Management of construction waste in public housing projects in Hong Kong
The DOI matches its Crossref record; 7 of the 7 references it cites were found in a registry or an index.
Abstract
Waste management in the building industry in Hong Kong has become a major environmental issue in recent years. Of particular concern is the increasing amount of construction and demolition (C&D) waste being dumped at landfill sites. Greater consideration must be given to waste generation and management at the planning stage of a building development to reduce wastage levels. The causes and quantities of building construction waste generated on public housing building sites in Hong Kong have been analysed. Five public housing construction sites were selected for the study by regular site visits. Timber boards used in formwork were the most significant waste type requiring disposal followed by waste derived from wet trades. Waste generation could be significantly reduced by the use of precasting and system formworks. The major causes of wastes were improper preparation and handling, misuse, and incorrect processing. In general, little on-site waste sorting was carried out. Appropriate planning including the preparation of a detailed waste management plan is essential for effective waste minimization. At the construction stage, better house keeping and more vigorous on-site sorting of inert from non-inert materials are necessary. Waste indices calculated from waste monitoring data should be publicized and used for future waste estimations.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Construction Waste: Quantification and Source Evaluation
Bossink, B. A. G., & Brouwers, H. J. H. (1996) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1996)122:1(55 · Cited by 578 · cited 1×
“Waste research data from the Netherlands indicated that 9% (by weight) of the totally purchased materials ended up as waste, and from 1% to 10% of every single purchased construction material leaves the construction site as solid waste (Bossink and Brouwers, 1996).”
BackgroundOn-site sorting of construction and demolition waste in Hong Kong
Poon, C. S., Yu, A. T. W., & Ng, L. H. (2001) · Resources, Conservation and Recycling · doi:10.1016/s0921-3449(01)00052-0 · Cited by 431 · cited 3×
“…project to anticipate the quantities of waste that will be produced in projects in order to establish awareness of waste management, to develop good planning on resources and environmental management and to reduce wastes generation during all stages of a construction project (Poon et al., 2001a).”
BackgroundSelf-citationMinimizing waste on construction project sites
FANIRAN, O. O., & CABAN, G. (1998) · Engineering, Construction and Architectural Management · doi:10.1108/eb021073 · Cited by 220 · cited 1×
“Like many other urbanized cities, the construction industry is the major solid waste generator in Hong Kong (Kibert, 1994; Ferguson et al., 1995; Graham and Smithers, 1996; Faniran and Caban, 1998; Guthrie et al., 1999; Symonds Group Ltd, 1999; Lawson and Douglas, 2001).”
BackgroundImplementing a waste management plan during the construction phase of a project: a case study
Mcdonald, B., & Smithers, M. (1998) · Construction Management and Economics · doi:10.1080/014461998372600 · Cited by 157 · cited 1×
“In general, a WMP lists specific wastes and identifies the amounts to be targeted for reduction, salvage, reuse or recycling (McDonald and Smithers, 1998).”
BackgroundManaging and minimizing construction waste: a practical guide
Ferguson, J. (1995) · doi:10.1680/mamcwapg.20238 · Cited by 136
Recycling construction and demolition wastes – a UK perspective
Lawson, N., Douglas, I., Garvin, S., McGrath, C., Manning, D., & Vetterlein, J. (2001) · Environmental Management and Health · doi:10.1108/09566160110389898 · Cited by 100 · cited 1×
“Like many other urbanized cities, the construction industry is the major solid waste generator in Hong Kong (Kibert, 1994; Ferguson et al., 1995; Graham and Smithers, 1996; Faniran and Caban, 1998; Guthrie et al., 1999; Symonds Group Ltd, 1999; Lawson and Douglas, 2001).”
