Creating the customer‐responsive supply chain: a reconciliation of concepts
The DOI matches its Crossref record; 92 of the 92 references it cites were found in a registry or an index.
Abstract
Purpose: While the concept of supply chain responsiveness (SCR) has received considerable attention in the operations management literature, mostly under the auspices of concepts such as build‐to‐order, mass customisation, lean and agility, so far there is a lack of comprehensive definition of SCR, as well as a defined relationship between “responsiveness” and “flexibility”. Also, the frameworks at hand tend to consider only a subset of factors previously identified in the literature, and thus do not comprehensively portray the cause‐and‐effect relationships involved. This paper aims to address these gaps. Design/methodology/approach: The paper synthesises the existing contributions to manufacturing and supply chain flexibility and responsiveness, and draws on various related bodies of literature that affect a supply chain's responsiveness such as the discussion of product architecture and modularisation. Findings: Four types of responsiveness are identified: product, volume, mix, and delivery, all of which can relate to different time horizons, and can be present as either potential or demonstrated responsiveness. It is argued that a supply chain can feature different levels of responsiveness at different tiers, depending on the configuration of the individual nodes, as well as the integration thereof. Furthermore, a holistic framework is proposed, distinguishing between requiring and enabling factors for responsiveness, identifying the key relationships within and between these two categories. Research limitations/implications: The definition and framework proposed provide novel insights into the concept of SCR as well as a clear terminology that will inform future research. The framework developed in this paper is suitable for both qualitative and holistic quantitative studies. Originality/value: In addition to a detailed review of the factors associated with SCR, a generic definition of responsiveness is developed. The paper proposes a definition of four types of responsiveness which will support further empirical studies into the concept and its application. Furthermore, a holistic framework is developed that allows for cause‐and‐effect relationships to be investigated and dependencies to be identified.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Transaction-Cost Economics: The Governance of Contractual Relations
Williamson, O. E. (1979) · The Journal of Law and Economics · doi:10.1086/466942 · Cited by 10,190 · cited 1×
“Depending on the particular supply chain and the characteristics of the transactions carried out between the partners, those factors will be more or less formalised ( Williamson, 1979”
BackgroundInformation Distortion in a Supply Chain: The Bullwhip Effect
Lee, H. L., Padmanabhan, V., & Whang, S. (1997) · Management Science · doi:10.1287/mnsc.43.4.546 · Cited by 4,698
What is the Right Supply Chain for Your Product
Fisher, M. L. (1997) · Harvard business review · Cited by 3,069
The role of product architecture in the manufacturing firm
Ulrich, K. (1995) · Research Policy · doi:10.1016/0048-7333(94)00775-3 · Cited by 2,885
Modeling Managerial Behavior: Misperceptions of Feedback in a Dynamic Decision Making Experiment
Sterman, J. D. (1989) · Management Science · doi:10.1287/mnsc.35.3.321 · Cited by 2,500 · cited 1×
“Subsequent studies were conducted by Sterman (1989) and Lee et al. (1997) confirming these findings.”
Result(1991) · HarperPerennial eBooks · Cited by 2,372
Industrial Dynamics: A Major Breakthrough for Decision Makers
Forrester, J. W. (2012) · The Roots of Logistics · doi:10.1007/978-3-642-27922-5_13 · Cited by 2,058
Christopher, M. (2000) · Industrial Marketing Management · doi:10.1016/s0019-8501(99)00110-8 · Cited by 1,940
Learning to evolve: A review of contemporary lean thinking
Hines, P., Holweg, M., & Rich, N. (2004) · International Journal of Operations & Production Management · doi:10.1108/01443570410558049 · Cited by 1,664 · cited 3×
“, 2004), and lean thinking (Womack & Jones, 1996; Hines et al., 2004), justifies a review of this body of literature, and the subsequent attempt to propose a set of clear definitions.”
BackgroundSelf-citationEmpirical research methods in operations management
Flynn, B. B., Sakakibara, S., Schroeder, R. G., Bates, K. A., & Flynn, E. J. (1990) · Journal of Operations Management · doi:10.1016/0272-6963(90)90098-x · Cited by 1,634 · cited 2×
“Such a two-sided measurement is further essential for supporting the criterion-related validity (cf. Flynn et al., 1990) of any supply chain responsiveness index made up of factors assumed to increase a supply chain's responsiveness.”
