Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“The success criteria of projects are determined by cost, quality, and time [29,30], also called the 'iron or golden triangle'.”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [29]
In the citing paper
“In the world of production, the ideal outcome is often a trade-off between good (quality), fast (time), and cheap (cost), with firms rarely achieving all 3.11”
From Outcomes and Complications of the Mustardé Otoplasty: A “Good–Fast–Cheap” Technique for the Prominent Ear Deformity (2020) · cites this paper as [11]
Citations
Cites
Information Systems Success: The Quest for the Dependent Variable
DeLone, W. H., & McLean, E. R. (1992) · Information Systems Research · doi:10.1287/isre.3.1.60 · Cited by 10,697
Measurement of project success
de Wit, A. (1988) · International Journal of Project Management · doi:10.1016/0263-7863(88)90043-9 · Cited by 981
Information Systems: A Management Perspective
Alter, S. (1991) · Cited by 540
How can IS/IT projects be measured for success?
Wateridge, J. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00022-7 · Cited by 476
How the right measures help teams excel
Meyer, C. (1994) · Harvard business review · Cited by 309
Handy, C. (2002) · Arrow Books · Cited by 286
CRITICAL SUCCESS FACTORS ACROSS THE PROJECT LIFE CYCLE
Al-Fahdawi, M. S., Rawi, O. S. A., & Hassan, A. S. (2025) · Journal of Al-Azhar University Engineering Sector · doi:10.21608/auej.2025.336575.1735 · Cited by 259
The 3-D Model of Information Systems Success
Ballantine, J., Bonner, M., Levy, M., Martin, A., Munro, I., & Powell, P. L. (1996) · Information Resources Management Journal · doi:10.4018/irmj.1996100101 · Cited by 163
Time and budget: the twin imperatives of a project sponsor
Wright, J. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00059-2 · Cited by 94
System development methodology and project success
Saarinen, T., & Saarinen, T. (1990) · Information & Management · doi:10.1016/0378-7206(90)90004-2 · Cited by 69
Research works printed but not linked: 10
- Morris PWG, Hough GH. The Anatomy of Major Projects. John Wiley and Sons, Chichester, 1993.
- Gallagher K. Chaos, Information Technology and Project Management Conference Proceedings, London, 19–20 Sep. 1995, 19–36.
- Oisen, 1971, Can project management be defined?, Project Management Quarterly, 2, 12
- Burke R. Project Management. John Wiley and Sons, Chichester, 1993.
- Bernstein PL. Have we replaced old-world superstitions with a dangerous reliance on numbers? Harvard Business Review Mar-Apr. 1996, 47–51.
- Turner JR. The Handbook of Project-based Management. McGraw-Hill, 1993
- Morris PWG, Hough GH. The Anatomy of Major Projects. John Wiley, 1987.
- Pinto, 1988, Critical success factors across the project lifecycle, Project Management Journal, XIX, 67
- Williams, 1995, Why do software projects fail?, GEC Journal of Research, 12, 13
- Shenhar, 1997, Mapping the dimensions of project success, Project Management Journal, 28, 5
Cited by
Sorted by citations
Items 901–1,000 of 1,000
Ćwikła, M., & Jałocha, B. (2015) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-11-2014-0078 · Cited by 9
Introduction to Project Management
(2014) · Auerbach Publications eBooks · doi:10.1201/b16547-3 · Cited by 9
Transforming exams - how IT works for BYOD e-Exams
Hillier, M., & Fluck, A. E. (2017) · UTAS Research Repository · Cited by 8
PROJECT MANAGEMENT ASSESSMENTS (PMAs): AN EMPIRICAL STUDY
Siriram, R. (2018) · The South African Journal of Industrial Engineering · doi:10.7166/29-1-1675 · Cited by 9
“Further research, specifically of factors affecting poor project outcomes and how to mitigate those outcomes, is given by the following researchers, among others: Baker and Fisher [46], identifying factors affecting project success; Atkinson [47] on the project management focus on cost, time, and quality; Chapman and…”
BackgroundThe Effect of Project Manager’s Leadership Style on Performance of Water Projects in Kenya
Kariuki, J. T. (2018) · European Scientific Journal ESJ · doi:10.19044/esj.2018.v14n17p33 · Cited by 9
“Engineering, Construction and Architectural Management, 6(3), 287-298.”
