Determinants of Timeliness in Product Development
The DOI matches its OpenAlex record; 21 of the 21 references it cites were found in a registry or an index.
Abstract
Speed to market is a compelling objective in new product development. Robert Cooper and Elko Kleinschmidt report the results of an extensive study of 103 new product projects in the chemical industry, with a particular emphasis on project timeliness. The key questions addressed in the study are: what are the drivers of an on-time, fast-paced project; and to what extent are timeliness and profitability connected? The strongest driver of project timeliness was the use of a cross-functional, dedicated, accountable team, with a strong leader and top management support. Number two was solid up-front or predevelopment homework, whereas building in the voice of the customer–a customer-focused, market-oriented new product effort–was the third key to on-time, fast-paced product development projects. In total, six drivers of project timeliness were uncovered. The authors expand on each timeliness driver, giving details of best practices in the projects and firms studied, as well as their recommendations to managers for driving products to market more quickly. There are some words of caution as well: the link between timeliness and profitability was also investigated, with some sobering and provocative results.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Winning at new products : accelerating the process from idea to launch
Cooper, R. G. (2001) · Cited by 1,825
Self-citationNew Products: What Separates Winners from Losers?
Cooper, R. G., & Kleinschmidt, E. J. (1987) · Journal of Product Innovation Management · doi:10.1016/0737-6782(87)90002-6 · Cited by 1,618
Self-citationPeters, T. (1988) · Cited by 1,153
The Dimensions of Industrial New Product Success and Failure
Cooper, R. G. (1979) · Journal of Marketing · doi:10.1177/002224297904300310 · Cited by 1,121
Self-citationA study of success and failure in product innovation: The case of the U.S. electronics industry
Maidique, M. A., & Zirger, B. J. (1984) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1984.6447537 · Cited by 635
Accelerating the Development of Technology-Based New Products
Gupta, A. K., & Wilemon, D. L. (1990) · California Management Review · doi:10.2307/41166603 · Cited by 556
Accelerating the development of technology-based new products
(1990) · Long Range Planning · doi:10.1016/0024-6301(90)90331-w · Cited by 469
The Timing of Competitive Market Entry: An Exploratory Study of New Industrial Products
Lilien, G. L., & Yoon, E. (1990) · Management Science · doi:10.1287/mnsc.36.5.568 · Cited by 394
Major New Products: What Distinguishes the Winners in the Chemical Industry?
Cooper, R. G., & Kleinschmidt, E. J. (1993) · Journal of Product Innovation Management · doi:10.1016/0737-6782(93)90002-8 · Cited by 339
Self-citationMetrics for Measuring Product Development Cycle Time
Griffin, A. (1993) · Journal of Product Innovation Management · doi:10.1016/0737-6782(93)90003-9 · Cited by 338
Cited by
The dynamics of crowdfunding: An exploratory study
Mollick, E. (2014) · Journal of Business Venturing · doi:10.1016/j.jbusvent.2013.06.005 · Cited by 4,221
Supply chain collaboration: Impact on collaborative advantage and firm performance
Cao, M., & Zhang, Q. (2011) · Journal of Operations Management · doi:10.1016/j.jom.2010.12.008 · Cited by 2,049
Benchmarking the Firm's Critical Success Factors in New Product Development
Cooper, R. G., & Kleinschmidt, E. J. (1995) · Journal of Product Innovation Management · doi:10.1016/0737-6782(95)00059-3 · Cited by 1,226
Self-citationOrganizational Market Information Processes: Cultural Antecedents and New Product Outcomes
Moorman, C. (1995) · Journal of Marketing Research · doi:10.1177/002224379503200307 · Cited by 1,020
Innovation Speed: A Conceptual Model of Context, Antecedents, and Outcomes
Kessler, E. H., & Chakrabarti, A. K. (1996) · The Academy of Management Review · doi:10.2307/259167 · Cited by 847
Towards Holistic “Front Ends” In New Product Development
Khurana, A., & Rosenthal, S. R. (1998) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(97)00066-0 · Cited by 706
Damanpour, F., & Daniel Wischnevsky, J. (2006) · Journal of Engineering and Technology Management · doi:10.1016/j.jengtecman.2006.08.002 · Cited by 653
The Effect of Project and Process Characteristics on Product Development Cycle Time
Griffin, A. (1997) · Journal of Marketing Research · doi:10.1177/002224379703400103 · Cited by 621
Product Development and Learning in Project Teams: The Challenges Are the Benefits*
Edmondson, A. C., & Nembhard, I. M. (2009) · Journal of Product Innovation Management · doi:10.1111/j.1540-5885.2009.00341.x · Cited by 589
