Leanness assessment using multi-grade fuzzy approach
The DOI matches its Crossref record; 25 of the 25 references it cites were found in a registry or an index.
Abstract
The manufacturing organisations have been witnessing a transition from mass manufacturing to lean manufacturing. Lean operations are characterised by the elimination of obvious wastes occurring in the manufacturing process, thereby facilitating cost reduction. This paper reports a research carried out to assess the leanness of an organisation using multi-grade fuzzy approach. During this research, a leanness measurement model incorporated with multi-grade fuzzy approach was designed. This is followed by the substitution of the data gathered from a manufacturing organisation. After the computation of leanness index, the areas for leanness improvement have been identified. The approach contributed in this project could be used as a test kit for periodically evaluating an organisation's leanness.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Lean manufacturing: context, practice bundles, and performance
Shah, R., & Ward, P. T. (2003) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00108-0 · Cited by 2,897 · cited 2×
“Shah and Ward ( 2003 ) have provided a comprehensive definition of lean production which is an integrated socio-technical system whose objective is to eliminate waste by reducing and minimising the supplier, customer and internal variability.”
BackgroundDefining and developing measures of lean production
Shah, R., & Ward, P. T. (2007) · Journal of Operations Management · doi:10.1016/j.jom.2007.01.019 · Cited by 2,399 · cited 2×
“Shah and Ward ( 2007 ) have defined the measures of lean production.”
BackgroundAbdulmalek, F. A., & Rajgopal, J. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.09.009 · Cited by 1,046 · cited 2×
“Some of the enabling techniques of lean manufacturing include total quality management (TQM), total productive maintenance (TPM), Kaizen, Kanban, single minute exchange of dies (SMED) and value stream mapping (VSM) (Doolen and Hacker 2005 , Abdulmalek and Rajgopal 2007 , Lian and Van Landeghem 2007 ).”
BackgroundThe seven value stream mapping tools
Hines, P., & Rich, N. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710157989 · Cited by 944 · cited 2×
“The seven wastes include overproduction, waiting, transport, inappropriate processing, unnecessary inventory, unnecessary motion and defects (Hines and Rich 1997, Modarress et al. 2005).”
BackgroundDisentangling leanness and agility: An empirical investigation
Narasimhan, R., Swink, M., & Kim, S. W. (2006) · Journal of Operations Management · doi:10.1016/j.jom.2005.11.011 · Cited by 680 · cited 2×
“( 2006 ) have presented the empirical investigation of disentangling leanness and agility.”
BackgroundLean, agile or leagile? Matching your supply chain to the marketplace
Mason-Jones, R., Naylor, B., & Towill, D. R. (2000) · International Journal of Production Research · doi:10.1080/00207540050204920 · Cited by 595 · cited 1×
“Mason-Jones et al. (2000) have matched various strategies of supply chain with product type.”
BackgroundClassification scheme for lean manufacturing tools
Pavnaskar, S. J., Gershenson, J. K., & Jambekar, A. B. (2003) · International Journal of Production Research · doi:10.1080/0020754021000049817 · Cited by 466 · cited 2×
“Pavnaskar et al. (2003) have presented a classification scheme for lean manufacturing tools.”
BackgroundDoolen, T. L., & Hacker, M. E. (2005) · Journal of Manufacturing Systems · doi:10.1016/s0278-6125(05)80007-x · Cited by 347 · cited 6×
“The VSM has been adopted for streamlining the processes.”
BackgroundInfluentialA new value stream mapping approach for complex production systems
Braglia, M., Carmignani, G., & Zammori, F. (2006) · International Journal of Production Research · doi:10.1080/00207540600690545 · Cited by 298 · cited 2×
“Braglia et al. (2006) have presented a new approach for a complex production system based on seven iterative steps associated with typical industrial engineering tools including VSM.”
BackgroundDetty, R. B., & Yingling, J. C. (2000) · International Journal of Production Research · doi:10.1080/002075400189509 · Cited by 274 · cited 1×
“…production include; setup time reduction, simplicity in product design, adherence to daily schedule, customer focus, work force management, etc. Detty and Yingling (2000) have attempted to quantify the benefits of implementing lean manufacturing at an assembly operation using simulation based…”
BackgroundBayou, M. E., & de Korvin, A. (2008) · Journal of Engineering and Technology Management · doi:10.1016/j.jengtecman.2008.10.003 · Cited by 247
The Toyota Production System and art: making highly customized and creative products the Toyota way
Lander, E., & Liker, J. K. (2007) · International Journal of Production Research · doi:10.1080/00207540701223519 · Cited by 232 · cited 2×
“Lander and Liker (2007) have presented a case example of a low volume, highly customised artistic clay tile company which has utilised a Toyota Production System (TPS) approach for creating highly customised products.”
BackgroundAnalysing the effects of Lean manufacturing using a value stream mapping-based simulation generator
Lian, Y.-H., & Van Landeghem, H. (2007) · International Journal of Production Research · doi:10.1080/00207540600791590 · Cited by 191 · cited 5×
“Mason-Jones et al. (2000) have matched various strategies of supply chain with product type. They have introduced a ‘leagile’ approach which determines the decoupling point between lean and agile paradigms in a supply chain. Sullivan et al. (2002) have presented the performance of equipment replacement decision proble…”
BackgroundInfluentialEquipment replacement decisions and lean manufacturing
Sullivan, W. G., McDonald, T. N., & Aken, E. M. V. (2002) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/s0736-5845(02)00016-9 · Cited by 171 · cited 1×
“Sullivan et al. (2002) have presented the performance of equipment replacement decision problems within the context of lean manufacturing.”
