What is the Iron Triangle, and how has it changed?
Open accessThe DOI matches its Crossref record; 52 of the 52 references it cites were found in a registry or an index.
Abstract
Purpose: The Iron Triangle, also called the Triple Constraint, is a central concept to project management research and practice, representing the relationship between key performance criteria. However, there is disagreement about which criteria should be represented on the vertices of this triangle. The purpose of this paper is to explore which concepts are part of the Iron Triangle, and how these concepts have changed over time. Design/methodology/approach: This paper explores 45 years of project management research, drawing on a database of 109,804 records from 1970 to 2015. Three corpora were constructed, representing the project management and Time, Cost, and Quality Management literature. Time and Cost are consistently identified as part of the Iron Triangle. However, the status of quality is contested. Key concepts in the project management literature were explored using scientometric research techniques, to understand the relationship between these concepts. Findings: Significant links were found between Time, Cost, and Quality, verifying these concepts as the vertices on the Iron Triangle. These links were significantly stronger than links to alternatives, such as Scope, Performance, or Requirements. Other concepts that are core to the Iron Triangle were also identified, and how these have changed over time. Originality/value: This research develops the understanding of a key project management concept by clarifying which concepts are part of the Iron Triangle, based on evidence of how the concept is used in research. This paper also reveals the context in which this concept is used, and how this has changed over the last 45 years.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
Atkinson, R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00069-6 · Cited by 2,359
The “real” success factors on projects
Cooke-Davies, T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00067-9 · Cited by 1,837
A new framework for determining critical success/failure factors in projects
Belassi, W., & Tukel, O. I. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00064-x · Cited by 1,187
The Logical Framework Method for Defining Project Success
Baccarini, D. (1999) · Project Management Journal · doi:10.1177/875697289903000405 · Cited by 1,136
Measurement of project success
de Wit, A. (1988) · International Journal of Project Management · doi:10.1016/0263-7863(88)90043-9 · Cited by 977
Key performance indicators for measuring construction success
Chan, A. P. C., & Chan, A. P. L. (2004) · Benchmarking: An International Journal · doi:10.1108/14635770410532624 · Cited by 968
The role of project management in achieving project success
Munns, A., & Bjeirmi, B. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00057-7 · Cited by 910
A Retrospective look at our Evolving Understanding of Project Success
Jugdev, K., & Müller, R. (2005) · Project Management Journal · doi:10.1177/875697280503600403 · Cited by 907
Project Success as a Topic in Project Management Journals
Ika, L. A. (2009) · Project Management Journal · doi:10.1002/pmj.20137 · Cited by 783
Current practice in project management — an empirical study
White, D., & Fortune, J. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00029-6 · Cited by 705
Toor, S.-U.-R., & Ogunlana, S. O. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.05.005 · Cited by 619
Framing of project critical success factors by a systems model
Fortune, J., & White, D. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.07.004 · Cited by 616
The Influence of Project Managers on Project Success Criteria and Project Success by Type of Project
Müller, R., & Turner, R. (2007) · European Management Journal · doi:10.1016/j.emj.2007.06.003 · Cited by 579
Different stakeholder groups and their perceptions of project success
Davis, K. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.02.006 · Cited by 532
How can IS/IT projects be measured for success?
Wateridge, J. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00022-7 · Cited by 474
Badewi, A. A. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.05.005 · Cited by 430
Turner, R., & Zolin, R. (2012) · Project Management Journal · doi:10.1002/pmj.21289 · Cited by 419
Do project managers practice what they preach, and does it matter to project success?
