Lean implementation and its benefits to production industry
The DOI matches its Crossref record; 35 of the 36 references it cites were found in a registry or an index.
Abstract
Purpose – The purpose of this paper is to discuss the lean implementation process and its quantified benefits for the production industry with the help of value stream mapping (VSM). Both current and future state maps of the organization's shop floor scenarios are discussed using VSM techniques in order to highlight improvement areas and to bridge the gap between the existing state and the proposed state of shop floor of the selected industry.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Except the improvement in productivity, lean manages to level up customer and employers satisfaction [36, 38].”
From Lean and Kaizen: The Past and the Future of the Methodologies (2021) · cites this paper as [36]
In the citing paper
“Lean manufacturing contributed in improving manufacturing operations, protecting the industrial jobs and lift customer satisfaction [36].”
From Lean and Kaizen: The Past and the Future of the Methodologies (2021) · cites this paper as [36]
Citations
Cites
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
Abdulmalek, F. A., & Rajgopal, J. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.09.009 · Cited by 1,046
Toyota Production System: An Integrated Approach to Just-In-Time
Monden, Y. (1993) · Cited by 957
The seven value stream mapping tools
Hines, P., & Rich, N. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710157989 · Cited by 944 · cited 1×
“The classification scheme suggested by Hines and Rich (1997)”
MethodAn initial classification of supply networks
Lamming, R., Johnsen, T., Zheng, J., & Harland, C. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010321667 · Cited by 472
Classification scheme for lean manufacturing tools
Pavnaskar, S. J., Gershenson, J. K., & Jambekar, A. B. (2003) · International Journal of Production Research · doi:10.1080/0020754021000049817 · Cited by 466 · cited 1×
“Another scheme of classification for lean manufacturing tools and allied detailing proposed by Pavnaskar et al. (2003)”
MethodHines, P., Rich, N., Bicheno, J., Brunt, D., Taylor, D., Butterworth, C., & Sullivan, J. (1998) · The International Journal of Logistics Management · doi:10.1108/09574099810805726 · Cited by 358
Seth *, D., & Gupta, V. (2005) · Production Planning & Control · doi:10.1080/09537280512331325281 · Cited by 348
A new value stream mapping approach for complex production systems
Braglia, M., Carmignani, G., & Zammori, F. (2006) · International Journal of Production Research · doi:10.1080/00207540600690545 · Cited by 298
An evaluation of the value stream mapping tool
Serrano Lasa, I., Ochoa Laburu, C., & de Castro Vila, R. (2008) · Business Process Management Journal · doi:10.1108/14637150810849391 · Cited by 227
Utilising Simulation to Enhance Value Stream Mapping: A Manufacturing Case Application
McDonald, T., Van Aken, E. M., & Rentes, A. F. (2002) · International Journal of Logistics Research and Applications · doi:10.1080/13675560210148696 · Cited by 216
Analysing the effects of Lean manufacturing using a value stream mapping-based simulation generator
Lian, Y.-H., & Van Landeghem, H. (2007) · International Journal of Production Research · doi:10.1080/00207540600791590 · Cited by 191
(2000) · Medical Entomology and Zoology · Cited by 161
Seth, D., Seth, N., & Goel, D. (2008) · Journal of Manufacturing Technology Management · doi:10.1108/17410380810869950 · Cited by 159
Russell, R. S. (1999) · CERN Document Server (European Organization for Nuclear Research) · Cited by 158
Lean philosophy: implementation in a forging company
Sahoo, A. K., Singh, N. K., Shankar, R., & Tiwari, M. (2007) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-006-0870-2 · Cited by 150
Evaluation of value stream mapping in manufacturing system redesign
Serrano, I., Ochoa, C., & Castro, R. D. (2008) · International Journal of Production Research · doi:10.1080/00207540601182302 · Cited by 145
