Classification scheme for lean manufacturing tools
The DOI matches its Crossref record; 11 of the 11 references it cites were found in a registry or an index.
Abstract
For the past few years almost every manufacturing industry has been trying to get 'lean'. A headlong rush to become lean also resulted in many misapplications of existing lean manufacturing tools often due to inadequate understanding of the purpose of tools. While tool descriptions abound, there is no way systematically to link a manufacturing organization to its problems and to the possible tools to eliminate these problems. The main purpose of this paper is to propose a classification scheme to serve as a link between manufacturing waste problems and lean manufacturing tools. A manufacturing organization can then match its manufacturing wastes with the appropriate lean manufacturing tools. The classification of existing knowledge is often the first step in moving from a practice to a science. This classification scheme systematically organizes lean manufacturing tools and metrics according to their level of abstraction, appropriate location of application of the tool in the organization, whether it addresses management waste or activity waste, the type of resource waste it addresses, and whether it identifies waste, measures waste, eliminates waste, or a combination of the three. We have organized 101 lean manufacturing tools and metrics using this classification scheme. We have also described some common manufacturing problems using this classification scheme and shown the problem-tool connection through examples. The classification scheme is not intended as a decision-making tool, i.e. it does not decide if something is a waste. However, the proposed scheme does an excellent job of classifying all well-known lean manufacturing tools and metrics and suggests lean manufacturing tools and metrics that will help to address manufacturing problems. This classification scheme will assist companies trying to become lean and can serve as a foundation for research into the science of lean.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
The Machine That Changed the World
Wolf, B. M. (1991) · Journal of International Business Studies · doi:10.1057/jibs.1991.40 · Cited by 4,717
Japanese Manufacturing Techniques: Nine Hidden Lessons in Simplicity
Mitchell, P. S., & Schonberger, R. J. (1983) · The Academy of Management Review · doi:10.2307/257841 · Cited by 976
Lean Manufacturing: Tools, Techniques, and How to Use Them
Feld, W. M. (2000) · CRC Press eBooks · doi:10.1201/9781420025538 · Cited by 361
Lean manufacturing—tools, techniques, and how to use them
(2001) · Journal of Manufacturing Systems · doi:10.1016/s0278-6125(01)80022-4 · Cited by 330
(2000) · Medical Entomology and Zoology · Cited by 161
Russell, R. S. (1999) · CERN Document Server (European Organization for Nuclear Research) · Cited by 158
The Sayings of Shigeo Shingo: Key Strategies for Plant Improvement
Shingo, S. (1987) · Cited by 54
(1995) · doi:10.1093/oso/9780195095555.001.0001 · Cited by 43
The Design of Lean Manufacturing Systems Using Time‐based Analysis
Barker, R. C. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410068666 · Cited by 40
Cited by
Lean manufacturing: literature review and research issues
Bhamu, J., & Singh Sangwan, K. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2012-0315 · Cited by 983
Implementation of Industry 4.0 and lean production in Brazilian manufacturing companies
Tortorella, G. L., & Fettermann, D. (2018) · International Journal of Production Research · doi:10.1080/00207543.2017.1391420 · Cited by 797
The impact of lean methods and tools on the operational performance of manufacturing organisations
Belekoukias, I., Garza-Reyes, J. A., & Kumar, V. (2014) · International Journal of Production Research · doi:10.1080/00207543.2014.903348 · Cited by 474
“In the case of VSM, it is a lean manufacturing method that visually identifies and measures waste resulting from the inefficiencies, unreliability and/or incapability of information, time, money, space, people, machines, material and tools during the transformation process of a product (Pavnaskar et al., 2003).”
InfluentialFour decades of lean: a systematic literature review
Stone, K. B. (2012) · International Journal of Lean Six Sigma · doi:10.1108/20401461211243702 · Cited by 393
The integration of Six Sigma and lean management
Salah, S., Rahim, A., & Carretero, J. A. (2010) · International Journal of Lean Six Sigma · doi:10.1108/20401461011075035 · Cited by 370
Seth *, D., & Gupta, V. (2005) · Production Planning & Control · doi:10.1080/09537280512331325281 · Cited by 348
A Systematic Literature Review on Recent Lean Research: State‐of‐the‐art and Future Directions
Danese, P., Manfè, V., & Romano, P. (2018) · International Journal of Management Reviews · doi:10.1111/ijmr.12156 · Cited by 345
Implementing lean production systems: research areas and opportunities for future studies
Marodin, G. A., & Saurin, T. A. (2013) · International Journal of Production Research · doi:10.1080/00207543.2013.826831 · Cited by 328
Karim, A., & Arif‐Uz‐Zaman, K. (2013) · Business Process Management Journal · doi:10.1108/14637151311294912 · Cited by 322
Chiarini, A., & Kumar, M. (2021) · Production Planning & Control · doi:10.1080/09537287.2020.1784485 · Cited by 315
Implementing 5S within a Japanese context: an integrated management system
Gapp, R., Fisher, R., & Kobayashi, K. (2008) · Management Decision · doi:10.1108/00251740810865067 · Cited by 300
In pursuit of implementation patterns: the context of Lean and Six Sigma
Shah, R., Chandrasekaran, A., & Linderman, K. (2008) · International Journal of Production Research · doi:10.1080/00207540802230504 · Cited by 296
Learning on lean: a review of thinking and research
Moyano‐Fuentes, J., & Sacristán‐Díaz, M. (2012) · International Journal of Operations & Production Management · doi:10.1108/01443571211226498 · Cited by 278
Lean healthcare: review, classification and analysis of literature
Costa, L. B. M., & Godinho Filho, M. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1143131 · Cited by 271
“According to Pavnaskar, Gershenson, and Jambekar (2003), the main reasons for lean fails are associated with the use of a wrong tool to solve a problem, use of a single tool to solve all the problems, and use of all the tools on each problem.”
