Designing, implementing and updating performance measurement systems
The DOI matches its Crossref record; 34 of the 36 references it cites were found in a registry or an index.
Abstract
This paper addresses issues met when designing, implementing, using and continuously updating performance measurement systems in manufacturing companies. The paper develops, from theory, a framework for analysing the implementation of a performance measurement system and uses this framework to interpret three longitudinal case studies. The paper concludes that specific processes are required to continuously align the performance measurement system with strategy. When these processes are combined with a well defined model of strategic success, the measurement system can enhance the strategic management process by challenging the assumptions and the strategy itself.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Bourne et al., identified from previous literature three main phases of performance measurement system implementation, i.e., design, implementation and use; besides, they underlined also the essential role of updating and reviewing processes of measures and targets.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“The adoption of a BSC follows four phases [40].”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“in line with [40], the review process includes a set of mechanisms for reviewing targets and standards and processes for a periodical review of the set of measures adopted.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“As BSC literature outlines, there are four phases in the BSC adoption [40,58]”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
In the citing paper
“By adopting the review’s framework (Figure 2), BSC adoption phases [40], i.e., design, implementation, use and review are strictly related.”
From The Evolution of Balanced Scorecard in Healthcare: A Systematic Review of Its Design, Implementation, Use, and Review (2022) · cites this paper as [40]
Citations
Cites
(1984) · Cited by 81,983
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
The balanced scorecard: Translating strategy into action
(1997) · Long Range Planning · doi:10.1016/s0024-6301(97)80925-9 · Cited by 8,192
(1992) · PubMed · Cited by 7,979
Leading change: why transformation efforts fail
Kotter, J. P. (2009) · IEEE Engineering Management Review · doi:10.1109/emr.2009.5235501 · Cited by 3,566
Relevance Lost: The Rise and Fall of Management Accounting
Johnson, T. H., & Kaplan, R. S. (1987) · Medical Entomology and Zoology · Cited by 3,177
Putting the Balanced Scorecard to Work
Kaplan, R. S., & Norton, D. P. (1998) · The Economic Impact of Knowledge · doi:10.1016/b978-0-7506-7009-8.50023-9 · Cited by 2,180
The performance measurement revolution: why now and what next?
Neely, A. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910247437 · Cited by 1,154 · cited 2×
“Academic interest is manifest through the considerable number of papers on the topic ( Neely, 1999 ).”
BackgroundSelf-citationPerformance measurement in service businesses
Brignall, T. J., Fitzgerald, L., Johnston, R., & Silvestro, R. (1991) · University of Warwick · doi:10.82444/warw.33720976 · Cited by 777
(2020) · Management Accounting · doi:10.24053/9783739880280-167 · Cited by 706
Research works printed but not linked: 15
- Banks, R.L. and Wheelwright, S.C. (1979), “Operations versus strategy – trading tomorrow for today”, Harvard Business Review, May/June, pp. 112‐20.
- Deming, W.E. (1986), Out of Crisis, Massachusetts Institute of Technology, Centre for Advanced Engineering Study, Cambridge, MA.
- Eccles, R.G. and Pyburn, P.J. (1992), “Creating a comprehensive system to measure performance”, Management Accounting (US), October, pp. 41‐4.
- Fry, T.D. and Cox, J.F. (1989), “Manufacturing performance; local versus global measures”, Production and Inventory Management Journal, 2nd Quarter, pp. 52‐6.
- Goold, M. (1991), “Strategic control in the decentralised firm”, Sloan Management Review, Vol. 32 No. 2, pp. 69‐81.
- Grady, M.W. (1991), “Performance measurement: implementing strategy”, Management Accounting, June, pp. 49‐53.
- Hayes, R.H. and Abernathy, W.J. (1980), “Managing our way to economic decline”, Harvard Business Review, Vol. 62, pp. 95‐101.
- Lingle, J.H. and Schiemann, W.A. (1996), “From balanced scorecard to strategy gauge: is measurement worth it?”, Management Review, March , pp. 56‐62.
- McMann, P. and Nanni, A.J. (1994), “Is your company really measuring performance”, Management Accounting (US), November, pp. 55‐8.
