Lean implementation and its benefits to production industry
The DOI matches its Crossref record; 35 of the 36 references it cites were found in a registry or an index.
Abstract
Purpose – The purpose of this paper is to discuss the lean implementation process and its quantified benefits for the production industry with the help of value stream mapping (VSM). Both current and future state maps of the organization's shop floor scenarios are discussed using VSM techniques in order to highlight improvement areas and to bridge the gap between the existing state and the proposed state of shop floor of the selected industry.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Except the improvement in productivity, lean manages to level up customer and employers satisfaction [36, 38].”
From Lean and Kaizen: The Past and the Future of the Methodologies (2021) · cites this paper as [36]
In the citing paper
“Lean manufacturing contributed in improving manufacturing operations, protecting the industrial jobs and lift customer satisfaction [36].”
From Lean and Kaizen: The Past and the Future of the Methodologies (2021) · cites this paper as [36]
Citations
Cites
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
Abdulmalek, F. A., & Rajgopal, J. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.09.009 · Cited by 1,046
Toyota Production System: An Integrated Approach to Just-In-Time
Monden, Y. (1993) · Cited by 957
The seven value stream mapping tools
Hines, P., & Rich, N. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710157989 · Cited by 944 · cited 1×
“The classification scheme suggested by Hines and Rich (1997)”
MethodAn initial classification of supply networks
Lamming, R., Johnsen, T., Zheng, J., & Harland, C. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010321667 · Cited by 472
Classification scheme for lean manufacturing tools
Pavnaskar, S. J., Gershenson, J. K., & Jambekar, A. B. (2003) · International Journal of Production Research · doi:10.1080/0020754021000049817 · Cited by 466 · cited 1×
“Another scheme of classification for lean manufacturing tools and allied detailing proposed by Pavnaskar et al. (2003)”
MethodHines, P., Rich, N., Bicheno, J., Brunt, D., Taylor, D., Butterworth, C., & Sullivan, J. (1998) · The International Journal of Logistics Management · doi:10.1108/09574099810805726 · Cited by 358
Seth *, D., & Gupta, V. (2005) · Production Planning & Control · doi:10.1080/09537280512331325281 · Cited by 348
A new value stream mapping approach for complex production systems
Braglia, M., Carmignani, G., & Zammori, F. (2006) · International Journal of Production Research · doi:10.1080/00207540600690545 · Cited by 298
An evaluation of the value stream mapping tool
Serrano Lasa, I., Ochoa Laburu, C., & de Castro Vila, R. (2008) · Business Process Management Journal · doi:10.1108/14637150810849391 · Cited by 227
Research works printed but not linked: 8
- Beesley, A. (1994), “A need for time based process mapping and its application in procurement”,Proceedings of 3rd Annual IPSERA Conference, University of Glamorgan, Pontypridd, pp. 41‐56.
- Childerhouse, P., Disney, S.M. and Towill, D.R. (2000), “The uncertainty circle as a value stream audit tool”,Proceedings of the 11th International Working Seminar on Production Economics, Innsbruck, Austria, pp. 119‐30.
- Forza, C., Vinelli, A. and Filippini, R. (1993), “Telecommunication services for quick response in the textile‐apparel industry”,Proceedings of the 1st International Symposium on Logistics, University of Nottingham, Nottingham, pp. 119‐26.
- Grewal, C.S. and Sareen, K.K. (2006), “Development of model for lean implementation: a case study of automobile industry”,Industrial Engineering Journal, No. 5, pp. 24‐7.
- Grewal, C.S. and Singh, B. (2006), “Application of value stream mapping in a traditional Indian environment: a case study”,International Conference on Advances in Mechanical Engineering, Fatehgarh Sahib, December 1‐3, pp. 127‐133(M‐III).
- Hines, P. (1999), “Value stream management: next frontier in supply chain”,Logistics Focus, Vol. 1 No. 3, pp. 36‐9.
- Jessop, D. and Jones, O. (1995), “Value stream process modeling: a methodology for creating competitive advantage”,Proceedings of 4th Annual IPSERA Conference, University of Birmingham, Birmingham.
- Zayko, M., Broughman, D. and Hancock, W. (1997), “Lean manufacturing yields world class improvements for small manufacturer”,IIE Solutions, Vol. 29 No. 4, pp. 46‐64.