BackgroundImplementation of lean practices in the construction industry: A systematic review
Babalola, O., Ibem, E. O., & Ezema, I. C. (2019) · Building and Environment · doi:10.1016/j.buildenv.2018.10.051 · Cited by 270
Lean and green combine to impact environmental and operational performance
Inman, R. A., & Green, K. W. (2018) · International Journal of Production Research · doi:10.1080/00207543.2018.1447705 · Cited by 259
“Since lean manufacturing practices aim to eliminate all forms of waste (Pavnaskar, Gershenson, and Jambekar 2013) and green supply chain management practices aim to specifically eliminate environmental wastes (Zhu, Sarkis, and Lai 2008; Green et al. 2012), it is logical to argue that having lean…”
BackgroundA framework for lean manufacturing implementation
Mostafa, S., Dumrak, J., & Soltan, H. (2013) · Production & Manufacturing Research · doi:10.1080/21693277.2013.862159 · Cited by 248
“It is suggested by Pavnaskar et al. (2003) that insuf fi ciency of understanding lean tools and their utilisation results in misapplications and ineffectiveness.”
A leanness measure of manufacturing systems for quantifying impacts of lean initiatives
Wan, H.-D., & Frank Chen, F. (2008) · International Journal of Production Research · doi:10.1080/00207540802230058 · Cited by 229
“Pavnaskar et al. (2003) organize 101 lean tools and metrics to match manufacturing wastes with appropriate tools; however this matrix provides only the problem-tool connection without a measure of leanness.”
BackgroundLean implementation and its benefits to production industry
Singh, B., Garg, S. K., Sharma, S. K., & Grewal, C. (2010) · International Journal of Lean Six Sigma · doi:10.1108/20401461011049520 · Cited by 223
“Another scheme of classification for lean manufacturing tools and allied detailing proposed by Pavnaskar et al. (2003)”
MethodLean manufacturing performance in Indian manufacturing plants
Ghosh, M. (2012) · Journal of Manufacturing Technology Management · doi:10.1108/17410381311287517 · Cited by 201
Value stream mapping: literature review and implications for Indian industry
Singh, B., Garg, S. K., & Sharma, S. K. (2011) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-010-2860-7 · Cited by 194
“This classification scheme systematically organizes lean manufacturing tools and metrics according to their level of abstraction, appropriate location of application of the tool in the organization, whether it addresses management waste or activity waste, the type of resource waste it addresses, and whether it identif…”
BackgroundLeanness assessment using multi-grade fuzzy approach
Vinodh, S., & Chintha, S. K. (2011) · International Journal of Production Research · doi:10.1080/00207540903471494 · Cited by 194
“Pavnaskar et al. (2003) have presented a classification scheme for lean manufacturing tools.”
BackgroundLean supply chain management: Empirical research on practices, contexts and performance
Tortorella, G. L., Miorando, R., & Marodin, G. (2017) · International Journal of Production Economics · doi:10.1016/j.ijpe.2017.07.006 · Cited by 166
Bevilacqua, M., Ciarapica, F. E., & De Sanctis, I. (2017) · International Journal of Production Research · doi:10.1080/00207543.2016.1211346 · Cited by 164
Lacerda, A. P., Xambre, A. R., & Alvelos, H. M. (2016) · International Journal of Production Research · doi:10.1080/00207543.2015.1055349 · Cited by 162
“Lean manufacturing methodologies have been implemented by the companies who intend to achieve competitive advantage and business sustainability (Pavnaskar, Gershenson, and Jambekar 2003).”
BackgroundMethodSingh, B., & Sharma, S. K. (2009) · Measuring Business Excellence · doi:10.1108/13683040910984338 · Cited by 133
Approaches and practices of lean manufacturing: the case of electrical and electronics companies
(2011) · Global Journal of Business Management · doi:10.5897/ajbm10.404 · Cited by 61
Redesigning an assembly line through Lean-Kaizen: an Indian case
Prashar, A. (2014) · The TQM Journal · doi:10.1108/tqm-04-2013-0054 · Cited by 40
A Study on Lean Manufacturing Implementation in Malaysian Automotive Component Industry
Rose, A. N. M., Md. Deros, B., & Ab. Rahman, M. N. (2013) · International Journal of Automotive and Mechanical Engineering · doi:10.15282/ijame.8.2013.33.0121 · Cited by 40
El-Khalil, R. (2022) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-10-2017-0118 · Cited by 29
Khusaini, N. S., Jaffar, A., & Noriah, Y. (2013) · Advanced Materials Research · doi:10.4028/www.scientific.net/amr.845.642 · Cited by 19
Metadata
- Authors
- Pavnaskar, S. J., Gershenson, J. K., & Jambekar, A. B.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2003-01
- Volume
- 41
- Issue
- 13
- Pages
- 3075-3090
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W1998109490
- Cited by
- 466
- References
- 11
- FWCI
- 2.51
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.