Conceptual Model of Partnering and Alliancing
Open accessThe DOI matches its Crossref record; 92 of the 92 references it cites were found in a registry or an index.
Abstract
Partnering as a concept has matured in its application and many empirical studies provide evidence of its impact on project performance beyond the rather prescriptive and anecdotal claims of earlier cookbooks on the subject. What has remained elusive, however, is a guiding theory on partnering. Drawing on the literature, partnering is explained within the framework of intergroup contact theory and teamwork in organizations. More specifically, partnering has the potential to create the essential conditions for optimal intergroup contact and hence, to reduce bias and increase cooperation among construction project workgroups and, consequently, favorably impact on project performance. Demonstrating a close fit with the published literature on partnering provides useful support for the proposed model. The model can clearly help project managers to focus their attention on the necessary aspects of workgroup processes that lead to high cooperation and performance.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Economic Action and Social Structure: The Problem of Embeddedness
Granovetter, M. (1985) · American Journal of Sociology · doi:10.1086/228311 · Cited by 28,745
(1954) · Cited by 15,935
The Economic Institutions of Capitalism
Dugger, W. M. (1987) · Journal of Economic Issues · doi:10.1080/00213624.1987.11504638 · Cited by 14,786
An Integrative Theory of Intergroup Conflict
Tajfel, H., & Turner, J. (2000) · Organizational Identity · doi:10.1093/oso/9780199269464.003.0005 · Cited by 12,487
The Social psychology of intergroup relations
Austin, W. G., & Worchel, S. (1979) · Medical Entomology and Zoology · Cited by 11,623
The Economic Institutions of Capitalism
(1986) · The Antitrust Bulletin · doi:10.1177/0003603x8603100308 · Cited by 10,730
Not So Different After All: A Cross-Discipline View Of Trust
Rousseau, D. M., Sitkin, S. B., Burt, R. S., & Camerer, C. (1998) · Academy of Management Review · doi:10.5465/amr.1998.926617 · Cited by 10,274
Social psychology of intergroup relations
Tajfel, H. (1982) · Annual Review of Psychology · doi:10.1146/annurev.ps.33.020182.000245 · Cited by 7,949
Pettigrew, T. F. (1998) · Annual Review of Psychology · doi:10.1146/annurev.psych.49.1.65 · Cited by 6,001 · cited 10×
“, trust, positive affect) involved (Gaertner et al., 1993; Pettigrew, 1998).”
BackgroundInfluential(1978) · Cited by 5,009
A Theory of Goal Setting and Task Performance
Tosi, H. L., Locke, E. A., & Latham, G. P. (1991) · The Academy of Management Review · doi:10.2307/258875 · Cited by 4,839
Tosi, H. L. (1991) · Academy of Management Review · doi:10.5465/amr.1991.4278976 · Cited by 4,145
Between Trust and Control: Developing Confidence in Partner Cooperation in Alliances
Das, T. K., & Teng, B.-S. (1998) · The Academy of Management Review · doi:10.2307/259291 · Cited by 3,358
Competitive Advantage Through People
Pfeffer, J. (1994) · California Management Review · doi:10.2307/41165742 · Cited by 2,446
Joining Together: Group Theory and Group Skills
Johnson, D. W., & Johnson, F. P. (1975) · Cited by 2,384
Trustworthiness as a Source of Competitive Advantage
Barney, J. B., & Hansen, M. H. (1994) · Strategic Management Journal · doi:10.1002/smj.4250150912 · Cited by 2,211 · cited 1×
“Research also shows that norms of obligation and cooperation lead to both interpersonal and inter-organizational trust (Sandler, 1993; Barney and Hansen, 1994; Das and Teng, 1998; Jones and George, 1998; Rousseau et al., 1998).”
Background(2000) · Cited by 2,172
The experience and evolution of trust: Implications for cooperation and teamwork
Jones, G. R., & George, J. M. (1998) · The Academy of Management Review · doi:10.2307/259293 · Cited by 2,135
Organizational Climate and Culture
(2016) · The SAGE Encyclopedia of Theory in Psychology · doi:10.4135/9781483346274.n219 · Cited by 2,034
A theory of goal setting & task performance
Locke, E. A., & Latham, G. P. (1990) · Medical Entomology and Zoology · Cited by 2,022
Price, Authority, and Trust: From Ideal Types to Plural Forms
Bradach, J. L., & Eccles, R. G. (1989) · Annual Review of Sociology · doi:10.1146/annurev.so.15.080189.000525 · Cited by 1,990
Evidence that task performance should be distinguished from contextual performance.
