Risk management in the conceptual phase of a project
The DOI matches its Crossref record; 10 of the 10 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Corporate Culture and Performance
Kotter, J. P., & Heskett, J. L. (1992) · Cited by 3,367
Project management : a systems approach to planning, scheduling, and controlling
Kerzner, H. (1995) · Thammasat University Digital Collections · Cited by 3,099
Risk Management and Construction
Flanagan, R. (1993) · Medical Entomology and Zoology · Cited by 910
Morris, P. W. G. (1994) · doi:10.1680/mop.16934 · Cited by 645
The Creation and Change of Organizational Cultures: A Conceptual Framework
Gagliardi, P. (1986) · Organization Studies · doi:10.1177/017084068600700203 · Cited by 513
Flexible Manufacturing Organizations: Implications for Strategy Formulation and Organization Design
Nemetz, P. L., & Fry, L. W. (1988) · Academy of Management Review · doi:10.5465/amr.1988.4307510 · Cited by 312
Risk Analysis and Its Applications
Carter, H. (1984) · Journal of the Operational Research Society · doi:10.1057/jors.1984.90 · Cited by 219
Eccles, T. (1981) · Cited by 89
Usage and benefits of project risk analysis and management
Simister, S. (1994) · International Journal of Project Management · doi:10.1016/0263-7863(94)90003-5 · Cited by 84
Decision and Risk Analysis in a New Product and Facilities Planning Problem
Hertz, D., & Thomas, H. (1983) · Singapore Management University Institutional Knowledge (InK) (Singapore Management University) · Cited by 11
Cited by
Understanding the key risks in construction projects in China
Zou, P. X. W., Zhang, G., & Wang, J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.03.001 · Cited by 859
Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.01.003 · Cited by 574
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Project risk management in the Queensland engineering construction industry: a survey
Lyons, T., & Skitmore, M. (2004) · International Journal of Project Management · doi:10.1016/s0263-7863(03)00005-x · Cited by 340
Construction safety and digital design: A review
Zhou, W., Whyte, J., & Sacks, R. (2012) · Automation in Construction · doi:10.1016/j.autcon.2011.07.005 · Cited by 303
Factors affecting contractors’ risk attitudes in construction projects: Case study from China
Wang, J., & Yuan, H. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.02.006 · Cited by 216
“It is also the very phase at which the greatest degree of uncertainty about the future is encountered (Uher and Toakley, 1999), since the nature of complexity, dynamics and uncertainty of construction projects prevents projects from being implemented in real world the same as they were planned in the feasibility studi…”
BackgroundRisk Management in the Chinese Construction Industry
Tang, W., Qiang, M., Duffield, C. F., Young, D. M., & Lu, Y. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:12(944 · Cited by 198
“…tools, and techniques currently used by consultants Wood and Ellis 2003 ; 13 risk management in the © ASCE / DECEMBER 2007 conceptual phase of a project Uher and Toakley 1999 ; 14 risks perceived by the BOT road project participants in India Thomas et al. 2003 ; and 15 Kuwaiti contractors’…”
MethodHwang, K., & Choi, M. (2017) · Government Information Quarterly · doi:10.1016/j.giq.2017.02.001 · Cited by 85
Risk Assessment at the Design Phase of Construction Projects in Ghana
Awuni, M. A. (2019) · Journal of Building Construction and Planning Research · doi:10.4236/jbcpr.2019.72004 · Cited by 5
“[15] examined various structural and cultural factors concerned”
Background
Metadata
- Authors
- Uher, T. E., & Toakley, A. R.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 1999-06
- Volume
- 17
- Issue
- 3
- Pages
- 161-169
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W1995602025
- Cited by
- 175
- References
- 10
- FWCI
- 1.17
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.