Material Waste in Building Industry: Main Causes and Prevention
The DOI matches its Crossref record; 9 of the 9 references it cites were found in a registry or an index.
Abstract
Material waste has been recognized as a major problem in the construction industry that has important implications both for the efficiency industry and for the environmental impact of construction projects. Moreover, waste measurement plays an important role in the management of production systems since it is an effective way to assess their performance, allowing areas of potential improvement to be pointed out. This paper describes the main results of two research studies carried out in Brazil that investigated the occurrence of material waste at 74 building sites located in different regions of that country. Some typical figures for the waste of some key construction materials are provided, and the main causes of waste in the sector are discussed. The results indicate that the waste of materials in the Brazilian building industry is fairly high and that a large variability in waste incidence is found across different projects. Most of this waste can be avoided by implementing inexpensive preventive measures, mostly related to managerial improvements.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Principles of Scientific Management, The
(2015) · The SAGE Encyclopedia of Economics and Society · doi:10.4135/9781452206905.n541 · Cited by 5,038
An exploration towards a production theory and its application to construction
Koskela, L. (2000) · Aaltodoc (Aalto University) · Cited by 1,868
Application of the New Production Philosophy to Construction
Koskela, L., & Koskela, L. (1992) · Cited by 1,398
Toyota Production System: Practical Approach to Production Management
Monden, Y. (1983) · Cited by 612
Construction Waste: Quantification and Source Evaluation
Bossink, B. A. G., & Brouwers, H. J. H. (1996) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1996)122:1(55 · Cited by 578
Productivity improvement in construction
Oglesby, C. H., Parker, H. W., & Howell, G. A. (1988) · Medical Entomology and Zoology · Cited by 510
Source Evaluation of Solid Waste in Building Construction
Gavilan, R. M., & Bernold, L. E. (1994) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1994)120:3(536 · Cited by 257
Cost Management for Today's Advanced Manufacturing: The Cam-I Conceptual Design
Berliner, C., & Brimson, J. A. (1988) · Medical Entomology and Zoology · Cited by 244
Materials wastage – a misuse of resources
Skoyles, E. R. (1976) · Batiment International Building Research and Practice · doi:10.1080/09613217608550498 · Cited by 65
Cited by
Scrivener, K. L., John, V. M., & Gartner, E. M. (2018) · Cement and Concrete Research · doi:10.1016/j.cemconres.2018.03.015 · Cited by 3,620
Environmental impacts and decarbonization strategies in the cement and concrete industries
Habert, G., Miller, S. A., John, V. M., Provis, J. L., Favier, A., Horvath, A., & Scrivener, K. L. (2020) · Nature Reviews Earth & Environment · doi:10.1038/s43017-020-0093-3 · Cited by 1,572
Carbon dioxide reduction potential in the global cement industry by 2050
Miller, S. A., John, V. M., Pacca, S. A., & Horvath, A. (2018) · Cement and Concrete Research · doi:10.1016/j.cemconres.2017.08.026 · Cited by 757
Kabirifar, K., Mojtahedi, M., Wang, C., & Tam, V. W. Y. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.121265 · Cited by 695
Construction with digital twin information systems
Sacks, R., Brilakis, I., Pikas, E., Xie, H. S., & Girolami, M. (2020) · Data-Centric Engineering · doi:10.1017/dce.2020.16 · Cited by 609
Applying lean thinking in construction and performance improvement
Aziz, R. F., & Hafez, S. M. (2013) · Alexandria Engineering Journal · doi:10.1016/j.aej.2013.04.008 · Cited by 513
Ogunmakinde, O. E., Egbelakin, T., & Sher, W. (2022) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2021.106023 · Cited by 405
Quantifying construction and demolition waste: An analytical review
Wu, Z., Yu, A. T. W., Shen, L., & Liu, G. (2014) · Waste Management · doi:10.1016/j.wasman.2014.05.010 · Cited by 400
A framework for understanding waste management studies in construction
Lu, W., & Yuan, H. (2011) · Waste Management · doi:10.1016/j.wasman.2011.01.018 · Cited by 353
Attitude and behavioral factors in waste management in the construction industry of Malaysia
Begum, R. A., Siwar, C., Pereira, J. J., & Jaafar, A. H. (2009) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2009.01.005 · Cited by 315
Building waste assessment score: design-based tool
Ekanayake, L. L., & Ofori, G. (2004) · Building and Environment · doi:10.1016/j.buildenv.2004.01.007 · Cited by 289