An investigation of the use of global, virtual, and colocated new product development teams
McDonough, E. F., Kahnb, K. B., & Barczaka, G. (2001) · Journal of Product Innovation Management · doi:10.1111/1540-5885.1820110 · Cited by 543
Investigation of Factors Contributing to the Success of Cross‐Functional Teams
McDonough, E. F. (2000) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(00)00041-2 · Cited by 538
Dahan, E., & Hauser, J. R. (2002) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(02)00151-0 · Cited by 520
The Effect of “Front‐Loading” Problem‐Solving on Product Development Performance
Thomke, S. H., & Fujimoto, T. (2000) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(99)00031-4 · Cited by 515
Upper management control of new product development projects and project performance
Bonner, J. (2002) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(02)00139-x · Cited by 413
Buyl, T., Boone, C., Hendriks, W., & Matthyssens, P. (2011) · Journal of Management Studies · doi:10.1111/j.1467-6486.2010.00932.x · Cited by 389
An Evaluation of Research on Integrated Product Development
Gerwin, D., & Barrowman, N. J. (2002) · Management Science · doi:10.1287/mnsc.48.7.938.2818 · Cited by 356
Lee, Y., & Colarelli O'Connor, G. (2003) · Journal of Product Innovation Management · doi:10.1111/1540-5885.t01-1-201002 · Cited by 348
New insights into consumer-led food product development
Costa, A. I. A., & Jongen, W. M. F. (2006) · Trends in Food Science & Technology · doi:10.1016/j.tifs.2006.02.003 · Cited by 343
Absorptive capacity: Enhancing the assimilation of time‐based manufacturing practices
Tu, Q., Vonderembse, M. A., Ragu‐Nathan, T. S., & Sharkey, T. W. (2006) · Journal of Operations Management · doi:10.1016/j.jom.2005.05.004 · Cited by 331
Understanding antecedents of new product development speed: A meta‐analysis
Chen, J., Damanpour, F., & Reilly, R. R. (2010) · Journal of Operations Management · doi:10.1016/j.jom.2009.07.001 · Cited by 329
Standardized project management may increase development projects success
Milosevic, D., & Patanakul, P. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.11.002 · Cited by 327
The fuzzy front end and success of new product development: a causal model
Zhang, Q., & Doll, W. J. (2001) · European Journal of Innovation Management · doi:10.1108/14601060110390602 · Cited by 311
Speeding Up the Pace of New Product Development
Kessler, E. H., & Chakrabarti, A. K. (1999) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(98)00048-4 · Cited by 302
Schmidt, J. B., Montoya‐Weiss, M. M., & Massey, A. P. (2001) · Decision Sciences · doi:10.1111/j.1540-5915.2001.tb00973.x · Cited by 281
Problem–Solving Oscillations in Complex Engineering Projects
Mihm, J., Loch, C., & Huchzermeier, A. (2003) · Management Science · doi:10.1287/mnsc.49.6.733.16021 · Cited by 280
Project failure from corporate entrepreneurship: Managing the grief process
Shepherd, D. A., Covin, J. G., & Kuratko, D. F. (2009) · Journal of Business Venturing · doi:10.1016/j.jbusvent.2008.01.009 · Cited by 277
Koufteros, X. A., Vonderembse, M. A., & Doll, W. J. (2002) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00018-9 · Cited by 274
Is faster really better? An empirical test of the implications of innovation speed
Kessler, E. H., & Bierly, P. E. (2002) · IEEE Transactions on Engineering Management · doi:10.1109/17.985742 · Cited by 263
Concurrent engineering and its consequences
Koufteros, X., Vonderembse, M., & Doll, W. (2001) · Journal of Operations Management · doi:10.1016/s0272-6963(00)00048-6 · Cited by 261
The Impacts of Speed-to-Market on New Product Success: The Moderating Effects of Uncertainty
Chen, J., Reilly, R. R., & Lynn, G. S. (2005) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2005.844926 · Cited by 258
The Moderating Effect of Environmental Uncertainty on New Product Development and Time Efficiency*
Bstieler, L. (2005) · Journal of Product Innovation Management · doi:10.1111/j.0737-6782.2005.00122.x · Cited by 245
“Both sets of activities, when carried out in a quality fashion, were found to correlate with timeliness (Cooper, 1995; Cooper and Kleinschmidt, 1994).”
BackgroundResultInfluentialKnowledge Integration and Information Technology Project Performance1
Mitchell, V. L. (2006) · MIS Quarterly · doi:10.2307/25148759 · Cited by 231
Knowledge management in new product teams: practices and outcomes
Lynn, G. S., Reilly, R. R., & Akgun, A. E. (2000) · IEEE Transactions on Engineering Management · doi:10.1109/17.846789 · Cited by 230
“Cooper and Kleinschmidt [13] assert that, “speed to market is a compelling objective in new product development.””