BackgroundLeagility: Integrating the lean and agile manufacturing paradigms in the total supply chain
Ben Naylor, J., Naim, M. M., & Berry, D. (1999) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00223-0 · Cited by 1,573 · cited 3×
“In addition, within the last decade two new terms have been introduced, ‘agility’ and ‘leagility’ (Goldman & Nagel, 1993; Naylor et al., 1999), which postulate flexibility and responsiveness in manufacturing operations, organisations and supply chains as a key tenet of a firm’s competitiveness.”
BackgroundInformation systems in supply chain integration and management
Gunasekaran, A., & Ngai, E. W. T. (2004) · European Journal of Operational Research · doi:10.1016/j.ejor.2003.08.016 · Cited by 1,219 · cited 2×
“…due to slow information flows • Eliminating unnecessary demand uncertainty and variability facilitates a better focus on end customer demand • Forrester, 1958 • Lee et al., 1997 • Christopher, 2000 • Gunasekaran & Ngai, 2004 Coordination and resource sharing • Removes delays and unnecessary…”
BackgroundTime – The Next Source of Competitive Advantage
Stalk, G. (2012) · The Roots of Logistics · doi:10.1007/978-3-642-27922-5_16 · Cited by 1,187 · cited 3×
“Time based competition (Bower & Hout, 1988; Stalk, 1988; McCutcheon et al., 1994) by definition increase the need to be responsive, because the firm or supply chain is given less time to respond to new orders or changes in existing ones.”
BackgroundPetersen, K. J., Handfield, R. B., & Ragatz, G. L. (2005) · Journal of Operations Management · doi:10.1016/j.jom.2004.07.009 · Cited by 1,181 · cited 1×
“As a result, supply chain partners increasingly make product development decisions jointly (Petersen et al., 2005) and ideally align them with the respective operations strategy and supply chain structure (Fixson, 2005).”
BackgroundTowards a System of Systems Concepts
Ackoff, R. L. (1971) · Management Science · doi:10.1287/mnsc.17.11.661 · Cited by 1,149 · cited 3×
“The first section of the paper will define responsiveness and its relation to the concept of flexibility drawing mainly on existing definitions of flexibility and responsiveness, both in manufacturing systems and supply chains, and supported by a systems’ terminology (cf. Ackoff, 1971).”
BackgroundMethodManufacturing Flexibility: A Strategic Perspective
Gerwin, D. (1993) · Management Science · doi:10.1287/mnsc.39.4.395 · Cited by 1,132 · cited 4×
“The contributions on flexibility in manufacturing systems are numerous (Gerwin, 1993; Upton, 1994; Lau, 1999) and difficult to summarise (de Toni & Tonchia, 1998).”
BackgroundInfluentialManaging in an age of modularity
Antoine, C. (2013) · Publications Docs-en-stock.com · Cited by 1,128
A Study of the Toyota Production System From an Industrial Engineering Viewpoint
Shingo, S., & Bodek, N. (2019) · doi:10.4324/9781315136509 · Cited by 1,064 · cited 5×
“…uncertainty • Closely linked to the decoupling point, which is a common criterion for classifying supply chain strategies, such as build-to-order supply chains • Shingo, 1989 • Hoekstra & Romme, 1992 • Davis, 1993 • Turnbull et al., 1993 • Womack & Jones, 1996 • Holweg & Pil, 2004 Product…”
BackgroundMethodInfluentialThe role of trust and relationship structure in improving supply chain responsiveness
Handfield, R. B., & Bechtel, C. (2002) · Industrial Marketing Management · doi:10.1016/s0019-8501(01)00169-9 · Cited by 994 · cited 2×
“) and entire supply chains ( Handfield and Bechtel, 2002”
BackgroundThe Management of Manufacturing Flexibility
Upton, D. M. (1994) · California Management Review · doi:10.2307/41165745 · Cited by 974 · cited 19×
“Nevertheless, a reduction in the system’s throughput time (the ‘P’ in Mather’s P”
BackgroundMethodInfluentialThe seven value stream mapping tools
Hines, P., & Rich, N. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710157989 · Cited by 944 · cited 2×
“A similar definition is also used by Hines (1998), who refers to the responsiveness of the supply chains studied using the supply-chain response matrix (see Hines & Rich, 1997).”
MethodThe four faces of mass customization.
