Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“The success criteria of projects are determined by cost, quality, and time [29,30], also called the 'iron or golden triangle'.”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [29]
In the citing paper
“In the world of production, the ideal outcome is often a trade-off between good (quality), fast (time), and cheap (cost), with firms rarely achieving all 3.11”
From Outcomes and Complications of the Mustardé Otoplasty: A “Good–Fast–Cheap” Technique for the Prominent Ear Deformity (2020) · cites this paper as [11]
Citations
Cites
Information Systems Success: The Quest for the Dependent Variable
DeLone, W. H., & McLean, E. R. (1992) · Information Systems Research · doi:10.1287/isre.3.1.60 · Cited by 10,697
Measurement of project success
de Wit, A. (1988) · International Journal of Project Management · doi:10.1016/0263-7863(88)90043-9 · Cited by 981
Information Systems: A Management Perspective
Alter, S. (1991) · Cited by 540
How can IS/IT projects be measured for success?
Wateridge, J. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00022-7 · Cited by 476
How the right measures help teams excel
Meyer, C. (1994) · Harvard business review · Cited by 309
Handy, C. (2002) · Arrow Books · Cited by 286
CRITICAL SUCCESS FACTORS ACROSS THE PROJECT LIFE CYCLE
Al-Fahdawi, M. S., Rawi, O. S. A., & Hassan, A. S. (2025) · Journal of Al-Azhar University Engineering Sector · doi:10.21608/auej.2025.336575.1735 · Cited by 259
The 3-D Model of Information Systems Success
Ballantine, J., Bonner, M., Levy, M., Martin, A., Munro, I., & Powell, P. L. (1996) · Information Resources Management Journal · doi:10.4018/irmj.1996100101 · Cited by 163
Time and budget: the twin imperatives of a project sponsor
Wright, J. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00059-2 · Cited by 94
System development methodology and project success
Saarinen, T., & Saarinen, T. (1990) · Information & Management · doi:10.1016/0378-7206(90)90004-2 · Cited by 69
Research works printed but not linked: 10
- Morris PWG, Hough GH. The Anatomy of Major Projects. John Wiley and Sons, Chichester, 1993.
- Gallagher K. Chaos, Information Technology and Project Management Conference Proceedings, London, 19–20 Sep. 1995, 19–36.
- Oisen, 1971, Can project management be defined?, Project Management Quarterly, 2, 12
- Burke R. Project Management. John Wiley and Sons, Chichester, 1993.
- Bernstein PL. Have we replaced old-world superstitions with a dangerous reliance on numbers? Harvard Business Review Mar-Apr. 1996, 47–51.
- Turner JR. The Handbook of Project-based Management. McGraw-Hill, 1993
- Morris PWG, Hough GH. The Anatomy of Major Projects. John Wiley, 1987.
- Pinto, 1988, Critical success factors across the project lifecycle, Project Management Journal, XIX, 67
- Williams, 1995, Why do software projects fail?, GEC Journal of Research, 12, 13
- Shenhar, 1997, Mapping the dimensions of project success, Project Management Journal, 28, 5
Cited by
Sorted by citations
Items 801–900 of 1,000
The path towards discovering PMO: an exploratory analysis of the Italian banking sector
Pansini, F., Terzieva, M., & Morabito, V. (2022) · International journal of information systems and project management · doi:10.12821/ijispm020202 · Cited by 12
Knowledge Areas Delivered in Project Management Programs: Exploratory Study
Nguyen, L. D., Chih, Y., & de Soto, B. G. (2016) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000473 · Cited by 12
Holzmann, V., & Mazzini, L. (2020) · Journal of organizational culture, communication and conflict · Cited by 12
de Lemos, J. C., & Chagas, M. F. (2016) · RAI revista de administração e inovação · doi:10.1016/j.rai.2015.08.001 · Cited by 12
Baker, D. (2004) · Elsevier eBooks · doi:10.1016/b978-1-84334-041-6.50013-9 · Cited by 12
The conception and operationalization of leadership in construction companies
Price, J. (2010) · Unisa Institutional Repository (University of South Africa) · Cited by 12
A Study of Uncertainty and Risk Management Practice Related to Perceived Project Complexity
Harvett, C. M. (2013) · e-publications@bond (Bond University) · Cited by 12
Project success assessment – business and individual perspectives
Albert, M., Spang, K., & Balve, P. (2018) · University of Technology, Sydney eBooks · doi:10.5130/pmrp.ipmarc2017.5580 · Cited by 11
“…the success of a project, whereas project success factors can be understood as levers to increase the probability of project success, being neither part of a project’s mission nor explicitly defined tasks (Ashley, Lurie, & Jaselskis 1987; Atkinson 1999; Müller & Jugdev 2012; Westerveld 2003).”