BackgroundA guide for managing and minimizing building and demolition waste
Poon, C. S., Yu, A. T. W., & Ng, L. H. (2001) · PolyU Institutional Research Archive (Hong Kong Polytechnic University) · Cited by 86
Self-citation
Cited by
Kabirifar, K., Mojtahedi, M., Wang, C., & Tam, V. W. Y. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.121265 · Cited by 695
Architects’ perspectives on construction waste reduction by design
Osmani, M., Glass, J., & Price, A. D. F. (2008) · Waste Management · doi:10.1016/j.wasman.2007.05.011 · Cited by 496
Shen, L.-Y., Tam, V. W. Y., Tam, L., & Ji, Y.-B. (2010) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2009.10.014 · Cited by 426
Purchase, C. K., Al Zulayq, D. M., O’Brien, B. T., Kowalewski, M. J., Berenjian, A., Tarighaleslami, A. H., & Seifan, M. (2021) · Materials · doi:10.3390/ma15010076 · Cited by 357
A framework for understanding waste management studies in construction
Lu, W., & Yuan, H. (2011) · Waste Management · doi:10.1016/j.wasman.2011.01.018 · Cited by 353
Critical success criteria for mass house building projects in developing countries
Ahadzie, D. K., Proverbs, D. G., & Olomolaiye, P. O. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.09.006 · Cited by 304
Lu, W., Yuan, H., Li, J., Hao, J. J. L., Mi, X., & Ding, Z. (2011) · Waste Management · doi:10.1016/j.wasman.2010.12.004 · Cited by 266
On the effectiveness in implementing a waste-management-plan method in construction
Tam, V. W. Y. (2008) · Waste Management · doi:10.1016/j.wasman.2007.04.007 · Cited by 263
Scenarios for applying RFID technology in construction project management
Lu, W., Huang, G. Q., & Li, H. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.09.007 · Cited by 261
Akinade, O. O., Oyedele, L. O., Ajayi, S. O., Bilal, M., Alaka, H. A., Owolabi, H. A., & Arawomo, O. O. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.01.022 · Cited by 260
Exploring critical success factors for waste management in construction projects of China
Lu, W., & Yuan, H. (2010) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2010.09.010 · Cited by 239
“From the body of literature covering C&D WM around the world (e.g. Esin and Cosgun, 2007; Faniran and Caban, 1998; Treloar et al., 2003; Poon et al., 2004b, c; Tam et al., 2003; Tam et al., 2007; Tam, 2008b; Kang, 2005), this study identified 13 factors for successful C&D WM A pilot study was then…”
BackgroundEstimation of building-related construction and demolition waste in Shanghai
Ding, T., & Xiao, J. (2014) · Waste Management · doi:10.1016/j.wasman.2014.07.029 · Cited by 237
Best practice of prefabrication implementation in the Hong Kong public and private sectors
Tam, V. W. Y., Fung, I. W. H., Sing, M. C. P., & Ogunlana, S. O. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.09.045 · Cited by 212
The classification of construction waste material using a deep convolutional neural network
Davis, P., Aziz, F., Newaz, M. T., Sher, W., & Simon, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103481 · Cited by 204
Improving waste management in construction projects: An Australian study
Udawatta, N., Zuo, J., Chiveralls, K., & Zillante, G. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.05.003 · Cited by 199
Extended theory of planned behaviour for promoting construction waste recycling in Hong Kong
Mak, T. M. W., Yu, I. K. M., Wang, L., Hsu, S.-C., Tsang, D. C. W., Li, C. N., Yeung, T. L. Y., Zhang, R., & Poon, C. S. (2019) · Waste Management · doi:10.1016/j.wasman.2018.11.016 · Cited by 196
Self-citationLu, W., & Yuan, H. (2013) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2013.08.048 · Cited by 196
“In spite of its significant contribution to built environment development, construction is also perceived as a contributor to the degradation of environment (Bossink and Brouwers, 1996; Poon et al., 2004a).”
BackgroundStrategies for minimizing construction and demolition wastes in Malaysia
Esa, M. R., Halog, A., & Rigamonti, L. (2017) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2016.12.014 · Cited by 186
Material Waste in the UAE Construction Industry: Main Causes and Minimization Practices
Al-Hajj, A., & Hamani, K. (2011) · Architectural Engineering and Design Management · doi:10.1080/17452007.2011.594576 · Cited by 173
“One of the main requirements of the ISO 14001 is waste minimization and the development of a waste management plan as part of the EMS (Powell and Craighill, 2001; Poon et al., 2004).”
BackgroundInfluentialA model for estimating construction waste generation index for building project in China
Li, J., Ding, Z., Mi, X., & Wang, J. (2013) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2013.02.015 · Cited by 171
Lu, W., Webster, C., Peng, Y., Chen, X., & Zhang, X. (2017) · International Journal of Construction Management · doi:10.1080/15623599.2016.1166548 · Cited by 162
“Estimation of C&D waste generation on a project level Estimating C&D waste generation on a project level also attracted considerable research interest (e.g. Skoyles 1976; Bossink & Brouwers 1996; Poon et al. 2004; Lin 2006; Tam et al. 2007; Lu et al. 2011; Li et al. 2013).”
BackgroundWang, L., Chen, S. S., Tsang, D. C. W., Poon, C. S., & Shih, K. (2016) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2016.08.053 · Cited by 147
Self-citationPreliminary study for the management of construction and demolition waste
Kourmpanis, B., Papadopoulos, A., Moustakas, K., Stylianou, M., Haralambous, K. J., & Loizidou, M. (2008) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x07083344 · Cited by 128
“The steps of conventional demolition are identified in the following list (Poon et al. 2004a).”
BackgroundConstruction and Demolition (C&D) Waste Management and Disposal
Hassan, S. H., Aziz, H. A., Johari, I., & Hung, Y.-T. (2022) · Handbook of Environmental Engineering · doi:10.1007/978-3-030-89336-1_3 · Cited by 16
Metadata
- Authors
- Poon, C. S., Yu, A. T. W., Wong, S. W., & Cheung, E.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2004-09
- Volume
- 22
- Issue
- 7
- Pages
- 675-689
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2098681522
- Cited by
- 218
- References
- 7
- FWCI
- 12.79
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.