Cited by
Lean, Six Sigma and Lean Six Sigma: an analysis based on operations strategy
Drohomeretski, E., Gouvea da Costa, S. E., Pinheiro de Lima, E., & Garbuio, P. A. D. R. (2014) · International Journal of Production Research · doi:10.1080/00207543.2013.842015 · Cited by 260
“…is why the area is going through major changes to adapt to the new production management system, from the process of demand management, capacity planning, signalling of the need for materials and the quantity to be produced, among others (Pepper and Spedding 2010; Singh, Garg, and Sharma 2010).”
BackgroundA literature review of lean manufacturing
Gupta, S., & Jain, S. K. (2013) · International Journal of Management Science and Engineering Management · doi:10.1080/17509653.2013.825074 · Cited by 228
“Singh et al. (2010c) demonstrated the outcomes in a production company after the successful implementation of VSM benefited the firm.”
BackgroundYadav, G., Luthra, S., Huisingh, D., Mangla, S. K., Narkhede, B. E., & Liu, Y. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.118726 · Cited by 228
Forno, A. J. D., Pereira, F. A., Forcellini, F. A., & Kipper, L. M. (2014) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-014-5712-z · Cited by 222
“47 [71, 72] Theoretical Production x x x x Int J Adv Manuf Technol (2014) 72:779–790 783”
BackgroundLean Manufacturing Case Study with Kanban System Implementation
Rahman, N. A. A., Sharif, S. M., & Esa, M. M. (2013) · Procedia Economics and Finance · doi:10.1016/s2212-5671(13)00232-3 · Cited by 203
“The goals of lean manufacturing are to reduce waste in human effort and inventory, reaching the market on time, and managing manufacturing stocks that are highly responsive to customer demand while producing quality products in the most efficient and economical manner (Bhim et al., 2010).”
BackgroundNawanir, G., Kong Teong, L., & Norezam Othman, S. (2013) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-03-2012-0027 · Cited by 190
“, 2003, 2004), productivity (Fullerton and Wempe, 2009; Singh et al., 2010), and cost reduction (Cua et al.”
BackgroundModelling lean and green: a review from business models
Duarte, S., & Cruz‐Machado, V. (2013) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-05-2013-0030 · Cited by 162
Leveraging Optimized and Cleaner Production through Industry 4.0
Amjad, M. S., Rafique, M. Z., & Khan, M. A. (2021) · Sustainable Production and Consumption · doi:10.1016/j.spc.2021.01.001 · Cited by 184
Singh, B., & Sharma, S. K. (2009) · Measuring Business Excellence · doi:10.1108/13683040910984338 · Cited by 133
Self-citationJasti, N. V. K., & Sharma, A. K. (2014) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-04-2012-0002 · Cited by 204
Application of Value Stream Mapping for Reduction of Cycle Time in a Machining Process
Venkataraman, K., Ramnath, B. V., Kumar, V. M., & Elanchezhian, C. (2014) · Procedia Materials Science · doi:10.1016/j.mspro.2014.07.192 · Cited by 117
Process improvement through Lean-Kaizen using value stream map: a case study in India
Kumar, S., Dhingra, A. K., & Singh, B. (2018) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-018-1684-8 · Cited by 191
“[7] applied VSM to identify wastes such as WIP, lead time, and manpower by bridging the gap between current state and future state of a production industry.”