- Marris, P. (1974), “The management of change”, in Loss and Change, Routledge, London, pp. 147‐59.
- Maskell, B. (1989), “Performance measurement for world class manufacturing”, Management Accounting, May, pp. 32‐3, June, pp. 32‐3, July/August, pp. 48 and 50, September, pp. 64‐6.
- Schein, E.H. (1969), Process Consultation, Addison‐Wesley, Reading, MA.
- Sink, P.E. (1986), “Performance and productivity measurement: the art of developing creative score boards”, Industrial Engineer, January, pp. 86‐90.
- Skinner, W. (1974), “The decline, fall and renewal of manufacturing”, Industrial Engineering, October, pp. 32‐8.
- Wisner and Fawcett (1991), “Link firm strategy to operating decisions through performance measurement”, Production and Inventory Management Journal, Third Quarter, pp. 5‐11.
Cited by
Items 901–1,000 of 1,000
Procurement improvement in the public agency
Matela, M. (2023) · LUTPub (LUT University) · Cited by 3
The Applicability of Balanced Scorecard in Public Sector: The Case of Ombudsman Institution
Aydın, G. (n.d.) · Research Journal of Politics Economics and Management · Cited by 3
Martínez, R. (2021) · Repositorio Institucional CONACYT · Cited by 3
Performance Information Use in the Canadian Higher Education Sector
Chan, G. (2018) · AUSpace (Athabasca University) · Cited by 3
von Cieminski, G., Karrer, M., & Zur, M. (2010) · IFIP International Federation for Information Processing/IFIP · doi:10.1007/978-3-642-16358-6_62 · Cited by 2
“Echoing findings by Bourne et al [5], only few references were identified that suggest detailed procedures for the implementation of performance measurement frameworks.”
Domingues, P., Sampaio, P. A. D. C. A., & Arezes, P. (2011) · Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT) · Cited by 2
An Assessment of Business Performance Measurement at a Petroleum Refining Business Unit in Ndola
Mwale, W., Inderpal, L.-A., & Cassim, N. (2015) · Nigerian Chapter of Arabian Journal of Business and Management Review · doi:10.12816/0014520 · Cited by 2
“It enables attention to be focused on strategic priorities and objectives (Bourne et al., 2000).”
BackgroundMonteiro, O. H. C. (2020) · Management Control Review · doi:10.51720/mcr.v5i2.3912 · Cited by 2
Zhang, X., Jie, X., & Li, X. (2022) · Lecture notes on data engineering and communications technologies · doi:10.1007/978-3-031-10385-8_32 · Cited by 2
Kai, T. S., & Siti‐Nabiha, A. K. (2023) · International Journal of Business and Technology Management · doi:10.55057/ijbtm.2023.5.3.13 · Cited by 2
Nespeca, A., & Chiucchi, M. S. (2018) · Emerald Group Publishing Limited eBooks · doi:10.1108/s1479-351220180000033005 · Cited by 2
DETERMINANTS OF PROCUREMENT PERFORMANCE IN COUNTY GOVERNMENTS IN KENYA
MUNYOKI, R., & Moronge, M. (2019) · Strategic Journal of Business & Change Management · doi:10.61426/sjbcm.v6i4.1393 · Cited by 2
de Mendonça, P. R. C., Monteiro, M. M., Scavarda, L. F., & Rocha, J. (2019) · Springer proceedings in business and economics · doi:10.1007/978-3-030-23816-2_64 · Cited by 2
Sistema de Avaliação de Desempenho Baseado em Controle Adaptativo: Uma Aplicação Participativa
de Oliveira, A. A., & Ribeiro, G. B. (2020) · Teoria e Prática em Administração · doi:10.21714/2238-104x2020v10i1-47322 · Cited by 2
Petkoska, D. S. M. M., KLISAROSKI, D. S. M. B., & MANCHESKI, D. S. G. (2020) · DOAJ (DOAJ: Directory of Open Access Journals) · doi:10.21113/iir.v10i1.555 · Cited by 2
Tedarik zinciri performans değerlendirmesi için yeni bir yaklaşım
Erik, A., & Kuvvetli, Y. (2020) · Gazi Üniversitesi Mühendislik-Mimarlık Fakültesi Dergisi · doi:10.17341/gazimmfd.691906 · Cited by 2