BackgroundMethodInfluentialRecommendations and guidelines for implementing PPP projects
Araújo, L. G., Piña, A. B. S., Aidar, L. A. G., Coelho, G. O., & Carvalho, M. T. M. (2019) · Built Environment Project and Asset Management · doi:10.1108/bepam-01-2018-0016 · Cited by 9
Grander, G., Vesco, D. G. D., & Ribeiro, I. (2019) · Revista de Gestão e Projetos · doi:10.5585/gep.v10i2.13965 · Cited by 13
The FeDiNAR Project: Using Augmented Reality to Turn Mistakes into Learning Opportunities
Atanasyan, A., Kobelt, D., Goppold, M., Cichon, T., & Schluse, M. (2020) · Springer series on cultural computing · doi:10.1007/978-3-030-42156-4_5 · Cited by 9
Modranský, R., Jakabová, S., Hanák, M., & Oláh, A. (2020) · Technium Social Sciences Journal · doi:10.47577/tssj.v9i1.1145 · Cited by 9
Grams, S., Schwade, F., Mosen, J., & Schubert, P. L. (2021) · Procedia Computer Science · doi:10.1016/j.procs.2021.01.202 · Cited by 9
PERFORMANCE MANAGEMENT IN CIVIL ENGINEERING: A SYSTEMATIC LITERATURE REVIEW
Marović, I., Hanák, T., & Plaum, S. (2022) · Elektronički časopis građevinskog fakulteta Osijek · doi:10.13167/2022.24.5 · Cited by 8
Project Management Maturity in Renovation and Remodelling Construction Firms
Machado, F., Duarte, N., & Amaral, A. (2023) · Buildings · doi:10.3390/buildings13020557 · Cited by 15
“Atkinson [37] and Turner and Zolan [38] defended that fulfilling the triple constraint of scope, time, and cost is mandatory to achieve project success.”
BackgroundDu, Y., & Yin, Y. (2010) · iBusiness · doi:10.4236/ib.2010.23036 · Cited by 9
Project Management Strategies for Prototyping Breakdowns
Granlien, M. S., Pries‐Heje, J., & Baskerville, R. (2009) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2009.357 · Cited by 9
A Configurational Approach to Project Delays
Krohwinkel, A. (2014) · Journal of Mixed Methods Research · doi:10.1177/1558689814522709 · Cited by 9
Defining 'project success' for a complex project - The case of a nuclear engineering development
Niekerk, S. V., & Steyn, H. (2011) · The South African Journal of Industrial Engineering · doi:10.7166/22-1-38 · Cited by 14
de Andrade, P. R. M., Albuquerque, A. B., & Teófilo, W. (2016) · International Journal of Advanced Information Technology · doi:10.5121/ijait.2016.6102 · Cited by 9
Ranking the Project Management Success Factors for Construction Project in South India
Aneesha, K., & Haridharan, M. K. (2017) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/80/1/012044 · Cited by 9
Influência das características pessoais do gerente de projetos no desempenho dos projetos
de Moura, R. L., Carneiro, T. C. J., & Diniz, B. D. (2017) · Gestão & Produção · doi:10.1590/0104-530x3595-16 · Cited by 9
Sintov, N. D., & Schuitema, G. (2018) · Energy Policy · doi:10.1016/j.enpol.2018.03.021 · Cited by 13
Quality Control Scheme Selection with a Case of Aviation Equipment Development
Feng, L., Huang, D., Jin, M., Li, W., He, Z., & Yu, A. J. (2019) · Engineering Management Journal · doi:10.1080/10429247.2019.1656518 · Cited by 9
“In general, project management could be described as the application of a series of tools and techniques to direct the use of diverse resources toward the accomplishment of a unique, complex, one-time task within time, cost and quality constraints (Atkinson, 1999).”
BackgroundCho, J. H. (2017) · Journal of the Korean society for quality management · doi:10.7469/jksqm.2017.45.3.403 · Cited by 9
Atencio, M. (2012) · University of Salford Institutional Repository (University of Salford) · Cited by 9
Factors critical to the success of business intelligence systems
Hawking, P. (2013) · Victoria University Research Repository (Victoria University) · Cited by 9
The performance effects of optimistic and pessimistic project status reporting behavior
Kaufmann, C., & Kock, A. (2023) · International Journal of Project Management · doi:10.1016/j.ijproman.2023.102514 · Cited by 8
Luo, Y., & Chen, Y. (2024) · Journal of Asian Architecture and Building Engineering · doi:10.1080/13467581.2024.2396606 · Cited by 8
“This suggestion is consistent with the logic of existing studies that consider project cost, quality, and schedule targets as measure index of project performance (Atkinson 1999).”
