Automated Progress Monitoring Using Unordered Daily Construction Photographs and IFC-Based Building Information Models
The DOI matches its Crossref record; 46 of the 46 references it cites were found in a registry or an index.
Abstract
Accurate and efficient tracking, analysis and visualization of as-built (actual) status of buildings under construction are critical components of a successful project monitoring. Such information directly supports control decision-making and if automated, can significantly impact management of a project. This paper presents a new automated approach for recognition of physical progress based on two emerging sources of information: (1) unordered daily construction photo collections, which are currently collected at almost no cost on all construction sites; and (2) building information models (BIMs), which are increasingly turning into binding components of architecture/engineering/construction contracts. First, given a set of unordered and uncalibrated site photographs, an approach based on structure-from-motion, multiview stereo, and voxel coloring and labeling algorithms is presented that calibrates cameras, photorealistically reconstructs a dense as-built point cloud model in four dimensions (three dimensions + time), and traverses and labels the scene for occupancy. This strategy explicitly accounts for occlusions and allows input images to be taken far apart and widely distributed around the environment. An Industry Foundation Class–based (IFC-based) BIM is subsequently fused into the as-built scene by a robust registration step and is traversed and labeled for expected progress visibility. Next, a machine-learning scheme built upon a Bayesian probabilistic model is proposed that automatically detects physical progress in the presence of occlusions and demonstrates that physical progress monitoring at schedule activity level could be fully automated. Finally, the system enables the expected and reconstructed elements to be explored with an interactive, image-based, three-dimensional (3D) viewer where deviations are automatically color-coded over the IFC-based BIM. To that extent, the underlying hypotheses and algorithms for generating integrated four-dimensional (4D) as-built and as-planned models plus automated progress monitoring are presented. Experimental results are reported for challenging image data sets collected under different lighting conditions and severe occlusions from two ongoing building construction projects. This marks the presented model as being the first probabilistic model for automated progress tracking and visualization of deviations that incorporates both as-planned models and unordered daily photographs in a principled way.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Distinctive Image Features from Scale-Invariant Keypoints
Lowe, D. G. (2004) · International Journal of Computer Vision · doi:10.1023/b:visi.0000029664.99615.94 · Cited by 62,647
LIBSVM: A library for support vector machines
Chang, C.-C., & Lin, C.-J. (2011) · ACM Transactions on Intelligent Systems and Technology · doi:10.1145/1961189.1961199 · Cited by 40,918
Multiple View Geometry in Computer Vision
Hartley, R., & Zisserman, A. (2004) · doi:10.1017/cbo9780511811685 · Cited by 21,070
A method for registration of 3-D shapes
Besl, P. J., & McKay, N. D. (1992) · IEEE Transactions on Pattern Analysis and Machine Intelligence · doi:10.1109/34.121791 · Cited by 18,103
Closed-form solution of absolute orientation using unit quaternions
Horn, B. K. P. (1987) · Journal of the Optical Society of America A · doi:10.1364/josaa.4.000629 · Cited by 4,116
Bundle Adjustment — A Modern Synthesis
Triggs, B., McLauchlan, P. F., Hartley, R. I., & Fitzgibbon, A. W. (2000) · Lecture Notes in Computer Science · doi:10.1007/3-540-44480-7_21 · Cited by 3,988
A Short Introduction to Boosting
Freund, Y., & Schapire, R. E. (1999) · Cited by 3,155
Accurate, Dense, and Robust Multiview Stereopsis
Furukawa, Y., & Ponce, J. (2010) · IEEE Transactions on Pattern Analysis and Machine Intelligence · doi:10.1109/tpami.2009.161 · Cited by 3,019
Photo tourism: exploring photo collections in 3D
Snavely, N., Seitz, S. M., & Szeliski, R. (2006) · ACM Transactions on Graphics · doi:10.1145/1141911.1141964 · Cited by 2,866
Modeling the World from Internet Photo Collections
Snavely, N., Seitz, S. M., & Szeliski, R. (2008) · International Journal of Computer Vision · doi:10.1007/s11263-007-0107-3 · Cited by 2,155
