Implications of Construction 4.0 to the workforce and organizational structures
Open accessThe DOI matches its Crossref record; 25 of the 25 references it cites were found in a registry or an index.
Abstract
The counterpart of Industry 4.0 in the AEC/FM industry is known as Construction 4.0. Its essence is the digitalization and automation of the AEC/FM industry. As robots and other technologies make their way into the different phases of the lifecycle of construction projects, the concern about the future of jobs and wages will increase. While the use of robotics has the potential to improve productivity and safety, it should not necessarily reduce total employment in the construction sector in the long run. It is expected that existing roles will evolve, and new roles will be created (e.g., in addition to designers there will be a need for employees with digital skills). Focusing on the construction phase of a robotically built concrete wall, the different roles were evaluated. From this study, it was found that there will be a time in which conventional construction and robotic technologies will coexist, leading to a higher job variability and new roles, both at the managerial and operations/execution levels. Although this study is not meant to be an exact representation of how the AEC/FM roles will change as a consequence of Construction 4.0, it opens the debate and research in this area.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The future of employment: How susceptible are jobs to computerisation?
Frey, C. B., & Osborne, M. A. (2017) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2016.08.019 · Cited by 8,727 · cited 4×
“Although some studies and projections are pessimistic about the impacts to labour (Frey and Osborne 2017), others give a more optimistic view (Arntz et al. 2016; OECD 2016), which is also shared by the authors.”
BackgroundInfluentialDevelopments in construction-scale additive manufacturing processes
Lim, S., Buswell, R. A., Le, T. T., Austin, S. A., Gibb, A. G. F., & Thorpe, T. (2012) · Automation in Construction · doi:10.1016/j.autcon.2011.06.010 · Cited by 1,205
Vision of 3D printing with concrete — Technical, economic and environmental potentials
De Schutter, G., Lesage, K., Mechtcherine, V., Nerella, V. N., Habert, G., & Agusti-Juan, I. (2018) · Cement and Concrete Research · doi:10.1016/j.cemconres.2018.06.001 · Cited by 1,072
Robots and Jobs: Evidence from US Labor Markets
Acemoglu, D., & Restrepo, P. (2017) · National Bureau of Economic Research · doi:10.3386/w23285 · Cited by 908
Sacks, R., Eastman, C., Lee, G., & Teicholz, P. (2018) · Wiley eBooks · doi:10.1002/9781119287568 · Cited by 884
Swan, M. (2009) · International Journal of Environmental Research and Public Health · doi:10.3390/ijerph6020492 · Cited by 730 · cited 2×
“Patients are 378 starting to manage their health with the collaboration of online communities and in consultative co379 care with medical professionals (Swan, 2009).”
BackgroundLahdenperä, P. (2012) · Construction Management and Economics · doi:10.1080/01446193.2011.648947 · Cited by 606 · cited 1×
“In addition, researchers started investigating the feasibility of robotic applications in various architecture and construction activities (Everett and Slocum 1994; Warszawski and Navon 1998; Boles et al. 1995) and also for freeform construction (Buswell et al. 2007; Lim et al. 2012).”
BackgroundFreeform Construction: Mega-scale Rapid Manufacturing for construction
Buswell, R. A., Soar, R. C., Gibb, A. G. F., & Thorpe, A. (2007) · Automation in Construction · doi:10.1016/j.autcon.2006.05.002 · Cited by 536 · cited 1×
“In addition, researchers started investigating the feasibility of robotic applications in various architecture and construction activities (Everett and Slocum 1994; Warszawski and Navon 1998; Boles et al. 1995) and also for freeform construction (Buswell et al. 2007; Lim et al. 2012).”
BackgroundThe future of skills: employment in 2030
Bakhshi, H., Downing, J. M., Osborne, M. A., & Schneider, P. (2017) · Oxford University Research Archive (ORA) (University of Oxford) · Cited by 500
Direct digital manufacturing: definition, evolution, and sustainability implications
Chen, D., Heyer, S., Ibbotson, S., Salonitis, K., Steingrímsson, J. G., & Thiede, S. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.05.009 · Cited by 498 · cited 1×
“Similarly, in the manufacturing sector, personalized models are emerging due to the proliferation of 3D printers, which allow users to fabricate their own objects (Chen et al. 2015).”
