Empowering project portfolio managers: How management involvement impacts project portfolio management performance
The DOI matches its Crossref record; 110 of the 110 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Information Systems Success: The Quest for the Dependent Variable
DeLone, W. H., & McLean, E. R. (1992) · Information Systems Research · doi:10.1287/isre.3.1.60 · Cited by 10,697 · cited 2×
“Information quality refers to the transparency that is achieved over the whole scope of projects of a certain project portfolio (Elonen and Artto, 2003), and is understood as multidimensional, using multiple criteria, such as: relevance, understandability, accuracy, conciseness, completeness, understandability, curren…”
What Makes Teams Work: Group Effectiveness Research from the Shop Floor to the Executive Suite
Cohen, S. G., & Bailey, D. E. (1997) · Journal of Management · doi:10.1177/014920639702300303 · Cited by 3,526 · cited 1×
“Furthermore, system evaluation models often look at inputs, processes, and outcomes (Bou-Llusar et al., 2009; Chang and Leu, 2006; Cohen and Bailey, 1997).”
BackgroundRevolutionizing Product Development: Quantum Leaps in Speed, Efficiency and Quality
Wheelwright, S. C., & Clark, K. B. (1992) · Cited by 3,342
THE DYNAMIC NATURE OF CONFLICT: A LONGITUDINAL STUDY OF INTRAGROUP CONFLICT AND GROUP PERFORMANCE.
Jehn, K. A., & Mannix, E. A. (2001) · Academy of Management Journal · doi:10.2307/3069453 · Cited by 2,487 · cited 3×
“…governing organizational decisions (Kang, 2007; Li et al., 2007; ZapataPhelan et al., 2009), this kind of action leads to less confidence, trust, and poor cooperation quality in the organization and may finally result in relationship-based role conflicts (Jehn, 1997; Jehn and Mannix, 2001).”
BackgroundRecent Developments in Role Theory
Biddle, B. J. (1986) · Annual Review of Sociology · doi:10.1146/annurev.so.12.080186.000435 · Cited by 2,358 · cited 1×
“In the fourth section, derived from role theory (Biddle, 1986; Guirguis and Chewning, 2005; Noble and Mokwa, 1999), I use the attributes role significance and role clarity for the project portfolio manager's role to make assumptions about their impact on the extent of task execution and success…”
MethodCarpenter, M. A., Geletkanycz, M. A., & Sanders, W. G. (2004) · Journal of Management · doi:10.1016/j.jm.2004.06.001 · Cited by 2,248 · cited 4×
“According to upper echelons research, the senior management in this role model represents the key decision makers of an organization (Carpenter et al., 2004; Gallén, 2009).”
BackgroundInfluentialMeasuring Organizational Performance: Towards Methodological Best Practice
Richard, P. J., Devinney, T. M., Yip, G. S., & Johnson, G. (2009) · Journal of Management · doi:10.1177/0149206308330560 · Cited by 2,217 · cited 2×
“The direction and strength of influence depends on (1) the role that is involved, on (2) how the concrete involvement looks like, and on (3) the success perspective that is addressed (Richard et al., 2009).”
BackgroundZiegel, E. R., Kaplan, R., & Norton, D. (1998) · Technometrics · doi:10.2307/1271199 · Cited by 2,187 · cited 1×
“This has led to the development of multidimensional success measurement models, such as The Balanced Scorecard (Kaplan and Norton, 1996) and sophisticated success dimensions (Dvir and Shenhar, 1992).”
MethodHandbook of Organizational Behavior
Price, R. H., D'Aunno, T. A., & Lorsch, J. W. (1988) · Contemporary Sociology · doi:10.2307/2070561 · Cited by 2,186
A Qualitative Analysis of Conflict Types and Dimensions in Organizational Groups
Jehn, K. A. (1997) · Administrative Science Quarterly · doi:10.2307/2393737 · Cited by 2,165 · cited 2×
“…governing organizational decisions (Kang, 2007; Li et al., 2007; ZapataPhelan et al., 2009), this kind of action leads to less confidence, trust, and poor cooperation quality in the organization and may finally result in relationship-based role conflicts (Jehn, 1997; Jehn and Mannix, 2001).”
BackgroundMeasuring information systems success: models, dimensions, measures, and interrelationships
Petter, S., DeLone, W., & McLean, E. (2008) · European Journal of Information Systems · doi:10.1057/ejis.2008.15 · Cited by 1,884 · cited 2×
“Information quality refers to the transparency that is achieved over the whole scope of projects of a certain project portfolio (Elonen and Artto, 2003), and is understood as multidimensional, using multiple criteria, such as: relevance, understandability, accuracy, conciseness, completeness, understandability, curren…”
BackgroundHoegl, M., & Gemuenden, H. G. (2001) · Organization Science · doi:10.1287/orsc.12.4.435.10635 · Cited by 1,671 · cited 2×
“Third, this study contributes to the literature on project portfolio management by explicitly considering the temporal perspective of success criteria and conceptualizing a dynamic multidimensional model for project portfolio management system success, based on research on teams that introduce ‘process criteria of eff…”
BackgroundWhy Some New Products are More Successful than Others
Henard, D. H., & Szymanski, D. M. (2001) · Journal of Marketing Research · doi:10.1509/jmkr.38.3.362.18861 · Cited by 1,467 · cited 2×
“…consider the exploitation of synergies between running projects (e.g., technical synergies) and project results (e.g., market synergies) on a portfolio level as a form of value generation itself (Henard and Szymanski, 2001; Loch and Kavadias, 2002; Pattikawa et al., 2006; Verma and Sinha, 2002).”