Gilmore, J. H., & Pine, B. J. (1997) · PubMed · Cited by 938
Effective supply chain management: Understanding the impact of complexity and mitigation strategies
(2020) · Strategic Direction · doi:10.1108/sd-04-2020-0081 · Cited by 898
Strategic positioning of the order penetration point
Olhager, J. (2003) · International Journal of Production Economics · doi:10.1016/s0925-5273(03)00119-1 · Cited by 852 · cited 3×
“However, many recent contributions argue that in the case that the P:D ratio cannot be reduced to below one, decoupling points (Hoekstra & Romme, 1992; Olhager, 2003) and thus inventory are required in supply chains (Naylor et al.”
BackgroundOn theory in operations management
Schmenner, R. W., & Swink, M. L. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(98)00028-x · Cited by 811 · cited 1×
“), we are not aware of any empirical study that examines to what extent entire supply chains can push their performance frontiers ( Schmenner and Swink, 1998”
BackgroundMaking supply meet demand in an uncertain world
Fisher, M. L., Hammond, J. H., OBERMEYER, W., & Raman, A. (1994) · Harvard business review · Cited by 744
Sako, M., & Helper, S. (1998) · Journal of Economic Behavior & Organization · doi:10.1016/s0167-2681(97)00082-6 · Cited by 739 · cited 1×
“…Can increase the responsiveness and general performance of supply chains in various ways • Particularly important impact on trust, which is required for a variety of interactions between supply chain members • Sako & Helper, 1998 • Bagchi & Skjoett-Larsen, 2002 • Droge et al., 2004 •…”
BackgroundHolweg, M., Disney, S., Holmström, J., & Småros, J. (2005) · European Management Journal · doi:10.1016/j.emj.2005.02.008 · Cited by 723 · cited 4×
“Manufacturing flexibility • Traditional focus of the flexibility and responsiveness discussion • Can directly reduce the production lead-times and changeover times for products in supply chains • Slack, 1987 • Mather, 1988 • Upton, 1994 • Blumenfeld et al., 1999 Inventory • Can both increase and decrease the responsiv…”
BackgroundInfluentialSelf-citationThe Economics of Product Variety: A Survey
Lancaster, K. (1990) · Marketing Science · doi:10.1287/mksc.9.3.189 · Cited by 718 · cited 1×
“Product Variety One of the prevailing streams in the literature on the management of product variety is on its implications on the firm’s wider performance (Lancaster, 1990; da Silveira, 1998; Ramdas, 2003; Pil & Holweg, 2004).”
BackgroundSupply Chain Postponement and Speculation Strategies: How to choose the right strategy
Pagh, J. D., & Cooper, M. (1998) · Journal of Business Logistics · Cited by 682
Droge, C., Jayaram, J., & Vickery, S. K. (2004) · Journal of Operations Management · doi:10.1016/j.jom.2004.08.001 · Cited by 660 · cited 2×
“The supply chain literature features many contributions on the effects of organisational integration on supply chain performance and its contributing factors (Suarez et al., 1995; Lamming, 2000; Droge et al., 2004), and the ways in which organisational integration can be achieved (Rich & Hines, 1997; Bagchi & Skjoett-…”
BackgroundSupply Chain Flexibility: An Empirical Study
Vickery, S. N., Calantone, R., & Dröge, C. (1999) · Journal of Supply Chain Management · doi:10.1111/j.1745-493x.1999.tb00058.x · Cited by 656 · cited 1×
“Vickery et al. (1999) and Lummus et al. (2003) provide the two most prominent examples of this extension.”
BackgroundModelling the Costs and Benefits of Delayed Product Differentiation
Lee, H. L., & Tang, C. S. (1997) · Management Science · doi:10.1287/mnsc.43.1.40 · Cited by 605 · cited 2×
“…related concepts of modularisation (Starr, 1965; Ulrich, 1995; Baldwin & Clark, 1997), postponement and late configuration (Feitzinger & Lee, 1997; Lee & Tang, 1997; Pagh & Cooper, 1998; Pil & Holweg, 2004), are often linked to the mass customisation debate (Lampel & Mintzberg, 1996; Gilmore &…”
BackgroundMeasuring agile capabilities in the supply chain
I. van Hoek, R., Harrison, A., & Christopher, M. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110358495 · Cited by 602 · cited 4×
“Vickery et al. (1999) and Lummus et al.”