Under construction: action research in innovation measurement
de Jong, I. S. (2020) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-01-2020-0036 · Cited by 2
The Features of Performance Measurement Systems in Value-Based Selling
Sundholm, V., & Hellström, M. (2021) · Springer eBooks · doi:10.1007/978-3-030-75771-7_10 · Cited by 2
Measuring and managing digital supply chain performance
Jha, A. K., Verma, N. K., & Bose, I. (2022) · Elsevier eBooks · doi:10.1016/b978-0-323-91614-1.00012-5 · Cited by 2
Supplier Risk Tower: The Vigilant Eye on Supply Chains
Wöhner, H., Schupp, F., Arnold, M., Kholikova, B., & Schick, A. (2022) · Springer series in supply chain management · doi:10.1007/978-3-031-16489-7_9 · Cited by 2
Financial performance measurement supporting the transition towards circular business models
Kanzari, A. (2023) · FiF-avhandling · doi:10.3384/9789180753906 · Cited by 2
Affonso, R. C., Galichet, G., & Cheutet, V. (2022) · European J of Industrial Engineering · doi:10.1504/ejie.2024.135385 · Cited by 2
Development of a Procurement-4.0-PMS using the balanced scorecard
Pirrone, L., & Meyer, D. (2021) · Alexandria (UniSG) (University of St.Gallen) · doi:10.15480/882.3984 · Cited by 2
Supply Chain Performance Approaches for Indian Manufacturing Organizations
Marwah, A. K., Thakar, G., Gupta, R. C., & Shukla, A. C. (2013) · Cited by 2
Gynnild, V., & Eide, K. M. (2015) · Uniped · doi:10.18261/issn1893-8981-2015-03-06 · Cited by 2
Performance Measurement Systems for Craft-Oriented Small Enterprises
Gamme, I., Seim, E. A., & Lodgaard, E. (2013) · IFIP advances in information and communication technology · doi:10.1007/978-3-642-40361-3_34 · Cited by 2
“The two driving factors are top management commitment and apprehended benefits from the process, while the four main obstacles are defined as: Lack of time and resources, insufficient access to necessary data, resistance to the PMS process and change of focus from parent company [20].”
BackgroundSupply Chain Performance Measurement- Implementierung – Eine komparative Studie
Heigoldt, M., & Asdecker, B. (2011) · Gabler eBooks · doi:10.1007/978-3-8349-6691-9_7 · Cited by 2
Martini, M., Andreani, M., & Trivellato, B. (2016) · International Journal of Public Administration · doi:10.1080/01900692.2016.1162802 · Cited by 2
Voit, T. (2009) · Schriften aus der Fakultät Wirtschaftsinformatik und Angewandte Informatik der Otto-Friedrich-Universität Bamberg. · doi:10.20378/irb-306 · Cited by 2
Factors influencing use of a performance measurement system in a rehabilitation hospital
Zidarov, D., Sicotte, C., Menon, A., Hallé, M., & Poissant, L. (2016) · Journal of Hospital Administration · doi:10.5430/jha.v5n5p79 · Cited by 2
“[15, 27–30]”
Bocci, F., Mojoli, M., & Consulting, B. (2012) · Cited by 2
DEVELOPING A NEW APPROACH FOR EVALUATION OF BUSINESS PROCESSES IN A FUZZY ENVIRONMENT
Bagherzadeh, G., Cyrus, K. M., Yazdani–Chamzini, A., & Miečinskienė, A. (2016) · Technological and Economic Development of Economy · doi:10.3846/20294913.2016.1221866 · Cited by 2
Performance Measurement Usage in Developing Countries: The Case of Banking Sector in Sudan
Eltinay, N. B., Masri, R., & Chandran, V. (2013) · Management Science · Cited by 2
Odhiambo, P. O., Indoshi, F. C., & Agak, J. (2012) · Journal of Emerging Trends in Economics and Management Science · Cited by 2
A Theory-Based Framework for Integrated Supply Performance Measurement
Hartmann, E., Entchelmeier, A., Henke, M., & Jahns, C. (2008) · Gabler eBooks · doi:10.1007/978-3-8350-5486-8_8 · Cited by 2
“8 Bourne et al. (2000), S. 754.”