BackgroundMETAMORFOSE DA FILOSOFIA 5S E SEUS DESDOBRAMENTOS NO CONTEXTO BRASILEIRO
Yemal, J. A., Guerreiro, E. P., & Filho, U. M. M. (2018) · Revista SODEBRAS · doi:10.29367/issn.1809-3957.13.2018.156.14 · Cited by 11
Prioritizing Preproject Planning Activities Using Value of Information Analysis
Esfahani, M. E., Rausch, C., Haas, C. T., & Adey, B. T. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000822 · Cited by 11
Trott, P., Baxter, D., Ellwood, P., & van der Duin, P. A. (2022) · Prometheus · doi:10.13169/prometheus.38.2.0207 · Cited by 11
“While the project management triangle (the ‘iron triangle’) might offer unsuitable metrics for many projects (Atkinson, 1999), it does embody a long-held view that decisions about time, cost and quality represent a trade-off in which two objectives may be met at the expense of the third.”
BackgroundExploring the Current Practices and Future Directions in Project Management Education and Training
Özsoy, T., & Sezgili, K. (2024) · SAGE Open · doi:10.1177/21582440241236053 · Cited by 11
“Hard skills, on the other hand, encompass methodologies, protocols, tools, and approaches essential for executing tasks within a specific industry, such as scope, time, cost, and quality management (Atkinson, 1999; Pant & Baroudi, 2008).”
Lean Construction: A Sustainability Operation for Government Projects
Bigwanto, A., Widayati, N., Wibowo, M. A., & Sari, E. M. (2024) · Sustainability · doi:10.3390/su16083386 · Cited by 11
Digital twins for machine tools: a systematic mapping study
Chen, S., Ellwein, C., Klingel, L., Neumann, R., Zhang, J., Riedel, O., Verl, A. W., & Wortmann, A. (2025) · Digital Twin · doi:10.1080/27525783.2025.2538727 · Cited by 11
Measuring Process Effectiveness Using Cpm/Pert
Ajiboye, A. S. (2011) · International Journal of Business and Management · doi:10.5539/ijbm.v6n6p286 · Cited by 11
Managing knowledge in large‐scale virtual projects: a community‐based approach
Marabelli, M., Rajola, F., Frigerio, C., & Newell, S. (2013) · International Journal of Managing Projects in Business · doi:10.1108/17538371311319043 · Cited by 11
Mkoba, E. S., & Marnewick, C. (2016) · South African Institute of Computer Scientists and Information Technologists · doi:10.1145/2987491.2987495 · Cited by 11
“factors frameworks and categorised them into common themes [4, 5, 45, 57, 70]”
BackgroundOdusanya, S., Ochoa, J. J., Chileshe, N., & Ahn, S. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-11-2020-0354 · Cited by 11
Defining success in open source hardware development projects: a survey of practitioners
Antoniou, R., Bonvoisin, J., Hsing, P., Dekoninck, E. A., & Defazio, D. (2022) · Design Science · doi:10.1017/dsj.2021.30 · Cited by 11
“In project management, the traditional way of evaluating project success is through the ‘triple constraint’, also known as the ‘iron triangle’, which contains three key dimensions: time, cost, and quality (Atkinson 1999). These dimensions relate to whether the project was completed on or ahead of time; within or under…”
InfluentialTekic, A., Žerjav, V., & Tekić, Ž. (2022) · International Journal of Project Management · doi:10.1016/j.ijproman.2022.05.002 · Cited by 15
Cleary, J. P., & Lamanna, A. J. (2022) · Buildings · doi:10.3390/buildings12070957 · Cited by 11
Thilakarathne, N., Rathnasinghe, A. P., Kulatunga, U., Thurairajah, N., & Weerasinghe, L. N. K. (2022) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-03-2022-0018 · Cited by 11
Measurement of Information System Project Success in German Organizations