Akbar, M. A., Naseem, A., Zaman, U. K. U., & Petronijević, J. (2024) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-024-14601-9 · Cited by 8
“The iron triangle consists of three elements such as time, cost, and quality [24] to prevent or learn from manufacturing recalls by analyzing the potential risks with respect to their behaviour, probability, and severity, heading towards [ 165 ] w it h m o r e p r ec i s e r e s u lt s -”
Maturity Of Project Management In Polish And Foreign Construction Companies
Górecki, J. (2015) · Foundations of Management · doi:10.1515/fman-2015-0026 · Cited by 8
Realising benefits in public IT projects: A multiple case study
Holgeid, K. K., Jørgensen, M., Volden, G. H., & Berg, H. (2022) · IET Software · doi:10.1049/sfw2.12079 · Cited by 8
Akbar, M. A., Naseem, A., Ahmad, Y., & Zaman, U. K. U. (2024) · Ain Shams Engineering Journal · doi:10.1016/j.asej.2024.102756 · Cited by 8
Mavi, N. K., Brown, K. A., Fulford, R. G., & Goh, M. (2024) · Engineering Construction & Architectural Management · doi:10.1108/ecam-08-2023-0838 · Cited by 8
R&D best practices, absorptive capacity and project success
Oliva, S. V., Sánchez, Á. M., & Berges-Muro, L. (2015) · DYNA · doi:10.15446/dyna.v82n191.42558 · Cited by 9
Analysis of Project Success Criteria in the Nigerian Construction Industry
DOSUMU, O. S., & Onukwube, H. N. (2013) · International Journal of Sustainable Construction Engineering Technology · Cited by 8
Serious Gaming for User Centered Innovation and Adoption of Disaster Response Information Systems
Meesters, K., & de Walle, B. V. (2014) · International Journal of Information Systems for Crisis Response and Management · doi:10.4018/ijiscram.2014040101 · Cited by 8
Bouras, V. K. (2013) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2013.03.008 · Cited by 8
Doskočil, R. (2016) · Periodica Polytechnica Social and Management Sciences · doi:10.3311/ppso.8236 · Cited by 8
Sumadilaga, D. H., Soetjipto, B. W., Wahyuni, S., & Wijanto, S. H. (2016) · International Journal of Public Administration · doi:10.1080/01900692.2016.1242613 · Cited by 11
“The iron triangle of cost, quality, and time is one of the most celebrated theories used to measure organizational performance (Atkinson, 1999).”
BackgroundOn how the selection of materials affects sustainability
Hernández, A. E. B. (2019) · Procedia Manufacturing · doi:10.1016/j.promfg.2019.04.078 · Cited by 8
The social representation of success in IT projects
Jóia, L. A., & Melon, M. R. (2019) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-01-2019-0005 · Cited by 8
Sociotechnical Challenges In Knowledge-Intensive Production Environments
Hannola, L., Heinrich, P., Richter, A., & Stocker, A. (2016) · Zenodo (CERN European Organization for Nuclear Research) · doi:10.5281/zenodo.826185 · Cited by 8
Aljamee, H. K., & Naeem, S. M. (2020) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/745/1/012155 · Cited by 8
“14 References List [1] Atkinson R 1999 Project Management: Cost, Time and Quality, Two Best Guesses and a Phenomenon, its Time to Accept Other Success Criteria'.”
BackgroundInfluentialProject Management in Data Warehouse Implementations: A Literature Review
Bogojević, P. (2020) · IEEE Access · doi:10.1109/access.2020.3045072 · Cited by 8
Kirker, korona og nettbaserte gudstjenester
Hodøl, H.-O., Emanuelsen, R., & Johannessen, G. C. (2021) · Norsk medietidsskrift · doi:10.18261/issn.0805-9535-2021-02-02 · Cited by 8
Productivity Measurement and Improvement for Public Construction Projects
Zhan, W., Pan, W., & Hao, G. (2022) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002282 · Cited by 8
Tensions and ambidexterity: a case study of an agile project at a government agency
Lindskog, C. (2022) · International journal of information systems and project management · doi:10.12821/ijispm100201 · Cited by 8
“…of the current study are in line with the fact that the Agile approach also suits government agencies because both the interviews and the documentation testified to the project being successful, and not just on the basis of the three sides of the project triangle; i.e. cost, quality, time [76].”