An initiative to implement lean manufacturing using value stream mapping in a small company
Grewal, C. (2008) · International Journal of Manufacturing Technology and Management · doi:10.1504/ijmtm.2008.020176 · Cited by 144
Self-citationDevelopment of index for measuring leanness: study of an Indian auto component industry
Singh, B., Garg, S. K., & Sharma, S. K. (2010) · Measuring Business Excellence · doi:10.1108/13683041011047858 · Cited by 142
Self-citationSingh, B., & Sharma, S. K. (2009) · Measuring Business Excellence · doi:10.1108/13683040910984338 · Cited by 133
Self-citationValue stream analysis and mapping for product development
McManus, H., & Millard, R. (2002) · DSpace@MIT (Massachusetts Institute of Technology) · Cited by 109
Nicholas, J. M. (1997) · Medical Entomology and Zoology · Cited by 102
Using value‐stream maps to improve leadership
Emiliani, M. L., & Stec, D. J. (2004) · Leadership & Organization Development Journal · doi:10.1108/01437730410564979 · Cited by 94 · cited 1×
“applied VSM for product development and Emiliani and Stec (2004)”
MethodMaterials flow improvement in a lean assembly line: a case study
Domingo, R., Alvarez, R., Melodía Peña, M., & Calvo, R. (2007) · Assembly Automation · doi:10.1108/01445150710733379 · Cited by 85
Al‐Sudairi, A. A. (2007) · Construction Innovation · doi:10.1108/14714170710721322 · Cited by 85
Lean can be a survival strategy during recessionary times
Singh, B., Garg, S. K., & Sharma, S. K. (2009) · International Journal of Productivity and Performance Management · doi:10.1108/17410400911000426 · Cited by 60
Self-citationScope for lean implementation: a survey of 127 Indian industries
Singh, B., Garg, S. K., & Sharma, S. K. (2010) · International Journal of Rapid Manufacturing · doi:10.1504/ijrapidm.2010.034253 · Cited by 53
Self-citationFrom Current State to Future State: Mapping the Steel to Component Supply Chain
Brunt, D. (2000) · International Journal of Logistics Research and Applications · doi:10.1080/713682765 · Cited by 45
The Design of Lean Manufacturing Systems Using Time‐based Analysis
Barker, R. C. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410068666 · Cited by 40
A simulation based approach for dock allocation in a food distribution center
Gopakumar, B., Sundaram, S., Wang, S., Koli, S., & Srihari, K. (2008) · doi:10.5555/1516744.1517226 · Cited by 22
Value stream mapping in a jobshop
Chitturi, R. M., Glew, D. J., & Paulls, A. (2007) · doi:10.1049/cp:20070020 · Cited by 18
Value stream mapping: A dairy industry prospective
Melvin, A., & Baglee, D. (2008) · IEEE International Engineering Management Conference (IEMC) · doi:10.1109/iemce.2008.4618003 · Cited by 17
A simulation based approach for dock allocation in a food distribution center
Gopakumar, B., Sundaram, S., Wang, S., Koli, S., & Srihari, K. (2008) · Winter Simulation Conference · doi:10.1109/wsc.2008.4736393 · Cited by 17
Cycle time reduction in assembly and test manufacturing factories: A KPI driven methodology
Li, Z., Xiao, J. Z., Hou, F., Feng, W., & Li, N. (2008) · doi:10.1109/ieem.2008.4738067 · Cited by 16
Optimizing the Operations of an Ingot Mill in an Aluminium Smelter
Nicholls, M. G. (1994) · Journal of the Operational Research Society · doi:10.1057/jors.1994.165 · Cited by 12
Research works printed but not linked: 8
- Beesley, A. (1994), “A need for time based process mapping and its application in procurement”,Proceedings of 3rd Annual IPSERA Conference, University of Glamorgan, Pontypridd, pp. 41‐56.
- Childerhouse, P., Disney, S.M. and Towill, D.R. (2000), “The uncertainty circle as a value stream audit tool”,Proceedings of the 11th International Working Seminar on Production Economics, Innsbruck, Austria, pp. 119‐30.
- Forza, C., Vinelli, A. and Filippini, R. (1993), “Telecommunication services for quick response in the textile‐apparel industry”,Proceedings of the 1st International Symposium on Logistics, University of Nottingham, Nottingham, pp. 119‐26.