BackgroundDesign rules for implementing the Toyota Production System
Black†, J. (2007) · International Journal of Production Research · doi:10.1080/00207540701223469 · Cited by 160 · cited 5×
“Black (2007) has presented design rules for implementing the principles of TPS.”
MethodInfluentialAgility evaluation of mass customization product manufacturing
Yang, S., & Li, T. F. (2002) · Journal of Materials Processing Technology · doi:10.1016/s0924-0136(02)00674-x · Cited by 155 · cited 3×
“Multi-grade fuzzy approach has been used for computation of leanness (Yang and Li 2002).”
BackgroundMethodInfluentialEvaluation of value stream mapping in manufacturing system redesign
Serrano, I., Ochoa, C., & Castro, R. D. (2008) · International Journal of Production Research · doi:10.1080/00207540601182302 · Cited by 145 · cited 1×
“Lean operations are characterised by the elimination of wastes occurring in the manufacturing process, thereby facilitating cost reduction (Serrano et al. 2008).”
BackgroundImproving Quality through Value Stream Mapping: A Case Study of a Physician's Clinic
Lummus, R. R., Vokurka, R. J., & Rodeghiero, B. (2006) · Total Quality Management & Business Excellence · doi:10.1080/14783360600748091 · Cited by 137 · cited 1×
“This is followed by the emergence of lean manufacturing where the focus is on waste elimination thereby achieving cost reduction (Muda and Hendry 2002, Lummus et al. 2006).”
BackgroundMeasuring the impact of Lean tools on the cost–time investment of a product using cost–time profiles
Rivera, L., & Frank Chen, F. (2007) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2007.02.013 · Cited by 134 · cited 2×
“Rivera and Chen ( 2007 ) have measured the impact of lean tools on the cost-time investment of a product using a cost-time profile.”
BackgroundMethodAn extended model of design process of lean production systems by means of process variables
Houshmand, M., & Jamshidnezhad, B. (2005) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2005.01.004 · Cited by 134 · cited 2×
“The tools and techniques of lean manufacturing include TQM, TPM, Kanban, Kaizen, SMED, Poka-Yoke, and visual control, etc. Houshmand and Jamshidnezhad (2006) have presented an extended model of design process of lean production system by means of process variables.”
BackgroundMethodKaizen costing for lean manufacturing: a case study
Modarress, B., Ansari *, A., & Lockwood, D. L. (2005) · International Journal of Production Research · doi:10.1080/00207540500034174 · Cited by 116 · cited 1×
“The seven wastes include overproduction, waiting, transport, inappropriate processing, unnecessary inventory, unnecessary motion and defects (Hines and Rich 1997, Modarress et al. 2005).”
BackgroundLean and reflective production: the dynamic nature of production models
Pil, F. K., & Fujimoto, T. (2007) · International Journal of Production Research · doi:10.1080/00207540701223659 · Cited by 92 · cited 1×
“2.1 Literature review on lean manufacturing and assessment Lean principles have been originated from Toyota’s production system known as just in time (JIT) production (Tang et al. 2005, Pil and Fujimoto 2007).”
BackgroundInfluentialA Research Agenda for Value Stream Mapping the Sales Process
Barber, C. S., & Tîetje, B. C. (2008) · Journal of Personal Selling and Sales Management · doi:10.2753/pss0885-3134280204 · Cited by 88 · cited 1×
“Lean manufacturing is characterised by low buffering cost, minimum processing time and high delivery speed (Barber and Tietje 2008).”
BackgroundLean tool selection in a die casting unit: a fuzzy-based decision support heuristic
Singh, R. K., Kumar, S., Choudhury, A. K., & Tiwari, M. K. (2006) · International Journal of Production Research · doi:10.1080/00207540500272980 · Cited by 73
Technopreneurship in Native American businesses: current issues and future with a case study
Chen, J. C. H., Parker, L. J., & Lin, B. (2005) · International Journal of Management and Enterprise Development · doi:10.1504/ijmed.2006.008243 · Cited by 46 · cited 1×
“The contemporary manufacturing organisations have been witnessing a transformation in the manufacturing paradigm (Chen et al. 2006).”
Background
Cited by
A Systematic Literature Review on Recent Lean Research: State‐of‐the‐art and Future Directions
Danese, P., Manfè, V., & Romano, P. (2018) · International Journal of Management Reviews · doi:10.1111/ijmr.12156 · Cited by 345
Antony, J., Psomas, E., Garza-Reyes, J. A., & Hines, P. (2021) · Production Planning & Control · doi:10.1080/09537287.2020.1776410 · Cited by 116
Research gaps in Lean manufacturing: a systematic literature review
Psomas, E., & Antony, J. (2019) · International Journal of Quality & Reliability Management · doi:10.1108/ijqrm-12-2017-0260 · Cited by 93
What can we learn from the evolution of research on lean management assessment?
Camacho-Miñano, M.-D.-M., Moyano-Fuentes, J., & Sacristán-Díaz, M. (2013) · International Journal of Production Research · doi:10.1080/00207543.2012.677550 · Cited by 85
Metadata
- Authors
- Vinodh, S., & Chintha, S. K.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2011-01-15
- Volume
- 49
- Issue
- 2
- Pages
- 431-445
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W2082920734
- Cited by
- 194
- References
- 25
- FWCI
- 19.58
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.