Joosten, D., Basten, D., & Mellis, W. (2014) · International Journal of Information Technology Project Management · doi:10.4018/ijitpm.2014070101 · Cited by 11
Borges, J. G., & de Carvalho, M. M. (2014) · Production · doi:10.1590/s0103-65132014005000019 · Cited by 12
Managerial Perceptions of Project Stability
Swartz, S. M. (2008) · Project Management Journal · doi:10.1002/pmj.20078 · Cited by 11
Beyond The Iron Triangle: Year Zero 1
Bragantini, D., & Caccamese, A. (2013) · Cited by 11
PROJECT RELIABILITY: PROBABILITY OF A PROJECT MEETS ITS QUALITY-COST-TIME TARGET UNDER UNCERTAINTY
Saputra, Y. A., & Ladamay, O. S. A. (2011) · Int. J. Electron. Bus. Manag. · Cited by 11
Identifying and managing Drift-changes
Usher, G. S., & Whitty, S. J. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.02.015 · Cited by 12
Strategic Implementation: An Illustration of Theory/Practice Disconnect in Public Administration
Mitchell, D. A. (2018) · Public Administration Quarterly · doi:10.1177/073491491804200103 · Cited by 11
“Non-Fiscal Assessability represents the ability to measure a successful initiative implementation beyond fiscal terms, traditionally judged in terms of 1) completion, 2) on-time implementation, and 3) within-budget implementation (Atkinson, 1999; Baccarini, 1999).”
BackgroundHamerski, D. C., Formoso, C. T., Isatto, E. L., & Jaramillo, C. A. C. (2019) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2019/0217 · Cited by 11
“Although management styles have evolved over time, companies from different industries continue to face problems and obtain failed results (Atkinson 1999).”
BackgroundPROJECT FAILURE FACTORS AND THEIR IMPACTS ON THE CONSTRUCTION INDUSTRY: A LITERATURE REVIEW
El-sokhn, H., & Othman, E. (2014) · The International Conference on Civil and Architecture Engineering · doi:10.21608/iccae.2014.44191 · Cited by 11
Implications of ‘Lock-in’ on Public Sector Project Management in a Small Island Development State
Chadee, A. A., Chadee, X. T., Mwasha, A., & Martin, H. G. (2021) · Buildings · doi:10.3390/buildings11050198 · Cited by 11
“As Atkinson [27] explains, the ‘iron triangle’ components of time, cost, and quality can be easily understood and measured quantitatively.”
BackgroundExpertise based skills management system to support resource allocation
Bibi, N., Anwar, Z., & Rana, T. A. (2021) · PLoS ONE · doi:10.1371/journal.pone.0255928 · Cited by 11
Project Success Criteria, Critical Success Factors (CSF), and Agile Projects
Bilir, C. (2021) · Advances in logistics, operations, and management science book series · doi:10.4018/978-1-7998-7872-8.ch004 · Cited by 11
Hu, B., Leopold, A., & Pickl, S. (2014) · Central European Journal of Operations Research · doi:10.1007/s10100-014-0378-z · Cited by 11
Felice, F. D., Petrillo, A., & Silvestri, A. (2015) · Business Process Management Journal · doi:10.1108/bpmj-01-2014-0008 · Cited by 11
Project Control Factors at Front End: Indian Perspective
Pandit, D., & Yadav, S. (2014) · American journal of civil engineering and architecture · doi:10.12691/ajcea-2-2-4 · Cited by 11
Grando, A., Tapiero, C. S., & Belvedere, V. (2006) · International Journal of Business Performance Management · doi:10.1504/ijbpm.2007.011858 · Cited by 11
Edkins, A., & Smith, A. (2012) · Palgrave Macmillan UK eBooks · doi:10.1057/9781137274618_5 · Cited by 11
Ssegawa, J. K., & Kasule, D. (2016) · European Journal of Engineering Education · doi:10.1080/03043797.2016.1193124 · Cited by 11
“Projects are temporal and therefore time management is essential (Atkinson 1999).”