- Grewal, C.S. and Sareen, K.K. (2006), “Development of model for lean implementation: a case study of automobile industry”,Industrial Engineering Journal, No. 5, pp. 24‐7.
- Grewal, C.S. and Singh, B. (2006), “Application of value stream mapping in a traditional Indian environment: a case study”,International Conference on Advances in Mechanical Engineering, Fatehgarh Sahib, December 1‐3, pp. 127‐133(M‐III).
- Hines, P. (1999), “Value stream management: next frontier in supply chain”,Logistics Focus, Vol. 1 No. 3, pp. 36‐9.
- Jessop, D. and Jones, O. (1995), “Value stream process modeling: a methodology for creating competitive advantage”,Proceedings of 4th Annual IPSERA Conference, University of Birmingham, Birmingham.
- Zayko, M., Broughman, D. and Hancock, W. (1997), “Lean manufacturing yields world class improvements for small manufacturer”,IIE Solutions, Vol. 29 No. 4, pp. 46‐64.
Cited by
Lean, Six Sigma and Lean Six Sigma: an analysis based on operations strategy
Drohomeretski, E., Gouvea da Costa, S. E., Pinheiro de Lima, E., & Garbuio, P. A. D. R. (2014) · International Journal of Production Research · doi:10.1080/00207543.2013.842015 · Cited by 260
“…is why the area is going through major changes to adapt to the new production management system, from the process of demand management, capacity planning, signalling of the need for materials and the quantity to be produced, among others (Pepper and Spedding 2010; Singh, Garg, and Sharma 2010).”
BackgroundA literature review of lean manufacturing
Gupta, S., & Jain, S. K. (2013) · International Journal of Management Science and Engineering Management · doi:10.1080/17509653.2013.825074 · Cited by 228
“Singh et al. (2010c) demonstrated the outcomes in a production company after the successful implementation of VSM benefited the firm.”
BackgroundYadav, G., Luthra, S., Huisingh, D., Mangla, S. K., Narkhede, B. E., & Liu, Y. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.118726 · Cited by 228
Forno, A. J. D., Pereira, F. A., Forcellini, F. A., & Kipper, L. M. (2014) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-014-5712-z · Cited by 222
“47 [71, 72] Theoretical Production x x x x Int J Adv Manuf Technol (2014) 72:779–790 783”
BackgroundLean Manufacturing Case Study with Kanban System Implementation
Rahman, N. A. A., Sharif, S. M., & Esa, M. M. (2013) · Procedia Economics and Finance · doi:10.1016/s2212-5671(13)00232-3 · Cited by 203
“The goals of lean manufacturing are to reduce waste in human effort and inventory, reaching the market on time, and managing manufacturing stocks that are highly responsive to customer demand while producing quality products in the most efficient and economical manner (Bhim et al., 2010).”
Background
Metadata
- Authors
- Singh, B., Garg, S. K., Sharma, S. K., & Grewal, C.
- Affiliations
- Galgotias College of Engineering & Technology (IN)
- Delhi Technological University (IN)
- National Institute of Technology Kurukshetra (IN)
- University of Calgary (CA)
- Venue
- International Journal of Lean Six Sigma
- Publisher
- Emerald
- Published
- 2010-05-28
- Volume
- 1
- Issue
- 2
- Pages
- 157-168
- ISSN
- 2040-4166 (ISSN-L)
- OpenAlex
- W1984348823
- Cited by
- 223
- References
- 36
- Citations by year
- 2026: 6 · 2025: 6 · 2024: 7 · 2023: 11 · 2022: 10 · 2021: 21 · 2020: 18 · 2019: 21 · 2018: 29 · 2017: 15 · 2016: 8 · 2015: 20 · 2014: 19 · 2013: 17 · 2012: 12
- FWCI
- 19.59
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emeraldinsight.com/page/tdm (tdm)
- Locations
- International Journal of Lean Six Sigma (publishedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Digital Transformation in Industry
- Keywords
- lean implementation, value stream mapping, manufacturing industry
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.