An efficient solution to the five-point relative pose problem
Nister, D. (2004) · IEEE Transactions on Pattern Analysis and Machine Intelligence · doi:10.1109/tpami.2004.17 · Cited by 2,009
Modeling and rendering architecture from photographs: a hybrid geometry- and image-based approach
Debevec, P. E., Taylor, C. J., & Malik, J. (1996) · Proceedings of the 23rd annual conference on Computer graphics and interactive techniques · doi:10.1145/237170.237191 · Cited by 1,905
The digital Michelangelo project
Levoy, M. (2003) · Second International Conference on 3-D Digital Imaging and Modeling (Cat. No.PR00062) · doi:10.1109/im.1999.805329 · Cited by 1,608
Project management — A managerial approach
(1989) · European Journal of Operational Research · doi:10.1016/0377-2217(89)90451-7 · Cited by 1,547
Agarwal, S., Snavely, N., Simon, I., Seitz, S. M., & Szeliski, R. (2009) · 2009 IEEE 12th International Conference on Computer Vision · doi:10.1109/iccv.2009.5459148 · Cited by 1,067
Detailed Real-Time Urban 3D Reconstruction from Video
Pollefeys, M., Nistér, D., Frahm, J.-M., Akbarzadeh, A., Mordohai, P., Clipp, B., Engels, C., Gallup, D., Kim, S.-J., Merrell, P., et al. (2008) · International Journal of Computer Vision · doi:10.1007/s11263-007-0086-4 · Cited by 717
A New Approach for Health Monitoring of Structures: Terrestrial Laser Scanning
Park, H. S., Lee, H. M., Adeli, H., & Lee, I. (2007) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/j.1467-8667.2006.00466.x · Cited by 589
Photorealistic Scene Reconstruction by Voxel Coloring
Seitz, S. M., & Dyer, C. R. (1999) · International Journal of Computer Vision · doi:10.1023/a:1008176507526 · Cited by 492
Feasibility Study of 4D CAD in Commercial Construction
Koo, B., & Fischer, M. A. (2000) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2000)126:4(251 · Cited by 485
Bosché, F. (2010) · Advanced Engineering Informatics · doi:10.1016/j.aei.2009.08.006 · Cited by 482
LIBLINEAR: A Library for Large Linear Classification
FanRong-En, ChangKai-Wei, HsiehCho-Jui, WangXiang-Rui, & LinChih-Jen (2008) · Journal of Machine Learning Research · doi:10.5555/1390681.1442794 · Cited by 328
Reconstructing building interiors from images
Furukawa, Y., Curless, B., Seitz, S. M., & Szeliski, R. (2009) · 2009 IEEE 12th International Conference on Computer Vision · doi:10.1109/iccv.2009.5459145 · Cited by 315
Integrating 3D laser scanning and photogrammetry for progress measurement of construction work
El‐Omari, S., & Moselhi, O. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.05.006 · Cited by 296
Golparvar-Fard, M., Peña-Mora, F., Arboleda, C. A., & Lee, S. (2009) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2009)23:6(391 · Cited by 259
Self-citationAssessing research issues in Automated Project Performance Control (APPC)
Navon, R., & Sacks, R. (2007) · Automation in Construction · doi:10.1016/j.autcon.2006.08.001 · Cited by 225
3D Urban Scene Modeling Integrating Recognition and Reconstruction
Cornelis, N., Leibe, B., Cornelis, K., & Van Gool, L. (2008) · International Journal of Computer Vision · doi:10.1007/s11263-007-0081-9 · Cited by 217
Golparvar-Fard, M., Peña-Mora, F., & Savarese, S. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000371 · Cited by 210
Self-citationModel-based object recognition in dense-range images—a review
Arman, F., & Aggarwal, J. K. (1993) · ACM Computing Surveys · doi:10.1145/151254.151255 · Cited by 209
Interactive 3D architectural modeling from unordered photo collections
Sinha, S. N., Steedly, D., Szeliski, R., Agrawala, M., & Pollefeys, M. (2008) · ACM Transactions on Graphics · doi:10.1145/1409060.1409112 · Cited by 208
Interactive 3D architectural modeling from unordered photo collections
Sinha, S. N., Steedly, D., Szeliski, R., Agrawala, M., & Pollefeys, M. (2008) · ACM SIGGRAPH Asia 2008 papers · doi:10.1145/1457515.1409112 · Cited by 194
Bosché, F., Haas, C. T., & Akinci, B. (2009) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2009)23:6(311 · Cited by 160
Fusion of Feature- and Area-Based Information for Urban Buildings Modeling from Aerial Imagery
Zebedin, L., Bauer, J., Karner, K., & Bischof, H. (2008) · Lecture notes in computer science · doi:10.1007/978-3-540-88693-8_64 · Cited by 142
Automating progress measurement of construction projects