BackgroundInvestigating the logistics costs model: recent update in Indonesia
Subiyanto, E. (2021) · Journal of Science and Technology Policy Management · doi:10.1108/jstpm-03-2020-0034 · Cited by 11
Front-End Loading in the Oil and Gas Industry
der Weijde, G. A. V. (2008) · Research Repository (Delft University of Technology) · Cited by 11
A systems thinking approach for modelling supply chain risk propagation
Ghadge, A. (2013) · Loughborough University Institutional Repository (Loughborough University) · Cited by 11
Dyrhaug, Q. X. (2002) · NORA - Norwegian Open Research Archives · Cited by 11
Chaturvedi, S., Bhatt, N., Rajasekar, E., & Patel, H. (2021) · Journal of The Institution of Engineers (India) Series A · doi:10.1007/s40030-021-00551-y · Cited by 10
Bugarčić, M., & Slavković, M. (2023) · Buildings · doi:10.3390/buildings13081898 · Cited by 15
Investigating the Impact of Lean Leadership on Construction Project Success
Sadikoglu, E., Jäger, J., Demirkesen, S., Baier, C., Oprach, S., & Haghsheno, S. (2023) · Engineering Management Journal · doi:10.1080/10429247.2023.2245317 · Cited by 10
“In almost all of the studies, time, cost, and quality, which form the so-called “the iron triangle” were reported to be the main components for measuring project success (Atkinson, 1999).”
BackgroundMusarat, M. A., Maqsoom, A., Naeem, M. H., Ullah, F., Salman, A., Alaloul, W. S., & Zahoor, H. (2024) · Ain Shams Engineering Journal · doi:10.1016/j.asej.2024.102794 · Cited by 14
Yi, B., & Nie, N. L. S. (2024) · Buildings · doi:10.3390/buildings14103185 · Cited by 10
“The specific results of the analysis are presented in Table 2.”
BackgroundJrad, R. B. N., & Sundaram, D. (2015) · International Conference on Information, Intelligence, Systems & Applications (IISA) · doi:10.1109/iisa.2015.7387960 · Cited by 10
Project Evaluation Using Cost-Time Investment Simulation
Kremljak, Z., Palčić, I., & Kafol, C. (2014) · International Journal of Simulation Modelling · doi:10.2507/ijsimm13(4)5.279 · Cited by 10
Effective Decision-Making in Project Based Environments
Galli, B. J. (2018) · International Journal of Applied Industrial Engineering · doi:10.4018/ijaie.2018010103 · Cited by 10
A framework for the performance assessment of construction contractors in Saudi Arabia
Tuffaha, F. M., Assaf, S., Zaben, Y. Z., & Hadidi, L. A. (2020) · Built Environment Project and Asset Management · doi:10.1108/bepam-01-2020-0004 · Cited by 10
A spherical fuzzy AHP model for contractor assessment during project life cycle
Abdulkareem, H. G., & Erzaij, K. R. (2022) · Journal of the Mechanical Behavior of Materials · doi:10.1515/jmbm-2022-0042 · Cited by 10
Fareed, M. Z., Su, Q., & Naqvi, N. A. (2022) · IEEE Engineering Management Review · doi:10.1109/emr.2022.3200408 · Cited by 12
A Case Study of How Stakeholder Management Influenced Project Uncertainty Regarding Project Benefits
Krane, H. P., Rolstadås, A., & Olsson, N. O. E. (2012) · International Journal of Information Technology Project Management · doi:10.4018/jitpm.2012040102 · Cited by 10
Practitioner understanding of value in the UK building sector
Thomson, D. S., Austin, S. A., Mills, G., & Devine‐Wright, H. (2013) · Engineering Construction & Architectural Management · doi:10.1108/09699981311323970 · Cited by 12
Construction project monitoring by means of RAM-based composite indicators
Tsolas, I. E. (2012) · Journal of the Operational Research Society · doi:10.1057/jors.2012.147 · Cited by 10
Improving Project Management Process in Municipality Based on SWOT Analysis
an, S. M. A. (2012) · International Journal of Engineering and Technology · doi:10.7763/ijet.2012.v4.443 · Cited by 10
Strategic Cost Management for Construction Project Success : A Systematic Study
Vasista, T. G. K. (2017) · Civil Engineering and Urban Planning An International Journal (CiVEJ) · doi:10.5121/civej.2017.4105 · Cited by 10
“However, in this paper, the definition as mentioned in Atkinson (1999) has been adopted.”
