Critical Success Factors for Public–Private Partnerships in Infrastructure Development
The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Abstract
Different types of public–private partnerships (PPPs) have been practiced in worldwide infrastructure development with diverse results and a variety of problems have been encountered. A number of factors combine to determine the success or failure of an infrastructure project in terms of its objectives. There is an urgent need for a workable and efficient procurement protocol for improved practices in future PPP projects. As an important step toward the development of such a protocol, this study identifies, analyzes, and categorizes various critical success factors (CSFs) for PPPs in general based on a public–private win–win principle and a systematic research approach that includes case studies, literature review, and interviews/correspondence with international experts. A CSF package is developed that contains five main CSFs, each including a number of success subfactors (SSFs). Relative significances of these CSFs and SSFs are examined based on the results of a questionnaire survey of international expert opinions. Agreement analysis shows that there is a good agreement in the ranking of these CSFs and SSFs between respondents from the industrial sector and those from the academic sector.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Critical Success Factors for Construction Projects
Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., & Coyle, M. (1992) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1992)118:1(94 · Cited by 478
Causes of High Costs of Construction in Nigeria
Okpala, D. C., & Aniekwu, A. N. (1988) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1988)114:2(233 · Cited by 234
Cited by
Osei-Kyei, R., & Chan, A. P. C. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.02.008 · Cited by 803
Towards a Comprehensive Understanding of Public Private Partnerships for Infrastructure Development
Kwak, Y. H., Chih, Y., & Ibbs, C. W. (2009) · California Management Review · doi:10.2307/41166480 · Cited by 582
Hwang, B.-G., Zhao, X., & Gay, M. J. S. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.08.003 · Cited by 410
Yuan, J., Zeng, A. Y., Skibniewski, M. J., & Li, Q. (2009) · Construction Management and Economics · doi:10.1080/01446190902748705 · Cited by 327
A review of emerging trends in global PPP research: analysis and visualization
Song, J., Zhang, H., & Dong, W. (2016) · Scientometrics · doi:10.1007/s11192-016-1918-1 · Cited by 323
Research Trend of Public-Private Partnership in Construction Journals
Ke, Y., Wang, S., Chan, A. P., & Cheung, E. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:10(1076 · Cited by 309
Identifying the critical success factors for relationship management in PPP projects
Zou, W., Kumaraswamy, M., Chung, J., & Wong, J. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.05.004 · Cited by 265
Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects
Iyer, K. C., & Jha, K. N. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:8(871 · Cited by 244
Commitment, coordination, competence and the iron triangle
Jha, K. N., & Iyer, K. C. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.009 · Cited by 243
“In recent researches Zhang [22] studied CSF for public–private partnership in infrastructure development while Abraham [23] studied CSF for the construction industry.”
BackgroundCritical success factors (CSFs) for sustainable affordable housing
Adabre, M. A., & Chan, A. P. C. (2019) · Building and Environment · doi:10.1016/j.buildenv.2019.04.030 · Cited by 219
Life Cycle Critical Success Factors for Public-Private Partnership Infrastructure Projects
Liu, J., Love, P. E. D., Smith, J., Regan, M., & Davis, P. R. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000307 · Cited by 201
“” This inherent characteristic of PPPs acts a trigger for producing the complexity of factors that can contribute to PPP project success, which in turn determines the necessity for this type of study with regard to CSFs for PPPs (Zhang 2005).”
BackgroundResultInfluentialStakeholder dynamics and responsibilities in Public–Private Partnerships: A mixed experience
De Schepper, S., Dooms, M., & Haezendonck, E. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.01.006 · Cited by 190
“Stakeholder opposition mainly emerges from the gap between expectations of different stakeholders involved in PPPs on the desired process or outcome of the project (Levy, 1996; Zhang, 2005).”
BackgroundFuzzy AHP-Based Risk Assessment Methodology for PPP Projects
Li, J., & Zou, P. X. W. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000362 · Cited by 182
“There have been many spectacularly unsuccessful PPP projects, such as the Malaysian Privatized National Sewerage project, Parkeerschap Den Bosch, the Betuwe Railway in Netherlands (Zhang 2005), the Sydney Airport Link, the Sydney Cross City Tunnel, the 9th Shen Yang Water Plant, the 4th Min Jiang River Bridge in Fuzho…”
BackgroundZhao, Z.-Y., Zuo, J., & Zillante, G. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.08.066 · Cited by 171
Sony, M., Antony, J., Mc Dermott, O., & Garza-Reyes, J. A. (2021) · Technology in Society · doi:10.1016/j.techsoc.2021.101754 · Cited by 170
Ahmadabadi, A. A., & Heravi, G. (2019) · Transport Policy · doi:10.1016/j.tranpol.2018.07.004 · Cited by 166
Yuan, J., Wang, C., Skibniewski, M. J., & Li, Q. (2012) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000113 · Cited by 164
“70 recommended in Nunnally’s (1978) guideline and Zhang’s (2006) similar research, which suggest that, in the early stages of research on predictive tests or hypothesized measures of a construct, reliability of 0.”
BackgroundValipour, A., Yahaya, N., Md Noor, N., Kildienė, S., Sarvari, H., & Mardani, A. (2015) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2015.1051104 · Cited by 111
Yevu, S. K., Yu, A. T. W., Nani, G., Darko, A., & Tetteh, M. O. (2022) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002213 · Cited by 22
IT PROJECT RISK MANAGEMENT: AN ANALYTICAL REVIEW OF RESEARCH
Yasinetskyi, O., & Fesenko, T. (2025) · Bulletin of NTU "KhPI". Series: Strategic management, portfolio, program and project management · doi:10.20998/2413-3000.2025.10.6 · Cited by 3
Metadata
- Authors
- Zhang, X.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2005-01
- Volume
- 131
- Issue
- 1
- Pages
- 3-14
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2005)131:1(3
- OpenAlex
- W2100809862
- Cited by
- 748
- References
- 2
- FWCI
- 23.73
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.