical Management Practices Influencing On-Site Waste Minimization in Construction Projects
Ajayi, S. O., Oyedele, L. O., Bilal, M., Akinade, O. O., Alaka, H. A., & Owolabi, H. A. (2017) · Waste Management · doi:10.1016/j.wasman.2016.10.040 · Cited by 200
Ruparathna, R., & Hewage, K. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.07.007 · Cited by 191
Ajayi, S. O., & Oyedele, L. O. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.01.075 · Cited by 191
“Among other environmental impacts of building and construction activities, increasing generation of construction waste is continuously raising concerns about environmental impacts, depletion of mineral resources and environmental health (Shen and Tam, 2002).”
Green supply chain management: an empirical investigation on the construction sector
Balasubramanian, S., & Shukla, V. (2017) · Supply Chain Management: An International Journal · doi:10.1108/scm-07-2016-0227 · Cited by 185
“These practices are relevant only to main/sub-Contractors, and involve considerations such as waste ma agement planning (Shen and Tam, 2002), the use of automation (Chen et al., 2010), the implementation of wastewater recycling technology (Shrestha, 2016), the adoption of offsite-prefabrication…”
BackgroundMethodInfluentialShurrab, J., Hussain, M., & Khan, M. (2019) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-02-2018-0056 · Cited by 182
Material Waste in the UAE Construction Industry: Main Causes and Minimization Practices
Al-Hajj, A., & Hamani, K. (2011) · Architectural Engineering and Design Management · doi:10.1080/17452007.2011.594576 · Cited by 173
“…(i) The same method has been used by Begum et al. (2006) in assessing the significance and levels of practice of waste minimisation factors in Malaysia; and by Shen and Tam (2002) in their study of the benefits of and barriers to the implementation of Environmental Management System in Hong Kong.”
BackgroundMethodAssessing the prioritization of barriers toward green innovation: small and medium enterprises Nexus
Chien, F., Kamran, H. W., Nawaz, M. A., Thach, N. N., Long, P. D., & Baloch, Z. A. (2022) · Environment, Development and Sustainability · doi:10.1007/s10668-021-01513-x · Cited by 170
Woo, C., Kim, M. G., Chung, Y., & Rho, J. J. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.05.119 · Cited by 161
Gangolells, M., Casals, M., Gassó, S., Forcada, N., Roca, X., & Fuertes, A. (2009) · Building and Environment · doi:10.1016/j.buildenv.2008.05.001 · Cited by 159
“Shen and Tam [15] classified construction-related environmental impacts as the extraction of environmental resources such as fossil fuels and minerals; the extension of consumption of generic resources; the production of waste that requires the consumption of land for disposal; and the pollution of the living environm…”
BackgroundPham, H., & Kim, S.-Y. (2019) · Sustainable Production and Consumption · doi:10.1016/j.spc.2019.05.003 · Cited by 158
Optimizing work–rest schedule for construction rebar workers in hot and humid environment
Yi, W., & Chan, A. P. C. (2013) · Building and Environment · doi:10.1016/j.buildenv.2012.12.012 · Cited by 107
Metadata
- Authors
- Shen, L. Y., & Tam, V. W. Y.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2002-10
- Volume
- 20
- Issue
- 7
- Pages
- 535-543
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2073531049
- Cited by
- 367
- References
- 5
- FWCI
- 15.88
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.