BackgroundInfluentialSelf-citationProductivity gains through standardization-of-work in a manufacturing company
Mor, R. S., Bhardwaj, A., Singh, S., & Sachdeva, A. K. (2018) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-07-2017-0151 · Cited by 250
Dehdasht, G., Ferwati, M. S., Zin, R. M., & Abidin, N. Z. (2020) · PLoS ONE · doi:10.1371/journal.pone.0228746 · Cited by 137
Lean implementation in Indian process industries – some empirical evidence
Panwar, A., Jain, R., & Rathore, A. P. S. (2015) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-05-2013-0049 · Cited by 101
An empirical study for implementation of lean principles in Indian manufacturing industry
Jasti, N. V. K., & Kodali, R. (2016) · Benchmarking: An International Journal · doi:10.1108/bij-11-2013-0101 · Cited by 84
Management of lean waste in a public higher education institution
Klein, L. L., Tonetto, M. S., Ávila, L. V., & Moreira, R. M. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.125386 · Cited by 122
Applying Value Stream Mapping in Manufacturing: A Systematic Literature Review
Romero, L. F., & Arce, A. (2017) · IFAC-PapersOnLine · doi:10.1016/j.ifacol.2017.08.385 · Cited by 108
Leme, R. D., Nunes, A. O., Costa, L. B. M., & Silva, D. A. L. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.06.064 · Cited by 115
Habib, M. A., Rizvan, R., & Ahmed, S. (2022) · Results in Engineering · doi:10.1016/j.rineng.2022.100818 · Cited by 181
Hariyani, D., & Mishra, S. (2022) · Cleaner Engineering and Technology · doi:10.1016/j.clet.2022.100449 · Cited by 98
Lean Six Sigma effect on Jordanian pharmaceutical industry’s performance
Alkunsol, W. H., Sharabati, A. A., Salhi, N. A., & El-Tamimi, H. S. (2018) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-01-2017-0003 · Cited by 67
Kumar, S., Dhingra, A. K., & Singh, B. (2017) · Journal of Engineering Design and Technology · doi:10.1108/jedt-08-2017-0083 · Cited by 139
“…experiment design and rabbit chasing techniques that reduced variation in a plasma cutting process, reduced inventory levels (Garcia et al., 2014; Singh et al., 2010a; Seth and Gupta, 2005) and improved the system flexibility of the organization (Hartini and Ciptomulyono, 2015; Venkataraman et…”
BackgroundMethodResultInfluentialSelf-citationSreedharan, V. R., & Vijaya Sunder, M. (2018) · Production Planning & Control · doi:10.1080/09537287.2018.1492042 · Cited by 78
“Singh et al. (2010) developed Lean projects aided by value stream mapping in selected manufacturing industries.”
BackgroundDrivers and motives for sustainable manufacturing system
Hariyani, D., Mishra, S., Hariyani, P., & Sharma, M. K. (2023) · Innovation and Green Development · doi:10.1016/j.igd.2022.100031 · Cited by 74
Why do organizations discontinue Lean Six Sigma initiatives?
Sony, M., Naik, S. S., & Karingada, K. T. B. (2019) · International Journal of Quality & Reliability Management · doi:10.1108/ijqrm-03-2018-0066 · Cited by 70
A case study of kanban implementation within the pharmaceutical supply chain
Papalexi, M., Bamford, D., & Dehe, B. (2016) · International Journal of Logistics Research and Applications · doi:10.1080/13675567.2015.1075478 · Cited by 58
Application of lean manufacturing using value stream mapping in an auto‐parts manufacturing unit
Singh, H., & Singh, A. (2013) · Journal of Advances in Management Research · doi:10.1108/09727981311327776 · Cited by 93
“lean principles; however, it is apparent that there is a need to understand the entire system in order to gain maximum benefits (Singh et al., 2010).”
BackgroundA FMEA-based approach to prioritize waste reduction in lean implementation
de Souza, R. V. B., & Carpinetti, L. C. R. (2014) · International Journal of Quality & Reliability Management · doi:10.1108/ijqrm-05-2012-0058 · Cited by 83
Lean production practices and bundles: a comparative analysis
Sahoo, S., & Yadav, S. (2018) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-01-2017-0002 · Cited by 55
Boosting Lean Production via TPM
Bakri, A., Rahim, A. R., Yusof, N. M., & Ahmad, R. (2012) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2012.11.153 · Cited by 81
Empirical assessment of the causal relationships among lean criteria using DEMATEL method
Sharma, V., Dixit, A. R., & Qadri, M. A. (2016) · Benchmarking An International Journal · doi:10.1108/bij-08-2014-0078 · Cited by 57
Does lean manufacturing improve firm value?
Zhu, X., & Lin, Y. (2017) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-05-2016-0071 · Cited by 70
Bhamu, J., Kumar, J. V. S., & Sangwan, K. S. (2012) · International Journal of Productivity and Quality Management · doi:10.1504/ijpqm.2012.048751 · Cited by 52
Lean manufacturing implementation in an automated production line: a case study
Bhamu, J., Khandelwal, A., & Sangwan, K. S. (2013) · International Journal of Services and Operations Management · doi:10.1504/ijsom.2013.054883 · Cited by 52
Demirkesen, S. (2019) · Production Planning & Control · doi:10.1080/09537287.2019.1675914 · Cited by 63
“Singh et al. (2010) rather focussed on the benefits of Lean implementation in the production industry.”