Motowidlo, S. J., & Scotter, J. R. V. (1994) · Journal of Applied Psychology · doi:10.1037//0021-9010.79.4.475 · Cited by 1,792
The common ingroup identity model: recategorization and the reduction of intergroup bias.
Gaertner, S. L., Dovidio, J. F., Anastasio, P. A., Bachman, B. A., & Rust, M. C. (1993) · European Review of Social Psychology · doi:10.1080/14792779343000004 · Cited by 1,559 · cited 4×
“Team incentives Rewards associated with pleasant cooperative interaction or successes enhance mutual attraction and lead to more favorable and inclusive categorization of the workgroup memberships (Gaertner et al., 1993; Drew and Coulson-Thomas, 1996).”
BackgroundInfluentialPrice, Authority, And Trust: From Ideal Types To Plural Forms
Bradach, J. (1989) · Annual Review of Sociology · doi:10.1146/annurev.soc.15.1.97 · Cited by 1,559
Collaborative advantage: The art of alliances
Kanter, R. M. (1994) · Harvard business review · Cited by 1,552
Trustworthiness as a source of competitive advantage
(1995) · Long Range Planning · doi:10.1016/0024-6301(95)94297-c · Cited by 1,430
Cooperation in Groups: Procedural Justice, Social Identity, and Behavioral Engagement
Tyler, T. R., & Blader, S. L. (2000) · Cited by 1,430
Innovation and Creativity at Work: Psychological and Organizational Strategies.
Simonton, D. K., West, M. A., & Farr, J. L. (1992) · Administrative Science Quarterly · doi:10.2307/2393481 · Cited by 1,338
Initial trust formation in new organizational relationships
McKnight, D. H., Cummings, L. L., & Chervany, N. L. (1998) · The Academy of Management Review · doi:10.2307/259290 · Cited by 1,296
Simon, H. A. (1991) · Journal of Economic Perspectives · doi:10.1257/jep.5.2.25 · Cited by 1,211
STUDIES OF INDIVIDUALISM-COLLECTIVISM: EFFECTS ON COOPERATION IN GROUPS.
Wagner, J. A. (1995) · Academy of Management Journal · doi:10.2307/256731 · Cited by 1,188
Generalized Intergroup Contact Effects on Prejudice
Pettigrew, T. F. (1997) · Personality and Social Psychology Bulletin · doi:10.1177/0146167297232006 · Cited by 1,179
Contact and Conflict in Intergroup Encounters
Hewstone, M., & Brown, R. J. (1986) · Cited by 1,166
The construction industry as a loosely coupled system: implications for productivity and innovation
Dubois, A., & Gadde, L.-E. (2002) · Construction Management and Economics · doi:10.1080/01446190210163543 · Cited by 1,041
INTRA- AND INTERORGANIZATIONAL COOPERATION: TOWARD A RESEARCH AGENDA.
Smith, K. G., Carroll, S. J., & Ashford, S. J. (1995) · Academy of Management Journal · doi:10.2307/256726 · Cited by 1,015
Katzenbach, J. R., & Smith, D. K. (1993) · PubMed · Cited by 1,002
Beyond the Contact Hypothesis: Theoretical Perspectives on Desegregation
Brewer, M. B., & Miller, N. (1984) · Groups in Contact · doi:10.1016/b978-0-12-497780-8.50019-x · Cited by 883
The quasifirm in the construction industry
Eccles, R. G. (1981) · Journal of Economic Behavior & Organization · doi:10.1016/0167-2681(81)90013-5 · Cited by 876
(1990) · Lancaster EPrints (Lancaster University) · Cited by 686
Why incentive plans cannot work
Kohn, A. (1993) · Harvard business review · Cited by 679
Partnering in construction: a critical review of issues, problems and dilemmas
Bresnen, M., & Marshall, N. (2000) · Construction Management and Economics · doi:10.1080/014461900370852 · Cited by 632
Exploring Critical Success Factors for Partnering in Construction Projects
Chan, A. P. C., Chan, D. W. M., Chiang, Y. H., Tang, B., Chan, E. H. W., & Ho, K. S. K. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2004)130:2(188 · Cited by 582
The changing role of the information systems executive : a critical success factors perspectivePreprint
Rockart, J. F. (1980) · RePEc: Research Papers in Economics · Cited by 550
Project Team Communication and Cross‐Functional Cooperation in New Program Development
Pinto, M. B., & Pinto, J. K. (1990) · Journal of Product Innovation Management · doi:10.1016/0737-6782(90)90004-x · Cited by 524
MILLER, J. L. L., & Schein, E. H. (1966) · American Sociological Review · doi:10.2307/2090940 · Cited by 467