BackgroundHandbook of Organizational Behavior
Golembiewski, R. T. (2001) · Cited by 1,375
MORRISON, E. W. (1994) · Academy of Management Journal · doi:10.2307/256798 · Cited by 1,253 · cited 1×
“An employee's role definition is the individual understanding of which duties and responsibilities form a particular job (Moideenkutty, 2009; Morrison, 1994).”
BackgroundPerspective: The Stage‐Gate® Idea‐to‐Launch Process—Update, What's New, and NexGen Systems*
Cooper, R. G. (2008) · Journal of Product Innovation Management · doi:10.1111/j.1540-5885.2008.00296.x · Cited by 1,249
Benchmarking the Firm's Critical Success Factors in New Product Development
Cooper, R. G., & Kleinschmidt, E. J. (1995) · Journal of Product Innovation Management · doi:10.1016/0737-6782(95)00059-3 · Cited by 1,226
Project Success: A Multidimensional Strategic Concept
Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001) · Long Range Planning · doi:10.1016/s0024-6301(01)00097-8 · Cited by 1,222 · cited 6×
“But in contrast to Shenhar et al. (2001), the measures are proposed to be applied at the overall portfolio level instead of the single project success.”
BackgroundInfluentialA Capability‐Based Framework for Open Innovation: Complementing Absorptive Capacity
Lichtenthaler, U., & Lichtenthaler, E. (2009) · Journal of Management Studies · doi:10.1111/j.1467-6486.2009.00854.x · Cited by 1,057 · cited 2×
“Due to the high relevance of organizational learning literature (Lichtenthaler and Lichtenthaler, 2009; Prencipe and Tell, 2001), I add this phase to the first three more common phases on the portfolio level.”
BackgroundAn integrated framework for project portfolio selection
Archer, N. P., & Ghasemzadeh, F. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00032-5 · Cited by 856 · cited 3×
“Finally, according to literature, providing a maximum of value for an organization from its project portfolios implies a portfolio balance along several criteria (Archer and Ghasemzadeh, 1999; Cooper et al., 2002; Killen et al., 2008).”
BackgroundInfluentialPDMA Success Measurement Project: Recommended Measures for Product Development Success and Failure
Griffin, A., & Page, A. L. (1996) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(96)00052-5 · Cited by 854 · cited 4×
“…success thereby refers to the delivering of projects on time, within budget, to the specifications, and customer satisfaction in the average over all projects within the portfolio (Cooper and Edgett, 2003; Engwall and Jerbrant, 2003; Griffin and Page, 1996; Lechler and Dvir, 2010; Payne, 1995).”
BackgroundMethodInfluentialNew Product Portfolio Management: Practices and Performance
Cooper, R. G., Edgett, S. J., & Kleinschmidt, E. J. (1999) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(99)00005-3 · Cited by 827 · cited 1×
“Deriving from this approach and in combination with process-based understanding of portfolio management (Cooper, 2008; Cooper et al., 1999, 2001; Killen et al., 2008), I structure the managerial tasks into one overall project portfolio management process using a chronological sequence of four…”
MethodPortfolio Management For New Products
Cooper, R. G., Edgett, S. J., & Kleinschmidt, E. J. (1998) · University of Maribor digital library (University of Maribor) · Cited by 809
Ritter, T., & Gemünden, H. G. (2003) · Journal of Business Research · doi:10.1016/s0148-2963(01)00259-4 · Cited by 777 · cited 3×
“(Ritter and Gemuenden, 2003).”
BackgroundMethodInfluentialCreating project plans to focus product development.
Wheelwright, S. C., & Clark, K. B. (1992) · PubMed · Cited by 775
Inter-project learning: processes and outcomes of knowledge codification in project-based firms
Prencipe, A., & Tell, F. (2001) · Research Policy · doi:10.1016/s0048-7333(01)00157-3 · Cited by 759 · cited 3×
“In this narrow context, organizational learning is aimed at securing and maintaining relevant knowledge for the organization after project closure, while portfolio exploitation means the utilization and dissemination of project results and lessons learned from earlier projects, which is often seen as a particular task…”
BackgroundSuccess Factors of New Product Development: A Review of the Empirical Literature
Ernst, H. (2002) · International Journal of Management Reviews · doi:10.1111/1468-2370.00075 · Cited by 738 · cited 6×
“For defining strategic fit as the third dimension of portfolio success, I follow Dietrich and Lehtonen (2005) and comprise the alignment of project objectives with strategy, the alignment of resources with strategy, and the degree in which the portfolio reflects the overall strategy (Chao et al., 2009; Ernst, 2002; Mi…”
BackgroundInfluentialSeibert, S. E., Silver, S. R., & Randolph, W. A. (2004) · Academy of Management Journal · doi:10.5465/20159585 · Cited by 651 · cited 1×
“These collective activities can be seen as strategic or macro involvement in favor of the project portfolio manager and will be summarized under the term of empowerment (Seibert et al., 2004; Tuuli and Rowlinson, 2009).”