BackgroundInfluentialKoufteros, X., & Marcoulides, G. A. (2006) · International Journal of Production Economics · doi:10.1016/j.ijpe.2005.08.004 · Cited by 218
“Several studies report that heavy-weight product management and concurrent engineering practices co-vary (Koufteros et al., 2002b; Gupta and Wilemon, 1990; Clark and Fujimoto, 1991; Cooper and Kleinschmidt, 1994; Mabert et al., 1992).”
BackgroundKichuk, S. L., & Wiesner, W. H. (1997) · Journal of Engineering and Technology Management · doi:10.1016/s0923-4748(97)00010-6 · Cited by 215
Fast Polyhedral Adaptive Conjoint Estimation
Toubia, O., Simester, D. I., Hauser, J. R., & Dahan, E. (2003) · Marketing Science · doi:10.1287/mksc.22.3.273.17743 · Cited by 209
“1 For evidence of the reliability and validity of conjoint methods see Bateson, Reibstein, and Boulding (1987), Bucklin and Srinivasan (1991), Carmone, Green, and Jain (1978), Green and Helsen (1989), Leigh, MacKay, and Summers (1984), Montgomery and Wittink (1980), Reibstein, Bateson, and Boulding (1988), and Segal (…”
Knowledge integration and infromation technology project performance
Mitchell, V. L. (2006) · MIS Quarterly · doi:10.5555/2017317.2017324 · Cited by 209
Sherman, J. D., Souder, W. E., & Jenssen, S. A. (2000) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(00)00046-1 · Cited by 203
Planned Flexibility: Linking Anticipation and Reaction in Product Development Projects
Verganti, R. (1999) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(98)00067-8 · Cited by 193
Cassia, L., De Massis, A., & Pizzurno, E. (2012) · International Journal of Entrepreneurial Behavior & Research · doi:10.1108/13552551211204229 · Cited by 190
Enabling and measuring innovation in the construction industry
Gambatese, J. A., & Hallowell, M. (2011) · Construction Management and Economics · doi:10.1080/01446193.2011.570357 · Cited by 190
“Likewise, Cooper and Kleinschmidt ( 1994 ) studied 103 new product projects in the chemical industry and identified the use of a cross‐functional, dedicated, accountable team as a significant factor in delivering a project.”
BackgroundThe Roles of Marketing and Industrial Design in Discontinuous New Product Development*
Veryzer, R. W. (2005) · Journal of Product Innovation Management · doi:10.1111/j.0737-6782.2005.00101.x · Cited by 184
Dröge, C., Jayaram, J., & Vickery, S. K. (2000) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(99)00009-0 · Cited by 182
Innovation Speed in Small and Medium‐Sized Enterprises
Allocca, M. A., & Kessler, E. H. (2006) · Creativity and Innovation Management · doi:10.1111/j.1467-8691.2006.00389.x · Cited by 178
Lean Launch: Managing Product Introduction Risk Through Response‐Based Logistics
Bowersox, D. J., Stank, T. P., & Daugherty, P. J. (1999) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(99)00016-8 · Cited by 169
“time [20,36,43], and market testing and forecasting techniques [27,44,45,52].”
BackgroundCarbonell, P., & Rodriguez, A. I. (2006) · International Journal of Research in Marketing · doi:10.1016/j.ijresmar.2006.01.002 · Cited by 166
Coussement, K., & Van den Poel, D. (2008) · Information & Management · doi:10.1016/j.im.2008.01.005 · Cited by 163
“[10,11,21]), no prior work has used VOC in a churn-prediction model.”
Koufteros, X. A., Rawski, G. E., & Rupak, R. (2010) · Decision Sciences · doi:10.1111/j.1540-5915.2009.00259.x · Cited by 161
Sigala, M. (2012) · International Journal of Contemporary Hospitality Management · doi:10.1108/09596111211258874 · Cited by 161
“the fuzzy front-end) rather than the later stages of NSD (Cooper and Kleinschmidt, 1994; Alam, 2006).”
BackgroundTeam member experiences in new product development: views from the trenches
Barczak, G., & Wilemon, D. (2003) · R&D Management · doi:10.1111/1467-9310.00311 · Cited by 120
Metadata
- Authors
- Cooper, R. G., & Kleinschmidt, E. J.
- Venue
- Journal of Product Innovation Management
- Publisher
- Wiley
- Published
- 1994-11-01
- Volume
- 11
- Issue
- 5
- Pages
- 381-396
- ISSN
- 0737-6782 (ISSN-L)
- OpenAlex
- W2130083470
- Cited by
- 501
- References
- 21
- FWCI
- 15.14
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.