Managing change in performance measures: a case study on practice and challenges
Salloum, M., & Myrelid, A. (2013) · DiVA (Mälardalen University College) · Cited by 2
Creating and sustaining competitive advantage through collaborative systems: the what? and the how?
Bititci, U., Martinez, V., & Albores, P. (2003) · Springer eBooks · doi:10.1007/978-0-387-35698-3_35 · Cited by 2
Understanding and managing the manage processes
Bititci, U., & McCallum, N. (2004) · Strathprints: The University of Strathclyde institutional repository (University of Strathclyde) · Cited by 2
Chutima, P., & Nimsaard, N. (2008) · IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) · doi:10.1109/ieem.2008.4737965 · Cited by 2
Performance measurement practices and organisational strategy: a study of Indian leisure enterprises
Chand, M. (2008) · International Journal of Leisure and Tourism Marketing · doi:10.1504/ijltm.2009.021988 · Cited by 2
Lima, R. H. P., & Carpinetti, L. C. R. (2010) · Produto & Produção · doi:10.22456/1983-8026.5104 · Cited by 2
Davila, T., & Wouters, M. J. F. (2004) · International series in management science/operations research/International series in operations research & management science · doi:10.1007/0-387-27275-5_14 · Cited by 2
Performance Measurement Indicators for Plastic Injection Manufacturin
Chutima, P., & Nimsaard, N. (2012) · The Journal of King Mongkut s University of Technology North Bangkok · Cited by 2
Dynamic evaluation of supplier performance based on product strategy
Min, Z., & Jia-Zhen, H. (2008) · IEEE International Conference on Service Operations and Logistics, and Informatics (SOLI) · doi:10.1109/soli.2008.4682925 · Cited by 2
“In recent years, supply chain performance management has received much attention from researchers [1] [2] [3] [4] [5] [6] [7] [8] [9].”
BackgroundManufacturing performance measurement
Platts, K., Bourne, M., & Elliott, R. N. (2001) · Cambridge University Engineering Department Publications Database · Cited by 2
Self-citationAN EVALUATION OF CORPORATE STRATEGIC PERFORMANCE: An Evidence From Jordan
Al-Qatamin, A. A., & Al-Qatamin, A. A. (2012) · Australian Journal of Business and Management Research · doi:10.52283/nswrca.ajbmr.20120201a02 · Cited by 2
Performance Management in Innovative SMEs: the Key Role of the Social Media
Sardi, A., & Garengo, P. (2015) · Institutional Research Information System University of Turin (University of Turin) · Cited by 2
Are More Formal Performance Management Systems More Successful?
Kadak, T., & Laitinen, E. K. (2016) · International Conference on Accounting, Auditing, and Taxation (ICAAT) · doi:10.2991/icaat-16.2016.19 · Cited by 2
“1999; Schneiderman 1999; Bourne et al ., 2000).”
Ferreira, A. M. D. S. D. C., & Rodrigues, J. P. P. (2011) · Repositório do ISCTE-IUL · Cited by 2
MUTISYA, A. N. (2017) · Strategic Journal of Business & Change Management · doi:10.61426/sjbcm.v4i3.509 · Cited by 2
Kolingerová, H. G. (2018) · Central European Journal of Management · doi:10.5817/cejm2016-2-1 · Cited by 2
Ручкин, А. В. (2016) · Муниципалитет: экономика и управление · Cited by 2
Yangol, H. (2019) · Oblik i finansi · doi:10.33146/2307-9878-2019-2(84)-164-172 · Cited by 2
Kehelwalatenna, S., & Premaratne, G. (2019) · Colombo Business Journal International Journal of Theory and Practice · doi:10.4038/cbj.v10i1.43 · Cited by 2
Statistical analysis of Hungarian public service processes for key performance indicator measurement
Buics, L., & Süle, E. (2020) · Hungarian Statistical Review · doi:10.35618/hsr2020.02.en071 · Cited by 2
Factors affecting the software developer’s performance
Bibhushan, R. (2018) · Journal of administrative and business studies · doi:10.20474/jabs-4.6.3 · Cited by 2
“Many researchers have found performance measurement tends to update and continuously change (Bourne, Mills, Wilcox, Neely, & Platts, 2000; Dixon, 1990; Gha-layini & Noble, 1996; Hang, 2015; Meyer & Gupta, 1994).”