MethodMubarak, F., & Mumtaz, S. (2018) · Cogent Business & Management · doi:10.1080/23311975.2018.1532278 · Cited by 12
“Three factors are necessary for the success of the project which are quality, cost, and time (Atkinson, 1999).”
BackgroundSelection and implementation of a set of key performance indicators for project management
Montero, G., Onieva, L., & Palacín, R. (2015) · Newcastle University ePrints (Newcastle Univesity) · doi:10.25405/ncl.34305063 · Cited by 10
Self-Regulation Strategies in an Engineering Design Project
Lawanto, O., Febrian, A., Butler, D. L., & Mina, M. (2019) · International Education Studies · doi:10.5539/ies.v12n5p133 · Cited by 10
“Those limitations are considered as acceptable criteria of success for an engineering design project (Atkinson, 1999; Jonassen et al., 2006).”
BackgroundGui, A., Fernando, Y., Wiwoho, A. S., Handoko, B. L., & Haron, H. B. (2019) · KnE Social Sciences · doi:10.18502/kss.v3i22.5077 · Cited by 10
“According to previous studies, (Atkinson, 1999; Shenhar, Levy & Dvir, 1997; Jugdev and Muller, 2005; Thomas & Fernandez, 2008; Collyer & Warren, 2009, Gomes & Romao, 2016) mentioned that the ”iron triangle” or ”triple constraint” can be used to measure the success of a project.”
Resultalkhlaifat, B. I., Abdullah, A. A., & Magassouba, S. M. (2019) · European Journal of Business and Management · doi:10.7176/ejbm/11-36-06 · Cited by 10
“Atkinson, R. (1999). Project management: cost, time and quality, two best guesses and a phenomenon, it’s time to accept other success criteria.”
BackgroundInfluentialKaranja, E., & Malone, L. C. (2021) · Journal of economic and administrative sciences. · doi:10.1108/jeas-12-2020-0200 · Cited by 10
What is the measurement of the IT project success?
Sulistiyani, E., & Tyas, S. H. Y. (2022) · Procedia Computer Science · doi:10.1016/j.procs.2021.12.142 · Cited by 10
Petroutsatou, K., Ladopoulos, I., & Tsakelidou, K. (2022) · Sustainability · doi:10.3390/su14116836 · Cited by 10
Tumpa, R., Skaik, S., Ham, M., & Chaudhry, G. (2022) · Sustainability · doi:10.3390/su14159679 · Cited by 9
UM ESTUDO DE CASO SOBRE GERENCIAMENTO DE PORTFÓLIO DE PROJETOS E APOIO À DECISÃO MULTICRITÉRIO
Lacerda, R. T. D. O., Ensslin, L., & Ensslin, S. R. (2010) · Revista Gestão Industrial · doi:10.3895/s1808-04482010000100001 · Cited by 10
The relationship between planning & control risk and ERP project success
Tsai, W.-H., Lin, S., Lin, W.-R., & Liu, J.-Y. (2009) · doi:10.1109/ieem.2009.5373183 · Cited by 10
Diagnostic framework and health check tool for engineering and technology projects
Philbin, S. P., & Kennedy, D. A. (2014) · Journal of Industrial Engineering and Management · doi:10.3926/jiem.1150 · Cited by 10
Conceptualising and responding to risk in IT projects
Brookfield, D., Fischbacher‐Smith, D., Mohd-Rahim, F. A., & Boussabaine, H. A. (2014) · Risk Management · doi:10.1057/rm.2014.10 · Cited by 10
A Circular Framework for Evaluating Highway Construction Projects Success: AHP Approach
Akal, A. Y., El-Maaty, A. E. A., & El-Hamrawy, S. A.-K. (2016) · Civil Engineering Journal · doi:10.28991/cej-2016-00000037 · Cited by 10
“One of the most widely used project performance measure has been the ‘iron triangle’ consisting of schedule, cost and quality at the three vertices [6].”