Papke-Shields, K. E., Beise, C., & Quan, J. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.11.002 · Cited by 393
From projectification to programmification
Maylor, H., Brady, T., Cooke-Davies, T., & Hodgson, D. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.09.014 · Cited by 360
Defining ‘success’ for software projects: An exploratory revelation
Agarwal, N., & Rathod, U. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.009 · Cited by 349
Construction Project Management
(2004) · Structural Survey · doi:10.1108/ss.2004.11022bae.009 · Cited by 340
Multi-level project governance: Trends and opportunities
Biesenthal, C., & Wilden, R. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.06.005 · Cited by 302
On the broadening scope of the research on projects: a review and a model for analysis
Söderlund, J. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.05.011 · Cited by 250
The Current State of Project Management Research: Trends, Interpretations, and Predictions
Kloppenborg, T. J., & Opfer, W. A. (2002) · Project Management Journal · doi:10.1177/875697280203300203 · Cited by 248
Commitment, coordination, competence and the iron triangle
Jha, K. N., & Iyer, K. C. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.009 · Cited by 243
Identification of variables that impact project success in Brazilian companies
Berssaneti, F. T., & Carvalho, M. M. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.07.002 · Cited by 225
The Perceived Value and Potential Contribution of Project Management Practices to Project Success
Besner, C., & Hobbs, B. (2006) · Project Management Journal · doi:10.1177/875697280603700305 · Cited by 214
COLLINS, A., & BACCARINI, D. (2004) · Journal of Construction Research · doi:10.1142/s1609945104000152 · Cited by 204
Project Management in the Information Systems and Information Technologies Industries
Hartman, F., & Ashrafi, R. A. (2002) · Project Management Journal · doi:10.1177/875697280203300303 · Cited by 202
Angus, D., Rintel, S., & Wiles, J. (2013) · International Journal of Social Research Methodology · doi:10.1080/13645579.2013.774186 · Cited by 199
Gardiner, P. D., & Stewart, K. L. (2000) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00022-8 · Cited by 187
Six decades of project management research: Thematic trends and future opportunities
Padalkar, M., & Gopinath, S. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.006 · Cited by 182
Perceptions of the impact of project sponsorship practices on project success
Bryde, D. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.12.001 · Cited by 182
Pollack, J., & Adler, D. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.04.011 · Cited by 182
Self-citationThe relationship between success criteria and success factors in organisational event projects
Cserháti, G., & Szabó, L. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.08.008 · Cited by 174
A Guide to the Future of Strategy?
Cummings, S. P., & Daellenbach, U. (2009) · Long Range Planning · doi:10.1016/j.lrp.2008.12.005 · Cited by 170
Models of Science Dynamics: Encounters Between Complexity Theory and Information Sciences
Scharnhorst, A., Börner, K., & van den Besselaar, P. (2012) · Understanding complex systems · doi:10.1007/978-3-642-23068-4 · Cited by 168
Relationship quality and satisfaction: Customer-perceived success factors for on-time projects
Williams, P., Ashill, N. J., Naumann, E., & Jackson, E. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.07.009 · Cited by 166
Managing quality in projects: An empirical study
Basu, R. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.02.003 · Cited by 131
Towards total project quality: a gap analysis approach
Winch, G., Usmani, A., & Edkins, A. (1998) · Construction Management and Economics · doi:10.1080/014461998372484 · Cited by 122
Hermano, V., López‐Paredes, A., Martín‐Cruz, N., & Pajares, J. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.07.004 · Cited by 113
Organizing time: Internationalization narratives of executive managers
Middleton, S. A., Liesch, P. W., & Steen, J. T. (2010) · International Business Review · doi:10.1016/j.ibusrev.2010.07.007 · Cited by 70
Introduction to Project Management
Sampietro, M., & Villa, T. (2014) · Auerbach Publications eBooks · doi:10.1201/b16547-5 · Cited by 63
Professionalization, risk transfer, and the effect on gender gap in project management
Legault, M., & Chasserio, S. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.11.004 · Cited by 55
Hook, P. A., & Börner, K. (2006) · Springer eBooks · doi:10.1007/1-4020-4014-8_10 · Cited by 48
Towards a conceptualisation of quality in information technology projects
Geraldi, J. G., Kutsch, E., & Turner, N. W. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.06.004 · Cited by 42
Signs to dogma: A Heideggerian view of how artefacts distort the project world
van der Hoorn, B., & Whitty, S. J. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.02.011 · Cited by 34
Börner, K. (2007) · Environment and Planning B Planning and Design · doi:10.1068/b3302t · Cited by 24
Understanding the divide between the theory and practice of organisational change
Pollack, J. (2015) · Organisational Project Management · doi:10.5130/opm.v2i1.4401 · Cited by 22
Self-citationDomain Maps: Purposes, History, Parallels with Cartography, and Applications
Hook, P. A. (2007) · International Conference on Information Visualisation (IV) · doi:10.1109/iv.2007.42 · Cited by 14
Mapping the development of scientometrics2002-2008
Chen, Y., 陈云伟, Fang, S., 方曙, & Börner, K. (2011) · CAS OpenIR (Chinese Academy of Sciences) · Cited by 13
Metadata
- Authors
- Pollack, J., Helm, J., & Adler, D.
- Venue
- International Journal of Managing Projects in Business
- Publisher
- Emerald
- Published
- 2018-04-13
- Volume
- 11
- Issue
- 2
- Pages
- 527-547
- ISSN
- 1753-8378 (ISSN-L)
- OpenAlex
- W2797300136
- Cited by
- 221
- References
- 52
- FWCI
- 6.60
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.