SOUZA, R. A., SILVEIRA, J. V. S. D., & FERNANDES, B. S. (2023) · Anais ... Encontro Nacional de Engenharia de Produção/Anais do Encontro Nacional de Engenharia de Produção · doi:10.14488/enegep2023_tn_wg_404_1986_45778 · Cited by 2
Il contributo dei sistemi di RM e PM alla sostenibilità integrata: il caso B&C Speakers
Leto, L., & Vito, D. (2024) · MANAGEMENT CONTROL · doi:10.3280/maco2023-003006 · Cited by 2
Praničević, D. G., & Srića, V. (2013) · DOAJ (DOAJ: Directory of Open Access Journals) · Cited by 2
Rabbani, F. (2010) · Figshare · Cited by 2
Famá, G., & de Campos, C. R. (2011) · Americanae (AECID Library) · Cited by 3
Agile Supply Chain Management in the UK Fashion Sector
Purvis, L. (2010) · Edinburgh Napier Research Repository (Edinburgh Napier University) · doi:10.17869/enu.210151 · Cited by 2
Performance measures in supply chain management of small manufacturing enterprises
Matsoso, M. L. (2014) · Cited by 2
Jayashree, P., & Hussain, S. J. (2010) · Research Online (University of Wollongong) · Cited by 2
Performance Measurement and Management System Inter Company Case Study Approach - Tamilnadu, India
Journals, I., & S.Venkatesh, D. S. R. (2014) · Figshare · doi:10.6084/m9.figshare.1118713 · Cited by 2
Wester, S. (2013) · Lund University Publications Student Papers (Lund University) · Cited by 2
EVALUATING XYZ'S PERFORMANCE MANAGEMENT SYSTEM IMPLEMENTATION
Gotore, M. M. (2011) · Ounongo Repository · Cited by 2
Hofmann, S. (2008) · DiVA (Digitala Vetenskapliga Arkivet) · Cited by 2
The Work of Work-Related Learning: An Institutional Ethnography
Zurawski, C. D. (2012) · doi:10.82465/6794 · Cited by 2
Suoritusarviointi ja organisaation suorituskyky : case Maanpuolustuskorkeakoulu
Ikonen, I. T. (2015) · Doria (University of Helsinki) · Cited by 2
Kategoriajohtaminen hankintatoimen strategisen kehittämisen välineenä
Savolainen, M. (2016) · LUTPub (LUT University) · Cited by 2
Integralni sistem upravljačkog računovodstva za merenje poslovnih performansi
Milosavljević, M. S. (2015) · National Repository of Dissertations in Serbia · Cited by 2
The Value of Integrated Information Systems for U.S. General Hospitals
Fu, L. (2015) · ODU Digital Commons (Old Dominion University) · doi:10.25777/c35t-ye42 · Cited by 2
“4) A PMS should be used for questioning strategic assumptions (Bourne et al., 2000).”
Developing a dynamic scorecard : a case study of a digital advertising firm
Fretheim, M. (2013) · NORA - Norwegian Open Research Archives · Cited by 2
Grosswiele, L. (2016) · EPub Bayreuth (University of Bayreuth) · Cited by 2
Dominant operational performance measures for SME owner managers
CÁTHÁL, W. (2013) · Arrow@dit (Dublin Institute of Technology) · Cited by 2
High flow operations: an investigation into the UK high-value manufacturing sector
Shararah, M. (2016) · Figshare · doi:10.25401/cardiffmet.20286687 · Cited by 2
EMPLOYEE PERCEPTION ON PERFORMANCE MANAGEMENT AND EMPLOYEE PERFORMANCE IN HOTEL INDUSTRY IN KENYA
Makori, A. O. (2014) · Cited by 2
Etab, M. M. (2016) · DMU Open Research Archive (De Montfort University) · Cited by 3
A study of performance measurement practices in northern Nigerian SMEs
Akpabot, S. (2016) · Coventry University Open Collections (Coventry university) · Cited by 2
Design of a Sustainable Competitiveness Evaluation and Execution System (SuCEES)
Cavaco, N. M. (2016) · Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT) · Cited by 2
Mäkilä, M. (2014) · Aaltodoc (Aalto University) · Cited by 2
Performance management and measurement - the experience ofBritish multiple retailers 1920 to 1970
Hull, A. (2018) · CentAUR (University of Reading) · Cited by 2
Exploring the influence of national culture on performance management systems.