BackgroundImpacts of Kaizen in a small-scale industry of India: a case study
Arya, A. K., & Jain, S. K. (2014) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-03-2013-0019 · Cited by 62
A conceptual framework for the implementation of quality management systems
Garza‐Reyes, J. A., Rocha-Lona, L., & Kumar, P. V. (2014) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2014.929254 · Cited by 48
“Taylor and Wright (2003), for instance, comment that the lack of connection between QMSs and business strategy leads implementations to fail, while Sebastianelli and Tamimi (2003) found that this issue was the most significant factor which inhibits effective TQM implementations.”
BackgroundAssessing the application of Kaizen principles in Indian small-scale industry
Arya, A. K., & Choudhary, S. (2015) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-11-2014-0033 · Cited by 61
Continuous improvement methodologies and practices in hospitality and tourism
Farrington, T., Antony, J., & O’Gorman, K. D. (2017) · International Journal of Contemporary Hospitality Management · doi:10.1108/ijchm-03-2017-0141 · Cited by 57
How do organizations implement an effective LSS initiative? A qualitative study
Sony, M., Antony, J., & Naik, S. S. (2020) · Benchmarking An International Journal · doi:10.1108/bij-10-2019-0451 · Cited by 54
An empirical study on lean awareness and potential for lean implementations in Qatar industries
Salem, R. W., Musharavati, F., Hamouda, A. M. S., & Al‐Khalifa, K. N. (2015) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-015-7421-7 · Cited by 44
“In [34], the authors used value stream techniques in order to highlight improvement areas and to bridge the gap between the existing state and the proposed state of a job shop production system.”
MethodDevelopment of Kanban System at Local Manufacturing Company in Malaysia–Case Study
Adnan, A. N., Jaffar, A. M., Yusoff, N., & Hayati, N. (2012) · Procedia Engineering · doi:10.1016/j.proeng.2012.07.374 · Cited by 43
“In many researches had reported that it would gain maximum benefits from JIT and Kanban system implementation [3, 6].”
BackgroundAchieving Lean Objectives through RFID: A Simulation‐Based Assessment*
Chongwatpol, J., & Sharda, R. (2013) · Decision Sciences · doi:10.1111/deci.12007 · Cited by 41
Bandehnezhad, M., Zailani, S. H. M., & Fernando, Y. (2012) · International Journal of Value Chain Management · doi:10.1504/ijvcm.2012.048379 · Cited by 47
“, 2006) through reduction of waste in different areas of manufacturing such as human effort, transportation, manufacturing space, processing and inventory in order to enhance responsiveness to customer demand while producing high quality products (Singh et al., 2010).”
BackgroundIdentification of Lean Six Sigma barriers in automobile part manufacturing industry
Rathi, R., Singh, M., Verma, A. K., Gurjar, R. S., Singh, A. J., & Samantha, B. (2021) · Materials Today Proceedings · doi:10.1016/j.matpr.2021.05.221 · Cited by 54
Innovative lean: work practices and product and process improvements
Angelis, J., & Fernandes, B. (2012) · International Journal of Lean Six Sigma · doi:10.1108/20401461211223740 · Cited by 37
Dhingra, A. K., Kumar, S., & Singh, B. (2019) · International Journal of Systems Assurance Engineering and Management · doi:10.1007/s13198-019-00810-z · Cited by 52
Self-citationKolawole, O. A., Mishra, J., & Hussain, Z. (2021) · Industrial Marketing Management · doi:10.1016/j.indmarman.2021.01.006 · Cited by 58
Barriers for Lean implementation in the textile industry
Robertsone, G., Mežinska, I., & Lapiņa, I. (2021) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-12-2020-0225 · Cited by 59
Yusof, M. M., Khodambashi, S., & Mokhtar, A. M. (2012) · BMC Medical Informatics and Decision Making · doi:10.1186/1472-6947-12-150 · Cited by 55
“VSM does not just focus on single processes; but instead, creates a holistic schema of all processes and workflows, to understand the interdependency of functions and departments, and the effect of the unit as a whole [7].”
BackgroundAn empirical review of lean manufacturing and their strategies
Chahal, V., & Narwal, M. S. (2017) · Management Science Letters · doi:10.5267/j.msl.2017.4.004 · Cited by 51
“Lean manufacturing lifts in overall production output and power up customer and the employee’s job satisfaction (Soriano‐Meier et al., 2002; Singh et al., 2010; Rose et al., 2013).”