MethodIntegral and transformative engineering coursework in formative research for undergraduate curricula
Mugruza-Vassallo, C. A. (2016) · IEEE Frontiers in Education Conference (FIE) · doi:10.1109/fie.2016.7757633 · Cited by 10
“In a project, usually one is given the options of “Fast” (the time required to deliver the product), “Good” (quality of the final product), and “Cheap” (total cost of designing and building the product) [4].”
BackgroundRadujković, M., & Sjekavica, M. (2017) · Journal of the Croatian Association of Civil Engineers · doi:10.14256/jce.1866.2016 · Cited by 10
Project Portfolio Management Best Practice and Implementation: A South African Perspective
Oostuizen, C., Grobbelaar, S. S. S., & Bam, W. G. (2018) · International Journal of Innovation and Technology Management · doi:10.1142/s0219877018500360 · Cited by 10
Do Longer Projects Have Larger Cost Deviation Than Shorter Construction Projects?
Belay, A. M., & Torp, O. (2017) · Procedia Engineering · doi:10.1016/j.proeng.2017.07.198 · Cited by 10
Almarri, K., & Boussabaine, H. A. (2017) · Journal of Engineering Project and Production Management · doi:10.32738/jeppm.201707.0005 · Cited by 12
“The use of success criteria that focusses on cost, time, quality, and scope are considered one of the most cited evaluation criteria for measuring project success or failure (Atkinson, 1999; Ika, 2009; Lazarević and Prlinčević, 2014; Shenhar and Dvir, 2007; Westerveld, 2003).”
BackgroundMethodThe causes of project delay in Iraqi petroleum industry: A case study in Basra Oil Company
Aljamee, H. K., Naeem, S. M., & Bell, A. P. (2019) · Journal of Transnational Management · doi:10.1080/15475778.2019.1698935 · Cited by 10
“Iron triangle (Atkinson, 1999).”
BackgroundThe Enhanced-Earned Value Management (E-EVM) Model: A Proposal for the Aerospace Industry
Pascual, J. L., Rodríguez, J. C. M., & Rambaud, S. C. (2021) · Symmetry · doi:10.3390/sym13020232 · Cited by 10
“Several scholars [14,15] point out that in recent years, factors such as cost, time, and quality have been linked to the success of project management.”
BackgroundA lean enterprise approach to process improvement in a health care organization
Casey, J. R. (2007) · DSpace@MIT (Massachusetts Institute of Technology) · Cited by 10
Ananga, E. O. (2015) · Digital Commons - University of South Florida (University of South Florida) · Cited by 10
A Study Case about a Software Project Management Success Metrics
Lacerda, R. T. D. O., Ensslin, L., & Ensslin, S. R. (2009) · IEEE Software Engineering Workshop (SEW) · doi:10.1109/sew.2009.14 · Cited by 9
Facilities Management Models, Methods and Tools
Jensen, P. A. (2021) · Buildings · doi:10.3390/buildings11100490 · Cited by 9
Building Resilience and Understanding Complexities of Event Project Stakeholder Management
Wallace, K., & Michopoulou, E. (2023) · Event Management · doi:10.3727/152599522x16419948695143 · Cited by 9
Koi-Akrofi, G. Y., Aboagye-Darko, D., Gaisie, E., & Banaseka, F. K. (2023) · Management Review Quarterly · doi:10.1007/s11301-023-00362-4 · Cited by 17
“This confusion has led to a myriad of definitions and concepts which do not qualify to be called definitions (de Wit 1988; Shrnhur et al. 1997; Atkinson 1999; Joslin and Müller 2015; Putra et al. 2016; Davis 2017).”