ResultEaton, C., Patel, S. A., Glandon, K. L., Weger, K., Mesmer, B. L., & Moreland, R. (2022) · Space Policy · doi:10.1016/j.spacepol.2022.101515 · Cited by 8
Planning of construction projects taking into account the design risk
Kostrzewa-Demczuk, P., & Rogalska, M. (2023) · Archives of Civil Engineering · doi:10.24425/ace.2023.144191 · Cited by 9
Comparing Risk and Success Factors in ERP Projects: A Literature Review
Hoermann, S., Kienegger, H., Langermeier, M., Mayer, M., & Krcmar, H. (2011) · Journal of the Association for Information Systems · Cited by 8
Defense vs. civilian projects: The effect of project type on performance
Sadeh, A., Dvir, D., & Shenhar, A. J. (2010) · Portland International Conference on Management of Engineering and Technology (PICMET) · Cited by 8
Impacts of Engineering Work Quality on Project Success
Mortaheb, M. M., Amini, Y., Younesian, A. H., & Soltani, P. (2013) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2013.03.021 · Cited by 8
An Exploratory Study of Organizing Structures for Post-Implementation ERP
Gallagher, K. P., & Gallagher, V. C. (2010) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2010.56 · Cited by 8
THE CRITERIA OF PROJECT SUCCESS
Boukanos, A. K. (2007) · Cited by 8
Eik-Andresen, P., Johansen, A., Landmark, A. D., & Sørensen, A. Ø. (2016) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2016.06.191 · Cited by 8
“Scientists and writers (i.a. Atkinson 1999; Miller & Lessard 2001; Shenhar & Dvir 2007; Rolstadås, Hetland et al. 2011) tend to think that the governance criteria for a portfolio or program vary from organization to organisation.”
BackgroundProject Management Yinyang: Coupling project success and client satisfaction
Usher, G. S., & Whitty, S. J. (2017) · Project Management Research and Practice · doi:10.5130/pmrp.v4i0.5523 · Cited by 8
“More often than not project management practitioners consider their projects to be successful when they can demonstrate quantifiable performance against metrics that have been predetermined at the outset of the project (Thomson:2011, Atkinson:1999). Traditionally, project managers have used the constraints of the Iron…”
BackgroundDialogue on risk: effects of project risk management on project success
de Bakker, K. F. C. (2011) · Cited by 8
RAI - Revista de Administração e Inovação
Pereira, R. M. C., Geleilate, J. M. G., Leocádio, Á. L., & Gomes, D. M. D. O. A. (2013) · Cited by 8
Modeling of customeroriented construction project management using the gender logic systems
Fesenko, T., Shakhov, A., Fesenko, G., Bibik, N. V., & Тупченко, В. В. (2018) · Eastern-European Journal of Enterprise Technologies · doi:10.15587/1729-4061.2018.123124 · Cited by 8
The transaction costs of intra-organizational captive buying and selling relationships
de Waard, E., de Bock, P., & Beeres, R. J. M. (2019) · Journal of Accounting & Organizational Change · doi:10.1108/jaoc-07-2018-0058 · Cited by 8
Impact of Construction Project Planning on Contractor’s Profit
Akinradewo, O. I., Aigbavboa, C. O., & Akinradewo, O. F. (2019) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/385/1/012009 · Cited by 8
Ramos, P. A., & Mota, C. M. D. M. (2015) · Production · doi:10.1590/0103-6513.173114 · Cited by 8
Rugenyi, F., & Bwisa, H. M. (2016) · Strategic Journal of Business & Change Management · doi:10.61426/sjbcm.v3i2.241 · Cited by 9
Shared Leadership Functions in Geographically Dispersed Project Teams
Muethel, M., & Hoegl, M. (2011) · Advances in strategic management · doi:10.1108/s0742-3322(2011)0000028015 · Cited by 9
Une lecture structurationniste des pratiques de management de projet SI
Figueiredo, M. B., & Morley, C. (2015) · Systèmes d information & management · doi:10.3917/sim.152.0037 · Cited by 7
Lapidus, A. A., Motylev, R. V., & Sokolnikov, V. V. (2023) · Vestnik MGSU · doi:10.22227/1997-0935.2023.1.116-131 · Cited by 7
Framework for Estimating Quality-Related Incentive and Disincentive in Construction Projects
Garg, S., & Misra, S. (2023) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-12259 · Cited by 7
Jensen, M. H., & Kadenic, M. D. (2024) · Software Quality Journal · doi:10.1007/s11219-024-09665-5 · Cited by 7
“Project success (Pinto & Slevin, 1987) draws from a rich literature and practical field of project management that provides tools and approaches to meet objectives in terms of time, cost, scope, and quality (Atkinson, 1999; PMI, 2013; Pollack et al., 2018).”