Jwijati, I. (2017) · Cited by 2
Performance measurement and management within construction firms in Saint Lucia
Sonson, S. (2019) · University of Salford Institutional Repository (University of Salford) · Cited by 2
Biojalostamon KPI-lukujen määrittely ja tehokkuuden mittaaminen
Kauppinen, O. (2019) · LUTPub (LUT University) · Cited by 2
Systematiska och processorienterade mätsystem : En teoriöversikt
van den Berg, E., Norrman, A., & Näslund, D. (2015) · DiVA (Digitala Vetenskapliga Arkivet) · Cited by 2
Mamede, P. (2019) · theses.fr (ABES) · doi:10.70675/b338e4d0z6a52z416fz8526z7b81e2ea7f9d · Cited by 2
Organisational performance measurement in the third sector
Lebec, L. (2021) · Enlighten: Theses (The University of Glasgow) · doi:10.5525/gla.thesis.82225 · Cited by 2
Silva, A. S. A. (2013) · Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT) · Cited by 2
Um sistema de avaliação de desempenho logístico na Delta Cafés: caso de estudo
Cachola, C. F. G. (2014) · Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT) · Cited by 2
Metodologia de planejamento e controle da produção para obras de engenharia natural
Sousa, R. D. S. (2019) · Americanae (AECID Library) · Cited by 2
Tehlikeli madde lojistiğinde taşıma performansının ölçümlenmesi
KAYHAN, R. (2018) · Dspace Repository (Marmara Üniversitesi) · Cited by 2
Mittaaminen osana liiketoimintalähtöistä tietoturvallisuuden hallinnointia
Salmela, I. (2013) · Tampere University of Technology Institutional Repository · Cited by 2
Lacerda, R. T. D. O. (2012) · LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas) · Cited by 3
Türk bankacılık sisteminde performans ölçümü ve yönetimi
Işıl, H. Ö. (2008) · Marmara University Open Access System · Cited by 2
Moisan, L. (2019) · e-Theses (Université du Québec à Trois-Rivières) · Cited by 2
Marques, L. T. (2023) · LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas) · Cited by 2
Linking performance metrics to financial performance from perspective of agency theory
Pirskanen, L. A. (2024) · Jyväskylä University Digital Archive (University of Jyväskylä) · Cited by 2
Metadata
- Authors
- Bourne, M., Mills, J., Wilcox, M., Neely, A., & Platts, K.
- Affiliations
- University of Cambridge (GB)
- Northumbria University (GB)
- Cranfield University (GB)
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 2000-07-01
- Volume
- 20
- Issue
- 7
- Pages
- 754-771
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W1991697830
- Cited by
- 1,143
- References
- 36
- Citations by year
- 2026: 18 · 2025: 20 · 2024: 14 · 2023: 35 · 2022: 39 · 2021: 69 · 2020: 59 · 2019: 57 · 2018: 68 · 2017: 52 · 2016: 72 · 2015: 69 · 2014: 66 · 2013: 72 · 2012: 75
- FWCI
- 23.48
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emerald.com/insight/site-policies (tdm)
- Locations
- International Journal of Operations & Production Management (publishedVersion)
- Cambridge University Engineering Department Publications Database (submittedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Accounting › Accounting and Organizational Management
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Corporate Governance and Management
- Keywords
- performance measurement systems, strategic alignment, strategic management, manufacturing companies, implementation framework
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.