Key Success Factors for Implementing Public-Private Partnership Infrastructure Projects
Herath, S. K., & Herath, L. M. (2023) · Practice, progress, and proficiency in sustainability · doi:10.4018/979-8-3693-0794-6.ch001 · Cited by 9
Al-Naser, N. K., & Al-Tabtabai, H. (2024) · Journal of Engineering Research · doi:10.1016/j.jer.2024.12.017 · Cited by 9
Knowledge Transfer Mechanisms in an ERP Post-implementation Stage
Goyette, S., Cassivi, L., Courchesne, M., & Elia, E. (2014) · Procedia Technology · doi:10.1016/j.protcy.2014.10.109 · Cited by 9
Project execution obstacles: a case of King Abdulaziz Airport in Saudi Arabia
Alhudhaif, A. (2021) · International Journal of Information Technology · doi:10.1007/s41870-020-00602-w · Cited by 9
Timelines of Transportation Infrastructure Delivery 2000 to 2018 in Toronto, Canada and London, UK
Saxe, S., Dean, M., Raghav, S., Durrant, D., & Siemiatycki, M. (2021) · European journal of transport and infrastructure research · doi:10.18757/ejtir.2021.21.3.5515 · Cited by 9
“Performance measurement in construction projects had thus been dominated by the conventional measures of time, cost, and quality, also referred to as the ‘iron triangle’ (see Atkinson, 1999) or the ‘triple constraint’ (see Pinto, 2004).”
Michalski, R., & Zaleski, S. (2024) · Information · doi:10.3390/info15020105 · Cited by 12
Takagi, N. H., Varajão, J. E., Ventura, T. M., Ubialli, D., & da Silva, T. F. B. (2024) · Cogent Business & Management · doi:10.1080/23311975.2024.2336273 · Cited by 15
“Both criteria are explored extensively in the literature (atkinson, 1999; Deutsch, 1991; griffin & Page, 1996; Osei-Kyei & chan, 2018; shenhar et al., 2001; turner, 2014; Xiang et al., 2014). the success criteria ‘business process control increased’ is in line with the principles of good BPM (Vom…”
InfluentialCustomer Satisfaction in IS Projects: Assessing the Role of Process and Product Performance
Basten, D., & Pankratz, O. (2015) · Communications of the Association for Information Systems · doi:10.17705/1cais.03722 · Cited by 9
Construction Projects Immediate Health Check: A CSF & KPI Approach
Mian, D., Humphreys, M., & Sidwell, A. (2004) · Cited by 9
Stochastic dominance in projects
Ogwueleka, A. C. (2010) · International Journal of Project Organisation and Management · doi:10.1504/ijpom.2010.033663 · Cited by 9
Technology deployment process model
Baškarada, S., McKay, T. J., & McKenna, T. (2013) · Operations Management Research · doi:10.1007/s12063-013-0082-5 · Cited by 12
Determining the Contribution of IS Projects: An Approach to Measure Performance
Barclay, C., & Osei-Bryson, K.-M. (2009) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2009.155 · Cited by 9
Louw, T., & Rwelamila, P. D. (2012) · Project Management Journal · doi:10.1002/pmj.21276 · Cited by 9
Metadata
- Authors
- Atkinson, R.
- Affiliations
- Bournemouth University (GB)
- Corresponding author
- Atkinson, Roger
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 1999-12
- Volume
- 17
- Issue
- 6
- Pages
- 337-342
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2092587332
- Cited by
- 2,359
- References
- 19
- Citations by year
- 2026: 63 · 2025: 90 · 2024: 119 · 2023: 119 · 2022: 150 · 2021: 153 · 2020: 126 · 2019: 145 · 2018: 192 · 2017: 148 · 2016: 166 · 2015: 150 · 2014: 136 · 2013: 122 · 2012: 112
- FWCI
- 7.08
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- International Journal of Project Management (publishedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Computer Science › Information Systems › Software Engineering Techniques and Practices
- Social Sciences › Business, Management and Accounting › Management of Technology and Innovation › Economic and Technological Systems Analysis
- Keywords
- project success criteria, iron triangle, cost, time, quality, stakeholder benefits, IT project management, information systems projects, project management framework
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review