BackgroundFraming of project critical success factors by a systems model
Fortune, J., & White, D. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.07.004 · Cited by 616 · cited 1×
“Pinto and Prescott (1990), alongside many others, give empirical evidence on strong positive influence (Fortune and White, 2006).”
BackgroundHall, M. (2008) · Accounting, Organizations and Society · doi:10.1016/j.aos.2007.02.004 · Cited by 614 · cited 1×
“According to earlier studies, managers are assumed to be more effective when they understand what needs to be done, whereas role ambiguity decreases work performance (Hall, 2008; Tubre and Collins, 2000).”
BackgroundHoegl, M., Weinkauf, K., & Gemuenden, H. G. (2004) · Organization Science · doi:10.1287/orsc.1030.0053 · Cited by 611 · cited 2×
“Third, this study contributes to the literature on project portfolio management by explicitly considering the temporal perspective of success criteria and conceptualizing a dynamic multidimensional model for project portfolio management system success, based on research on teams that introduce ‘process criteria of eff…”
BackgroundBou‐Llusar, J. C., Escrig‐Tena, A. B., Roca‐Puig, V., & Beltrán‐Martín, I. (2009) · Journal of Operations Management · doi:10.1016/j.jom.2008.04.001 · Cited by 603 · cited 1×
“Furthermore, system evaluation models often look at inputs, processes, and outcomes (Bou-Llusar et al., 2009; Chang and Leu, 2006; Cohen and Bailey, 1997).”
BackgroundFactors influencing project success: the impact of human resource management
Belout, A., & Gauvreau, C. (2004) · International Journal of Project Management · doi:10.1016/s0263-7863(03)00003-6 · Cited by 566 · cited 2×
“Despite a number of direct effects demonstrated in empirical research (Belout and Gauvreau, 2004; Bonner et al., 2002; Swink, 2000, 2003), I assume the explanatory power of the model being maximized by conceptualizing indirect and moderating effects of management's role definitions and their involvement on the portfol…”
BackgroundTubre, T. C., & Collins, J. M. (2000) · Journal of Management · doi:10.1177/014920630002600104 · Cited by 481
The resource allocation syndrome: the prime challenge of multi-project management?
Engwall, M., & Jerbrant, A. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00113-8 · Cited by 473 · cited 5×
“…success thereby refers to the delivering of projects on time, within budget, to the specifications, and customer satisfaction in the average over all projects within the portfolio (Cooper and Edgett, 2003; Engwall and Jerbrant, 2003; Griffin and Page, 1996; Lechler and Dvir, 2010; Payne, 1995).”
BackgroundInfluentialImplementing Marketing Strategies: Developing and Testing a Managerial Theory
Noble, C. H., & Mokwa, M. P. (1999) · Journal of Marketing · doi:10.2307/1251974 · Cited by 418
Upper management control of new product development projects and project performance
Bonner, J. (2002) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(02)00139-x · Cited by 413 · cited 3×
“But there is also literature that points out the negative influence of top management involvement on project success (Bonner et al., 2002; Kessler, 2000).”
BackgroundProblems in managing internal development projects in multi-project environments
Elonen, S., & Artto, K. A. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00097-2 · Cited by 374 · cited 8×
“…projects within the portfolio that might additionally increase the overall portfolio value, (3) the portfolio fit to a company's business strategy, and (4) the portfolio balance in terms of as risk, area of application and use of technology (Elonen and Artto, 2003; Martinsuo and Lehtonen, 2007).”
BackgroundInfluentialTop management support: Mantra or necessity?
Young, R., & Jordan, E. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.06.001 · Cited by 366 · cited 1×
“For instance, concerning the single project success, the majority of literature shows a positive impact of top management support (Young and Jordan, 2008; Zwikael, 2008).”
BackgroundCarmeli, A., & Halevi, M. Y. (2009) · The Leadership Quarterly · doi:10.1016/j.leaqua.2009.01.011 · Cited by 356
Do Project Managers’ Leadership Competencies Contribute to Project Success?
Geoghegan, L., & Dulewicz, V. (2008) · Project Management Journal · doi:10.1002/pmj.20084 · Cited by 317 · cited 4×
“I disregard this attribute—understood as the qualification level and the amount of professional skills for PPM tasks execution (Geoghegan and Dulewicz, 2008)—for that it might not show great potential for surprisingly new findings that contribute to the addressed research question in this narrow…”
BackgroundInfluentialDe Brentani, U., & Kleinschmidt, E. J. (2004) · Journal of Product Innovation Management · doi:10.1111/j.0737-6782.2004.00085.x · Cited by 309
Project portfolio management – There’s more to it than what management enacts
Blichfeldt, B. S., & Eskerod, P. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.06.004 · Cited by 303 · cited 3×
“…process-based understanding of project portfolio managerial tasks (What to do?) with four phases, which consist of those tasks that are related to portfolio structuring, resource management, portfolio steering, and organizational learning and portfolio exploitation (Blichfeldt and Eskerod, 2008a).”