BackgroundLean-excellence business management for manufacturing SMEs focusing on KRI
Mohammad, I. S., & Oduoza, C. F. (2019) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-11-2018-0389 · Cited by 48
Strategic lean actions for sustainable competitive advantage
Hallam, C. R. A., Valerdi, R., & Contreras, C. (2017) · International Journal of Quality & Reliability Management · doi:10.1108/ijqrm-10-2016-0177 · Cited by 46
Lean manufacturing and Six Sigma based on Brazilian model “PNQ”: An integrated management tool
Campos, L. M. D. S. (2013) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-08-2012-0007 · Cited by 49
Hartini, S., Ciptomulyono, U., Anityasari, M., Sriyanto, S., & Pujotomo, D. (2018) · MATEC Web of Conferences · doi:10.1051/matecconf/201815401055 · Cited by 37
Human factors involved in lean management: a systematic literature review
Bouranta, N., Psomas, E., & Antony, J. (2021) · Total Quality Management & Business Excellence · doi:10.1080/14783363.2021.1936481 · Cited by 90
“Lean can be approached as a set of management practices, tools and techniques such as Kanban method, equipment layout, Gemba, 6 S’s approach, Just-in-Time, batch size reduction (Shetty et al., 2010) or as a long-term philosophy related to certain principles/elements (Singh et al., 2010).”
MethodZhu, Y., Lu, Z., & Dai, H. (2014) · Journal of the Association for Vascular Access · doi:10.1016/j.java.2014.07.004 · Cited by 28
Lean service system design: a simulation-based VSM case study
Çavdur, F., Yağmahan, B., Oguzcan, E., Arslan, N., & Sahan, N. (2018) · Business Process Management Journal · doi:10.1108/bpmj-02-2018-0057 · Cited by 52
A case study concerning the 5S lean technique in a scientific equipment manufacturing company
Gupta, S., & Chandna, P. (2020) · Grey Systems Theory and Application · doi:10.1108/gs-01-2020-0004 · Cited by 28
An application of value stream mapping in auto-ancillary industry: a case study
Jasti, N. V. K., Kota, S., & Sangwan, K. S. (2019) · The TQM Journal · doi:10.1108/tqm-11-2018-0165 · Cited by 48
A decade of the international journal of lean six sigma: bibliometric overview
Prakash, S., Kumar, S., Soni, G., Mahto, R. V., & Pandey, N. (2021) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-12-2020-0219 · Cited by 35
Al-Hanakta, R., Hossain, M. B., Pataki, L., & Dunay, A. (2023) · PLoS ONE · doi:10.1371/journal.pone.0281664 · Cited by 37
Measuring lean implementation for maintenance service companies
de Jong, S. J., & van Blokland, W. W. A. B. (2016) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-12-2014-0039 · Cited by 41
“Bhasin (2011) and Singh et al. (2010) reported about lean implementation for production companies however the cost benefit or financial aspects are still missing.”
BackgroundEl-Khalil, R., Leffakis, Z. M., & Hong, P. C. (2020) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-08-2019-0289 · Cited by 41
Nawanir, G., Lim, K. T., Ramayah, T., Mahmud, F. B., Lee, K. L., & Maarof, M. G. (2020) · Benchmarking An International Journal · doi:10.1108/bij-05-2019-0205 · Cited by 30
Suárez‐Barraza, M. F., Dávila, J. Á. M., & Contreras, M. F. M. (2021) · International Journal of Quality and Service Sciences · doi:10.1108/ijqss-07-2020-0113 · Cited by 36
Benchmarking fuzzy logic and ANFIS approaches for leanness evaluation in an Indian SME: A case study
Agrawal, R., Asokan, P., & Vinodh, S. (2017) · Benchmarking An International Journal · doi:10.1108/bij-06-2016-0083 · Cited by 35
Impact of the Planning from the Kanban System on the Company’s Operating Benefits
Magaña, M. M., Tiznado, J. E. O., García-Alcaráz, J. L., Wilson, C. C., Barreras, J. A. L., & López, R. J. P. (2018) · Sustainability · doi:10.3390/su10072506 · Cited by 67
“In addition, kanban reduces the need for labor to track the demand and inventory in the organization, therefore improving the communication with the supplier [69].”