New Directions for Organization Theory: Problems and Prospects
Pfeffer, J. (1997) · doi:10.1093/oso/9780195114348.001.0001 · Cited by 447
Groups in harmony and tension : an integration of studies on intergroup relations
Sherif, M., & Sherif, C. W. (1953) · Harper & Brothers eBooks · Cited by 430
New Directions for Organization Theory: Problems and Prospects
Leblebici, H., & Pfeffer, J. (1999) · The Academy of Management Review · doi:10.2307/259045 · Cited by 370
INSTITUTION OF CIVIL ENGINEERS
BRODIE, R. (2014) · The Reminiscences of a Civil Engineering Contractor · doi:10.1016/b978-1-4831-6762-6.50015-0 · Cited by 364
Penrose’s Resource‐Based Approach: The Process and Product of Research Creativity
Kor, Y. Y., & Mahoney, J. T. (2000) · Journal of Management Studies · doi:10.1111/1467-6486.00174 · Cited by 343
Innovation and learning in complex offshore construction projects
Barlow, J. (2000) · Research Policy · doi:10.1016/s0048-7333(00)00115-3 · Cited by 329 · cited 6×
“, Eccles, 1981a; Hampson and Kwok, 1997; Kale and Arditi, 2001) and also between clients and main contractors (e.g., Tse, 1984; Loraine, 1994; Bennett and Jayes, 1998; Barlow, 2000).”
BackgroundInfluentialProject complexity: The focal point of construction production planning
Gidado, K. I. (1996) · Construction Management and Economics · doi:10.1080/014461996373476 · Cited by 294 · cited 1×
“This complexity, uncertainty and interdependence have significant implications for the organization, control and coordination of construction projects (Eccles, 1981b; Gidado, 1996; Shirazi et al., 1996; Dubois and Gadde, 2002; Winch, 2003).”
BackgroundRelational competence and strategic procurement management
Cox, A. (1996) · European Journal of Purchasing & Supply Management · doi:10.1016/0969-7012(95)00019-4 · Cited by 294
Gaertner, S. L., Dovidio, J. F., Banker, B. S., Houlette, M., Johnson, K. M., & McGlynn, E. A. (2000) · Group Dynamics: Theory, Research, and Practice · doi:10.1037//1089-2699.4.1.98 · Cited by 267
Motivation, commitment and the use of incentives in partnerships and alliances
Bresnen, M., & Marshall, N. (2000) · Construction Management and Economics · doi:10.1080/014461900407392 · Cited by 266
Joint risk management through transactionally efficient relational contracting
Rahman, M. M., & Kumaraswamy, M. M. (2002) · Construction Management and Economics · doi:10.1080/01446190110089682 · Cited by 251
Self-citationEstablishment of Critical Success Factors for Construction Partnering
Cheng, E. W. L., Li, H., & Love, P. E. D. (2000) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2000)16:2(84 · Cited by 233 · cited 2×
“17 The role of trust Numerous studies mention trust and/or its correlates as critical success factors for partnering (e.g., Larson and Drexler, 1997; Black et al., 2000; Cheng et al., 2000; Fisher, 2004).”
BackgroundPartnering research in construction
Li, H., Cheng, E. W. L., & Love, P. E. D. (2000) · Engineering Construction & Architectural Management · doi:10.1108/eb021134 · Cited by 203
Concurrent engineering: a strategy for procuring construction projects
Love, P. E. D., Gunasekaran, A., & Li, H. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00066-5 · Cited by 185
Diagnosing organizational decision making through responsibility charting.
Je, M., & Tn, G. (1983) · PubMed · Cited by 181
The Economic Theory of Alliances: A Survey
Sandler, T. (1993) · Journal of Conflict Resolution · doi:10.1177/0022002793037003003 · Cited by 173
Eccles, R. G. (1981) · Administrative Science Quarterly · doi:10.2307/2392517 · Cited by 165
The definition of partnering as a Wittgenstein family‐resemblance concept
Nyström, J. (2005) · Construction Management and Economics · doi:10.1080/01446190500040026 · Cited by 165 · cited 1×
“, 1997; Cheng and Li, 2001), (b) describe and/ or categorize various stages in the development of the relationship amongst the parties (e.g., Ellison and Miller, 1995; Thompson and Sanders, 1998; Nyström, 2005) or (c) describe the facilitating structure for resource exchange and decision-making amongst the parties (e.”