Zhang, X., Bakis, N., Lukins, T. C., Ibrahim, Y. M., Wu, S., Kagioglou, M., Aouad, G. F., Kaka, A. P., & Trucco, E. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.09.004 · Cited by 142
Ibrahim, Y. M., Lukins, T. C., Zhang, X., Trucco, E., & Kaka, A. P. (2008) · Advanced Engineering Informatics · doi:10.1016/j.aei.2008.07.002 · Cited by 140
Detecting and matching repeated patterns for automatic geo-tagging in urban environments
Schindler, G., Krishnamurthy, P., Lublinerman, R., et al. (2008) · IEEE Computer Society Conference on Computer Vision and Pattern Recognition/Proceedings - IEEE Computer Society Conference on Computer Vision and Pattern Recognition/Proceedings · doi:10.1109/cvpr.2008.4587461 · Cited by 124
Kiziltas, S., Akinci, B., Ergen, E., Tang, P., & Gordon, C. (2008) · Cited by 109
PHOTO-NET II: a computer-based monitoring system applied to project management
Abeid, J., Allouche, E. N., Arditi, D., & Hayman, M. (2003) · Automation in Construction · doi:10.1016/s0926-5805(03)00042-6 · Cited by 106
Application of Visualization Techniques for Construction Progress Monitoring
Fard, M. G., & Pena-Mora, F. A. (2007) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/40937(261)27 · Cited by 99
AN Extension of the ICP Algorithm Considering Scale Factor
Du, S., Zheng, N., Ying, S., You, Q., & Wu, Y. S. (2007) · Proceedings - International Conference on Image Processing · doi:10.1109/icip.2007.4379798 · Cited by 78
Comparison of construction photograph and VR image in construction progress
Kim, H., & Kano, N. (2007) · Automation in Construction · doi:10.1016/j.autcon.2006.12.005 · Cited by 66
Towards Automated Visual Assessment of Progress in Construction Projects
Lukins, T. C., & Trucco, E. (2007) · British Machine Vision Conference (BMVC) · doi:10.5244/c.21.18 · Cited by 47
Framework for Real-Time Three-Dimensional Modeling of Infrastructure
Teizer, J., Kim, C., Haas, C. T., Liapi, K. A., & Caldas, C. H. (2005) · Transportation Research Record Journal of the Transportation Research Board · doi:10.1177/0361198105191300117 · Cited by 38
Digital image reasoning for tracking excavation activities
Quiñones-Rozo, C., Hashash, Y. M. A., & Liu, L. Y. (2008) · Automation in Construction · doi:10.1016/j.autcon.2007.10.008 · Cited by 32
High-fidelity image-based modeling
Ponce, J., & Furukawa, Y. (2008) · Cited by 23
Digital Imaging in Assessment of Construction Project Progress
Wu, Y., & Kim, H. (2004) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2004/0093 · Cited by 23
Audio/visual information in construction project control
Abudayyeh, O. Y. (1997) · Advances in Engineering Software · doi:10.1016/s0965-9978(96)00046-4 · Cited by 13
Cited by
Baduge, S. K., Thilakarathna, S., Perera, J. S., Arashpour, M., Sharafi, P., Teodosio, B., Shringi, A., & Mendis, P. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104440 · Cited by 1,007
“SVM has been used for progress monitoring using point clouds and 4D BIM by Golparvar-Fard et al. [152] while it has been used to identify and document concrete regions in construction photographs for as-built component identification by Zhu et al. [153].”
MethodBosché, F., Ahmed, M., Turkan, Y., Haas, C. T., & Haas, R. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.05.014 · Cited by 550
Computer vision techniques in construction: A critical review
Xu, S., Wang, J., Shou, W., Ngo, T., Sadick, A.-M., & Wang, X. (2021) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-020-09504-3 · Cited by 409
“In addition to the mainstream studies that use an aligned scan-vs-BIM method to identify discrepancies in construction progress [41, 119], BIM (sometimes in the form of a 3D CAD model) can help filter outliers and refine the reconstructed point clouds [16, 32, 77], assist with object detection in…”
BackgroundMethodA review of 3D reconstruction techniques in civil engineering and their applications
Ma, Z., & Liu, S. (2018) · Advanced Engineering Informatics · doi:10.1016/j.aei.2018.05.005 · Cited by 347
Ding, L., Zhou, Y., & Akinci, B. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.009 · Cited by 330
Metadata
- Authors
- Golparvar-Fard, M., Peña-Mora, F., & Savarese, S.
- Venue
- Journal of Computing in Civil Engineering
- Published
- 2015-01
- Volume
- 29
- Issue
- 1
- ISSN
- 0887-3801 (ISSN-L)
- 1943-5487
- OpenAlex
- W1989502406
- Cited by
- 404
- References
- 46
- FWCI
- 38.06
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.