BackgroundMethodInfluentialCOMPETITIVE PRIORITIES: INVESTIGATING THE NEED FOR TRADE‐OFFS IN OPERATIONS STRATEGY
BOYER, K. K., & LEWIS, M. W. (2002) · Production and Operations Management · doi:10.1111/j.1937-5956.2002.tb00181.x · Cited by 599
Lean, agile or leagile? Matching your supply chain to the marketplace
Mason-Jones, R., Naylor, B., & Towill, D. R. (2000) · International Journal of Production Research · doi:10.1080/00207540050204920 · Cited by 595
The Flexibility of Manufacturing Systems
Slack, N. (1987) · International Journal of Operations & Production Management · doi:10.1108/eb054798 · Cited by 581 · cited 11×
“A large body of knowledge on manufacturing flexibility and its positive effects on supply chains and lead-time reductions is available (Lim, 1987; Slack, 1987; Gerwin, 1993; Upton, 1994; Blumenfeld et al., 1999; Gindy et al., 1999), and was reviewed inter alia, by de Toni & Tonchia (1998) and Beach…”
BackgroundMethodInfluentialMacDuffie, J. P., Sethuraman, K., & Fisher, M. L. (1996) · Management Science · doi:10.1287/mnsc.42.3.350 · Cited by 573 · cited 1×
“Those problems have also led firms to rethink the level of product variety that is really demanded by their customers (Fisher et al., 1994; MacDuffie et al., 1996).”
BackgroundAgile supply chain capabilities: Determinants of competitive objectives
Yusuf, Y. Y., Gunasekaran, A., Adeleye, E. O., & Sivayoganathan, K. (2004) · European Journal of Operational Research · doi:10.1016/j.ejor.2003.08.022 · Cited by 541 · cited 2×
“We argue that the importance of responsiveness in today’s industry settings, in conjunction with a wealth of contributions that have blurred the boundaries to related concepts, such as flexibility (Slack, 1987; Upton, 1994), agility (Goldman & Nagel, 1993; van Hoek et al., 2001; Yusuf et al., 2004), and lean thinking…”
BackgroundBuild‐to‐order supply chain management: a literature review and framework for development
Gunasekaran, A., & Ngai, E. W. T. (2005) · Journal of Operations Management · doi:10.1016/j.jom.2004.10.005 · Cited by 540 · cited 1×
“) and more recently, BTO supply chain management ( Gunasekaran and Ngai, 2005”
BackgroundProduct architecture assessment: a tool to link product, process, and supply chain design decisions
Fixson, S. K. (2005) · Journal of Operations Management · doi:10.1016/j.jom.2004.08.006 · Cited by 491 · cited 2×
“As a result, supply chain partners increasingly make product development decisions jointly (Petersen et al., 2005) and ideally align them with the respective operations strategy and supply chain structure (Fixson, 2005).”
BackgroundMANAGING PRODUCT VARIETY: AN INTEGRATIVE REVIEW AND RESEARCH DIRECTIONS
Ramdas, K. (2003) · Production and Operations Management · doi:10.1111/j.1937-5956.2003.tb00199.x · Cited by 439 · cited 2×
“One of the prevailing streams in the literature on the management of product variety is on its implications on the firm’s wider performance (Lancaster, 1990; da Silveira, 1998; Ramdas, 2003; Pil & Holweg, 2004).”
BackgroundA review of empirical research on manufacturing flexibility
Vokurka, R. J., & O'Leary‐Kelly, S. W. (2000) · Journal of Operations Management · doi:10.1016/s0272-6963(00)00031-0 · Cited by 427 · cited 3×
“These 15 types are also used by Vokurka and O'Leary-Kelly (2000), while other authors report varying types and numbers (see de Toni & Tonchia, 1998 for a comprehensive review).”
BackgroundMethodde Treville, S., Shapiro, R. D., & Hameri, A. (2004) · Journal of Operations Management · doi:10.1016/j.jom.2003.10.001 · Cited by 420 · cited 3×
“De Treville et al. (2004) investigate different demand anticipation and information exchange strategies and develop what they refer to as the three levels of relative supply lead-time (RSLT), a concept based on Mather’s P:D ratio (Mather, 1988).”