BackgroundZapata-Phelan, C. P., Colquitt, J. A., Scott, B. A., & Livingston, B. (2009) · Organizational Behavior and Human Decision Processes · doi:10.1016/j.obhdp.2008.08.001 · Cited by 296
Role of single-project management in achieving portfolio management efficiency
Martinsuo, M., & Lehtonen, P. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.04.002 · Cited by 288 · cited 5×
“…projects within the portfolio that might additionally increase the overall portfolio value, (3) the portfolio fit to a company's business strategy, and (4) the portfolio balance in terms of as risk, area of application and use of technology (Elonen and Artto, 2003; Martinsuo and Lehtonen, 2007).”
BackgroundInfluentialA new framework for understanding organisational project management through the PMO
Aubry, M., Hobbs, B., & Thuillier, D. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.01.004 · Cited by 287 · cited 2×
“…to the multi-project level, so far the multiple-project manager (Patanakul and Milosevic, 2009), the program manager (Blomquist and Müller, 2006) and several kinds of (multi-) project management offices (Aubry et al., 2007, 2008, 2009; Hobbs et al., 2008) are explicitly mentioned in literature.”
BackgroundKeegan, A. E., & Den Hartog, D. N. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.05.005 · Cited by 285 · cited 2×
“Such an assignment severely limits the traditionally strong role of the line managers (Keegan and Hartog, 2004; Laslo and Goldberg, 2008) within a matrix organization.”
BackgroundChao, R. O., & Kavadias, S. (2008) · Management Science · doi:10.1287/mnsc.1070.0828 · Cited by 283 · cited 1×
“I define portfolio balance as the adjustment between high and low project risks, between new and old areas of application, and between the use of new and existing technologies within the projects (Chao and Kavadias, 2008; Chao et al., 2009).”
BackgroundPerformance of Global New Product Development Programs: A Resource‐Based View
Kleinschmidt, E. J., De Brentani, U., & Salomo, S. (2007) · Journal of Product Innovation Management · doi:10.1111/j.1540-5885.2007.00261.x · Cited by 278 · cited 2×
“For instance, when firms tend to providemore influence to their projects, more autonomy to their teams, better qualifications, information, and top management attention, and an integration of customers and suppliers to the project (Kleinschmidt et al., 2007; Wheelwright and Clark, 1992b), then each single project with…”
BackgroundThe project management office as an organisational innovation
Hobbs, B., Aubry, M., & Thuillier, D. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.05.008 · Cited by 277 · cited 2×
“…to the multi-project level, so far the multiple-project manager (Patanakul and Milosevic, 2009), the program manager (Blomquist and Müller, 2006) and several kinds of (multi-) project management offices (Aubry et al., 2007, 2008, 2009; Hobbs et al., 2008) are explicitly mentioned in literature.”
BackgroundTop management team behavioral integration, decision quality, and organizational decline
Carmeli, A., & Schaubroeck, J. (2006) · The Leadership Quarterly · doi:10.1016/j.leaqua.2006.06.001 · Cited by 263 · cited 2×
“…has also been conducted regarding the role of the top management support and top management teams in general (Carmeli andHaleviMeyrav, 2009; Carmeli and Schaubroeck, 2006; Carpenter et al., 2004; Dammer, 2008), on the role of certain top managers, e.g., CEO or CIO (Leker and Salomo, 2000;…”
BackgroundTeamwork for innovation – the ‘troika’ of promotors
Hauschildt, J., & Kirchmann, E. (2001) · R and D Management · doi:10.1111/1467-9310.00195 · Cited by 262 · cited 5×
“To overcome those barriers I suggest using literature on promotors in innovation management research as one starting point for further analysis (Gemünden, 1985; Hauschildt and Kirchmann, 2001; Rost et al., 2007; Witte, 1977).”
BackgroundMethodInfluentialLine management responsibility for HRM: what is happening in Europe?
Holt Larsen, H., & Brewster, C. (2003) · Employee Relations · doi:10.1108/01425450310475838 · Cited by 253
Swink, M. L. (2000) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(00)00040-0 · Cited by 251 · cited 2×
“Despite a number of direct effects demonstrated in empirical research (Belout and Gauvreau, 2004; Bonner et al., 2002; Swink, 2000, 2003), I assume the explanatory power of the model being maximized by conceptualizing indirect and moderating effects of management's role definitions and their…”
BackgroundOn the broadening scope of the research on projects: a review and a model for analysis
Söderlund, J. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.05.011 · Cited by 250 · cited 2×
“The recent literature on portfolio management theory in contrast analyzes critical success factors predominantly separately or by modeling certain aspects and their relationship with success (Killen et al., 2008; Martinsuo and Lehtonen, 2007; Payne and Turner, 1999; Sanchez et al., 2008; Söderlund, 2004).”
BackgroundBliese, P. D., & Castro, C. A. (2000) · Work & Stress · doi:10.1080/026783700417230 · Cited by 250 · cited 2×
““Role clarity has been explored in literally hundreds of occupational stress studies” (Bliese and Castro, 2000, p.66).”
BackgroundDynamic Portfolio Selection of NPD Programs Using Marginal Returns
Loch, C. H., & Kavadias, S. (2002) · Management Science · doi:10.1287/mnsc.48.10.1227.275 · Cited by 249 · cited 3×
“…consider the exploitation of synergies between running projects (e.g., technical synergies) and project results (e.g., market synergies) on a portfolio level as a form of value generation itself (Henard and Szymanski, 2001; Loch and Kavadias, 2002; Pattikawa et al., 2006; Verma and Sinha, 2002).”
