CoChat

Implications of Construction 4.0 to the workforce and organizational structures

Open access
García de Soto, Borja, Agustí-Juan, Isolda, Joss, Samuel, Hunhevicz, Jens · 2022 · International Journal of Construction Management
Cited by 205

The DOI matches its Crossref record; 25 of the 25 references it cites were found in a registry or an index.

Abstract

The counterpart of Industry 4.0 in the AEC/FM industry is known as Construction 4.0. Its essence is the digitalization and automation of the AEC/FM industry. As robots and other technologies make their way into the different phases of the lifecycle of construction projects, the concern about the future of jobs and wages will increase. While the use of robotics has the potential to improve productivity and safety, it should not necessarily reduce total employment in the construction sector in the long run. It is expected that existing roles will evolve, and new roles will be created (e.g., in addition to designers there will be a need for employees with digital skills). Focusing on the construction phase of a robotically built concrete wall, the different roles were evaluated. From this study, it was found that there will be a time in which conventional construction and robotic technologies will coexist, leading to a higher job variability and new roles, both at the managerial and operations/execution levels. Although this study is not meant to be an exact representation of how the AEC/FM roles will change as a consequence of Construction 4.0, it opens the debate and research in this area.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1080/15623599.2019.1616414

Cites

25 of 25 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Research works printed but not linked: 27

  1. 10.1080/014461997373006 · doi:10.1080/014461997373006
  2. 10.1016/0263-7863(87)90020-2 · doi:10.1016/0263-7863(87)90020-2
  3. Bock T. 2008. Digital design and robotic production 3-D shaped precast components. The 25th International Symposium on Automation in Construction, Vilnius, Lituania, 2008, 11–21, ISARC-2008. DOI: https://doi.org/10.22260/ISARC2008/0005 · doi:10.3846/isarc.20080626.11
  4. 10.1061/(ASCE)0733-9364(1995)121:1(143) · doi:10.1061/(asce)0733-9364(1995)121:1(143
  5. Cisneros R, 2018, IROS: International Conference on Intelligent Robots and Systems
  6. Cleland DI., 1986, Proj Manag J, 17, 36
  7. 10.1061/(ASCE)0733-9364(1994)120:2(443) · doi:10.1061/(asce)0733-9364(1994)120:2(443
  8. Gambao E, 1999, Proceedings of the 16th ISARC, Madrid, Spain
  9. García de Soto B, 2018, Sixth Creative Construction Conference 2018
  10. Gramazio F, 2014, The robotic touch: how robots change architecture: Gramazio & Kohler Research ETH Zurich 2005-2013
  11. 10.1111/j.1467-8667.1995.tb00298.x · doi:10.1111/j.1467-8667.1995.tb00298.x
  12. Hall D., 2018, Engineering Project Organization Conference (EPOC)
  13. Herbsman Z, Ellis R. 1988. Potential application of robotics in highway construction. Proceedings of the 5th International Symposium on Robotics in Construction, Japan Industrial Robot Association, Tokyo, Japan, June; pp. 299–308. DOI: https://doi.org/10.22260/ISARC1988/0037 · doi:10.22260/isarc1988/0037
  14. Hu W., 2005, roceedings of Construction Research Congress (CRC) 2005
  15. Kobayashi T, Honda S, Tsukhara Y. 1988. Study on a robotic system for pavement cutting work. In Proceedings to the 5th International Symposium on Robotics in Construction, Japan Industrial Robot Association, Tokyo, Japan, June; pp. 289–298. DOI: https://doi.org/10.22260/ISARC1988/0036 · doi:10.22260/isarc1988/0036
  16. 10.1061/(ASCE)0733-9364(2004)130:1(75) · doi:10.1061/(asce)0733-9364(2004)130:1(75
  17. Matarić MJ., 2007, The robotics primer
  18. Morales G, Herbzman Z, Najafi FT. 1999. Robots and construction automation. InProceedings of ISARC 1999, 16th Automation and Robotics in Construction, Madrid, Spain; pp. 283–288. DOI:https://doi.org/10.22260/ISARC1999/0043 · doi:10.22260/isarc1999/0043
  19. 10.1007/978-3-540-78831-7_3 · doi:10.1007/978-3-540-78831-7_3
  20. OECD, 2016, Automation and independent work in a digital economy, policy brief on the future of work
  21. Sheffer DA. 2011. Innovation in modular industries: Implementing energy-efficient innovations in US buildings. PhD Thesis. Stanford University, Stanford, USA. (accessed 2017 October 14) http://purl.stanford.edu/rq526jy0504
  22. Skibniewski MJ., 1988, Robotics in civil engineering
  23. 10.1061/(ASCE)0733-947X(1990)116:3(261) · doi:10.1061/(asce)0733-947x(1990)116:3(261
  24. 10.1016/j.proeng.2016.11.619 · doi:10.1016/j.proeng.2016.11.619
  25. Warszawski A. 1984b. Application of Robotics to Building Construction. In: Proceedings of the 1st ISARC, Pittsburgh, USA. DOI: https://doi.org/10.22260/ISARC1984/0003 · doi:10.22260/isarc1984/0003
  26. Warszawski A., 1990, Industrialization and robotics in building: a managerial approach
  27. 10.1080/09613218.2017.1324726 · doi:10.1080/09613218.2017.1324726

Cited by

See all 205

Metadata

Authors
García de Soto, B., Agustí-Juan, I., Joss, S., & Hunhevicz, J.
Venue
International Journal of Construction Management
Published
2019-05-20
Volume
22
Issue
2
Pages
205-217
ISSN
  • 1562-3599 (ISSN-L)
  • 2331-2327
OpenAlex
W2945838180
Cited by
205
References
25
FWCI
12.82
Type
journal article
Language
en
Open access
green

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.