Cited by 213Extraction and Separation ProcessesEnvironmental Impact and SustainabilityMining and Resource Management

Understanding the future of lithium: part 1, resource model

Ambrose, Hanjiro, Kendall, Alissa·2020·Journal of Industrial Ecology

Abstract

Lithium is a critical energy material in part due to an array of emerging technologies from electric vehicles to renewable energy systems that rely on large‐format lithium ion batteries. Recent growth in demand for lithium is primarily from increased use in batteries, which comprised 46% of total lithium by end use in 2017. These technologies are often deployed to improve environmental sustainability, yet the environmental effects and sustainability of the resources they rely on are often not well understood, especially as demand increases over time. This is the first in a two part article series that together quantify the lithium resource use and its environmental effects over time by coupling a resource production model and life cycle assessment model. In this first part, a novel resource production model is developed to create scenarios of future lithium demand and production characteristics (e.g., timing, location, and ore type). These scenarios are then used to create a life cycle assessment in part two that captures temporal and spatial changes in production systems over time. Results of the resource production model show global lithium resources range from 293 to 527 million metric tons (Mt) of lithium carbonate equivalent (LCE). Global production will likely increase from 237,000 metric tons LCE in 2018 to 4.4–7.5 Mt LCE/year by 2100. Even with rapidly increasing demand, production from high‐grade brines may satisfy most lithium demand through 2035. Though resources can meet demand through 2100, development of lower grade and unfavorable deposits is likely required after 2050.

Integrity signals

Registry

Crossref · 10.1111/jiec.12949

Cites

28 of 28 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Claims the paper makes

We couldn’t retrieve this paper’s full text, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Cites

Flagged first, then by citations

Cited by

Sorted by citations

Authors
Ambrose, H., & Kendall, A.
Affiliations
University of California, Davis (US)
Corresponding author
Kendall, Alissa
Venue
Journal of Industrial Ecology
Published
2019-10
Volume
24
Issue
1
Pages
80-89
ISSN
  • 1088-1980 (ISSN-L)
  • 1530-9290
OpenAlex
W2977700459
Cited by
213
References
28
Citations by year
2026: 24 · 2025: 50 · 2024: 48 · 2023: 35 · 2022: 25 · 2021: 19 · 2020: 10 · 2019: 2
FWCI
7.87
Type
journal article
Language
en
Open access
closed
Locations
Journal of Industrial Ecology (publishedVersion)
Funders
National Science Foundation (CBET‐1337095)
Topics
  • Physical Sciences › Engineering › Mechanical Engineering › Extraction and Separation Processes
  • Physical Sciences › Environmental Science › Environmental Engineering › Environmental Impact and Sustainability
  • Physical Sciences › Engineering › Building and Construction › Mining and Resource Management
Keywords
lithium, lithium brines, lithium-ion batteries, electric vehicles, resource sustainability, life cycle assessment

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review