BackgroundDoes Trust Improve Business Performance?*
Sako, M. (1998) · Trust Within And Between Organizations · doi:10.1093/oso/9780198293187.003.0004 · Cited by 405
Quantity Flexibility Contracts and Supply Chain Performance
Tsay, A. A., & Lovejoy, W. S. (1999) · Manufacturing & Service Operations Management · doi:10.1287/msom.1.2.89 · Cited by 398 · cited 1×
“Furthermore, in order to control the period prior to the frozen horizon, a so-called “quantity-flexibility” contract can be used to set upper limits for possible changes, thereby allowing the supply chain to focus its resources efficiently on those changes that are allowed ( Tsay and Lovejoy, 1999”
BackgroundFlexibility and the theory of the firm
Carlsson, B. (1989) · International Journal of Industrial Organization · doi:10.1016/0167-7187(89)90018-0 · Cited by 361 · cited 1×
“In addition, Upton draws attention to a time aspect in the flexibility discussion by saying that firms can be flexible at the operational, tactical and strategic level, each one focusing on different time horizons, thereby confirming previous arguments made by Carlsson (1989) and Zelenović (1982).”
ResultInternational Supply Chain Management
David, S. (2008) · Cited by 328
International Supply Chain Management
Houlihan, J. B. (1985) · International Journal of Physical Distribution & Materials Management · doi:10.1108/eb014601 · Cited by 301
The three dimensions of responsiveness
Holweg, M. (2005) · International Journal of Operations & Production Management · doi:10.1108/01443570510605063 · Cited by 292
Self-citationProduct Variety, Supply Chain Structure, and Firm Performance: Analysis of the U.S. Bicycle Industry
Randall, T., & Ulrich, K. (2001) · Management Science · doi:10.1287/mnsc.47.12.1588.10237 · Cited by 291 · cited 2×
“The longer the time horizon that needs to be forecasted however, the less reliable the forecast becomes (Mather, 1988; Randall & Ulrich, 2001), which in turn increases demand uncertainty.”
BackgroundAn Empirical Study of Flexibility in Manufacturing
Suárez, F. F., Cusumano, M. A., & Fine, C. H. (1995) · Sloan management review · Cited by 273
Linking Product Variety to Order-Fulfillment Strategies
Pil, F. K., & Holweg, M. (2004) · INFORMS Journal on Applied Analytics · doi:10.1287/inte.1040.0092 · Cited by 254 · cited 4×
“In the case of the Mercedes E-Class which is available in more than three septillion (3*1024) variations (Pil & Holweg, 2004) for example, a make-to-forecast strategy becomes virtually impossible.”
BackgroundInfluentialSelf-citationSupply chain flexibility: Building a new model
Lummus, R. R., Duclos, L. K., & Vokurka, R. J. (2003) · UNI ScholarWorks (University of Northern Iowa) · Cited by 243
Management, technology and agility: the emergence of a new era in manufacturing.
Goldman, S. L., & Nagel, R. N. (1993) · International Journal of Technology Management · doi:10.1504/ijtm.1993.025758 · Cited by 237 · cited 3×
“…with a wealth of contributions that have blurred the boundaries to related concepts, such as flexibility (Slack, 1987; Upton, 1994), agility (Goldman & Nagel, 1993; van Hoek et al., 2001; Yusuf et al., 2004), and lean thinking (Womack & Jones, 1996; Hines et al., 2004), justifies a review…”
Flexibility configurations for the supply chain management
Garavelli, A. C. (2003) · International Journal of Production Economics · doi:10.1016/s0925-5273(03)00106-3 · Cited by 230 · cited 2×
“The contributions on flexibility in manufacturing systems are numerous (Gerwin, 1993; Upton, 1994; Lau, 1999) and difficult to summarise (de Toni & Tonchia, 1998). In their literature review of manufacturing flexibility, de Toni & Tonchia (1998) propose a scheme for analysing this vast body of knowledge according to s…”
BackgroundSupply chain coordination with quantity discount policy
Li, J., & Liu, L. (2006) · International Journal of Production Economics · doi:10.1016/j.ijpe.2005.05.008 · Cited by 215
The Supply Chain Strategy Conundrum: To be Lean Or Agile or To be Lean And Agile?
Towill, D., & Christopher, M. (2002) · International Journal of Logistics Research and Applications · doi:10.1080/1367556021000026736 · Cited by 215
Akkermans, H., Bogerd, P., & van Doremalen, J. (2004) · European Journal of Operational Research · doi:10.1016/s0377-2217(03)00164-4 · Cited by 213 · cited 2×
“Various authors also take a more critical view on the extent to which information systems can solve supply chain problems and increase their responsiveness, pointing out that other inter-organisational aspects, such as trust (McIvor et al., 2003; Akkermans et al., 2004) and further process coordination and”
BackgroundMorash, E. A., & Clinton, S. R. (1998) · Journal of Marketing Theory and Practice · doi:10.1080/10696679.1998.11501814 · Cited by 204 · cited 2×
“The former will be referred to as ‘operational factors’, whereas the latter are commonly called the dimensions or factors of ‘supply chain integration’ (Morash & Clinton, 1998; Lee, 2000).”