BackgroundPLANNING AND TACTICAL FACTORS IN THE PROJECT IMPLEMENTATION PROCESS
Pinto, J. K., & Prescott, J. E. (1990) · Journal of Management Studies · doi:10.1111/j.1467-6486.1990.tb00249.x · Cited by 234 · cited 1×
“Pinto and Prescott (1990), alongside many others, give empirical evidence on strong positive influence (Fortune and White, 2006).”
BackgroundThe effect of acceleration techniques on product development time
Zirger, B. J., & Hartley, J. L. (1996) · IEEE Transactions on Engineering Management · doi:10.1109/17.509980 · Cited by 233 · cited 2×
“Zirger and Hartley (1996) demonstrate how too highly committed top management leads to longer project development times due to political involvement of many top managers at the same time.”
BackgroundProject Portfolio Control and Portfolio Management Performance in Different Contexts
Müller, R., Martinsuo, M., & Blomquist, T. (2008) · Project Management Journal · doi:10.1002/pmj.20053 · Cited by 230 · cited 2×
“In contrast to the recurring phase of portfolio structuring, the third phase of portfolio steering includes all the continuous tasks that are necessary for a permanent coordination of the portfolio (Müller et al., 2008).”
BackgroundProject portfolio management for product innovation
Killen, C. P., Hunt, R. A., & Kleinschmidt, E. J. (2008) · International Journal of Quality & Reliability Management · doi:10.1108/02656710810843559 · Cited by 229 · cited 6×
“Deriving from this approach and in combination with process-based understanding of portfolio management (Cooper, 2008; Cooper et al., 1999, 2001; Killen et al., 2008), I structure the managerial tasks into one overall project portfolio management process using a chronological sequence of four highly interdependent pha…”
BackgroundMethodInfluentialOrganizational learning through post–project reviews in R&D
Von Zedtwitz, M. (2002) · R&D Management · doi:10.1111/1467-9310.00258 · Cited by 213 · cited 1×
“This can be realized through re-evaluation of project results and by utilizing post project reviews at a later date (von Zedtwitz, 2002, 2003).”
MethodSmaltz, D. H., Sambamurthy, V., & Agarwal, R. (2006) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2006.872248 · Cited by 201 · cited 1×
“…Carmeli and Schaubroeck, 2006; Carpenter et al., 2004; Dammer, 2008), on the role of certain top managers, e.g., CEO or CIO (Leker and Salomo, 2000; Smaltz et al., 2006), and on the role of line management such as department or division heads (Bredin and Söderlund, 2007; Keegan and Hartog, 2004).”
BackgroundProject Management Characteristics and New Product Survival
Jeffrey Thieme, R., Michael Song, X., & Shin, G. (2003) · Journal of Product Innovation Management · doi:10.1111/1540-5885.2002004 · Cited by 196 · cited 1×
“Thus, I finally propose a third dimension: encouragement for intra-organizational collaboration (Mollenkopf et al., 2000; Thieme et al., 2003).”
BackgroundHuman resource allocation in a multi-project R&D environment
Hendriks, M. M., Voeten, B. B., & Kroep, L. L. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00026-x · Cited by 195 · cited 1×
“In the second phase, resource management is seen in the narrow sense of project portfolios only (Hendriks et al., 1999).”
BackgroundPerceptions of the impact of project sponsorship practices on project success
Bryde, D. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.12.001 · Cited by 182 · cited 2×
“management level (Bryde, 2008; Crawford et al., 2008), steering committees (Lechler and Cohen, 2009), as well as many kinds of project teams and their members (Gevers et al.”
BackgroundCorporate Championing and Antagonism as Forms of Political Behavior: An R&D Perspective
Markham, S. K. (2000) · Organization Science · doi:10.1287/orsc.11.4.429.14599 · Cited by 182 · cited 1×
“…can be helpful, but senior managers also tend to delay or prevent the abortion of a project they have initiated or strongly supported, even if there are clear indications that a continuation of the project induces more damage than value creation (Bonner et al., 2002; Ernst, 2002; Markham, 2000).”
BackgroundToward a theory of project interdependencies in high tech R&D environments
Verma, D., & Sinha, K. K. (2002) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00024-4 · Cited by 177 · cited 3×
“…consider the exploitation of synergies between running projects (e.g., technical synergies) and project results (e.g., market synergies) on a portfolio level as a form of value generation itself (Henard and Szymanski, 2001; Loch and Kavadias, 2002; Pattikawa et al., 2006; Verma and Sinha, 2002).”
Backgroundde Brentani, U., Kleinschmidt, E. J., & Salomo, S. (2010) · Journal of Product Innovation Management · doi:10.1111/j.1540-5885.2010.00707.x · Cited by 172 · cited 1×
“In literature, management involvement and its influence have often been discussed from different research perspectives, such as information management or strategic management (Brentani et al., 2010; Burgelman and Doz, 2001; Kearns, 2006).”