BackgroundConceptual Model of Partnering
Crowley, L. G., & Karim, M. A. (1995) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(1995)11:5(33 · Cited by 162
The engineering or evolution of co-operation? A tale of two partnering projects
Bresnen, M., & Marshall, N. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00043-6 · Cited by 160 · cited 1×
“However, several issues raise serious difficulties with the uptake of, understanding of, approach to, and implementation of, partnering within and across different national and organizational settings (Loraine, 1994; Green, 1999; Uher, 1999; Bresnen and Marshall, 2000a; Bresnen and Marshall, 2000b; Li et al., 2000; Fi…”
BackgroundUnderstanding the diffusion and application of new management ideas in construction
Bresnen, M., & Marshall, N. (2001) · Engineering Construction & Architectural Management · doi:10.1108/eb021194 · Cited by 159 · cited 1×
“This adversarial culture has been partly blamed for the poor uptake of new processes and management strategies in the construction industry (Bresnen and Marshall, 2001).”
BackgroundA model for supporting inter-organizational relations in the supply chain
Love, P. E. D., Irani, Z., Cheng, E., & LI, H. (2002) · Engineering Construction and Architectural Management · doi:10.1046/j.1365-232x.2002.00225.x · Cited by 158
The Political Economy of Trust
Korczynski, M. (2000) · Journal of Management Studies · doi:10.1111/1467-6486.00170 · Cited by 156
Institutional reform in British construction: partnering and private finance
Winch, G. (2000) · Building Research & Information · doi:10.1080/096132100369046 · Cited by 145 · cited 1×
“Many studies also highlight the roles of partnering as a team-building mechanism and as a catalyst for cultural change (e.g., Mosley et al., 1991; Moore et al., 1992; Abudayyeh, 1994; Albanese, 1994; Brown, 1994; Wilson Jr et al., 1995; Miles, 1996; Gardiner and Simmons, 1998; Winch, 2000; Nicolini, 2002; Beach et al.…”
BackgroundHow important is cooperation to construction project success? A grounded empirical quantification
Phua, F. T. T., & Rowlinson, S. (2004) · Engineering Construction & Architectural Management · doi:10.1108/09699980410512656 · Cited by 145 · cited 1×
“At the core of this research effort is the contact hypothesis (Allport, 1954). According to Allport (1954), four key conditions are essential for optimal (i.”
BackgroundOrganizational Climate and Culture
Goethals, G. R., J.Sorenson, G., & Burns, J. M. (2004) · Sage eBooks · doi:10.4135/9781412952392.n260 · Cited by 138
Project Partnering: Improving the Likelihood of Win/Win Outcomes
Lazar, F. D. (2000) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2000)16:2(71 · Cited by 135
Chinese culture and successful implementation of partnering in Singapore's construction industry
Kwan, A. Y., & Ofori, G. (2001) · Construction Management and Economics · doi:10.1080/01446190110062087 · Cited by 122
In search of 'project chemistry'
Nicolini, D. (2002) · Construction Management and Economics · doi:10.1080/01446190110101217 · Cited by 109 · cited 1×
“Many studies also highlight the roles of partnering as a team-building mechanism and as a catalyst for cultural change (e.g., Mosley et al., 1991; Moore et al., 1992; Abudayyeh, 1994; Albanese, 1994; Brown, 1994; Wilson Jr et al., 1995; Miles, 1996; Gardiner and Simmons, 1998; Winch, 2000; Nicolini, 2002; Beach et al.…”
BackgroundOrganizational structures in the construction industry
Shirazi, B., Langford, D. A., & Rowlinson, S. (1996) · Construction Management and Economics · doi:10.1080/014461996373467 · Cited by 97 · cited 2×
“This complexity, uncertainty and interdependence have significant implications for the organization, control and coordination of construction projects (Eccles, 1981b; Gidado, 1996; Shirazi et al., 1996; Dubois and Gadde, 2002; Winch, 2003).”
BackgroundDevelopment of a conceptual model of construction partnering
Cheng, E. W. L., & Li, H. (2001) · Engineering Construction & Architectural Management · doi:10.1046/j.1365-232x.2001.00210.x · Cited by 97
Change in construction: a critical perspective
Fernie, S., Leiringer, R., & Thorpe, T. (2006) · Building Research & Information · doi:10.1080/09613210500491639 · Cited by 91 · cited 1×
“With complexity and uncertainty being the hallmarks of all but, perhaps, the simplest construction projects, even the most ‘objective’ indices of performance are at best inadequate and highly corruptible (Simon, 1991; Kohn, 1993; Fernie et al., 2006).”