BackgroundGarcía de Soto, B., Agustí-Juan, I., Hunhevicz, J., Joss, S., Graser, K., Habert, G., & Adey, B. T. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.04.004 · Cited by 474
Self-citationSpringer Handbook of Automation
(2009) · Springer handbooks · doi:10.1007/978-3-540-78831-7 · Cited by 387
Construction automation: Research areas, industry concerns and suggestions for advancement
Chen, Q., García de Soto, B., & Adey, B. T. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.05.028 · Cited by 250
Self-citationVähä, P., Heikkilä, T., Kilpeläinen, P., Järviluoma, M., & Gambao, E. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.08.002 · Cited by 198 · cited 2×
“1990), digital design and production (Bock 2008), surveying (V€ah€a et al. 2013), prefabrication (Hu 2005; Benjaoran and Dawood 2006) and assembly (Chu et al.”
BackgroundMoniz, A. B., & Krings, B.-J. (2016) · Societies · doi:10.3390/soc6030023 · Cited by 184
Giftthaler, M., Sandy, T., Dörfler, K., Brooks, I., Buckingham, M., Rey, G., Kohler, M., Gramazio, F., & Buchli, J. (2017) · Construction Robotics · doi:10.1007/s41693-017-0003-5 · Cited by 142
Robot-based construction automation: An application to steel beam assembly (Part I)
Chu, B., Jung, K., Lim, M. T., & Hong, D. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.016 · Cited by 121
Robotics and Automation in Construction
Balaguer, C., & Abderrahim, M. (2008) · InTech eBooks · doi:10.5772/86 · Cited by 113 · cited 4×
“Even though the construction industry is one of the oldest and it represents a significant part of a country’s GDP, it is also one of the most unfamiliar regarding the R&D fields for the automation community (Balaguer and Abderrahim 2008).”
BackgroundMethodInfluentialAutomation and Robotics for Construction
Paulson, B. C. (1985) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1985)111:3(190 · Cited by 103
Implementation of Robotics in Building: Current Status and Future Prospects
Warszawski, A., & Navon, R. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:1(31 · Cited by 92 · cited 1×
“In addition, researchers started investigating the feasibility of robotic applications in various architecture and construction activities (Everett and Slocum 1994; Warszawski and Navon 1998; Boles et al. 1995) and also for freeform construction (Buswell et al. 2007; Lim et al. 2012).”
BackgroundThe Return of the Future: A Second Go at Robotic Construction
Bechthold, M. (2010) · Architectural Design · doi:10.1002/ad.1115 · Cited by 70
Intelligence approach to production planning system for bespoke precast concrete products
Benjaoran, V., & Dawood, N. N. (2005) · Automation in Construction · doi:10.1016/j.autcon.2005.09.007 · Cited by 69 · cited 2×
“, 2013), prefabrication (Benjaoran and Dawood, 2006; Hu, 2005) and assembly (Chu et al.”
BackgroundCastro‐Lacouture, D. (2009) · Springer handbooks · doi:10.1007/978-3-540-78831-7_61 · Cited by 62 · cited 2×
“While Construction 4.0 will increase productivity (Castro-Lacouture 2009; Garc ıa de Soto et al., 2018a), it should not necessarily reduce total employment in the long run.”
BackgroundInfluentialSaidi, K. S., OʼBrien, J. B., & Lytle, A. M. (2008) · Springer eBooks · doi:10.1007/978-3-540-30301-5_48 · Cited by 30
The contractor who invented a construction robot
Sweet, R. (2018) · Construction Research and Innovation · doi:10.1080/20450249.2018.1442702 · Cited by 15 · cited 2×
“Examples include the Semi-Automated Mason (SAM100, n.d.), the Tybot rebar-tying robot (Sweet 2018), the In situ Fabricator (Giftthaler et al. 2017), or the HRP-5P humanoid bot (Cisneros et al. 2018; Cowin 2018).”