BackgroundHolweg, M., & Pil, F. K. (2005) · Cited by 194
Self-citationSupply‐chain management and time‐based competition: the role of the supplier association
Rich, N., & Hines, P. (1997) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600039710170584 · Cited by 190 · cited 1×
“), and the ways in which organisational integration can be achieved ( Rich and Hines, 1997”
BackgroundOn a responsive supply chain information system
Lau, H. C. W., & Lee, W. B. (2000) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030010346242 · Cited by 187
Responding to schedule changes in build‐to‐order supply chains
Krajewski, L., Wei, J. C., & Tang, L. (2005) · Journal of Operations Management · doi:10.1016/j.jom.2004.10.006 · Cited by 182 · cited 4×
“An interesting sub-category of demand uncertainty is demand uncertainty under rollinghorizon planning/scheduling (Simpson, 1999; Dellaert & Jeunet, 2003; Krajewski et al., 2005), which is the prevailing method in repetitive manufacturing environments.”
BackgroundMethodInfluentialHolweg, M., & Pil, F. K. (2004) · The MIT Press eBooks · doi:10.7551/mitpress/6112.001.0001 · Cited by 177
Self-citationJapanese automakers, U.S. suppliers and supply-chain superiority
Liker, J. Κ., & Wu, Y. J. (2001) · MIT Sloan Management Review · Cited by 176
Utilization of time‐based strategies: Creating distribution flexibility/responsiveness
Daugherty, P. J., & Pittman, P. H. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510080418 · Cited by 173 · cited 1×
“Daugherty & Pittman (1995) for example, report the increasing use of late configuration in distribution centres which they thus refer to as ‘accessorization centers’.”
BackgroundBurgess, T. F. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410068620 · Cited by 166
Value stream analysis of a re-engineered construction supply chain
Arbulu, R., Tommelein, I. D., Walsh, K. D., & Hershauer, J. C. (2003) · Building Research & Information · doi:10.1080/09613210301993 · Cited by 162 · cited 1×
“…2000; Storey et al., 2005), personal computers (Kapuscinski et al., 2004), consumer electronics (Catalan & Kotzab, 2003), construction (Arbulu et al., 2003), and automobiles (Holweg & Pil, 2004), companies are contemplating strategies to increase their responsiveness to customer needs…”
BackgroundInventory Decisions in Dell's Supply Chain
Kapuściński, R., Zhang, R. Q., Carbonneau, P., Moore, R., & Reeves, B. (2004) · INFORMS Journal on Applied Analytics · doi:10.1287/inte.1030.0068 · Cited by 157 · cited 3×
“…or build-to-order (BTO) strategies have been implemented in the personal computer sector, with Dell being the most prominent example (see Kapuscinski et al., 2004), complex manufacturing operations, such as automotive, have been slower in adapting these strategies (Hertz et al., 2001;…”
BackgroundMethodOutsourcing in the automotive industry: From JIT to Modular Consortia
Collins, R. S., Bechler, K. A., & Pires, S. R. I. (1997) · European Management Journal · doi:10.1016/s0263-2373(97)00030-3 · Cited by 153 · cited 2×
“Collins et al. (1997) describe how similar shifts in the automotive value chain can contribute to increased supply chain responsiveness and general performance by leveraging core competencies and realigning complexity.”
BackgroundGeographical proximity and supplying relationships in modular production
Frigant, V., & Lung, Y. (2002) · International Journal of Urban and Regional Research · doi:10.1111/1468-2427.00415 · Cited by 144 · cited 2×
“…n Spatial integration and logistics • A reduction in transport lead-times directly increases the responsiveness of supply chains • Can further strengthen process coordination and organisational integration • Collins et al., 1997 • Frigant & Lung, 2002 • Larsson, 2002 • Reichhart & Holweg, 2005”
BackgroundEfficient versus Responsive Supply Chain Choice: An Empirical Examination of Influential Factors
Randall, T. R., Morgan, R. M., & Morton, A. R. (2003) · Journal of Product Innovation Management · doi:10.1111/1540-5885.00041 · Cited by 142 · cited 3×
“A range of previous studies identify uncertainty as the main reason for being responsive (Davis, 1993; Fisher et al., 1994; Randall et al., 2003).”