BackgroundFairness in interorganizational project relations: norms and strategies
Kadefors, A. (2005) · Construction Management and Economics · doi:10.1080/01446190500184238 · Cited by 81
Contracting strategies for the project environment
Thompson, I., Cox, A. M., & Anderson, L. J. (1998) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(98)00005-7 · Cited by 78
Efficiency and Social Institutions: Uses and Misuses of Economic Reasoning in Sociology
Oberschall, A., & Leifer, E. M. (1986) · Annual Review of Sociology · doi:10.1146/annurev.so.12.080186.001313 · Cited by 73 · cited 2×
“But, a closer look at trust development shows that the long-term is built from the short-term, rather than vice versa (Oberschall and Leifer, 1986).”
BackgroundHuman Relations in Interracial Housing: A Study of the Contact Hypothesis.
Lee, F. F., Wilner, D. M., Walkley, R. P., Cook, S. W., & Work, N. C. O. S. (1956) · American Sociological Review · doi:10.2307/2089142 · Cited by 67
Integrated project development teams: another fad … or a permanent change
Fleming, Q. W., & Koppelman, J. M. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00068-2 · Cited by 62 · cited 3×
“Without the necessary authority support, teams function as committees (Fleming and Koppelman, 1996) and any shared goals, approach or climate developed will be largely subversive in character (Pettigrew, 1998; Gaertner and Dovidio, 2000).”
BackgroundTransformation through teamwork: the path to the new organization?
Drew, S., & Coulson‐Thomas, C. J. (1996) · Management Decision · doi:10.1108/00251749610106927 · Cited by 58
Human Relations in Interracial Housing: A Study of the Contact Hypothesis
Wilner, D. M., Walkley, R. P., & Cook, S. W. (1955) · Project Muse (Johns Hopkins University) · Cited by 54
Phua, F. T. T. (2004) · Construction Management and Economics · doi:10.1080/01446190310001649092 · Cited by 54 · cited 2×
“Wagner (1995) provides partial support for the moderating effect of culture on cooperation, but Phua and Rowlinson (2004a) did not establish any such moderator role for culture.”
BackgroundProject alliancing in the offshore industry
Halman, J. I. M., Braks, B., & Hector, M. V. (1997) · TU/e Research Portal · doi:10.1016/s0263-7863%2898%2900002-7 · Cited by 50
Phua, F. T. T., & Rowlinson, S. (2004) · Construction Management and Economics · doi:10.1080/01446190310001631000 · Cited by 46
Spatz, D. M. (2000) · Practice Periodical on Structural Design and Construction · doi:10.1061/(asce)1084-0680(2000)5:3(93 · Cited by 41
A systems model of effective teamwork
Ingram, H., Teare, R. E., Scheuing, E. E., & Armistead, C. G. (1997) · The TQM Journal · doi:10.1108/09544789710165563 · Cited by 38 · cited 2×
“The characteristics of optimal teams can be summarized as follows (West, 1990; Katzenbach and Smith, 1993; Albanese, 1994; Ingram et al., 1997; Anderson and West, 1998; Chow et al., 2005): (a) unitary focus and common goals; (b) interdependence, i.”
BackgroundHow Teamwork Works: The Dynamics of Effective Team Development
Syer, J., & Connolly, C. (1996) · Cited by 33
CHARACTERISTICS OF TEAMWORK IN SINGAPORE CONSTRUCTION PROJECTS
CHOW, L. J., Then, D. S., & Skitmore, M. (2005) · Journal of Restructuring Finance · doi:10.1142/s1609945105000237 · Cited by 21
(1998) · doi:10.1002/(sici)1099-1379(199805)19:3<235::aid-job837>3.0.co;2-c · cited 5×
“Task interdependency is a pre-requisite (Shaw, 1981; Anderson and West, 1998).”
BackgroundInfluential
Cited by
Partnering relationships in construction: A literature review
Bygballe, L. E., Jahre, M., & Swärd, A. (2010) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2010.08.002 · Cited by 278
Partnering in the construction industry—Problems and opportunities
Gadde, L.-E., & Dubois, A. (2010) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2010.09.002 · Cited by 208
“The historically developed adversarial culture between the stakeholders in the industry has been ‘‘blamed for the poor uptake of new processes and management strategies’’—partnering included (Anvuur and Kumaraswamy, 2007, p. 226).”
BackgroundInfluentialXue, X., Shen, Q., & Ren, Z. (2010) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000025 · Cited by 191
Metadata
- Authors
- Anvuur, A. M., & Kumaraswamy, M. M.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2007-03
- Volume
- 133
- Issue
- 3
- Pages
- 225-234
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2007)133:3(225
- OpenAlex
- W2093943838
- Cited by
- 163
- References
- 92
- FWCI
- 11.92
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.