BackgroundDietrich, P., & Lehtonen, P. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.03.002 · Cited by 172 · cited 1×
“For defining strategic fit as the third dimension of portfolio success, I follow Dietrich and Lehtonen (2005) and comprise the alignment of project objectives with strategy, the alignment of resources with strategy, and the degree in which the portfolio reflects the overall strategy (Chao et al.,…”
BackgroundA two-way influence between business strategy and project management
Srivannaboon, S., & Milosevic, D. Z. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.03.006 · Cited by 172 · cited 2×
“…and Lehtonen (2005) and comprise the alignment of project objectives with strategy, the alignment of resources with strategy, and the degree in which the portfolio reflects the overall strategy (Chao et al., 2009; Ernst, 2002; Milosevic and Srivannaboon, 2006; Srivannaboon and Milosevic, 2006).”
BackgroundThe balance between order and chaos in multi-project firms: A conceptual model
Geraldi, J. G. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.08.013 · Cited by 166 · cited 1×
“Thus, portfolio steering mainly tends to increase a company's adaptive capacity and flexibility regarding external and internal portfolio changes that appear on short notice (Geraldi, 2008, 2009; Spillecke, 2006).”
BackgroundLeadership, Team Building, and Team Member Characteristics in High Performance Project Teams
Ammeter, A. P., & Dukerich, J. M. (2002) · Engineering Management Journal · doi:10.1080/10429247.2002.11415178 · Cited by 159 · cited 1×
“Although competency may indeed be related to success and performance (Ammeter and Dukerich, 2002), it might hold lower conflict potential since more competency is assumed to be positively related to the system success, which would apply to all involved management roles equally.”
BackgroundPatanakul, P., & Milosevic, D. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.03.001 · Cited by 159 · cited 2×
“Besides the project portfolio manager and with particular regards to the multi-project level, so far the multiple-project manager (Patanakul and Milosevic, 2009), the program manager (Blomquist and Müller, 2006) and several kinds of (multi-) project management offices (Aubry et al., 2007, 2008,…”
BackgroundRole Ambiguity, Role Conflict, and Performance: Empirical Evidence of an Inverted‑U Relationship
Onyemah, V. (2008) · Journal of Personal Selling & Sales Management · doi:10.2753/pss0885-3134280306 · Cited by 159 · cited 1×
“Onyemah (2008), in contrast, stressed in his study on salespeople an inverted-U shaped relationship where moderate levels of role ambiguity are associated with higher performance while low and high levels are associated with low performance.”
BackgroundManaging multiple engineering projects in a manufacturing support environment
Fricke, S. E., & Shenbar, A. J. (2000) · IEEE Transactions on Engineering Management · doi:10.1109/17.846792 · Cited by 158 · cited 1×
“Allocation quality refers to an effective and efficient distribution of human resources among the portfolio (Fricke and Shenhar, 2000).”
BackgroundCompleting projects on-time: how project acceleration affects new product development
Swink, M. L. (2003) · Journal of Engineering and Technology Management · doi:10.1016/j.jengtecman.2003.08.002 · Cited by 155 · cited 2×
“Despite a number of direct effects demonstrated in empirical research (Belout and Gauvreau, 2004; Bonner et al., 2002; Swink, 2000, 2003), I assume the explanatory power of the model being maximized by conceptualizing indirect and moderating effects of management's role definitions and their…”
BackgroundThe Power of Strategic Integration
Burgelman, R. A., & Doz, Y. (2001) · Dialnet (Universidad de la Rioja) · Cited by 146
Xie, J., Song, M., & Stringfellow, A. (2003) · Journal of Product Innovation Management · doi:10.1111/1540-5885.2003005 · Cited by 145 · cited 1×
“According to Xie et al. (2003), this kind of senior management involvement positively influences the quality of collaboration and particularly the quality of information that is shared across functions and product development units.”
BackgroundPractices, Roles, and Responsibilities of Middle Managers in Program and Portfolio Management
Blomquist, T., & Müller, R. (2006) · Project Management Journal · doi:10.1177/875697280603700105 · Cited by 144 · cited 8×
“In project management literature it has also been suggested that project portfolio success should also be examined multidimensionally on the single project, portfolio, and corporate level (Blomquist and Müller, 2006; Müller et al., 2008).”
BackgroundInfluentialLi, H., Bingham, J. B., & Umphress, E. E. (2007) · Organization Science · doi:10.1287/orsc.1060.0231 · Cited by 131 · cited 3×
“According to the theory of procedural justice, which refers to the fairness of the formal procedures governing organizational decisions (Kang, 2007; Li et al., 2007; ZapataPhelan et al., 2009), this kind of action leads to less confidence, trust, and poor cooperation quality in the organization and…”
BackgroundMethodInfluentialGovernance and Support in the Sponsoring of Projects and Programs
Crawford, L. H., Cooke‐Davies, T., Hobbs, B., et al. (2008) · Project Management Journal · doi:10.1002/pmj.20059 · Cited by 130 · cited 3×
“management level (Bryde, 2008; Crawford et al., 2008), steering committees (Lechler and Cohen, 2009), as well as many kinds of project teams and their members (Gevers et al.”
BackgroundThe Role of Technology in the Project Manager Performance Model
Anantatmula, V. S. (2008) · Project Management Journal · doi:10.1002/pmj.20038 · Cited by 127 · cited 2×
“On the single project level, besides the project manager (Anantatmula, 2008; Geoghegan and Dulewicz, 2008), especially project sponsors on senior management level (Bryde, 2008; Crawford et al., 2008), steering committees (Lechler and Cohen, 2009), as well as many kinds of project teams and their…”
BackgroundExploring tensions in projectified matrix organisations
Arvidsson, N. (2008) · Scandinavian Journal of Management · doi:10.1016/j.scaman.2008.09.002 · Cited by 125 · cited 4×
“Even though the majority of industrial organizations might be in a matrix structure organization, the conflict potential is presumably determined by the degree of projectification of the firm (Arvidsson, 2009).”