Background
Research works printed but not linked: 27
- 10.1080/014461997373006 · doi:10.1080/014461997373006
- 10.1016/0263-7863(87)90020-2 · doi:10.1016/0263-7863(87)90020-2
- Bock T. 2008. Digital design and robotic production 3-D shaped precast components. The 25th International Symposium on Automation in Construction, Vilnius, Lituania, 2008, 11–21, ISARC-2008. DOI: https://doi.org/10.22260/ISARC2008/0005 · doi:10.3846/isarc.20080626.11
- 10.1061/(ASCE)0733-9364(1995)121:1(143) · doi:10.1061/(asce)0733-9364(1995)121:1(143
- Cisneros R, 2018, IROS: International Conference on Intelligent Robots and Systems
- Cleland DI., 1986, Proj Manag J, 17, 36
- 10.1061/(ASCE)0733-9364(1994)120:2(443) · doi:10.1061/(asce)0733-9364(1994)120:2(443
- Gambao E, 1999, Proceedings of the 16th ISARC, Madrid, Spain
- García de Soto B, 2018, Sixth Creative Construction Conference 2018
- Gramazio F, 2014, The robotic touch: how robots change architecture: Gramazio & Kohler Research ETH Zurich 2005-2013
- 10.1111/j.1467-8667.1995.tb00298.x · doi:10.1111/j.1467-8667.1995.tb00298.x
- Hall D., 2018, Engineering Project Organization Conference (EPOC)
- Herbsman Z, Ellis R. 1988. Potential application of robotics in highway construction. Proceedings of the 5th International Symposium on Robotics in Construction, Japan Industrial Robot Association, Tokyo, Japan, June; pp. 299–308. DOI: https://doi.org/10.22260/ISARC1988/0037 · doi:10.22260/isarc1988/0037
- Hu W., 2005, roceedings of Construction Research Congress (CRC) 2005
- Kobayashi T, Honda S, Tsukhara Y. 1988. Study on a robotic system for pavement cutting work. In Proceedings to the 5th International Symposium on Robotics in Construction, Japan Industrial Robot Association, Tokyo, Japan, June; pp. 289–298. DOI: https://doi.org/10.22260/ISARC1988/0036 · doi:10.22260/isarc1988/0036
- 10.1061/(ASCE)0733-9364(2004)130:1(75) · doi:10.1061/(asce)0733-9364(2004)130:1(75
- Matarić MJ., 2007, The robotics primer
- Morales G, Herbzman Z, Najafi FT. 1999. Robots and construction automation. InProceedings of ISARC 1999, 16th Automation and Robotics in Construction, Madrid, Spain; pp. 283–288. DOI:https://doi.org/10.22260/ISARC1999/0043 · doi:10.22260/isarc1999/0043
- 10.1007/978-3-540-78831-7_3 · doi:10.1007/978-3-540-78831-7_3
- OECD, 2016, Automation and independent work in a digital economy, policy brief on the future of work
- Sheffer DA. 2011. Innovation in modular industries: Implementing energy-efficient innovations in US buildings. PhD Thesis. Stanford University, Stanford, USA. (accessed 2017 October 14) http://purl.stanford.edu/rq526jy0504
- Skibniewski MJ., 1988, Robotics in civil engineering
- 10.1061/(ASCE)0733-947X(1990)116:3(261) · doi:10.1061/(asce)0733-947x(1990)116:3(261
- 10.1016/j.proeng.2016.11.619 · doi:10.1016/j.proeng.2016.11.619
- Warszawski A. 1984b. Application of Robotics to Building Construction. In: Proceedings of the 1st ISARC, Pittsburgh, USA. DOI: https://doi.org/10.22260/ISARC1984/0003 · doi:10.22260/isarc1984/0003
- Warszawski A., 1990, Industrialization and robotics in building: a managerial approach
- 10.1080/09613218.2017.1324726 · doi:10.1080/09613218.2017.1324726
Cited by
Construction with digital twin information systems
Sacks, R., Brilakis, I., Pikas, E., Xie, H. S., & Girolami, M. (2020) · Data-Centric Engineering · doi:10.1017/dce.2020.16 · Cited by 609
“Many authors have suggested that the same concept is applicable to the construction industry (e.g., García de Soto et al., 2019; Klinc and Turk, 2019; Sawhney et al., 2020).”
BackgroundGhobakhloo, M., Iranmanesh, M., Grybauskas, A., Vilkas, M., & Petraitė, M. (2021) · Business Strategy and the Environment · doi:10.1002/bse.2867 · Cited by 462
Sepasgozar, S. M. E. (2021) · Buildings · doi:10.3390/buildings11040151 · Cited by 367
Newman, C., Edwards, D., Martek, I., Lai, J., Thwala, W. D., & Rillie, I. (2021) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-02-2020-0016 · Cited by 311
Utilizing Industry 4.0 on the Construction Site: Challenges and Opportunities
Turner, C. J., Oyekan, J., Stergioulas, L., & Griffin, D. (2021) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2020.3002197 · Cited by 290
Metadata
- Authors
- García de Soto, B., Agustí-Juan, I., Joss, S., & Hunhevicz, J.
- Venue
- International Journal of Construction Management
- Publisher
- Informa UK Limited
- Published
- 2019-05-20
- Volume
- 22
- Issue
- 2
- Pages
- 205-217
- ISSN
- 1562-3599 (ISSN-L)
- 2331-2327
- OpenAlex
- W2945838180
- Cited by
- 205
- References
- 25
- FWCI
- 12.82
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.