The construction-related project management evolution and its future research directions
Russell, J. S., El-adaway, I. H., Khalef, R., Salih, F., & Ali, G. G. (2024) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2023-0426 · Cited by 7
Santos, C., Varajão, J. E., Takagi, N. H., & Gonçalves, A. M. (2024) · Scientific Reports · doi:10.1038/s41598-024-75437-7 · Cited by 10
Evaluation of the Factors behind the Failure of Project Management Practices
Shabir, R. (2023) · Journal of Development and Social Sciences · doi:10.47205/jdss.2023(4-iii)47 · Cited by 7
Selection of agile project management approaches based on project complexity
Pinciroli, F. (2024) · Journal of Software Evolution and Process · doi:10.1002/smr.2716 · Cited by 7
“1,2 While some variations exist, such as Atkinson using quality instead of scope 44 or Cockburn emphasizing process as the fourth dimension, 45 we will stick to the three basic elements due to their widespread use and acceptance.”
The Contingencies of Project Management: A Factor Analytic Approach to Complexity and Novelty
Puddicombe, M. S. (2011) · International Journal of Construction Education and Research · doi:10.1080/15578771.2011.595474 · Cited by 7
Construction Project Success ranking through the Data Envelopment Analysis
Zahedi-Seresht, M., Akbarijokar, M., Khosravi, S., & Afshari, H. (2014) · Data Envelopment Analysis and Decision Science · doi:10.5899/2014/dea-00056 · Cited by 7
The relationship between IT adoption, IS success and project success
Nguyen, T. D., Nguyen, T. M., & Cao, T. H. (2016) · International Conference on Advances in Computing, Communications and Informatics (ICACCI) · doi:10.1109/icacci.2016.7732207 · Cited by 7
Chen, C. C., Nakayama, M., Shou, Y., & Charoen, D. (2017) · International Journal of Information Technology Project Management · doi:10.4018/ijitpm.2018010103 · Cited by 7
Searching Success in a Successful IS Acquisition
Ylinen, M., & Pekkola, S. (2018) · Hawaii International Conference on System Sciences (HICSS) · doi:10.24251/hicss.2018.603 · Cited by 7
“examine whether the project fulfilled its objectives [2, 16].”
BackgroundE-GOVERNMENT SUCCESS FACTORS: A PERSPECTIVE ON GOVERNMENT UNITS
(2015) · Issues in Information Systems · doi:10.48009/2_iis_2015_16-27 · Cited by 7
User Group Consultation: Design Quality and Project Success
Carthey, J. (2019) · HERD Health Environments Research & Design Journal · doi:10.1177/1937586719873143 · Cited by 9
“Project success has evolved from the traditional “iron triangle” of time, cost, and scope of the 1950s–1980s to focus on a wider set of critical success factors (CSFs), advocated by Atkinson (1999) and others.”
BackgroundDETERMINANTES DE LA PRODUCTIVIDAD TOTAL DE FACTORES EN AMÉRICA DEL SUR
Villca, A. M. G. (2020) · Revista Investigación & Desarrollo · doi:10.23881/idupbo.019.2-1e · Cited by 7
Requirements for Model-Based Development Process Design and Compliance of Standardized Models
Shaked, A., & Reich, Y. (2021) · Systems · doi:10.3390/systems9010003 · Cited by 7
“It was proposed that adopting systems-related criteria and systems engineering techniques would help address this gap [1,9].”
BackgroundA tool for integrating time, cost and quality perspectives in Probability Impact (P-I) Tables
Demir, S. T., Bryde, D., Fearon, D. J., & Ochieng, E. G. (2014) · International Journal of Project Organisation and Management · doi:10.1504/ijpom.2014.066410 · Cited by 7
Project Implementation, Risk Management Practices and Project Success
Watema, J., & Tulirinya, J. (2021) · East African Journal of Business and Economics · doi:10.37284/eajbe.3.1.296 · Cited by 7
“Project success has been defined by the criteria of time, budget and deliverables (Atkinson, 1999).”