BackgroundLean Six Sigma in the power sector: frog into prince
Sony, M. (2019) · Benchmarking An International Journal · doi:10.1108/bij-10-2017-0276 · Cited by 31
Resource flexibility for lean manufacturing: SAP-LAP analysis of a case study
Chauhan, G., & Singh, T. P. (2013) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-10-2012-0010 · Cited by 34
Susanty, A., Sumiyati, L. S., Syaiful, S., & Nihlah, Z. (2021) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-08-2020-0124 · Cited by 44
Ndrecaj, V., Hashim, M. A. M., Mason-Jones, R. K., Ndou, V., & Tlemsani, I. (2023) · Sustainability · doi:10.3390/su152316542 · Cited by 34
Pinto, J. L. Q., Matias, J. C. O., Pimentel, C., Azevedo, S. G., & Govindan, K. (2018) · Management for professionals · doi:10.1007/978-3-319-77016-1_4 · Cited by 35
Lean manufacturing in fabrication industry: literature review and framework proposal
Aadithya, B. G., Asokan, P., & Vinodh, S. (2022) · International Journal of Quality & Reliability Management · doi:10.1108/ijqrm-03-2021-0084 · Cited by 32
Dehdasht, G., Ferwati, M. S., Mohandes, S. R., El-Sabek, L. M., & Edwards, D. J. (2022) · Engineering Construction & Architectural Management · doi:10.1108/ecam-02-2022-0121 · Cited by 26
The use of Lean Six-Sigma tools in the improvement of a manufacturing company – case study
Tran, T.-A., Luu-Nhan, K., Ghabour, R., & Daróczi, M. (2020) · Production Engineering Archives · doi:10.30657/pea.2020.26.07 · Cited by 35
“In the 19th century, as well as nowadays, such massive companies like Aston Martin used to handicraft produce many of automotive parts like seats for elite and rich people (Singh et al., 2010).”
BackgroundAgility Evaluation in the Rolling Industry: A Case Study
Sindhwani, R., Singh, P. L., Chopra, R., Sharma, K., Basu, A., Prajapati, D. K., & Malhotra, V. (2019) · Lecture notes in mechanical engineering · doi:10.1007/978-981-13-6412-9_70 · Cited by 20
Lean Approach to Enhance Manufacturing Productivity: A Case Study of Saudi Arabian Factory
Rehman, A. U., Usmani, Y. S., Umer, U., & Alkahtani, M. S. (2019) · Arabian Journal for Science and Engineering · doi:10.1007/s13369-019-04277-9 · Cited by 43
Lean manufacturing in Indian context: A survey
Kumar, R., & Kumar, V. (2015) · Management Science Letters · doi:10.5267/j.msl.2015.2.009 · Cited by 24
“These practicing companies published superior results after adoption of lean Manufacturing and this motivated other companies to adopt Lean Manufacturing to make their processes more efficient (Singh et al., 2010c).”
BackgroundFernandes, C. C., & Pinto, L. T. (2020) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-02-2018-0012 · Cited by 34
Strengths, weaknesses, opportunities and threats analysis of lean implementation frameworks
Mishra, R. P., & Chakraborty, A. (2014) · International Journal of Lean Enterprise Research · doi:10.1504/ijler.2014.066833 · Cited by 23
“3 Lean attributes 1 Define value from customer’s perspective 2 Identify the value stream 3 Eliminate the seven deadly wastes 4 Make the work flow 5 Pull the work rather than push it Singh et al. (2010) framework”
BackgroundPuram, P., & Gurumurthy, A. (2021) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-11-2020-0193 · Cited by 23
Lean-Mod: An Approach to Modular Construction Manufacturing Production Efficiency Improvement
Moghadam, M. (2014) · ERA: Education and Research Archive (University of Alberta) · doi:10.7939/r3nh4f · Cited by 23
Tetteh, M. G., Gupta, S., Kumar, M., Trollman, H., Salonitis, K., & Jagtap, S. (2024) · Heliyon · doi:10.1016/j.heliyon.2024.e36677 · Cited by 36
Developing a rapid response production system for aircraft manufacturing
Shan, S., Wang, L., Xin, T., & Bi, Z. (2012) · International Journal of Production Economics · doi:10.1016/j.ijpe.2012.12.006 · Cited by 17
Kumar, S., Dhingra, A. K., & Singh, B. (2018) · Advances in Fuzzy Systems · doi:10.1155/2018/2723768 · Cited by 32
Self-citationvan Blokland, W. W. A. B., van de Koppel, S., Lodewijks, G., & Breen, W. (2018) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-03-2017-0024 · Cited by 18
Optimization of Process Flow in an Assembly Line of Manufacturing Unit through Lean Tools Execution
Nallusamy, S., & Saravanan, V. (2018) · International journal of engineering research in Africa · doi:10.4028/www.scientific.net/jera.38.133 · Cited by 15
“The machine that changed the world book describes processes created by Toyota that, since the early nineties have severely impacted organizations worldwide [1-5].”