BackgroundResponsiveness of the order fulfilment process
Kritchanchai, D., & MacCarthy, B. L. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910274419 · Cited by 135 · cited 2×
“A major shortcoming of the majority of the existing frameworks is the lack of distinction between factors that require supply chains to be responsive and factors that enable them to be responsive ( Kritchanchai and MacCarthy, 1999”
BackgroundDesign of Performance Measures for Time‐based Companies
Azzone, G., Masella, C., & Bertelè, U. (1991) · International Journal of Operations & Production Management · doi:10.1108/01443579110143412 · Cited by 134 · cited 2×
“Many studies have investigated the factors that make responsiveness or flexibility a necessary feature of either individual manufacturing systems ( Azzone and Masella, 1991”
BackgroundThe barriers to customer responsive supply chain management
Storey, J. W., Emberson, C., & Reade, D. (2005) · International Journal of Operations & Production Management · doi:10.1108/01443570510581853 · Cited by 133 · cited 2×
“Across industry sectors, such as fashion (Christopher, 2000; Storey et al., 2005), personal computers (Kapuscinski et al.”
BackgroundIntensity and Managerial Scope of Supplier Integration
Wagner, S. M. (2003) · Journal of Supply Chain Management · doi:10.1111/j.1745-493x.2003.tb00160.x · Cited by 133
World Class Manufacturing: Further Evidence in the Lean Production Debate1
Oliver, N., Delbridge, R., Jones, D., & Lowe, J. (1994) · British Journal of Management · doi:10.1111/j.1467-8551.1994.tb00130.x · Cited by 130 · cited 1×
“Oliver et al. (1994) even conclude from their investigations into the differences between ‘world-class’ and ‘non world-class’ automotive component plants that demand stability ranked amongst the most important factors for overall plant performance.”
BackgroundOn measurement and valuation of manufacturing flexibility
GUPTA, D. (1993) · International Journal of Production Research · doi:10.1080/00207549308956909 · Cited by 113
Larsson, A. (2002) · International Journal of Urban and Regional Research · doi:10.1111/1468-2427.00417 · Cited by 110 · cited 3×
“…n Spatial integration and logistics • A reduction in transport lead-times directly increases the responsiveness of supply chains • Can further strengthen process coordination and organisational integration • Collins et al., 1997 • Frigant & Lung, 2002 • Larsson, 2002 • Reichhart & Holweg, 2005”
BackgroundTransshipments: An emerging inventory recourse to achieve supply chain leagility
Herer, Y. T., Tzur, M., & Yücesan, E. (2002) · International Journal of Production Economics · doi:10.1016/s0925-5273(02)00254-2 · Cited by 108
Assessing the responsiveness in the Danish mobile phone supply chain
Catalan, M., & Kotzab, H. W. (2003) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030310502867 · Cited by 95 · cited 3×
“The increasing importance of BTO supply chains results from two developments: first, the number of product variants has been increasing across most industries, such as consumer electronics (Catalan & Kotzab, 2003), fashion and sportswear (Fisher et al., 1994), and automobiles (Holweg & Pil, 2004).”
BackgroundCritical factors for achieving manufacturing flexibility
Lau, R. S. M. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910249741 · Cited by 92 · cited 3×
“Manufacturing flexibility should however not be seen as the only solution for achieving system flexibility as pointed out by Lau (1999) who further explains that managers should also include other functions in their company as well as their suppliers, an argument that has formed the basis for…”
BackgroundAn investigation into supplier responsiveness
Holweg, M. (2005) · The International Journal of Logistics Management · doi:10.1108/09574090510617376 · Cited by 91 · cited 3×
“…n Spatial integration and logistics • A reduction in transport lead-times directly increases the responsiveness of supply chains • Can further strengthen process coordination and organisational integration • Collins et al., 1997 • Frigant & Lung, 2002 • Larsson, 2002 • Reichhart & Holweg, 2005”
BackgroundSelf-citationFORRIDGE - Principles of good practice in material flow
TOWILL, D. R. (1997) · Production Planning & Control · doi:10.1080/095372897234722 · Cited by 88 · cited 2×
“Building upon Forrester’s bullwhip effect, Towill (1997) explains how demand uncertainty (especially with regards to aggregated volumes per period) further upstream in supply chains is created to a great extend by downstream supply chain members, referring to Burbidge’s work on the effects of…”
BackgroundJapanese Supply Chain Relationships in Recession
Lamming, R. (2000) · Long Range Planning · doi:10.1016/s0024-6301(00)00086-8 · Cited by 86 · cited 1×
“The supply chain literature features many contributions on the effects of organisational integration on supply chain performance and its contributing factors (Suarez et al., 1995; Lamming, 2000; Droge et al., 2004), and the ways in which organisational integration can be achieved (Rich & Hines, 1997; Bagchi & Skjoett-…”
BackgroundJIT Systems and External Logistics Suppliers
Spencer, M. S., Rogers, D. S., & Daugherty, P. J. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410062095 · Cited by 77 · cited 1×
“The coordination of processes and achievement of synergies can be further supported by outsourcing processes at the interfaces to third parties, such as logistics service providers (Spencer et al., 1994).”