BackgroundInfluentialRole theory: Literature review and implications for patient-pharmacist interactions
Guirguis, L. M., & Chewning, B. A. (2005) · Research in Social and Administrative Pharmacy · doi:10.1016/j.sapharm.2005.09.006 · Cited by 125 · cited 2×
“In the fourth section, derived from role theory (Biddle, 1986; Guirguis and Chewning, 2005; Noble and Mokwa, 1999), I use the attributes role significance and role clarity for the project portfolio manager's role to make assumptions about their impact on the extent of task execution and success (Who is doing it?).”
MethodA Theoretical Framework for Aligning Project Management with Business Strategy
Milosevic, D. Z., & Srivannaboon, S. (2006) · Project Management Journal · doi:10.1177/875697280603700310 · Cited by 123 · cited 2×
“…and Lehtonen (2005) and comprise the alignment of project objectives with strategy, the alignment of resources with strategy, and the degree in which the portfolio reflects the overall strategy (Chao et al., 2009; Ernst, 2002; Milosevic and Srivannaboon, 2006; Srivannaboon and Milosevic, 2006).”
BackgroundChao, R. O., Kavadias, S., & Gaimon, C. (2009) · Management Science · doi:10.1287/mnsc.1090.1046 · Cited by 117 · cited 3×
“…and Lehtonen (2005) and comprise the alignment of project objectives with strategy, the alignment of resources with strategy, and the degree in which the portfolio reflects the overall strategy (Chao et al., 2009; Ernst, 2002; Milosevic and Srivannaboon, 2006; Srivannaboon and Milosevic, 2006).”
BackgroundLechler, T. G., & Dvir, D. (2010) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2010.2044441 · Cited by 113 · cited 2×
“…success thereby refers to the delivering of projects on time, within budget, to the specifications, and customer satisfaction in the average over all projects within the portfolio (Cooper and Edgett, 2003; Engwall and Jerbrant, 2003; Griffin and Page, 1996; Lechler and Dvir, 2010; Payne, 1995).”
BackgroundLaslo, Z., & Goldberg, A. I. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.10.003 · Cited by 109 · cited 8×
“But while top management might not be aware of destructive interventions, line managers without any formal role integration into PPM simply have no reason to behave accordingly (Laslo and Goldberg, 2008).”
BackgroundInfluentialFrom models to practice: decision making at portfolio meetings
Christiansen, J. K., & Varnes, C. J. (2008) · International Journal of Quality & Reliability Management · doi:10.1108/02656710810843603 · Cited by 109 · cited 1×
“It is furthermore essential how decision makers manage to relate decisions to corporate strategy and make their decisions credible and comprehensible to the line managers (Christiansen and Varnes, 2008).”
BackgroundZwikael, O. (2008) · International Journal of Managing Projects in Business · doi:10.1108/17538370810883837 · Cited by 102 · cited 1×
“For instance, concerning the single project success, the majority of literature shows a positive impact of top management support (Young and Jordan, 2008; Zwikael, 2008).”
BackgroundPromotors or Champions? Pros and Cons of Role Specialisation for Economic Process
Rost, K., Hölzle, K., & Gemünden, H. G. (2007) · Schmalenbach Business Review · doi:10.1007/bf03396754 · Cited by 100 · cited 5×
“To overcome those barriers I suggest using literature on promotors in innovation management research as one starting point for further analysis (Gemünden, 1985; Hauschildt and Kirchmann, 2001; Rost et al., 2007; Witte, 1977).”
BackgroundMethodInfluentialKearns, G. S. (2004) · Omega · doi:10.1016/j.omega.2004.10.008 · Cited by 91 · cited 1×
“In literature, management involvement and its influence have often been discussed from different research perspectives, such as information management or strategic management (Brentani et al., 2010; Burgelman and Doz, 2001; Kearns, 2006).”
BackgroundTightening the belt: methods for reducing development costs associated with new product innovation
Kessler, E. H. (2000) · Journal of Engineering and Technology Management · doi:10.1016/s0923-4748(99)00020-x · Cited by 86 · cited 1×
“But there is also literature that points out the negative influence of top management involvement on project success (Bonner et al., 2002; Kessler, 2000).”
BackgroundEmpowerment in project teams: a multilevel examination of the job performance implications
Tuuli, M. M., & Rowlinson, S. (2009) · Construction Management and Economics · doi:10.1080/01446190902729713 · Cited by 76 · cited 2×
“These collective activities can be seen as strategic or macro involvement in favor of the project portfolio manager and will be summarized under the term of empowerment (Seibert et al., 2004; Tuuli and Rowlinson, 2009).”
BackgroundMethodTop management involvement in project management
Zwikael, O. (2008) · International Journal of Managing Projects in Business · doi:10.1108/17538370810906228 · Cited by 75 · cited 1×
“For instance, concerning the single project success, the majority of literature shows a positive impact of top management support (Young and Jordan, 2008; Zwikael, 2008).”