BackgroundTripathi, V., Chattopadhyaya, S., Mukhopadhyay, A., Sharma, S. K., Li, C., Singh, S., Saleem, W., Salah, B., & Mohamed, A. (2022) · Processes · doi:10.3390/pr10081587 · Cited by 30
Self-citation(2013) · Industrial engineering letters · Cited by 14
Benefits of Value Stream Mapping as A Lean Tool Implementation Manufacturing Industries : A Review
Patel, N., Chauhan, N., & Trivedi, P. (2015) · International Journal for Innovative Research in Science and Technology · Cited by 14
Sarwar, J., Khan, A. A., Khan, A., Hasnain, A., Arafat, S. M., Ali, H. U., Uddin, G. M., Sosnowski, M., & Krzywański, J. (2022) · Processes · doi:10.3390/pr10122591 · Cited by 34
Kumar, R., & Kumar, P. V. (2015) · Uncertain Supply Chain Management · doi:10.5267/j.uscm.2015.7.001 · Cited by 13
A study into the pros and cons of ISO 18404: viewpoints from leading academics and practitioners
Antony, J., McDermott, O., Sony, M., Cudney, E. A., Snee, R. D., & Hoerl, R. W. (2021) · The TQM Journal · doi:10.1108/tqm-03-2021-0065 · Cited by 14
Kumar, R., Kumar, P. V., & Singh, S. (2017) · Journal of Project Management · doi:10.5267/j.jpm.2017.5.001 · Cited by 12
“Lean Principles were developed for imparting the flexibility in the mass production by eliminating the wastages (Sohal, 1996; Guliyani, 2001; Shah & Ward, 2003; Singh et al., 2010).”
BackgroundAn empirical longitudinal study of adoption of lean management in India
Rajagopalan, J. (2020) · The TQM Journal · doi:10.1108/tqm-11-2019-0269 · Cited by 13
Dorion, E. C. H., de Guimarães, J. C. F., Severo, E. A., dos Reis, Z. C., & Oléa, P. M. (2014) · IEEE International Conference on Management of Innovation and Technology (ICMIT) · doi:10.1109/icmit.2014.6942400 · Cited by 10
Applying lean methodology to curriculum revision and internship placement process – a case study
Singh, J. (2020) · Journal of Research in Innovative Teaching & Learning · doi:10.1108/jrit-05-2019-0055 · Cited by 16
“Usage of these tools helps to reduce administrative expenses, streamline processes and enhance workforce participation in day-to-day activities (Gupta et al., 2014; Singh et al., 2010).”
BackgroundLean implementation barriers in the apparel industry in Bangladesh
Bashar, A., Hasin, A. A., Sakib, M. N., & Bashar, N. B. (2024) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-12-2022-0249 · Cited by 17
Metadata
- Authors
- Singh, B., Garg, S. K., Sharma, S. K., & Grewal, C.
- Affiliations
- Galgotias College of Engineering & Technology (IN)
- Delhi Technological University (IN)
- National Institute of Technology Kurukshetra (IN)
- University of Calgary (CA)
- Venue
- International Journal of Lean Six Sigma
- Publisher
- Emerald
- Published
- 2010-05-28
- Volume
- 1
- Issue
- 2
- Pages
- 157-168
- ISSN
- 2040-4166 (ISSN-L)
- OpenAlex
- W1984348823
- Cited by
- 223
- References
- 36
- Citations by year
- 2026: 6 · 2025: 6 · 2024: 7 · 2023: 11 · 2022: 10 · 2021: 21 · 2020: 18 · 2019: 21 · 2018: 29 · 2017: 15 · 2016: 8 · 2015: 20 · 2014: 19 · 2013: 17 · 2012: 12
- FWCI
- 19.59
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emeraldinsight.com/page/tdm (tdm)
- Locations
- International Journal of Lean Six Sigma (publishedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Digital Transformation in Industry
- Keywords
- lean implementation, value stream mapping, manufacturing industry
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.