BackgroundA contingency view of time‐based competition for manufacturers
Bozarth, C. C., & Chapman, S. F. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610119090 · Cited by 70 · cited 2×
“, market-, production- and product-related factors have to be considered in the positioning of the decoupling point, while Bozarth and Chapman (1996)”
BackgroundBenchmarking Toyota's Supply Chain: Japan vs U.K.
Hines, P. (1998) · Long Range Planning · doi:10.1016/s0024-6301(98)80028-9 · Cited by 67
Rapid changeover – a pre‐requisite for responsive manufacture
Mileham, A. R., Culley, S. J., Owen, G. W., et al. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910274383 · Cited by 59 · cited 2×
“, 2004) and factors directly linked to manufacturing flexibility like shortened machine changeover times (Shingo, 1989; Mileham et al., 1999).”
BackgroundWinners and Losers - ‘The Tiering’ of Component Suppliers in the UK Automotive Industry
Turnbull, P., Delbridge, R., Oliver, N., & Wilkinson, B. (1993) · Journal of General Management · doi:10.1177/030630709301900104 · Cited by 51 · cited 2×
“Turnbull et al. (1993) reported that when required to deliver just in time to their customers, smaller suppliers were still relying on inventories instead of synchronised production, an approach that Womack & Jones (1996) were also observing: ‘Most of the applications of JIT, even in Japan, have…”
Total Effectiveness in a Just‐in‐Time System
Karlsson, C., & Norr, C. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410058522 · Cited by 41 · cited 1×
“First, so-called “frozen horizons” (usually 4-6 days for automotive manufacturers), in which the production schedule does not change, can substantially reduce the need for very short-term responsiveness ( Karlsson and Norr, 1994”
Background
Cited by
Leveraging supply chain visibility for responsiveness: The moderating role of internal integration
Williams, B. D., Roh, J., Tokar, T., & Swink, M. (2013) · Journal of Operations Management · doi:10.1016/j.jom.2013.09.003 · Cited by 454
Santos Bernardes, E., & Hanna, M. D. (2009) · International Journal of Operations & Production Management · doi:10.1108/01443570910925352 · Cited by 388
Lean practices and their effect on performance: a literature review
Negrão, L. L. L., Godinho Filho, M., & Marodin, G. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1231853 · Cited by 243
“These results confirm what most of the literature reports regarding the application of some concepts/ lean tools in environments of high variability of demand (Crute et al. 2003; Jina, Bhattacharya, and Walton 1997; reichhart and Holweg 2007; White and Prybutok 2001).”
ResultRoh, J., Hong, P., & Min, H. (2014) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.04.013 · Cited by 238
“More recently, the paradigms of build-to-order production and rapidfire order fulfillment have been presented as a viable strategy that helps to improve supply chain responsiveness to volatile demand (Gunasekaran and Ngai, 2005; Reichhart and Holweg, 2007; Holweg, 2005; Sharif et al., 2007).”
BackgroundMethodTowards a theory of supply chain alignment enablers: a systematic literature review
Wong, C., Skipworth, H., Godsell, J., & Achimugu, N. (2012) · Supply Chain Management: An International Journal · doi:10.1108/13598541211246567 · Cited by 213
“…and profit-sharing contracts have been confirmed by numerous mathematical models in the academic literature (Simatupang and Sridharan, 2004; Reichhart and Holweg, 2007; Sha et al., 2008; Soosay et al., 2008), they are still very hard to achieve in practice, due to the asymmetric…”
Background
Metadata
- Authors
- Reichhart, A., & Holweg, M.
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 2007-10-16
- Volume
- 27
- Issue
- 11
- Pages
- 1144-1172
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W1982770612
- Cited by
- 251
- References
- 92
- FWCI
- 19.08
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.