BackgroundInfluentialA System Dynamics Analysis of Value Creation in Project Context
Pargar, F., & Kujala, J. (2021) · Engineering Project Organization Journal · doi:10.25219/epoj.2021.00112 · Cited by 7
Palopak, Y., & Huang, S.-J. (2022) · International Journal of Software Engineering and Knowledge Engineering · doi:10.1142/s0218194022500127 · Cited by 7
Akbar, F., & Shahid, R. (2022) · International Journal of Energy Sector Management · doi:10.1108/ijesm-03-2021-0010 · Cited by 7
Mahdavi-Roshan, P., & Mousavi, S. M. (2022) · Kybernetes · doi:10.1108/k-11-2021-1217 · Cited by 7
The innovation challenge in Spain: A Delphi study
Medina, M. G., Enríquez, J. G., Olivero, M. Á., & Mayo, F. J. D. (2023) · Expert Systems with Applications · doi:10.1016/j.eswa.2023.120611 · Cited by 7
Lean Design Versus Traditional Design Approach
Munthe-Kaas, T. S., Hjelmbrekke, H., Lohne, J., & Lædre, O. (2015) · Cited by 7
Lester, A. (2007) · Elsevier eBooks · doi:10.1016/b978-075066956-6/50011-3 · Cited by 7
ERP Project Success Perception by the Adopters
Lech, P. (2013) · International Journal of Information Technology Project Management · doi:10.4018/jitpm.2013010102 · Cited by 7
Culture and Project Management
Kuchta, D., & Sukpen, J. (2013) · Journal of Intercultural Management · doi:10.2478/joim-2013-0016 · Cited by 7
PHASING TECHNOLOGY TRANSFER PROJECTS FOR SUSTAINABLE SOCIO-ECONOMIC DEVELOPMENT
Beukman, E., & Steyn, H. (2011) · The South African Journal of Industrial Engineering · doi:10.7166/22-2-14 · Cited by 7
ASSESSING THE PERFORMANCE OF CONSTRUCTION WORKERS IN PENINSULA MALAYSIA
Zolkafli, U. K., Hanid, M., & Zakaria, N. M. N. (2009) · Cited by 7
Managing projects using a project management approach
Andrejić, M., Đorović, B. D., & Pamucar, D. S. (2011) · Vojnotehnicki glasnik · doi:10.5937/vojtehg1102142a · Cited by 7
Boakye, L. G., & Liu, L. (2016) · Universal Journal of Management · doi:10.13189/ujm.2016.040301 · Cited by 7
Governance of higher education – implementation of project governance
Macheridis, N. (2016) · Tertiary Education and Management · doi:10.1080/13583883.2016.1236285 · Cited by 7
Breakin' the Project Wave: Understanding and avoiding failure in project management
Wagner, D. N. (2016) · Cited by 7
Oke, A. E., & Aigbavboa, C. O. (2017) · Springer eBooks · doi:10.1007/978-3-319-54151-8_5 · Cited by 7
Successful Management in multi-project environment
Dietrich, P. H., Järvenpää, E., Karjalainen, J., & Artto, K. A. (2002) · Cited by 7
El-Maaty, A. E. A., Akal, A. Y., & El-Hamrawy, S. A.-K. (2017) · Sustainable civil infrastructures · doi:10.1007/978-3-319-61645-2_1 · Cited by 7
Paradigm shift from conventional software quality models to web based quality models
Kumar, A., & Gupta, D. (2018) · International Journal of Hybrid Intelligent Systems · doi:10.3233/his-180249 · Cited by 7
Metadata
- Authors
- Atkinson, R.
- Affiliations
- Bournemouth University (GB)
- Corresponding author
- Atkinson, Roger
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 1999-12
- Volume
- 17
- Issue
- 6
- Pages
- 337-342
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2092587332
- Cited by
- 2,359
- References
- 19
- Citations by year
- 2026: 63 · 2025: 90 · 2024: 119 · 2023: 119 · 2022: 150 · 2021: 153 · 2020: 126 · 2019: 145 · 2018: 192 · 2017: 148 · 2016: 166 · 2015: 150 · 2014: 136 · 2013: 122 · 2012: 112
- FWCI
- 7.08
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- International Journal of Project Management (publishedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Computer Science › Information Systems › Software Engineering Techniques and Practices
- Social Sciences › Business, Management and Accounting › Management of Technology and Innovation › Economic and Technological Systems Analysis
- Keywords
- project success criteria, iron triangle, cost, time, quality, stakeholder benefits, IT project management, information systems projects, project management framework
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review