BackgroundYuan, M., Zhang, X., Chen, Z., Vogel, D., & Chu, X. (2009) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2008.927819 · Cited by 74 · cited 1×
“It particularly focuses on the quality of cross-project cooperation (Cusumano and Nobeoka, 1998; Sauter et al., 1998; Yuan et al., 2009) in terms of mutual assistance of different project teams and conflict solving between project managers.”
BackgroundKaplan, R. S., & Miyake, D. N. (2010) · The School Administrator · Cited by 74
Cultural differences in decision making in project teams
Müller, R., Spang, K., & Ozcan, S. (2009) · International Journal of Managing Projects in Business · doi:10.1108/17538370910930527 · Cited by 73 · cited 1×
“…and Dulewicz, 2008), especially project sponsors on senior management level (Bryde, 2008; Crawford et al., 2008), steering committees (Lechler and Cohen, 2009), as well as many kinds of project teams and their members (Gevers et al., 2009; Müller et al., 2009) have been studied in recent years.”
BackgroundGevers, J., van Eerde, W., & Rutte, C. G. (2009) · European Journal of Work and Organizational Psychology · doi:10.1080/13594320701693217 · Cited by 73 · cited 2×
“…and Dulewicz, 2008), especially project sponsors on senior management level (Bryde, 2008; Crawford et al., 2008), steering committees (Lechler and Cohen, 2009), as well as many kinds of project teams and their members (Gevers et al., 2009; Müller et al., 2009) have been studied in recent years.”
BackgroundExploring the Role of Steering Committees in Realizing Value from Project Management
Lechler, T. G., & Cohen, M. A. (2009) · Project Management Journal · doi:10.1002/pmj.20094 · Cited by 65 · cited 3×
“…Geoghegan and Dulewicz, 2008), especially project sponsors on senior management level (Bryde, 2008; Crawford et al., 2008), steering committees (Lechler and Cohen, 2009), as well as many kinds of project teams and their members (Gevers et al., 2009; Müller et al., 2009) have been studied in…”
BackgroundInfluentialAnthony, M., & McKay, J. (1992) · Journal of Product Innovation Management · doi:10.1016/0737-6782(92)90005-w · Cited by 61 · cited 1×
“First and foremost, it is the project manager, whose role remains unattended due to complexity reasons although literature indicates that senior management interventions can strongly affect the project manager autonomy as well (Anthony and McKay, 1992).”
BackgroundA contingency theoretical model of manufacturing strategy
Ho, C. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610113960 · Cited by 53
Measuring the Success of Technology-Based Strategic Business Units
Dvir, D., & Shenhar, A. J. (1992) · Engineering Management Journal · doi:10.1080/10429247.1992.11414701 · Cited by 42 · cited 1×
“This has led to the development of multidimensional success measurement models, such as The Balanced Scorecard (Kaplan and Norton, 1996) and sophisticated success dimensions (Dvir and Shenhar, 1992).”
MethodRISK IN INFORMATION TECHNOLOGY PROJECT PORTFOLIO MANAGEMENT
Drake, J. R., & Byrd, T. A. (2006) · Journal of the Association for Information Systems · Cited by 27
Limits to Effective Leadership Style and Tactics in Critical Incident Interventions
Thomas, D., & Bendoly, E. (2009) · Project Management Journal · doi:10.1002/pmj.20118 · Cited by 22 · cited 1×
“Encouragement is part of the leadership style (Thomas and Bendoly, 2009), and in the closer context of role conflicts in PPM this means to convince of and motivate line management for the idea of PPM and to make the circumstances comprehensible (Laslo and Goldberg, 2008).”
BackgroundData mining model for identifying project profitability variables
Chang, A. S.-T., & Leu, S.-S. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.08.003 · Cited by 22
Thorpe, E. R., & Morgan, R. E. (2007) · Journal of Strategic Marketing · doi:10.1080/09652540701320985 · Cited by 17 · cited 2×
“Literature defines role significance by the extent to which a role is perceived to be critical to the overall success of the execution effort (Noble and Mokwa, 1999; Thorpe and Morgan, 2007).”
BackgroundTop management team composition and views of viable strategies
Gallén, T. (2009) · Team Performance Management · doi:10.1108/13527590911002113 · Cited by 16 · cited 2×
“According to upper echelons research, the senior management in this role model represents the key decision makers of an organization (Carpenter et al., 2004; Gallén, 2009).”
BackgroundInfluential(1987)
Cited by
Project portfolio management in practice and in context
Martinsuo, M. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.10.013 · Cited by 287
Behavior of internal stakeholders in project portfolio management and its impact on success
Beringer, C., Jonas, D., & Kock, A. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.11.006 · Cited by 271
Self-citationExplicating the dynamics of project capabilities
Davies, A., & Brady, T. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.04.006 · Cited by 265
Impact of integration management on construction project management performance
Demirkesen, S., & Ozorhon, B. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.09.008 · Cited by 259
Three domains of project organising
Winch, G. M. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.10.012 · Cited by 256
Metadata
- Authors
- Jonas, D.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2010-12
- Volume
- 28
- Issue
- 8
- Pages
- 818-831
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2167821173
- Cited by
- 220
- References
- 110
- FWCI
- 23.55
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.