Ajayi, S. O., Oyedele, L. O., Bilal, M., Akinade, O. O., Alaka, H. A., Owolabi, H. A., & Kadiri, K. O. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.06.001 · Cited by 282
Exploring factors influencing construction waste reduction: A structural equation modeling approach
Liu, J., Yi, Y., & Wang, X. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.123185 · Cited by 272
Strategies for Applying the Circular Economy to Prefabricated Buildings
Minunno, R., O’Grady, T., Morrison, G. M., Gruner, R. L., & Colling, M. (2018) · Buildings · doi:10.3390/buildings8090125 · Cited by 270
Lu, W., Yuan, H., Li, J., Hao, J. J. L., Mi, X., & Ding, Z. (2011) · Waste Management · doi:10.1016/j.wasman.2010.12.004 · Cited by 266
Li, J., Zuo, J., Cai, H., & Zillante, G. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.10.138 · Cited by 259
A SWOT analysis of successful construction waste management
Yuan, H. (2013) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2012.08.016 · Cited by 255
An agent-based framework for supply chain coordination in construction
Xue, X., Li, X., Shen, Q., & Wang, Y. (2005) · Automation in Construction · doi:10.1016/j.autcon.2004.08.010 · Cited by 254
Construction waste management policies and their effectiveness in Hong Kong: A longitudinal review
Lu, W., & Tam, V. W. Y. (2013) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2013.03.007 · Cited by 253
Factors Influencing Construction Waste Generation in Building Construction: Thailand’s Perspective
Luangcharoenrat, C., Intrachooto, S., Peansupap, V., & Sutthinarakorn, W. (2019) · Sustainability · doi:10.3390/su11133638 · Cited by 243
“Inadequate handling and improper transportation were the major sources of material waste [53].”
BackgroundEstimation of building-related construction and demolition waste in Shanghai
Ding, T., & Xiao, J. (2014) · Waste Management · doi:10.1016/j.wasman.2014.07.029 · Cited by 237
Won, J., & Cheng, J. C. P. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.02.002 · Cited by 221
Yuan, H., Chini, A. R., Lu, Y., & Shen, L. (2012) · Waste Management · doi:10.1016/j.wasman.2011.11.006 · Cited by 205
Critical Management Practices Influencing On-Site Waste Minimization in Construction Projects
Ajayi, S. O., Oyedele, L. O., Bilal, M., Akinade, O. O., Alaka, H. A., & Owolabi, H. A. (2017) · Waste Management · doi:10.1016/j.wasman.2016.10.040 · Cited by 200
Improving waste management in construction projects: An Australian study
Udawatta, N., Zuo, J., Chiveralls, K., & Zillante, G. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.05.003 · Cited by 199
A framework to improve construction processes: Integrating Lean, Green and Six Sigma
Banawi, A., & Bilec, M. M. (2014) · International Journal of Construction Management · doi:10.1080/15623599.2013.875266 · Cited by 184
“The tabulated questionnaire results in similar rankings of causal factors as what is found in the literature (Bossink & Brouwers 1996; Formoso et al. 2002; Rojas & Aramvareekul 2003; Poon et al. 2004; Tam 2008).”
BackgroundResultLean Methodologies and Techniques for Modular Construction: Chronological and Critical Review
Innella, F., Arashpour, M., & Bai, Y. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001712 · Cited by 180
A model for estimating construction waste generation index for building project in China
Li, J., Ding, Z., Mi, X., & Wang, J. (2013) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2013.02.015 · Cited by 171
Lost in transition: the transfer of lean manufacturing to construction
Jørgensen, B., & Emmitt, S. (2008) · Engineering, Construction and Architectural Management · doi:10.1108/09699980810886874 · Cited by 169
Hoang, N. H., Ishigaki, T., Kubota, R., Tong, T. K., Nguyen, T. T., Nguyen, H. G., Yamada, M., & Kawamoto, K. (2020) · Waste Management · doi:10.1016/j.wasman.2020.08.006 · Cited by 127
Construction and Demolition (C&D) Waste Management and Disposal
Hassan, S. H., Aziz, H. A., Johari, I., & Hung, Y.-T. (2022) · Handbook of Environmental Engineering · doi:10.1007/978-3-030-89336-1_3 · Cited by 16
Procedural Passport: A Framework for Circularity In Buildings.
Arole, O. I. (2019) · Environmental Design · doi:10.11575/prism/37120
Metadata
- Authors
- Formoso, C. T., Soibelman, L., De Cesare, C., & Isatto, E. L.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2002-08
- Volume
- 128
- Issue
- 4
- Pages
- 316-325
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2002)128:4(316
- OpenAlex
- W2113869233
- Cited by
- 434
- References
- 9
- FWCI
- 23.83
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.